Permit Status of (Issue) as of Report Date: 01/13/2020 4:14 pm
Permit Details Permit Number: 12-00156
273 S 5th W - Campus Courtyard Bldg #1 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Issued Date: 03/04/2014
Permit Inspection Statistics
31Total Inspections Completed:
27Total Inspections Passed:
Inspection Pass Rate: 87.10%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
04/10/2012PassPLL ADMINFooting Inspection
Footings ok to pour on #1
Finish hanging rebar
2-uffers west end
Interior footings/heated slab on grad approved (6/27,QO)
Hydronic heating still holding pressure (7/3, QO)
-As per Jon Berry
Inspector Comments:
9/13/12 JB: ext. sheathing ok to cover questions about shear wall and sheathing
at rim board and at wall joints
Inspector Comments:
12/4, QO: Perimeter Exterior wall OK to insulate.Firecaulking, Framing - OKInspector Comments:
2/11: Need to finish sealing tub drain penetrations.Inspector Comments:
02/19/2013PassQuinton OwensFraming/Structure Inspection
2/19: Firecaulking done. OK to insulate interior and drywall.Inspector Comments:
02/19/2013PassQuinton OwensInsulation Inspection
during fire caulking reinspect - ok to finish insulating and drywall.Inspector Comments:
3/21, QO: 3rd floor ok to tape drywall.Inspector Comments:
4/12 , QO: 2nd floor ok to tape (All 5/8" type x, double on ceiling).Inspector Comments:
4/16, QO: 1st floor done.Inspector Comments:
04/16/2013PassQuinton OwensSheetrock/Drywall Inspection
4/29, QO: Mechanical Room Drywall approved for taping.Inspector Comments:
06/03/2013Pass Sidewalk Inspection
side walk along road had 6"to8"and 12" in places
rebar: 18" on center both ways in approach and sidewalk
Approved to pour side walk from south property boundary to north property line,
also the approach
Inspector Comments:
Page 1 of 4
(Continued)
Permit Details Permit Number: 12-00156
273 S 5th W - Campus Courtyard Bldg #1 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Status of (Issue) as of Report Date: 01/13/2020 4:14 pm
Permit
Inspection
Summary
08/22/2013FailQuinton OwensBuilding Final
8/22,QO: ADA unit needs under sink protection. floor transition less than 1/2" or
beveled transition. Hole behind fire ring under kitchen sink in several units is too
large and needs firecaulking. Firecaulk penetrations under bathroom sink and
metal escutcheons on 1st floor.
Inspector Comments:
11/20/2013FailQuinton OwensBuilding Final
Apt. units completed - finish fire caulking on rated walls in data & mech. rooms.
Handicap parking signs not installed yet.
Inspector Comments:
11/20/2013PassQuinton OwensCommercial Building Final
Re-inspected with other buildings 1/27/14. Went to each building with Dean
Green.
Inspector Comments:
03/06/2014PassPLL ADMINFoundation Inspection
-Rebar supported in footings
-Insulation under slab.
-No kinks in hydronic tubing found.
-Hydronic tubing under pressure at about 60 psi (reinspect after pour).
7-3
Still at about 60 psi as before. OK
Inspector Comments:
Page 2 of 4
(Continued)
Permit Details Permit Number: 12-00156
273 S 5th W - Campus Courtyard Bldg #1 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Status of (Issue) as of Report Date: 01/13/2020 4:14 pm
Permit
Inspection
Summary
Electrical Inspection Type
01/11/2012Pass COM & MFR Electrical Service Inspection
01/11/2012Pass SFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover-SE cables throughout the building-also inspected the services
on this rough-in inspection.
Inspector Comments:
01/11/2012PassBret StoddardElectrical Underground Inspection
-Approved for Cover-SE Cables throughout Building.
-Service Approved to be energized for permanent power
-Approved to be energized for permanent power-2 services, inspected the service
on the rough-in SE cable inspection
Inspector Comments:
04/12/2012PassPLL ADMINCommercial Electrical Rough-in
Approved for Cover on Exterior walls only except on West wall SE cables, don't
cover.
Inspector Comments:
12/04/2012Pass Commercial Electrical Rough-in
Approved for cover in the outside walls only, do not cover in the west wall where
the SER cables are to be installed.
Inspector Comments:
02/20/2013Pass SFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover in the commons walls between all units in all three levels.Inspector Comments:
08/19/2013Fail COM, COM-A, COM-R, and COM-T Electrical Final Inspection
1102 has has reverse polarity in the kitchen, 1202 has bathroom switch upside
down, call for a re-inspect when ready.
Inspector Comments:
08/22/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final-all units only for electrical. Inspected the fire alarm for a final
on this inspection also. Managers unit and mechanical room not finished for this
building and building #2.
Inspector Comments:
11/19/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. building #1.Inspector Comments:
02/19/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. entire building.Inspector Comments:
Page 3 of 4
(Continued)
Permit Details Permit Number: 12-00156
273 S 5th W - Campus Courtyard Bldg #1 - 21 Plex
273 S 5th W
New Multi-Family Residence
Permit Status of (Issue) as of Report Date: 01/13/2020 4:14 pm
Permit
Inspection
Summary
Fire Inspection Type
06/14/2012PassDale PickeringFire Sprinkler Hydro
Underground pressure tested good at 200 psi, street to hydrant and to building.
Approved as per Jon Berry.
Inspector Comments:
02/11/2013PassDale PickeringFire Sprinkler Hydro
hydro - 200psu fir 2 hrs - ok
rough in - ok.
Inspector Comments:
08/22/2013Pass Fire Alarm Final Inspection
Witnessed fire alarm operation entirely, 24 hour/5 minute test completed with
A/C power loss on 8/21 8:30AM and A/C power restored at 9:15AM on 8/22, fire
alarm inspection report in file.
Inspector Comments:
10/21/2013Pass Fire Sprinkler Final Inspection
11:00 #210 pass
13:00 #210 pass
Inspector Comments:
11/19/2013Fail Fire Department Final Inspection
keys for knox box
sheet rock in mech. room
hydrant painted red.
Inspector Comments:
Mechanical Inspection Type
02/19/2013PassQuinton OwensHVAC Rough-in
In floor heating on upper floors insp. by Jon?Inspector Comments:
08/22/2013PassQuinton OwensHVAC Final Inspection
8/22,QO: apartments' mechanical ok. need final on Mechanical rom and
"office/storage"?
Inspector Comments:
Plumbing Inspection Type
05/30/2012PassDon AllenPlumbing Underground Inspection
All good to coverInspector Comments:
11/27/2012Pass Plumbing Rough-in
11/20 -rough in is all ok.Inspector Comments:
09/03/2013Pass Plumbing Sewer
09/03/2013Pass Plumbing Water
09/03/2013Pass Plumbing Final Inspection
All good for the c/oInspector Comments: