Loading...
HomeMy WebLinkAboutBOLTING TEST INSPECTION - 19-00686 - 1110 Golden Beauty Dr - Wilcox AdditonIdaho | Montana | Nevada | Oregon | Utah | Washington | Wyoming mti@mti-id.com • www.mti-id.com Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections MATERIALS TESTING & INSPECTION HIGH STRENGTH BOLTING REPORT Rev. May 2016 Date: __________________ MTI File #:_________________________ Project Name: _____________________________________ Contractor: _______________________________________________ Permit #:__________________________________________ Inspector: ________________________________________________ Weather: _________________________________________ Project Specifications  Snug Tight only  Full Tension/Slip Critical  Turn-of-the-Nut method  Calibrated Wrench method  Direct Tension Indicators  Load-Indicating Washers  Twist-Off-Bolts (”Lejune” bolts) Bolt Type  ASTM A-325  ASTM A-490  Other (specify): __________________________ Bolt Size Diameter: ____________ Length: ______________ Diameter: ____________ Length: ______________ Diameter: ____________ Length: ______________ Washer Specifications  Hardened washers  Plate washers  None required General Conditions  Faying surfaces ush and in full contact  Faying surfaces free from paint, oil, etc.  Visually monitored turn-of-the-nut method  Veried installation equipment and bolts using Skidmore-Wilhelm tension measuring device  Applied Inspection torque of _____________ft/lbs to ______________ diameter bolts _____________ft/lbs to ______________ diameter bolts  Visually inspected twist-off bolts  Washers at slotted holes under turned element  Inspected load-indicating washers with feeler gauge to:  0.015”  0.005”  Other: ___________  Veried a minimum of 2 bolts per connection or 10% of all bolts  Other (specifiy): ________________________________ Location(s): Reference Drawing Sheet and Detail, and Approved RFI: ____________________________________________________________ Work Inspected was:  in compliance  except as noted  reinspection/retesting required Remarks: NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.  This Report is Preliminary. A preliminary report is provided solely as evidence that eld observation was performed. Observations and/or conclusions and/or recommendations conveyed in the nal report may vary from and shall take precedence over those indicated in a preliminary report.  This Report is Final. A nal report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. Inspector: _________________________________________ Date: ________________ Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. Reviewed by: ______________________________________Date: ________________ Contractor Initials: ____________ 1/9/2020 E200005c Wilcox Fresh Warehouse Teton West Josh Clark Snowy ✔ ✔ 3/4 varied ✔ ✔ ✔ whole building ✔ 1/9/2020 ✔