Lumber
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x6 DF-L 1950f-1.7E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 218 plf at 0.00 to 188 plf at 6.00
TC: From 188 plf at 6.00 to 188 plf at 29.50
TC: From 188 plf at 29.50 to 218 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.93" DL: 0.26". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.934 D 455 240
VERT(CL): 1.193 D 357 180
HORZ(LL): 0.170 I - -
HORZ(TL): 0.217 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.957
Max Web CSI: 0.864
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A1
Ply: 1
Qty:3
Wgt: 246.4 lbs
SEQN: 332416 / T3 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 3605 /-/-/798 /406 /92
Q 3605 /-/-/797 /406 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.7
Q Brg Width = 5.5 Min Req =4.7
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 733 -6652
B - C 1097-10007
C - D 1187-10835
D - E 1023 -9332
Chords Tens.Comp.
E - F 1022 -9323
F - G 645 -5858
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -140
O - N 6943 -770
N - M 10137 -1114
M - L 10850 -1192
Chords Tens.Comp.
L - K 10850 -1192
K - J 9237 -1016
J - I 5674 -629
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 416 -3551
A - O 7207 -794
O - B 360 -2842
B - N 3381 -360
N - C 191 -1411
C - M 766 -79
M - D 79 -292
Webs Tens.Comp.
D - K 193 -1729
K - F 862 -70
F - J 424 -3861
J - G 1903 -160
G - I 712 -6423
H - I 81 -515
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12
(a)(a)
(a)
(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
SS1012
4X8 H1314
7X8
5X10
4X4(R)
3X5
4X6 4X10
SS0612 4X6
6X8
7X8
8X12 3X5
8X10
35'6"
35'6"
3'
3'8
"
1
4
Lumber
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x6 DF-L 1950f-1.7E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 218 plf at 0.00 to 188 plf at 6.00
TC: From 188 plf at 6.00 to 188 plf at 29.50
TC: From 188 plf at 29.50 to 218 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.93" DL: 0.26". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.934 D 455 240
VERT(CL): 1.193 D 357 180
HORZ(LL): 0.170 I - -
HORZ(TL): 0.217 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.957
Max Web CSI: 0.864
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A1
Ply: 1
Qty:3
Wgt: 246.4 lbs
SEQN: 332416 / T3 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 3605 /-/-/798 /406 /92
Q 3605 /-/-/797 /406 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.7
Q Brg Width = 5.5 Min Req =4.7
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 733 -6652
B - C 1097-10007
C - D 1187-10835
D - E 1023 -9332
Chords Tens.Comp.
E - F 1022 -9323
F - G 645 -5858
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -140
O - N 6943 -770
N - M 10137 -1114
M - L 10850 -1192
Chords Tens.Comp.
L - K 10850 -1192
K - J 9237 -1016
J - I 5674 -629
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 416 -3551
A - O 7207 -794
O - B 360 -2842
B - N 3381 -360
N - C 191 -1411
C - M 766 -79
M - D 79 -292
Webs Tens.Comp.
D - K 193 -1729
K - F 862 -70
F - J 424 -3861
J - G 1903 -160
G - I 712 -6423
H - I 81 -515
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12
(a)(a)
(a)
(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
SS1012
4X8 H1314
7X8
5X10
4X4(R)
3X5
4X6 4X10
SS0612 4X6
6X8
7X8
8X12 3X5
8X10
35'6"
35'6"
3'
3'8
"
1
4
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 DF-L 1950f-1.7E :B2 2x6 DF-L SS:
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 208 plf at 0.00 to 178 plf at 6.00
TC: From 178 plf at 6.00 to 178 plf at 29.50
TC: From 178 plf at 29.50 to 208 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.84" DL: 0.25". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.840 D 506 240
VERT(CL): 1.088 D 391 180
HORZ(LL): 0.151 I - -
HORZ(TL): 0.195 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.956
Max Web CSI: 0.965
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A2
Ply: 1
Qty:2
Wgt: 246.4 lbs
SEQN: 332419 / T6 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 3427 /-/-/798 /360 /92
Q 3427 /-/-/797 /360 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.5
Q Brg Width = 5.5 Min Req =4.5
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 648 -6320
B - C 968 -9504
C - D 1048-10295
D - E 902 -8861
Chords Tens.Comp.
E - F 901 -8854
F - G 570 -5563
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -140
O - N 6596 -700
N - M 9626 -983
M - L 10309 -1053
Chords Tens.Comp.
L - K 10309 -1053
K - J 8771 -896
J - I 5389 -556
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 371 -3376
A - O 6848 -702
O - B 323 -2696
B - N 3208 -316
N - C 171 -1337
C - M 734 -75
M - D 79 -273
Webs Tens.Comp.
D - K 172 -1648
K - F 821 -70
F - J 373 -3665
J - G 1809 -156
G - I 629 -6101
H - I 75 -490
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
B2
W2 W12(a)(a)(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
10X12
4X8 8X12
7X8
6X8
4X4(R)
3X5
4X6 4X10
SS0612 4X6
6X8
6X8
8X10 3X5
8X10
35'6"
35'6"
3'
3'8
"
1
4
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 DF-L 1950f-1.7E :B2 2x6 DF-L SS:
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 208 plf at 0.00 to 178 plf at 6.00
TC: From 178 plf at 6.00 to 178 plf at 29.50
TC: From 178 plf at 29.50 to 208 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.84" DL: 0.25". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.840 D 506 240
VERT(CL): 1.088 D 391 180
HORZ(LL): 0.151 I - -
HORZ(TL): 0.195 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.956
Max Web CSI: 0.965
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A2
Ply: 1
Qty:2
Wgt: 246.4 lbs
SEQN: 332419 / T6 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 3427 /-/-/798 /360 /92
Q 3427 /-/-/797 /360 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.5
Q Brg Width = 5.5 Min Req =4.5
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 648 -6320
B - C 968 -9504
C - D 1048-10295
D - E 902 -8861
Chords Tens.Comp.
E - F 901 -8854
F - G 570 -5563
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -140
O - N 6596 -700
N - M 9626 -983
M - L 10309 -1053
Chords Tens.Comp.
L - K 10309 -1053
K - J 8771 -896
J - I 5389 -556
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 371 -3376
A - O 6848 -702
O - B 323 -2696
B - N 3208 -316
N - C 171 -1337
C - M 734 -75
M - D 79 -273
Webs Tens.Comp.
D - K 172 -1648
K - F 821 -70
F - J 373 -3665
J - G 1809 -156
G - I 629 -6101
H - I 75 -490
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
B2
W2 W12(a)(a)(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
10X12
4X8 8X12
7X8
6X8
4X4(R)
3X5
4X6 4X10
SS0612 4X6
6X8
6X8
8X10 3X5
8X10
35'6"
35'6"
3'
3'8
"
1
4
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 2400f-2.0E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W4, W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 198 plf at 0.00 to 168 plf at 6.00
TC: From 168 plf at 6.00 to 168 plf at 29.50
TC: From 168 plf at 29.50 to 198 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-6-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.71" DL: 0.39". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.712 E 598 240
VERT(CL): 1.045 E 407 180
HORZ(LL): 0.136 J - -
HORZ(TL): 0.199 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.914
Max BC CSI: 0.784
Max Web CSI: 0.998
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A3
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332440 / T7 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3788 /-/-/797 /314 /87
R 3788 /-/-/796 /314 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =5.0
R Brg Width = 5.5 Min Req =5.0
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 584 -7369
B - C 864-11252
C - D 865-11239
D - E 945-12170
Chords Tens.Comp.
E - F 826 -10465
F - G 827 -10458
G - H 536 -6479
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 7692 -703
O - N 11414 -966
N - M 12212 -1010
Chords Tens.Comp.
M - L 12212 -1010
L - K 10396 -857
K - J 6267 -534
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 326 -3733
A - P 7962 -625
P - B 283 -3067
B - O 4164 -304
O - D 152 -1714
D - N 1421 -484
N - E 281 -580
Webs Tens.Comp.
E - L 165 -2428
L - G 1173 -69
G - K 350 -4605
K - H 2225 -155
H - J 560 -7066
I - J 70 -497
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W4 W12
(a)(a)
(a)
(a)
(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1319
5X7 SS1017
8X10 6X10
6X10
5X5
3X8
4X8 7X8
SS0612(I)4X8
6X10
8X10
SS1012 3X5
8X12
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 2400f-2.0E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W4, W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 198 plf at 0.00 to 168 plf at 6.00
TC: From 168 plf at 6.00 to 168 plf at 29.50
TC: From 168 plf at 29.50 to 198 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-6-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.71" DL: 0.39". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.712 E 598 240
VERT(CL): 1.045 E 407 180
HORZ(LL): 0.136 J - -
HORZ(TL): 0.199 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.914
Max BC CSI: 0.784
Max Web CSI: 0.998
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A3
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332440 / T7 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3788 /-/-/797 /314 /87
R 3788 /-/-/796 /314 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =5.0
R Brg Width = 5.5 Min Req =5.0
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 584 -7369
B - C 864-11252
C - D 865-11239
D - E 945-12170
Chords Tens.Comp.
E - F 826 -10465
F - G 827 -10458
G - H 536 -6479
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 7692 -703
O - N 11414 -966
N - M 12212 -1010
Chords Tens.Comp.
M - L 12212 -1010
L - K 10396 -857
K - J 6267 -534
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 326 -3733
A - P 7962 -625
P - B 283 -3067
B - O 4164 -304
O - D 152 -1714
D - N 1421 -484
N - E 281 -580
Webs Tens.Comp.
E - L 165 -2428
L - G 1173 -69
G - K 350 -4605
K - H 2225 -155
H - J 560 -7066
I - J 70 -497
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W4 W12
(a)(a)
(a)
(a)
(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1319
5X7 SS1017
8X10 6X10
6X10
5X5
3X8
4X8 7X8
SS0612(I)4X8
6X10
8X10
SS1012 3X5
8X12
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A3
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332440 / T7 / MONO
FROM: GLD
Page 2 of 2
DRW:
.../...08/28/2019
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 2400f-2.0E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 188 plf at 0.00 to 158 plf at 6.00
TC: From 158 plf at 6.00 to 158 plf at 29.50
TC: From 158 plf at 29.50 to 188 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.66" DL: 0.39". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.664 E 641 240
VERT(CL): 0.999 E 426 180
HORZ(LL): 0.126 J - -
HORZ(TL): 0.190 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.872
Max BC CSI: 0.748
Max Web CSI: 0.988
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A4
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332444 / T9 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3611 /-/-/797 /269 /87
R 3600 /-/-/796 /269 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.8
R Brg Width = 5.5 Min Req =4.7
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -7038
B - C 863-10732
C - D 864-10719
D - E 945-11617
Chords Tens.Comp.
E - F 826 -9988
F - G 827 -9981
G - H 536 -6153
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 7346 -703
O - N 10887 -965
N - M 11658 -1010
Chords Tens.Comp.
M - L 11658 -1010
L - K 9923 -857
K - J 5944 -534
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3558
A - P 7605 -626
P - B 254 -2923
B - O 3971 -302
O - D 135 -1636
D - N 1392 -481
N - E 280 -566
Webs Tens.Comp.
E - L 165 -2342
L - G 1133 -69
G - K 350 -4405
K - H 2132 -155
H - J 560 -6702
I - J 64 -471
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12
(a)(a)
(a)
(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1319
4X8 H1315
8X10 6X10
6X10
5X5
4X6
3X10 7X8
SS0612(I)4X8
6X10
7X10
8X12 3X5
7X12
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 2400f-2.0E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 188 plf at 0.00 to 158 plf at 6.00
TC: From 158 plf at 6.00 to 158 plf at 29.50
TC: From 158 plf at 29.50 to 188 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.66" DL: 0.39". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.664 E 641 240
VERT(CL): 0.999 E 426 180
HORZ(LL): 0.126 J - -
HORZ(TL): 0.190 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.872
Max BC CSI: 0.748
Max Web CSI: 0.988
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A4
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332444 / T9 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3611 /-/-/797 /269 /87
R 3600 /-/-/796 /269 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.8
R Brg Width = 5.5 Min Req =4.7
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -7038
B - C 863-10732
C - D 864-10719
D - E 945-11617
Chords Tens.Comp.
E - F 826 -9988
F - G 827 -9981
G - H 536 -6153
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 7346 -703
O - N 10887 -965
N - M 11658 -1010
Chords Tens.Comp.
M - L 11658 -1010
L - K 9923 -857
K - J 5944 -534
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3558
A - P 7605 -626
P - B 254 -2923
B - O 3971 -302
O - D 135 -1636
D - N 1392 -481
N - E 280 -566
Webs Tens.Comp.
E - L 165 -2342
L - G 1133 -69
G - K 350 -4405
K - H 2132 -155
H - J 560 -6702
I - J 64 -471
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12
(a)(a)
(a)
(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1319
4X8 H1315
8X10 6X10
6X10
5X5
4X6
3X10 7X8
SS0612(I)4X8
6X10
7X10
8X12 3X5
7X12
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A4
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332444 / T9 / MONO
FROM: GLD
Page 2 of 2
DRW:
.../...08/28/2019
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 1950f-1.7E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 178 plf at 0.00 to 148 plf at 6.00
TC: From 148 plf at 6.00 to 148 plf at 29.50
TC: From 148 plf at 29.50 to 178 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.66" DL: 0.41". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.657 E 648 240
VERT(CL): 1.016 E 419 180
HORZ(LL): 0.137 J - -
HORZ(TL): 0.212 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.840
Max BC CSI: 0.968
Max Web CSI: 0.997
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A5
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332448 / T11 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3433 /-/-/797 /223 /87
R 3423 /-/-/796 /223 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.5
R Brg Width = 5.5 Min Req =4.5
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -6699
B - C 863-10217
C - D 864-10206
D - E 945-11060
Chords Tens.Comp.
E - F 826 -9509
F - G 827 -9502
G - H 536 -5854
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 6991 -703
O - N 10365 -965
N - M 11100 -1010
Chords Tens.Comp.
M - L 11100 -1010
L - K 9449 -856
K - J 5655 -533
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3384
A - P 7238 -626
P - B 254 -2777
B - O 3796 -302
O - D 135 -1561
D - N 1355 -482
N - E 279 -547
Webs Tens.Comp.
E - L 165 -2253
L - G 1091 -69
G - K 350 -4205
K - H 2039 -155
H - J 559 -6376
I - J 57 -448
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12(a)(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1017
4X8 8X12
7X10 6X10
5X10
4X6
4X6
3X10 7X8
SS1319 4X8
5X10
8X8
8X10 3X5
8X10
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 1950f-1.7E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 178 plf at 0.00 to 148 plf at 6.00
TC: From 148 plf at 6.00 to 148 plf at 29.50
TC: From 148 plf at 29.50 to 178 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.66" DL: 0.41". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
18SS, WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.657 E 648 240
VERT(CL): 1.016 E 419 180
HORZ(LL): 0.137 J - -
HORZ(TL): 0.212 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.840
Max BC CSI: 0.968
Max Web CSI: 0.997
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A5
Ply: 1
Qty:2
Wgt: 273.0 lbs
SEQN: 332448 / T11 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3433 /-/-/797 /223 /87
R 3423 /-/-/796 /223 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.5
R Brg Width = 5.5 Min Req =4.5
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -6699
B - C 863-10217
C - D 864-10206
D - E 945-11060
Chords Tens.Comp.
E - F 826 -9509
F - G 827 -9502
G - H 536 -5854
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 6991 -703
O - N 10365 -965
N - M 11100 -1010
Chords Tens.Comp.
M - L 11100 -1010
L - K 9449 -856
K - J 5655 -533
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3384
A - P 7238 -626
P - B 254 -2777
B - O 3796 -302
O - D 135 -1561
D - N 1355 -482
N - E 279 -547
Webs Tens.Comp.
E - L 165 -2253
L - G 1091 -69
G - K 350 -4205
K - H 2039 -155
H - J 559 -6376
I - J 57 -448
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
W2 W12(a)(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
SS1017
4X8 8X12
7X10 6X10
5X10
4X6
4X6
3X10 7X8
SS1319 4X8
5X10
8X8
8X10 3X5
8X10
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 1950f-1.7E :B2 2x6 DF-L SS:
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 29.50
TC: From 134 plf at 29.50 to 164 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.57" DL: 0.41". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.569 E 748 240
VERT(CL): 0.922 E 461 180
HORZ(LL): 0.115 J - -
HORZ(TL): 0.186 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.780
Max BC CSI: 0.947
Max Web CSI: 0.926
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A6
Ply: 1
Qty:35
Wgt: 273.0 lbs
SEQN: 332452 / T29 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3185 /-/-/797 /138 /87
R 3174 /-/-/796 /141 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.2
R Brg Width = 5.5 Min Req =4.2
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -6225
B - C 863 -9500
C - D 864 -9489
D - E 945-10289
Chords Tens.Comp.
E - F 826 -8843
F - G 827 -8837
G - H 536 -5439
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 6497 -703
O - N 9638 -965
N - M 10327 -1010
Chords Tens.Comp.
M - L 10327 -1010
L - K 8789 -857
K - J 5252 -533
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3138
A - P 6727 -626
P - B 254 -2576
B - O 3550 -302
O - D 135 -1458
D - N 1307 -480
N - E 279 -523
Webs Tens.Comp.
E - L 165 -2131
L - G 1034 -69
G - K 350 -3927
K - H 1909 -155
H - J 560 -5922
I - J 46 -411
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
B2
W2 W12(a)(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
10X12
4X7 8X12
7X10 6X10
5X10
4X6
4X6
4X7 7X8
SS0612 5X6
5X10
7X8
8X10 1.5X4
7X10
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 DF-L 1950f-1.7E :B2 2x6 DF-L SS:
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 2100f-1.8E:
:W12 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 29.50
TC: From 134 plf at 29.50 to 164 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Truss checked for 750# movable concentrated load
along Top Chord, between 10-0-0 to 25-0-0, concurrent
with design gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.57" DL: 0.41". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.569 E 748 240
VERT(CL): 0.922 E 461 180
HORZ(LL): 0.115 J - -
HORZ(TL): 0.186 J - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.780
Max BC CSI: 0.947
Max Web CSI: 0.926
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A6
Ply: 1
Qty:35
Wgt: 273.0 lbs
SEQN: 332452 / T29 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 3185 /-/-/797 /138 /87
R 3174 /-/-/796 /141 /-
Wind reactions based on MWFRS
Q Brg Width = 5.5 Min Req =4.2
R Brg Width = 5.5 Min Req =4.2
Bearings Q & R Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 585 -6225
B - C 863 -9500
C - D 864 -9489
D - E 945-10289
Chords Tens.Comp.
E - F 826 -8843
F - G 827 -8837
G - H 536 -5439
H - I 50 -41
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 107 -132
P - O 6497 -703
O - N 9638 -965
N - M 10327 -1010
Chords Tens.Comp.
M - L 10327 -1010
L - K 8789 -857
K - J 5252 -533
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 302 -3138
A - P 6727 -626
P - B 254 -2576
B - O 3550 -302
O - D 135 -1458
D - N 1307 -480
N - E 279 -523
Webs Tens.Comp.
E - L 165 -2131
L - G 1034 -69
G - K 350 -3927
K - H 1909 -155
H - J 560 -5922
I - J 46 -411
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
B2
W2 W12(a)(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
10X12
4X7 8X12
7X10 6X10
5X10
4X6
4X6
4X7 7X8
SS0612 5X6
5X10
7X8
8X10 1.5X4
7X10
35'6"
19'11"13 15'6"3
3'
3'8
"
1
4
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 26.75
TC: From 134 plf at 26.75 to 176 plf at 36.75
BC: From 10 plf at 0.00 to 10 plf at 36.75
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Right cantilever is exposed to wind
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Provide for complete drainage of roof.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.67 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.518 D 778 240
VERT(CL): 0.731 D 551 180
HORZ(LL): 0.106 J - -
HORZ(TL): 0.150 K - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.366
Max BC CSI: 0.739
Max Web CSI: 0.860
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A7
Ply: 1
Qty:9
Wgt: 260.4 lbs
SEQN: 332434 / T2 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 2484 /-/-/747 /130 /93
K 3108 /-/-/937 /201 /-
Wind reactions based on MWFRS
R Brg Width = 5.5 Min Req =3.9
K Brg Width = 5.5 Min Req =4.5
Bearings R & K Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 519 -4320
B - C 761 -6498
C - D 832 -7025
D - E 728 -6030
Chords Tens.Comp.
E - F 728 -6022
F - G 464 -3667
G - H 158 -75
H - I 160 -70
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 116 -142
Q - P 4518 -641
P - O 6587 -867
O - N 7033 -901
Chords Tens.Comp.
N - M 7033 -901
M - L 5963 -760
L - K 3536 -462
K - J 54 -39
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 286 -2440
A - Q 4719 -559
Q - B 243 -1929
B - P 2246 -271
P - C 128 -959
C - O 485 -66
O - D 73 -176
D - M 154 -1190
Webs Tens.Comp.
M - F 637 -68
F - L 327 -2683
L - G 1351 -153
G - K 482 -4078
H - K 94 -833
K - I 99 -228
I - J 31 -29
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
W2
(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
7X10
4X7 7X10
5X8
4X10
3X5
3X4
4X4 4X7
H0514 4X4
4X10
5X8
7X8 1.5X4
8X12
3X4(R)
1.5X4
33'10"2'11"
36'9"
36'9"
3'3'
9
"
3
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 26.75
TC: From 134 plf at 26.75 to 176 plf at 36.75
BC: From 10 plf at 0.00 to 10 plf at 36.75
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Right cantilever is exposed to wind
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Provide for complete drainage of roof.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.67 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.518 D 778 240
VERT(CL): 0.731 D 551 180
HORZ(LL): 0.106 J - -
HORZ(TL): 0.150 K - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.366
Max BC CSI: 0.739
Max Web CSI: 0.860
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A7
Ply: 1
Qty:9
Wgt: 260.4 lbs
SEQN: 332434 / T2 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 2484 /-/-/747 /130 /93
K 3108 /-/-/937 /201 /-
Wind reactions based on MWFRS
R Brg Width = 5.5 Min Req =3.9
K Brg Width = 5.5 Min Req =4.5
Bearings R & K Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 519 -4320
B - C 761 -6498
C - D 832 -7025
D - E 728 -6030
Chords Tens.Comp.
E - F 728 -6022
F - G 464 -3667
G - H 158 -75
H - I 160 -70
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 116 -142
Q - P 4518 -641
P - O 6587 -867
O - N 7033 -901
Chords Tens.Comp.
N - M 7033 -901
M - L 5963 -760
L - K 3536 -462
K - J 54 -39
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 286 -2440
A - Q 4719 -559
Q - B 243 -1929
B - P 2246 -271
P - C 128 -959
C - O 485 -66
O - D 73 -176
D - M 154 -1190
Webs Tens.Comp.
M - F 637 -68
F - L 327 -2683
L - G 1351 -153
G - K 482 -4078
H - K 94 -833
K - I 99 -228
I - J 31 -29
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
W2
(a)(a)
11'
A B C D E F G H I
JKLMNOPQR
0.25 12
7X10
4X7 7X10
5X8
4X10
3X5
3X4
4X4 4X7
H0514 4X4
4X10
5X8
7X8 1.5X4
8X12
3X4(R)
1.5X4
33'10"2'11"
36'9"
36'9"
3'3'
9
"
3
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 29.50
TC: From 134 plf at 29.50 to 164 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.64" DL: 0.28". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.640 D 665 240
VERT(CL): 0.908 D 469 180
HORZ(LL): 0.126 I - -
HORZ(TL): 0.179 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.429
Max BC CSI: 0.836
Max Web CSI: 0.905
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A8
Ply: 1
Qty:10
Wgt: 246.4 lbs
SEQN: 332431 / T12 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 2646 /-/-/798 /138 /92
Q 2646 /-/-/797 /141 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.2
Q Brg Width = 5.5 Min Req =4.2
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 576 -4849
B - C 849 -7298
C - D 928 -7900
D - E 813 -6805
Chords Tens.Comp.
E - F 814 -6799
F - G 530 -4276
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -141
O - N 5059 -698
N - M 7391 -954
M - L 7909 -997
Chords Tens.Comp.
L - K 7909 -997
K - J 6734 -846
J - I 4141 -528
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 303 -2600
A - O 5252 -617
O - B 257 -2058
B - N 2471 -300
N - C 136 -1012
C - M 558 -74
M - D 80 -196
Webs Tens.Comp.
D - K 164 -1257
K - F 644 -70
F - J 346 -2808
J - G 1401 -156
G - I 554 -4688
H - I 44 -385
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
W2
(a)
(a)
(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
7X10
3X10 7X10
6X8
4X10
4X4
3X4
4X4 5X6
SS0514 4X4
4X10
5X8
6X10 3X4
8X10
35'6"
35'6"
3'
3'8
"
1
4
Lumber
Top chord 2x6 DF-L 1800f-1.6E :T2 2x6 SPF
1650f-1.5E:
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2 :W2 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 164 plf at 0.00 to 134 plf at 6.00
TC: From 134 plf at 6.00 to 134 plf at 29.50
TC: From 134 plf at 29.50 to 164 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Deflection
Max JT VERT DEFL: LL: 0.64" DL: 0.28". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.640 D 665 240
VERT(CL): 0.908 D 469 180
HORZ(LL): 0.126 I - -
HORZ(TL): 0.179 I - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.429
Max BC CSI: 0.836
Max Web CSI: 0.905
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:A8
Ply: 1
Qty:10
Wgt: 246.4 lbs
SEQN: 332431 / T12 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 2646 /-/-/798 /138 /92
Q 2646 /-/-/797 /141 /-
Wind reactions based on MWFRS
P Brg Width = 5.5 Min Req =4.2
Q Brg Width = 5.5 Min Req =4.2
Bearings P & Q Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 576 -4849
B - C 849 -7298
C - D 928 -7900
D - E 813 -6805
Chords Tens.Comp.
E - F 814 -6799
F - G 530 -4276
G - H 54 -44
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 116 -141
O - N 5059 -698
N - M 7391 -954
M - L 7909 -997
Chords Tens.Comp.
L - K 7909 -997
K - J 6734 -846
J - I 4141 -528
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 303 -2600
A - O 5252 -617
O - B 257 -2058
B - N 2471 -300
N - C 136 -1012
C - M 558 -74
M - D 80 -196
Webs Tens.Comp.
D - K 164 -1257
K - F 644 -70
F - J 346 -2808
J - G 1401 -156
G - I 554 -4688
H - I 44 -385
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
T2
W2
(a)
(a)
(a)
11'
A B C D E F G H
IJKLMNOPQ
0.25 12
7X10
3X10 7X10
6X8
4X10
4X4
3X4
4X4 5X6
SS0514 4X4
4X10
5X8
6X10 3X4
8X10
35'6"
35'6"
3'
3'8
"
1
4
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 9.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 276 plf at 0.00 to 234 plf at 6.00
TC: From 234 plf at 6.00 to 234 plf at 29.75
TC: From 234 plf at 29.75 to 276 plf at 36.75
BC: From 10 plf at 0.00 to 10 plf at 36.75
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Right cantilever is exposed to wind
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:0.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.67 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.369 E 999 240
VERT(CL): 0.555 E 726 180
HORZ(LL): 0.085 L - -
HORZ(TL): 0.128 L - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.686
Max Web CSI: 0.985
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:AA
Ply: 2
Qty:1
Wgt: 579.6 lbs
SEQN: 332480 / T16 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 4179 /-/-/747 /142 /88
L 5061 /-/-/937 /201 /-
Wind reactions based on MWFRS
S Brg Width = 5.5 Min Req =3.3
L Brg Width = 5.5 Min Req =3.7
Bearings S & L Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 261 -3692
B - C 387 -5582
C - D 387 -5572
D - E 423 -5997
E - F 369 -5107
Chords Tens.Comp.
F - G 369 -5100
G - H 234 -3027
H - I 74 -62
I - J 74 -60
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 54 -67
R - Q 3862 -320
Q - P 5659 -438
P - O 6004 -456
Chords Tens.Comp.
O - N 6004 -456
N - M 5049 -385
M - L 2915 -233
L - K 26 -19
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - S 143 -2060
A - R 4016 -281
R - B 120 -1625
B - Q 1906 -139
Q - D 64 -812
D - P 371 -32
P - E 36 -147
E - N 77 -1025
Webs Tens.Comp.
N - G 519 -34
G - M 166 -2321
M - H 1131 -76
H - L 239 -3391
I - L 53 -741
L - J 83 -104
J - K 16 -26
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
(a)
11'
A B C D E F G H I J
KLMNOPQRS
0.25 12
6X10
4X6 6X10
5X7 6X6
4X8
3X4
3X4
3X5 6X6
H0514 3X5
4X8
4X8
6X8 1.5X4
6X12
3X5(R)
1.5X4
33'10"2'11"
19'11"13 16'9"3
36'9"
3'3'
9
"
3
Lumber
Top chord 2x8 DF-L SS
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 9.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 276 plf at 0.00 to 234 plf at 6.00
TC: From 234 plf at 6.00 to 234 plf at 29.75
TC: From 234 plf at 29.75 to 276 plf at 36.75
BC: From 10 plf at 0.00 to 10 plf at 36.75
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Right cantilever is exposed to wind
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:0.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.67 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/10(0)
Plate Type:
WAVE, HS
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.369 E 999 240
VERT(CL): 0.555 E 726 180
HORZ(LL): 0.085 L - -
HORZ(TL): 0.128 L - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.686
Max Web CSI: 0.985
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:AA
Ply: 2
Qty:1
Wgt: 579.6 lbs
SEQN: 332480 / T16 / MONO
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 4179 /-/-/747 /142 /88
L 5061 /-/-/937 /201 /-
Wind reactions based on MWFRS
S Brg Width = 5.5 Min Req =3.3
L Brg Width = 5.5 Min Req =3.7
Bearings S & L Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 261 -3692
B - C 387 -5582
C - D 387 -5572
D - E 423 -5997
E - F 369 -5107
Chords Tens.Comp.
F - G 369 -5100
G - H 234 -3027
H - I 74 -62
I - J 74 -60
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 54 -67
R - Q 3862 -320
Q - P 5659 -438
P - O 6004 -456
Chords Tens.Comp.
O - N 6004 -456
N - M 5049 -385
M - L 2915 -233
L - K 26 -19
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - S 143 -2060
A - R 4016 -281
R - B 120 -1625
B - Q 1906 -139
Q - D 64 -812
D - P 371 -32
P - E 36 -147
E - N 77 -1025
Webs Tens.Comp.
N - G 519 -34
G - M 166 -2321
M - H 1131 -76
H - L 239 -3391
I - L 53 -741
L - J 83 -104
J - K 16 -26
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
(a)
11'
A B C D E F G H I J
KLMNOPQRS
0.25 12
6X10
4X6 6X10
5X7 6X6
4X8
3X4
3X4
3X5 6X6
H0514 3X5
4X8
4X8
6X8 1.5X4
6X12
3X5(R)
1.5X4
33'10"2'11"
19'11"13 16'9"3
36'9"
3'3'
9
"
3
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Bracing
Fasten rated sheathing to one face of this frame.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 334 plf at 0.00 to 334 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 S 999 240
VERT(CL): 0.004 S 999 180
HORZ(LL):-0.137 U - -
HORZ(TL): 0.181 U - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.064
Max BC CSI: 0.033
Max Web CSI: 0.132
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:AG
Ply: 1
Qty:2
Wgt: 259.7 lbs
SEQN: 332349 / T4 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AQ 265 /-/-/74 /26 /92
AR*339 /-/-/44 /8 /-
AS 237 /-/-/54 /43 /-
Wind reactions based on MWFRS
AQ Brg Width = 5.5 Min Req =1.5
AR Brg Width = 415 Min Req =-
AS Brg Width = 5.5 Min Req =1.5
Bearings AQ, AR, & AS Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 19 -25
B - C 19 -23
C - D 19 -21
D - E 19 -20
E - F 19 -19
F - G 20 -19
G - H 20 -18
H - I 20 -17
I - J 20 -16
J - K 21 -15
Chords Tens.Comp.
K - L 22 -14
L - M 23 -13
M - N 23 -13
N - O 24 -13
O - P 26 -12
P - Q 27 -12
Q - R 28 -12
R - S 29 -12
S - T 31 -11
T - U 32 -11
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AQ-AP 76 -76
AP-AO 76 -76
AO-AN 76 -76
AN-AM 76 -76
AM-AL 76 -76
AL-AK 76 -76
AK-AJ 76 -76
AJ-AI 76 -76
AI-AH 76 -76
AH-AG 76 -76
AG-AF 76 -76
Chords Tens.Comp.
AF-AE 76 -76
AE-AD 76 -75
AD-AC 76 -75
AC-AB 76 -75
AB-AA 76 -75
AA- Z 76 -75
Z - Y 76 -75
Y - X 76 -75
X - W 76 -75
W - V 76 -75
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
A -AQ 42 -249
B -AP 86 -658
C -AO 38 -678
D -AN 36 -668
F -AL 36 -669
G -AK 36 -667
H -AJ 36 -668
I -AI 36 -668
J -AH 36 -668
K -AF 36 -667
Gables Tens.Comp.
L -AE 36 -668
N -AD 36 -669
O -AC 36 -667
P -AB 36 -668
Q -AA 36 -668
R - Y 36 -667
S - X 38 -680
T - W 51 -672
U - V 43 -237
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C D E F G H I J K L M N O P Q R S T U
VWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARAS
0.25 12
3X4
4X4
4X5
4X5 4X5
4X5
4X5
3X4
3X4
5"8 34'7"5"8
20'11"13 14'6"3
35'6"
3'
3'
8
"
1
4
Lumber
Top chord 2x6 SPF 1650f-1.5E
Bot chord 2x6 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Bracing
Fasten rated sheathing to one face of this frame.
Special Loads
------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15)
TC: From 334 plf at 0.00 to 334 plf at 35.50
BC: From 10 plf at 0.00 to 10 plf at 35.50
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 S 999 240
VERT(CL): 0.004 S 999 180
HORZ(LL):-0.137 U - -
HORZ(TL): 0.181 U - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.064
Max BC CSI: 0.033
Max Web CSI: 0.132
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:AG
Ply: 1
Qty:2
Wgt: 259.7 lbs
SEQN: 332349 / T4 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AQ 265 /-/-/74 /26 /92
AR*339 /-/-/44 /8 /-
AS 237 /-/-/54 /43 /-
Wind reactions based on MWFRS
AQ Brg Width = 5.5 Min Req =1.5
AR Brg Width = 415 Min Req =-
AS Brg Width = 5.5 Min Req =1.5
Bearings AQ, AR, & AS Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 19 -25
B - C 19 -23
C - D 19 -21
D - E 19 -20
E - F 19 -19
F - G 20 -19
G - H 20 -18
H - I 20 -17
I - J 20 -16
J - K 21 -15
Chords Tens.Comp.
K - L 22 -14
L - M 23 -13
M - N 23 -13
N - O 24 -13
O - P 26 -12
P - Q 27 -12
Q - R 28 -12
R - S 29 -12
S - T 31 -11
T - U 32 -11
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AQ-AP 76 -76
AP-AO 76 -76
AO-AN 76 -76
AN-AM 76 -76
AM-AL 76 -76
AL-AK 76 -76
AK-AJ 76 -76
AJ-AI 76 -76
AI-AH 76 -76
AH-AG 76 -76
AG-AF 76 -76
Chords Tens.Comp.
AF-AE 76 -76
AE-AD 76 -75
AD-AC 76 -75
AC-AB 76 -75
AB-AA 76 -75
AA- Z 76 -75
Z - Y 76 -75
Y - X 76 -75
X - W 76 -75
W - V 76 -75
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
A -AQ 42 -249
B -AP 86 -658
C -AO 38 -678
D -AN 36 -668
F -AL 36 -669
G -AK 36 -667
H -AJ 36 -668
I -AI 36 -668
J -AH 36 -668
K -AF 36 -667
Gables Tens.Comp.
L -AE 36 -668
N -AD 36 -669
O -AC 36 -667
P -AB 36 -668
Q -AA 36 -668
R - Y 36 -667
S - X 38 -680
T - W 51 -672
U - V 43 -237
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C D E F G H I J K L M N O P Q R S T U
VWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARAS
0.25 12
3X4
4X4
4X5
4X5 4X5
4X5
4X5
3X4
3X4
5"8 34'7"5"8
20'11"13 14'6"3
35'6"
3'
3'
8
"
1
4
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.067
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E1
Ply: 1
Qty:64
Wgt: 22.4 lbs
SEQN: 332488 / T5 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /39
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 171 -125
A - C 138 -138
Webs Tens.Comp.
B - C 63 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.067
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E1
Ply: 1
Qty:64
Wgt: 22.4 lbs
SEQN: 332488 / T5 / MONO
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /39
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 171 -125
A - C 138 -138
Webs Tens.Comp.
B - C 63 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E1
Ply: 1
Qty:64
Wgt: 22.4 lbs
SEQN: 332488 / T5 / MONO
FROM: GLD
Page 2 of 2
DRW:
.../...08/28/2019
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.002 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.103
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E2
Ply: 1
Qty:57
Wgt: 22.4 lbs
SEQN: 332483 / T13 / FLAT
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /51
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 60 -42
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 60 -44
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 243 -143
A - C 214 -214
Webs Tens.Comp.
B - C 65 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
8
"
1
4
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.002 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.103
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E2
Ply: 1
Qty:57
Wgt: 22.4 lbs
SEQN: 332483 / T13 / FLAT
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /51
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 60 -42
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 60 -44
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 243 -143
A - C 214 -214
Webs Tens.Comp.
B - C 65 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
8
"
1
4
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E2
Ply: 1
Qty:57
Wgt: 22.4 lbs
SEQN: 332483 / T13 / FLAT
FROM: GLD
Page 2 of 2
DRW:
.../...08/28/2019
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.067
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E3
Ply: 1
Qty:9
Wgt: 22.4 lbs
SEQN: 332494 / T10 / SPEC
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /39
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 171 -125
A - C 138 -138
Webs Tens.Comp.
B - C 63 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.019
Max Web CSI: 0.067
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E3
Ply: 1
Qty:9
Wgt: 22.4 lbs
SEQN: 332494 / T10 / SPEC
FROM: GLD
Page 1 of 2
DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*144 /-/-/45 /8 /39
Wind reactions based on MWFRS
C Brg Width = 22.5 Min Req =-
Bearing D Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - C 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - D 171 -125
A - C 138 -138
Webs Tens.Comp.
B - C 63 -125
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B
CD
3X4
3X5
1.5X4
3X5(R)
1'10"8
3'
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E3
Ply: 1
Qty:9
Wgt: 22.4 lbs
SEQN: 332494 / T10 / SPEC
FROM: GLD
Page 2 of 2
DRW:
.../...08/28/2019
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL):-0.000 C - -
HORZ(TL): 0.001 C - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.082
Max BC CSI: 0.018
Max Web CSI: 0.055
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E4
Ply: 1
Qty:1
Wgt: 39.2 lbs
SEQN: 332474 / T8 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*144 /-/-/45 /8 /18
Wind reactions based on MWFRS
D Brg Width = 49.0 Min Req =-
Bearing F Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Chords Tens.Comp.
B - C 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 46 -34
Chords Tens.Comp.
E - D 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 105 -110
A - G 94 -94
Webs Tens.Comp.
H - D 94 -94
C - D 53 -109
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
G - B 147 -329
Gables Tens.Comp.
E - H 146 -328
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C
D
E
F
G
H
3X4
3X4(R)
4'1"
3'
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 B 999 240
VERT(CL): 0.001 B 999 180
HORZ(LL):-0.000 C - -
HORZ(TL): 0.001 C - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.082
Max BC CSI: 0.018
Max Web CSI: 0.055
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E4
Ply: 1
Qty:1
Wgt: 39.2 lbs
SEQN: 332474 / T8 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*144 /-/-/45 /8 /18
Wind reactions based on MWFRS
D Brg Width = 49.0 Min Req =-
Bearing F Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 46 -32
Chords Tens.Comp.
B - C 46 -32
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 46 -34
Chords Tens.Comp.
E - D 46 -34
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 105 -110
A - G 94 -94
Webs Tens.Comp.
H - D 94 -94
C - D 53 -109
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
G - B 147 -329
Gables Tens.Comp.
E - H 146 -328
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C
D
E
F
G
H
3X4
3X4(R)
4'1"
3'
/ C u s t : C a s h S a le s - 2 0 1 9S u n r o c _ R e x b u r g _ P iz z a H u t / C u s t : C a s h S a le s - 2 0 1 9
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 B 999 240
VERT(CL): 0.002 B 999 180
HORZ(LL):-0.001 C - -
HORZ(TL): 0.001 C - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.018
Max Web CSI: 0.087
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E5
Ply: 1
Qty:1
Wgt: 39.2 lbs
SEQN: 332477 / T1 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*144 /-/-/45 /8 /23
Wind reactions based on MWFRS
D Brg Width = 49.0 Min Req =-
Bearing F Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 59 -42
Chords Tens.Comp.
B - C 59 -42
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 59 -43
Chords Tens.Comp.
E - D 59 -43
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 136 -110
A - G 132 -132
Webs Tens.Comp.
H - D 132 -132
C - D 53 -110
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
G - B 146 -328
Gables Tens.Comp.
E - H 146 -327
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C
D
E
F
G H
3X4
3X4(R)
4'1"
3'8
"
7
Lumber
Top chord 2x4 SPF 1650f-1.5E
Bot chord 2x4 SPF 1650f-1.5E
Webs 2x4 SPF #1/#2
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IBC-15 section 1607.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Uplifts based on an elevation at or above 3000 ft.
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &
GABRST101014 for gable wind bracing and other
requirements.
Snow loading based on an unobstructed roof. Complete
drainage required.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:50.00
TCDL:17.00
BCLL: 0.00
BCDL: 5.00
Des Ld:72.00
NCBCLL:10.00 Soffit: 2.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: C
Kzt: NA
BCDL: 3.0 psf
Mean Height: 15.00 ft
Enclosure:Closed Risk Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IBC 2015
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: 50.0 Ct: 1.0
CAT: II
Pf: 35.0
Ce: 1.0
Lu: -Cs: 1.00
Snow Duration: 1.15
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 B 999 240
VERT(CL): 0.002 B 999 180
HORZ(LL):-0.001 C - -
HORZ(TL): 0.001 C - -
VIEW Ver: 18.02.01A.0205.19
Creep Factor: 2.0
Max TC CSI: 0.081
Max BC CSI: 0.018
Max Web CSI: 0.087
Mfg Specified Camber:
Job Number:B19-7799
/ Cust:Cash Sales - 2019
Truss Label:E5
Ply: 1
Qty:1
Wgt: 39.2 lbs
SEQN: 332477 / T1 / GABL
FROM: GLD DRW:
.../...08/28/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*144 /-/-/45 /8 /23
Wind reactions based on MWFRS
D Brg Width = 49.0 Min Req =-
Bearing F Fcperp = 405psi.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 59 -42
Chords Tens.Comp.
B - C 59 -42
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 59 -43
Chords Tens.Comp.
E - D 59 -43
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 136 -110
A - G 132 -132
Webs Tens.Comp.
H - D 132 -132
C - D 53 -110
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
G - B 146 -328
Gables Tens.Comp.
E - H 146 -327
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
11'
A B C
D
E
F
G H
3X4
3X4(R)
4'1"
3'8
"
7