HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00157 - 273 S 5th W - Campus Courtyard Bldg #2 - 21 PlexPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 01/14/2020 12:54 pm
Permit Details Permit Number: 12-00157
273 S 5th W - Campus Courtyard Bldg #2 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Issued Date: 03/10/2014
Permit Inspection Statistics
26Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 84.62%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
04/13/2012PassPLL ADMINFooting Inspection
Footings for bldg #2 look good. Continue to tie up rebar.
Uffers (2) in east end.
Approved as per Jon Berry.
Inspector Comments:
07/16/2012PassPLL ADMINSheeting
ext sheeting ok to cover.
Approved as per Jon Berry.
Inspector Comments:
07/17/2012PassPLL ADMINFoundation Inspection
PCW
Approved as per Jon Berry.
Inspector Comments:
10/16 JB: need anchor bolts in center bearing walls c/w 10/18/12
Ok to foam ext. walls.
Inspector Comments:
10/18 JB: fire caulking in ext. walls looks good. Ok to spray insult. on ext. walls.Inspector Comments:
2/11 QO: Seal Tub drain penetrations in floor/ceiling assembly.Inspector Comments:
02/13/2013PassQuinton OwensFraming/Structure Inspection
2/13 QO: Penetrations done, ok to drywall.Inspector Comments:
02/19/2013PassQuinton OwensInsulation Inspection
2/21: 3rd floor ok to tape. (ALL 5/8" type x)Inspector Comments:
3/6: 2nd floor approved (all 5/8" type x)Inspector Comments:
3/14: 1st floor approved. (same)Inspector Comments:
03/14/2013PassQuinton OwensSheetrock/Drywall Inspection
4/29, QO: Mechanical Room Drywall approved for taping.Inspector Comments:
06/04/2013FailQuinton OwensBuilding Final
Handrails (both sides) not installed at stairs. Parking/Paving not done. Addressing
on doors not completed. Interior walls considered one hour walls need
penetrations fire caulked and clean out covers to be metal.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 12-00157
273 S 5th W - Campus Courtyard Bldg #2 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 01/14/2020 12:54 pm
Permit
Inspection
Summary
08/23/2013FailQuinton OwensBuilding Final
Laundry room not finished. 1st floor needs fire caulking around the pipe under
bathroom sink in each unit & metal cover over clean outs.
Handicap parking signs not up. site address not posted.
Approved for 2nd and 3rd floor. DA for 1st floor.
Inspector Comments:
11/20/2013PassQuinton OwensBuilding Final
Electrical Inspection Type
10/16/2012Pass Commercial Electrical Rough-in
Approved for cover in the exterior walls only.Inspector Comments:
10/16/2012Pass COM & MFR Electrical Service Inspection
2 each Ufers installed east end-as per Jon Berry. Approved to be energized for
permanent power.
Inspector Comments:
05/29/2013Fail COM, COM-A, COM-R, and COM-T Electrical Final Inspection
3rd level third from the west-range cover missing, bath fans not wired in 2nd and
3rd units from the west end on the 1st level, breaker blanks needed in the 4th
unit from the west on the 1st level, call for a re-inspect when ready.
Inspector Comments:
05/30/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. building #2.Inspector Comments:
02/19/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. entire building.Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 12-00157
273 S 5th W - Campus Courtyard Bldg #2 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 01/14/2020 12:54 pm
Permit
Inspection
Summary
Fire Inspection Type
06/14/2012PassPLL ADMINFire Sprinkler Rough-in
Underground pressure tested good at 200 PSI
street to hydrant and to building.
-Approved as per Jon Berry.
Inspector Comments:
06/07/2013Fail Fire Alarm Final Inspection
24 Hour test from 3:00PM 6/5 to 3:12PM 6/6 5 minute test witnessed, only
building #2 was tested on this system-they are tied together with bldg. #1, flow
test with broken sprinkler head performed, FACP room not finished-therefore the
smoke detector cannot be uncovered above the panel and until this room is done
no final can be approved, alarm report is stapled to inspection ticket in file, call
for a re-inspect when ready.
Inspector Comments:
10/29/2013Pass Fire Sprinkler Rough-in
10/28 Balcony sprinkler hydro #210 @ 0900, #210 @ 1110 - Pass DPInspector Comments:
10/29/2013Pass Fire Sprinkler Final Inspection
10/29 Knox Box needs keys, mechanical room is unfinished. DPInspector Comments:
10/29/2013Pass Fire Sprinkler Final Inspection
11/19 Fire Dept. Final Reinspect - Approved as per Dale P.Inspector Comments:
11/19/2013Pass Fire Alarm Final Inspection
Approved for a final and C.O. building #2-witnessed operation of tamper switches
for new loops installed.
Inspector Comments:
Mechanical Inspection Type
02/19/2013PassQuinton OwensHVAC Rough-in
In floor heating inspected by Jon?Inspector Comments:
11/20/2013PassQuinton OwensHVAC Final Inspection
Plumbing Inspection Type
04/30/2012Pass Plumbing Underground Inspection
All good to cover.Inspector Comments:
10/16/2012Pass Plumbing Rough-in
09/03/2013Pass Plumbing Sewer
09/03/2013Pass Plumbing Water
09/03/2013Pass Plumbing Final Inspection
6/3: need to turn on hot water. ADA apt. need to be trimmed out. DAInspector Comments:
09/03/2013Pass Plumbing Final Inspection
8/23: All good for C/O.Inspector Comments: