HomeMy WebLinkAboutChange Order - WWTP Air Line - Edstrom ConstructionCHANGE ORDER DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Rexburg CONTRACTOR Edstrom Construction Inc. Contract: Wastewater Treatment Plant Process Air Line Replacement Project: Wastewater Treatment Plant Process Air Line Replacement OWNER's Contract No. WW -01-19 ENGINEER's Contract No. ENGINEER City of Rexburg You are directed to make the following changes in the Contract Documents: Description: • The Contractor will install a Class 50 ductile iron pipe air line with EPDM Fastite gaskets and C 153 ductile iron fittings, instead of the specified steel air line. • The proposed butterfly valves will not be installed. • All other project requirements remain in effect. • The resultant cost change for these modifications is a reduction of $238,934.00 as detailed in Attachment 1. Reason for the Change: • Construct the air line with ductile iron pipe with high temperature gaskets at a significant cost savings. Attachments: (List documents supporting change) 1. Quantities Summary 2. Proposal from Edstrom Construction II CHANGE IN CONTRACT PRICE: II Original Contract Price $605.814.00 Net Increase from previous Change Orders No. NA to NA: $NA Contract Price prior to this Change Order: $605.814.00 Net decrease of this Change Order: $238,934.00 Page 1 of 2 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: 45 days Ready for final payment: June 1, 2020 (days or dates) Net change from previous Change Orders No. NA to No. NA: Substantial Completion: NA Ready for final payment: NA (days) Contract Times prior to this Change Order: Substantial Completion: 45 days Ready for final payment: June 1. 2020 (days or dates) Net increase this Change Order: Substantial Completion: NA Ready for final payment: NA (days) No. I Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 45 days $366.880.00 Ready for final payment: June 1, 2020 (days or dates) APPROVED: ACCEPTED: BY: BY: OWNER (Authorized Signature) Date: APPROVED: By: FUNDING AGENCY (Authorized Signature) Date: CONTRACTOR (Authorized Signature) Date: Page 2 of 2 Attachment 1 Item No. Item Description Unit Original Unit Bid Price Original Adjusted Adjusted Quantity Contract ContractContractua on 'us IA Provide and Install 24" Steel Air Line LF 520 $319.00 $165,880.00 0 $0.00 -520 -S165,880.00 with Imported Bedding B Provide and Install 24" Steel Elbows EA 4 54,102.00 $16,408.00 0 $0.00 -4 416,408.00 iC Provide de and Install 24" X 18" Steel EA 3 $5,765.00 $17,295.00 0 $0.00 -3 -517,295.00 ID Provide and Install 24" Steel Cap EA 1 $2,752.00 52,752.00 0 50.00 -1 -52,752.00 2A Provide and Install 18" Steel Air Line LF 670 $243.00 $162,810.00 0 50.00 -670 -5162,810.00 with Imported Bedding 2B Provide and Install 18" X 8" Steel EA 12 54,105.00 549,260.00 0 50.00 -12 449,260.00 Tees 2C Provide and Install 18" Steel Cap EA 3 52,060.00 $6,180.00 0 50.00 -3 -$6,180.00 :9 2D Provide and Install 18" Butterfly EA 3 $9,244.00 $27,732.00 0 $0.00 -3 -$27,732.00 a Valves 00 3A Provide and Install 8" Steel Air Line 220 $217.00 547,740.00 0 50.00 -220 -547,740.00 C with Imported BeddingLF 3B Provide and Install 8" Steel Elbows EA 36 51,332.00 547,952.00 0 $0.00 -36 -547,952.00 4 Plant Mix Asphalt Pavement Surface SY 1204 $40.00 548,000.00 1200 548,000.00 0 50.00 Repairs 810.4.I.A.3 5 Concrete Sidewalk Replacement SY 30 5133.00 53,990.00 30 53,990.00 0 50.00 706.4.1. E.1 6 Replace Sod SY 300 $13.50 $4,050.00 300 54,050.00 0 50.00 7 Sprinkler Line Repairs LS 1 $3,904.00 $3,904.00 l $3,904.00 0 $0.00 8 Excavate and Cap 6" W3 Line LS 1 5416.00 5416.00 1 5416.00 0 $0.00 9 Provide and Install 4" PVC Conduit LF 170 58.50 $1,445.00 170 $1,445.00 0 50.00 IA Provide And Instal) 24" CL 50 DI LF 0 $172.00 $0.00 520 $89,440.00 520 $89,440.00 Pipe With Imported Bedding IB Provide And Install 24" MJ C153 EA 0 53,333.00 $0.00 4 $13,332.00 4 $13,332.00 Elbows 1 C Provide And Install 24"x 18" MJ EA 0 $5,228.00 50.00 3 $15,684.00 3 $15,684.00 C 153 Tees ID Provide And Install 24" MJ C 153 EA 0 $2,218.00 $0.00 1 $2,218.00 1 $2,218.00 a01. 2A Provide And Install 24" MJ C 153 LF 0 5132.00 50.00 670 $88,440.00 670 $88,440.00 Cap Bedding A 2B Provide And Install 18"x8" MJ C153 EA 0 S2,819.00 50.00 12 $33,828.00 12 $33,828.00 Tees 2C Provide And Install 18" MJ C 153 EA 0 $1,829.00 $0.00 3 $5,487.00 3 $5,487.00 Cap A ' 21) Provide And Install 18" Butterfly EA 0 $10,380.00 $0.00 0 $0.00 0 50.00 Valves 3A Provide And Install 8" CL 50 DI Pipe LF 0 $72.90 50.00 220 516,038.00 220 $16,038.00 With Imported Bedding 3B Provide And Install 8" MJ C 153 EA 0 $905.00 50.00 36 532,580.00 36 $32,580.00 Elbows 3C Provide And Install 8" Zip Flange To EA 0 $669.00 $0.00 12 58,028.00 12 58,028.00 Connect To Existinit Original Contract Adjusted Contract Change Order Amount $605,814.00 $366,880.00 -$238,934.00 EOSTROM CONSTRUCTION INC. y:-rr� i�D75 CORPORRTE OFFICE 1305 SOUTH 1E!TH WEST REX6UR0. ID 63440 To: Address: City Of Rexburg Rexburg, ID 83440 Contact: Justin Beard Phone: Fax: Project Name: Project location: Wastewater Treatment Plant Airline Replacement 2019 DI Pipe City Of Rexburg WWTP, Rexburg, ID Bid Number: Bid Date: 11/26/2019 Bedding Item # Item Description Estimated Quantity Unit Unit Price Total Price 1A Provide And Install 24" CL 50 DI Pipe With Imported 520.00 LF $172.00 $89,440.00 Bedding 1B Provide And Install 24" MJ C153 Elbows 4.00 EACH $3,333.00 $13,332.00 1C Provide And Install 24'x18" MJ C153 Tees 3.00 EACH $5,228.00 $15,684.00 1D Provide And Install 24" MJ 0153 Cap 1.00 EACH $2,218.00 $2,218.00 2A Provide And Install 18" CL 50 DI Pipe With Imported 670.00 LF $132.00 $88,440.00 Bedding 2B Provide And Install 18'x8" MJ C153 Tees 12.00 EACH $2,819.00 $33,828.00 2C Provide And Install 18" MJ C153 Cap 3.00 EACH $1,829.00 $5,487.00 2D Provide And Install 18" Butterfly Valves --- 3:06 -'EACH $10,380.00 -44144049- 3A Provide And Install 8" CL 50 DI Pipe With Imported 220.00 LF $72.90 $16,038.00 Bedding 3B Provide And Install 8" MJ C153 Elbows 36.00 EACH $905.00 $32,580.00 3C Provide And Install 8" Zip Flange To Connect To Existing 12.00 EACH $669.00 $8,028.00 4 Plant Mix Asphalt Pavement Surface Repairs 1,200.00 SY $40.00 $48,000.00 5 Concrete Sidewalk Replacement 30.00 SY $133.00 $3,990.00 6 Replace Sod 300.00 SY $13.50 $4,050.00 7 Sprinkler Line Repairs 1.00 LS $3,904.00 $3,904.00 8 Excavate And Cap 6' W3 Line 1.00 LS $416.00 $416.00 9 Provide And Install 4" PVC Conduit 170.00 LF $8.50 $1,445.00 Total Bid Price: .$398,024.06 Notes: • This bid is valid for 30 days. • Bid is based on standard construction practices and procedures and if only for the items noted on this bid. Unless otherwise noted, bid excludes: Bonds, permits, licenses, fees, testing, engineering, surveying, removal or relocation of existing utilities, unforseen conditions, cold weather protection or winterization, demolition, hard rock excavation, dewatering, export of material, soft spot remediation, and shoring and handling/removal of hazardous waste and/or substandard soils not identified in bid documents. • Public Works License: PWC -C -10467 -AAA -1-2-3 Idaho Contractors License: RCE -4494 Payment Terms: Payments for work performed are due 30 days from date of invoice. Late payments are subject to late fees and/or finance charges. 11/26/2019 9:20:27 AM Page 1 of 2