HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00180 - 110 W 4th S - Shake Out RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 01/16/2020 1:25 pm
Permit Details Permit Number: 12-00180
110 W 4th S - Shake Out Remodel
110 W 4th S
Commercial - Remodel
Permit Issued Date: 07/22/2014
Permit Inspection Statistics
9Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 100.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
04/27/2012PassPLL ADMINCommercial Framing/Structure Inspection
As per Jon Berry.Inspector Comments:
04/27/2012PassPLL ADMINCommercial Sheetrock/Drywall Inspection
As per Jon Berry. Drywall OK to coverInspector Comments:
06/18/2012PassPLL ADMINCommercial Building Final
As per Jon Berry, completed.Inspector Comments:
Electrical Inspection Type
04/20/2012PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the framed wall-as per Jane Shaw.Inspector Comments:
06/05/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved to final the permit-signs tied in (2), sign pole is existing, added
receptacles on on middle wall in kitchen, Pepsi machine, ice machine,
under-hood(south kitchen), and (north) kitchen under hood, as per Jon no ansul
connection required.
Inspector Comments:
Fire Inspection Type
06/18/2012PassPLL ADMINFire Department Final Inspection
As per Jon Berry. CompletedInspector Comments:
Mechanical Inspection Type
06/18/2012PassPLL ADMINHVAC Final Inspection
As per Jon Berry. No changes madeInspector Comments:
Plumbing Inspection Type
05/01/2012PassDon AllenPlumbing Rough-in
Washer BoxInspector Comments:
06/18/2012PassDon AllenPlumbing Final Inspection
6/18/12 - need to change the back flow in the kitchen
11/9/12 - Its all good. Need to change the CM hotcheck mech
Inspector Comments: