HomeMy WebLinkAboutChange Order - WWTP Air Line - Edstrom ConstructionCHANGE ORDER
DATE OF ISSUANCE
EFFECTIVE DATE
OWNER City of Rexburg
CONTRACTOR Edstrom Construction Inc.
Contract: Wastewater Treatment Plant Process Air Line Replacement
Project: Wastewater Treatment Plant Process Air Line Replacement
OWNER's Contract No. WW -01-19 ENGINEER's Contract No.
ENGINEER City of Rexburg
You are directed to make the following changes in the Contract Documents:
Description:
• The Contractor will install a Class 50 ductile iron pipe air line with EPDM Fastite gaskets and
C 153 ductile iron fittings, instead of the specified steel air line.
• The proposed butterfly valves will not be installed.
• All other project requirements remain in effect.
• The resultant cost change for these modifications is a reduction of $238,934.00 as detailed in
Attachment 1.
Reason for the Change:
• Construct the air line with ductile iron pipe with high temperature gaskets at a significant cost
savings.
Attachments: (List documents supporting change)
1. Quantities Summary
2. Proposal from Edstrom Construction
II CHANGE IN CONTRACT PRICE: II
Original Contract Price
$605.814.00
Net Increase from previous Change Orders
No. NA to NA:
$NA
Contract Price prior to this Change Order:
$605.814.00
Net decrease of this Change Order:
$238,934.00
Page 1 of 2
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion: 45 days
Ready for final payment: June 1, 2020
(days or dates)
Net change from previous Change Orders No. NA to
No. NA:
Substantial Completion: NA
Ready for final payment: NA
(days)
Contract Times prior to this Change Order:
Substantial Completion: 45 days
Ready for final payment: June 1. 2020
(days or dates)
Net increase this Change Order:
Substantial Completion: NA
Ready for final payment: NA
(days)
No. I
Contract Price with all approved Change Orders: Contract Times with all approved Change Orders:
Substantial Completion: 45 days
$366.880.00 Ready for final payment: June 1, 2020
(days or dates)
APPROVED: ACCEPTED:
BY: BY:
OWNER (Authorized Signature)
Date:
APPROVED:
By:
FUNDING AGENCY (Authorized Signature)
Date:
CONTRACTOR (Authorized Signature)
Date:
Page 2 of 2
Attachment 1
Item No.
Item Description
Unit
Original
Unit Bid Price
Original
Adjusted
Adjusted
Quantity
Contract
ContractContractua
on
'us
IA
Provide and Install 24" Steel Air Line
LF
520
$319.00
$165,880.00
0
$0.00
-520
-S165,880.00
with Imported Bedding
B
Provide and Install 24" Steel Elbows
EA
4
54,102.00
$16,408.00
0
$0.00
-4
416,408.00
iC
Provide
de and Install 24" X 18" Steel
EA
3
$5,765.00
$17,295.00
0
$0.00
-3
-517,295.00
ID
Provide and Install 24" Steel Cap
EA
1
$2,752.00
52,752.00
0
50.00
-1
-52,752.00
2A
Provide and Install 18" Steel Air Line
LF
670
$243.00
$162,810.00
0
50.00
-670
-5162,810.00
with Imported Bedding
2B
Provide and Install 18" X 8" Steel
EA
12
54,105.00
549,260.00
0
50.00
-12
449,260.00
Tees
2C
Provide and Install 18" Steel Cap
EA
3
52,060.00
$6,180.00
0
50.00
-3
-$6,180.00
:9
2D
Provide and Install 18" Butterfly
EA
3
$9,244.00
$27,732.00
0
$0.00
-3
-$27,732.00
a
Valves
00
3A
Provide and Install 8" Steel Air Line
220
$217.00
547,740.00
0
50.00
-220
-547,740.00
C
with Imported BeddingLF
3B
Provide and Install 8" Steel Elbows
EA
36
51,332.00
547,952.00
0
$0.00
-36
-547,952.00
4
Plant Mix Asphalt Pavement Surface
SY
1204
$40.00
548,000.00
1200
548,000.00
0
50.00
Repairs 810.4.I.A.3
5
Concrete Sidewalk Replacement
SY
30
5133.00
53,990.00
30
53,990.00
0
50.00
706.4.1. E.1
6
Replace Sod
SY
300
$13.50
$4,050.00
300
54,050.00
0
50.00
7
Sprinkler Line Repairs
LS
1
$3,904.00
$3,904.00
l
$3,904.00
0
$0.00
8
Excavate and Cap 6" W3 Line
LS
1
5416.00
5416.00
1
5416.00
0
$0.00
9
Provide and Install 4" PVC Conduit
LF
170
58.50
$1,445.00
170
$1,445.00
0
50.00
IA
Provide And Instal) 24" CL 50 DI
LF
0
$172.00
$0.00
520
$89,440.00
520
$89,440.00
Pipe With Imported Bedding
IB
Provide And Install 24" MJ C153
EA
0
53,333.00
$0.00
4
$13,332.00
4
$13,332.00
Elbows
1 C
Provide And Install 24"x 18" MJ
EA
0
$5,228.00
50.00
3
$15,684.00
3
$15,684.00
C 153 Tees
ID
Provide And Install 24" MJ C 153
EA
0
$2,218.00
$0.00
1
$2,218.00
1
$2,218.00
a01.
2A
Provide And Install 24" MJ C 153
LF
0
5132.00
50.00
670
$88,440.00
670
$88,440.00
Cap Bedding
A
2B
Provide And Install 18"x8" MJ C153
EA
0
S2,819.00
50.00
12
$33,828.00
12
$33,828.00
Tees
2C
Provide And Install 18" MJ C 153
EA
0
$1,829.00
$0.00
3
$5,487.00
3
$5,487.00
Cap
A '
21)
Provide And Install 18" Butterfly
EA
0
$10,380.00
$0.00
0
$0.00
0
50.00
Valves
3A
Provide And Install 8" CL 50 DI Pipe
LF
0
$72.90
50.00
220
516,038.00
220
$16,038.00
With Imported Bedding
3B
Provide And Install 8" MJ C 153
EA
0
$905.00
50.00
36
532,580.00
36
$32,580.00
Elbows
3C
Provide And Install 8" Zip Flange To
EA
0
$669.00
$0.00
12
58,028.00
12
58,028.00
Connect To Existinit
Original Contract
Adjusted Contract
Change Order Amount
$605,814.00
$366,880.00
-$238,934.00
EOSTROM
CONSTRUCTION INC.
y:-rr� i�D75
CORPORRTE OFFICE
1305 SOUTH 1E!TH WEST
REX6UR0. ID 63440
To:
Address:
City Of Rexburg
Rexburg, ID 83440
Contact: Justin Beard
Phone:
Fax:
Project Name:
Project location:
Wastewater Treatment Plant Airline Replacement 2019 DI Pipe
City Of Rexburg WWTP, Rexburg, ID
Bid Number:
Bid Date: 11/26/2019
Bedding
Item # Item Description Estimated Quantity Unit Unit Price Total Price
1A
Provide And Install 24" CL 50 DI Pipe With Imported
520.00 LF
$172.00
$89,440.00
Bedding
1B
Provide And Install 24" MJ C153 Elbows
4.00 EACH
$3,333.00
$13,332.00
1C
Provide And Install 24'x18" MJ C153 Tees
3.00 EACH
$5,228.00
$15,684.00
1D
Provide And Install 24" MJ 0153 Cap
1.00 EACH
$2,218.00
$2,218.00
2A
Provide And Install 18" CL 50 DI Pipe With Imported
670.00 LF
$132.00
$88,440.00
Bedding
2B
Provide And Install 18'x8" MJ C153 Tees
12.00 EACH
$2,819.00
$33,828.00
2C
Provide And Install 18" MJ C153 Cap
3.00 EACH
$1,829.00
$5,487.00
2D
Provide And Install 18" Butterfly Valves
--- 3:06 -'EACH
$10,380.00
-44144049-
3A
Provide And Install 8" CL 50 DI Pipe With Imported
220.00 LF
$72.90
$16,038.00
Bedding
3B
Provide And Install 8" MJ C153 Elbows
36.00 EACH
$905.00
$32,580.00
3C
Provide And Install 8" Zip Flange To Connect To Existing
12.00 EACH
$669.00
$8,028.00
4
Plant Mix Asphalt Pavement Surface Repairs
1,200.00 SY
$40.00
$48,000.00
5
Concrete Sidewalk Replacement
30.00 SY
$133.00
$3,990.00
6
Replace Sod
300.00 SY
$13.50
$4,050.00
7
Sprinkler Line Repairs
1.00 LS
$3,904.00
$3,904.00
8
Excavate And Cap 6' W3 Line
1.00 LS
$416.00
$416.00
9
Provide And Install 4" PVC Conduit
170.00 LF
$8.50
$1,445.00
Total Bid Price: .$398,024.06
Notes:
• This bid is valid for 30 days.
• Bid is based on standard construction practices and procedures and if only for the items noted on this bid. Unless otherwise noted, bid excludes:
Bonds, permits, licenses, fees, testing, engineering, surveying, removal or relocation of existing utilities, unforseen conditions, cold weather
protection or winterization, demolition, hard rock excavation, dewatering, export of material, soft spot remediation, and shoring and
handling/removal of hazardous waste and/or substandard soils not identified in bid documents.
• Public Works License: PWC -C -10467 -AAA -1-2-3
Idaho Contractors License: RCE -4494
Payment Terms:
Payments for work performed are due 30 days from date of invoice. Late payments are subject to late fees and/or finance charges.
11/26/2019 9:20:27 AM Page 1 of 2