Loading...
HomeMy WebLinkAboutCOMCHECK - 20-00038 - Rudd & Company - New CommercialCOMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No.2020-0038 Vertical Glazing / Wall Area:18% Location:Rexburg, Idaho Climate Zone:6b Construction Site: 490 First American Circle Rexburg, Idaho 83440 Owner/Agent: Jay Rice Advantage Architecture PC 81 Highway 31 Swan Valley, Idaho 83449 208-317-7423 jay@advantage-arch.com Designer/Contractor: Hayley Jones Project Information Energy Code: Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Building Area Floor Area 1-Office : Nonresidential 8145 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]8145 ---38.0 0.026 0.032 Ext. Wall: Wood-Framed, 24in. o.c., [Bldg. Use 1 - Office]5838 21.0 8.0 0.038 0.051 Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID H1635, SHGC 0.30, [Bldg. Use 1 - Office] (b) 992 ------0.300 0.360 Door: , Perf. Specs.: Product ID H1635, SHGC 0.30, [Bldg. Use 1 - Office] (b) 72 ------0.300 0.770 Floor: Unheated Slab-On-Grade, Vertical 4 ft., [Bldg. Use 1 - Office] (c) 417 ---8.0 0.504 0.540 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Envelope PASSES: Design 19% better than code Project Title: Data filename: 01/27/20Report date: 111 ofPage Name - Title Signature Date Project Title: Data filename: 01/27/20Report date: 112 ofPage COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No.2020-0038 Construction Site: 490 First American Circle Rexburg, Idaho 83440 Owner/Agent: Jay Rice Advantage Architecture PC 81 Highway 31 Swan Valley, Idaho 83449 208-317-7423 jay@advantage-arch.com Designer/Contractor: Hayley Jones Project Information Energy Code: Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Allowed Interior Lighting Power Proposed Interior Lighting Power Interior Lighting TBD: No lighting fixtures specified Project Title: Data filename: 01/27/20Report date: 113 ofPage COMcheck Software Version COMcheckWeb Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No.2020-0038 Construction Site: 490 First American Circle Rexburg, Idaho 83440 Owner/Agent: Jay Rice Advantage Architecture PC 81 Highway 31 Swan Valley, Idaho 83449 208-317-7423 jay@advantage-arch.com Designer/Contractor: Hayley Jones Project Information Energy Code: 0 (Unspecified)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / D Tradable Wattage E Allowed Watts (B X C) Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 0 0 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBD: Exterior lighting zone not specified (see project screen) Project Title: Data filename: 01/27/20Report date: 114 ofPage COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No.2020-0038 Location:Rexburg, Idaho Climate Zone:6b Construction Site: 490 First American Circle Rexburg, Idaho 83440 Owner/Agent: Jay Rice Advantage Architecture PC 81 Highway 31 Swan Valley, Idaho 83449 208-317-7423 jay@advantage-arch.com Designer/Contractor: Hayley Jones Project Information Energy Code: Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Mechanical Systems List Quantity System Type & Description Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: 01/27/20Report date: 115 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 116 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C104 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 117 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 2.1 [FR19]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 118 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 119 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable C104 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C104 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C104 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 1110 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C402.5.3 [FI51]3 Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms are sealed and insulated. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo doors. Complies Does Not Not Observable Not Applicable C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 01/27/20Report date: 1111 ofPage