06/14/2012Pass Fire Underground Inspection
underground pressure tested good at 200 psi
street to hydrant and to building.
Inspector Comments:
Building Inspection Type
05/04/2012PassPLL ADMINFooting Inspection
Footing and rebar look good
uffers 2 ea on north end of bldg
Approved as per Jon Berry.
Inspector Comments:
05/10/2012PassPLL ADMINFoundation Inspection
rebar and forms look good.
Approved as per Jon Berry.
Inspector Comments:
03/28/2013PassQuinton OwensSheeting
Outside sheeting - sheeting nailing only.Inspector Comments:
08/06/2013Fail Framing/Structure Inspection
7/8 TD: Fire blocking in 1st unit S.Btm./furdown not nailed to wall
need additional studs under girders, all locations top floor.
Anchor bolts missing on bearing walls
fire blocking missed in all units marked with chalk.
Fire caulking on 3rd floor missing where marked
insulation in furdowns and party walls missing
Inspector Comments:
08/06/2013Fail Framing/Structure Inspection
7/11 TD: anchour bolt missing in S plumbing wall, bottom south unit.Inspector Comments:
08/06/2013Fail Framing/Structure Inspection
7/25 VC: 1. secure fire safing at tubs.Inspector Comments:
08/07/2013PassQuinton OwensFraming/Structure Inspection
08/07/2013PassQuinton OwensInsulation Inspection
Mech room only - insul. okInspector Comments:
8/5,QO: 3rd floor approved. (a couple missed locations - done 8/6)Inspector Comments:
8/7,QO: 2nd floor approved (fix missed locations as noted by front doors where
applies)
Inspector Comments:
08/12/2013PassQuinton OwensSheetrock/Drywall Inspection
8/12,QO: 1st floor approved (fix a couple missed locations)Inspector Comments:
09/12/2013FailQuinton OwensBuilding Final
Handicap signs required (all HC parking). Handrails from 1st to 2nd level (outside
wall) are too low at top. Site address #'s visible from street. Finish exterior
coverings (sides & back).
Inspector Comments:
11/19/2013FailQuinton OwensBuilding Final
Fire caulking & sitework to finish (including H.C. parking signs)
Apartments ok. Finish Accessory rooms. Office, boiler rm, laundry..etc.
Inspector Comments:
North end parking stall in front of building does not have any turning radius for
backing out. This will be fixed with the 4 added buildings permitted in 2016.
Inspector Comments:
01/27/2014PassQuinton OwensCommercial Building Final
Building Final approved.Inspector Comments:
Electrical Inspection Type
07/15/2013Pass Commercial Electrical Rough-in
Approved for cover on the exterior walls only, for fire alarm and electrical.Inspector Comments:
07/25/2013Pass Commercial Electrical Rough-in
Approved for cover in the interior walls only throughout the building.Inspector Comments:
08/05/2013Pass COM & MFR Electrical Service Inspection
Approved to be energized for permanent power (2).Inspector Comments:
09/12/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
(temp C of O) - Approved for a temporary C.O. only on building #4-outside lights
photocell box not mounted and the contactors not done, call for a re-inspect
when ready.
Inspector Comments:
11/19/2013Fail COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Inspected the fire alarm on this inspection also-fire alarm is Approved for a final
and C.O.-electrical is not done on buildings 2 and 3-notes are here only, need
sheetrock to cover the NM-B in both mech. rooms, storage room(office not
finished)-call if done, call for re-inspect when ready with the rest.
Inspector Comments:
01/27/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Final reinspect - Approved for a final and C.O. for building #4.Inspector Comments:
02/19/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Final Reinspect & Boiler Room - Approved for a final and C.O. entire building.Inspector Comments:
Fire Inspection Type
06/26/2013PassDale PickeringFire Sprinkler Hydro
0900 - 210#
1100 - 209#
Inspector Comments:
07/15/2013Pass Fire Alarm Rough-in
Approved for cover on the exterior walls-inspected the fire alarm with the
electrical rough-in.
Inspector Comments:
09/13/2013Pass Fire Alarm Final Inspection
Approved for a temporary final and C.O.-witnessed 24 hour /5 minute test from
12:30PM 9/13 to 12:31PM 9/14, witnessed flow switch operation (33 seconds),
witnessed operation all signalling and initiating devices throughout the entire
building, fire alarm contractor report is in the file of bldg. #3, horn strobe in the
north stairway has a fault in it, must be fixed before Monday afternoon, call for a
re-inspect when ready.
Inspector Comments:
11/19/2013Pass Fire Alarm Final Inspection
Approved for a final and C.O. for fire alarm wiring-inspected the fire alarm on the
same inspection as the electrical final.
Inspector Comments:
11/19/2013Pass Fire Sprinkler Final Inspection
9/12 DP - verify flw and tamper & 24 test complettion. replace hend in 4207
"dirty".
11/19 DP - hoes in ceiling - mech room.
Inspector Comments:
Mechanical Inspection Type
09/12/2013FailQuinton OwensHVAC Final Inspection
Office, Laundry, and Mech. sections not doneInspector Comments:
11/19/2013PassQuinton OwensHVAC Final Inspection
Plumbing Inspection Type
06/04/2012Pass Plumbing Underground Inspection
all good to cover.Inspector Comments:
07/08/2013Pass Plumbing Rough-in
all good to cover rough inInspector Comments:
09/24/2013Pass Plumbing Sewer
09/24/2013Pass Plumbing Water
03/11/2014PassDon AllenPlumbing Final Inspection
testing 123Inspector Comments: