HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00198 - 273 S 5th W - Campus Courtyard Bldg #4 - 21 PlexPermit Inspection History *Refer to Individual Inspection Report for more Details 06/14/2012Pass Fire Underground Inspection underground pressure tested good at 200 psi street to hydrant and to building. Inspector Comments: Building Inspection Type 05/04/2012PassPLL ADMINFooting Inspection Footing and rebar look good uffers 2 ea on north end of bldg Approved as per Jon Berry. Inspector Comments: 05/10/2012PassPLL ADMINFoundation Inspection rebar and forms look good. Approved as per Jon Berry. Inspector Comments: 03/28/2013PassQuinton OwensSheeting Outside sheeting - sheeting nailing only.Inspector Comments: 08/06/2013Fail Framing/Structure Inspection 7/8 TD: Fire blocking in 1st unit S.Btm./furdown not nailed to wall need additional studs under girders, all locations top floor. Anchor bolts missing on bearing walls fire blocking missed in all units marked with chalk. Fire caulking on 3rd floor missing where marked insulation in furdowns and party walls missing Inspector Comments: 08/06/2013Fail Framing/Structure Inspection 7/11 TD: anchour bolt missing in S plumbing wall, bottom south unit.Inspector Comments: 08/06/2013Fail Framing/Structure Inspection 7/25 VC: 1. secure fire safing at tubs.Inspector Comments: 08/07/2013PassQuinton OwensFraming/Structure Inspection 08/07/2013PassQuinton OwensInsulation Inspection Mech room only - insul. okInspector Comments: 8/5,QO: 3rd floor approved. (a couple missed locations - done 8/6)Inspector Comments: 8/7,QO: 2nd floor approved (fix missed locations as noted by front doors where applies) Inspector Comments: 08/12/2013PassQuinton OwensSheetrock/Drywall Inspection 8/12,QO: 1st floor approved (fix a couple missed locations)Inspector Comments: 09/12/2013FailQuinton OwensBuilding Final Handicap signs required (all HC parking). Handrails from 1st to 2nd level (outside wall) are too low at top. Site address #'s visible from street. Finish exterior coverings (sides & back). Inspector Comments: 11/19/2013FailQuinton OwensBuilding Final Fire caulking & sitework to finish (including H.C. parking signs) Apartments ok. Finish Accessory rooms. Office, boiler rm, laundry..etc. Inspector Comments: North end parking stall in front of building does not have any turning radius for backing out. This will be fixed with the 4 added buildings permitted in 2016. Inspector Comments: 01/27/2014PassQuinton OwensCommercial Building Final Building Final approved.Inspector Comments: Electrical Inspection Type 07/15/2013Pass Commercial Electrical Rough-in Approved for cover on the exterior walls only, for fire alarm and electrical.Inspector Comments: 07/25/2013Pass Commercial Electrical Rough-in Approved for cover in the interior walls only throughout the building.Inspector Comments: 08/05/2013Pass COM & MFR Electrical Service Inspection Approved to be energized for permanent power (2).Inspector Comments: 09/12/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection (temp C of O) - Approved for a temporary C.O. only on building #4-outside lights photocell box not mounted and the contactors not done, call for a re-inspect when ready. Inspector Comments: 11/19/2013Fail COM, COM-A, COM-R, and COM-T Electrical Final Inspection Inspected the fire alarm on this inspection also-fire alarm is Approved for a final and C.O.-electrical is not done on buildings 2 and 3-notes are here only, need sheetrock to cover the NM-B in both mech. rooms, storage room(office not finished)-call if done, call for re-inspect when ready with the rest. Inspector Comments: 01/27/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection Final reinspect - Approved for a final and C.O. for building #4.Inspector Comments: 02/19/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection Final Reinspect & Boiler Room - Approved for a final and C.O. entire building.Inspector Comments: Fire Inspection Type 06/26/2013PassDale PickeringFire Sprinkler Hydro 0900 - 210# 1100 - 209# Inspector Comments: 07/15/2013Pass Fire Alarm Rough-in Approved for cover on the exterior walls-inspected the fire alarm with the electrical rough-in. Inspector Comments: 09/13/2013Pass Fire Alarm Final Inspection Approved for a temporary final and C.O.-witnessed 24 hour /5 minute test from 12:30PM 9/13 to 12:31PM 9/14, witnessed flow switch operation (33 seconds), witnessed operation all signalling and initiating devices throughout the entire building, fire alarm contractor report is in the file of bldg. #3, horn strobe in the north stairway has a fault in it, must be fixed before Monday afternoon, call for a re-inspect when ready. Inspector Comments: 11/19/2013Pass Fire Alarm Final Inspection Approved for a final and C.O. for fire alarm wiring-inspected the fire alarm on the same inspection as the electrical final. Inspector Comments: 11/19/2013Pass Fire Sprinkler Final Inspection 9/12 DP - verify flw and tamper & 24 test complettion. replace hend in 4207 "dirty". 11/19 DP - hoes in ceiling - mech room. Inspector Comments: Mechanical Inspection Type 09/12/2013FailQuinton OwensHVAC Final Inspection Office, Laundry, and Mech. sections not doneInspector Comments: 11/19/2013PassQuinton OwensHVAC Final Inspection Plumbing Inspection Type 06/04/2012Pass Plumbing Underground Inspection all good to cover.Inspector Comments: 07/08/2013Pass Plumbing Rough-in all good to cover rough inInspector Comments: 09/24/2013Pass Plumbing Sewer 09/24/2013Pass Plumbing Water 03/11/2014PassDon AllenPlumbing Final Inspection testing 123Inspector Comments: