HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00159 - Burton Elementary Addition & Site PlanPermit Inspection Summary Permit Status of (Open) as of Report Date: 01/14/2020 1:40 pm Permit Details Permit Number: 12-00159 Burton Elementary Addition & Site Plan 2211 W 1000 S Commercial - Addition Permit Issued Date: 07/16/2014 Permit Inspection Statistics 17Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/01/2012PassPLL ADMINFooting Inspection As per Jon Berry. Footings and rebar look good.Inspector Comments: 06/04/2012PassPLL ADMINFoundation Inspection As per Jon Berry. 6/4/12 - Foundation and rebar look good. 6/12/12 - Floor footings and rebar look good. Inspector Comments: 08/17/2012PassPLL ADMINSidewalk Inspection As per Jon Berry. Curb & gutter has 2 rebar unsupported & not tied to existing curb. Instructed contractor to pull rebar up off ground. Has about 4" gravel base. (7-23, Quinton) Inspector Comments: 08/17/2012PassPLL ADMINBuilding Final As per Jon Berry. Final completedInspector Comments: 08/20/2012PassPLL ADMINFraming/Structure Inspection As per Jon Berry. 7/9 N. 3/4's of roof ok to cover nailing approved CW 7/17 Sheathing and ext. wall framing passed. Needs hold downs at doorway. Inspector Comments: 08/20/2012PassPLL ADMINInsulation Inspection As per Jon Berry. 7/12 Roof insulation ok to cover. Inspector Comments: 08/20/2012PassPLL ADMINSheetrock/Drywall Inspection As Per Jon Berry.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 12-00159 Burton Elementary Addition & Site Plan 2211 W 1000 S Commercial - Addition Permit Status of (Open) as of Report Date: 01/14/2020 1:40 pm Permit Inspection Summary Electrical Inspection Type 07/17/2012PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 210 PSI-9:10AM, 210 PSI-11:10AM-hydrostatic test witnessed, visual walk through OK, need to inspect the tie in and the sprinkler head that is moving a few feet by the transition from existing to new, test report from the sprinkler contractor is coming for the final. Inspector Comments: 07/26/2012PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 7/19/12 - Approved for cover in the entryway at the end of the new wing only.Inspector Comments: 08/17/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection AM inspection-need dryer receptacle with four wire instead of 3 wire, blank cover needed in room A115, connectors required for termination in door openers-ADA. PM re-inspection, Approved for a final and C.O.-addition. Inspector Comments: Fire Inspection Type 08/10/2012PassDale PickeringFire Sprinkler Hydro 210 PSI-9:10AM, 210 PSI-11:10AM-hydrostatic test witnessed, visual walk through OK, need to inspect the tie in and the sprinkler head that is moving a few feet by the transition from existing to new, test report from the sprinkler contractor is coming for the final. Inspector Comments: 08/20/2012PassPLL ADMINFire Department Final Inspection As per Jon Berry. Paperwork required to be turned inInspector Comments: Mechanical Inspection Type 08/15/2012PassPLL ADMINHVAC Final Inspection As per Jon Berry. HVAC final looks good.Inspector Comments: Plumbing Inspection Type 07/30/2012PassDon AllenPlumbing Sewer 07/30/2012PassDon AllenPlumbing Water 07/30/2012PassDon AllenPlumbing Rough-in All good to coverInspector Comments: 08/20/2012PassSAUREY AMANDAPlumbing Final Inspection 08/15/2012: Need continuous waste on 2 sinks and 1 aerator on another sink, the contractor stated he would put them on when they show up. Looks good, per Nathan Wood. Inspector Comments: Page 2 of 2