HomeMy WebLinkAboutTRUSS SPECS - M19-00155 - Craner - 9828 S 400 W - New SFRJob
B0008-20
Truss
A1G
Truss Type
GABLE
Qty
2
Ply
1
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:03 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-5Xt9gKlSSfWrSKZrwFGxdOO?OoGZsYuFNzfyeyzy2kk
Scale = 1:72.8
T2
T3
T4
B1
W1 W2
B2 B1
W3
W2
T1 T1B3
W1
W4 W5 W4
ST2
ST2ST1
ST1
1
2
3
4
5
6 7
8
9
10
11
12
15 14 13
16 17
8x10
8x16 M18SHS 8x16 M18SHS
8x10
4x8
10x12 M18SHS
3x6
8x10 10x12 M18SHS
4x8
3x6 3x6
3x6
4x4
19-6-02-
1
0
-
4
8-
1
-
1
4
4-4-4
4-4-4
11-0-13
6-8-9
17-5-3
6-4-6
24-1-12
6-8-9
28-6-0
4-4-4
-2-0-0
2-0-0
2-5-10
2-5-10
4-4-4
1-10-10
8-11-1
4-6-13
9-11-6
1-0-5
11-0-13
1-1-7
17-5-3
6-4-6
18-6-10
1-1-7
19-6-15
1-0-5
24-1-12
4-6-13
26-0-6
1-10-10
28-6-0
2-5-10
30-6-0
2-0-0
0-
5
-
3
11
-
6
-
0
13
-
5
-
1
2
0-
5
-
3
11
-
6
-
0
12.00 12
Plate Offsets (X,Y)-- [2:0-8-0,0-0-15], [6:0-1-9,Edge], [7:0-1-9,Edge], [11:0-8-0,0-0-15], [13:0-6-0,Edge], [15:0-6-0,Edge], [18:0-1-11,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-R
0.39
0.89
0.14
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
Wind(LL)
in
-0.36
-0.51
0.01
0.00
(loc)
13-15
13-15
11
13-15
l/defl
>659
>463
n/a
>999
L/d
360
240
n/a
240
PLATES
MT20
M18SHS
Weight: 302 lb FT = 0%
GRIP
137/130
137/130
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except*
T2,T4: 2x10 DF SS
BOT CHORD 2x8 DF SS *Except*
B2,B3: 1-1/2X11-7/8 LP-LSL 1.75E
WEBS 2x4 DF Stud/Std *Except*
W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
OTHERS 2x4 DF Stud/Std
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 6-7.
BOT CHORD Rigid ceiling directly applied or 3-1-1 oc bracing.
WEBS 1 Row at midpt 5-8
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.All bearings 14-3-0.
(lb) - Max Horz2=235(LC 11)
Max Uplift All uplift 100 lb or less at joint(s) except 2=-258(LC 16), 11=-258(LC 16)
Max Grav All reactions 250 lb or less at joint(s) except 2=826(LC 1), 15=1987(LC 18), 13=1978(LC 19), 11=825(LC
1)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-1025/19, 3-4=-872/29, 4-5=-1168/167, 5-6=-693/78, 6-7=-574/67, 7-8=-685/74,
8-9=-1169/167, 9-10=-866/24, 10-11=-1020/14
BOT CHORD 2-15=0/690, 14-15=0/664, 13-14=0/670, 11-13=0/686
WEBS 4-15=-779/148, 9-13=-792/150
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=29ft; eave=2ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) -2-1-4 to 0-10-12, Exterior(2) 0-10-12 to 11-0-13, Corner(3) 11-0-13 to 14-0-13
, Exterior(2) 14-0-13 to 17-5-3, Corner(3) 17-5-3 to 20-5-3, Exterior(2) 20-5-3 to 30-7-4 zone; cantilever left and right exposed ; end
vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
4) Provide adequate drainage to prevent water ponding.
5) All plates are MT20 plates unless otherwise indicated.
6) All plates are 2x4 MT20 unless otherwise indicated.
7) Gable studs spaced at 2-0-0 oc.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
10) Ceiling dead load (7.0 psf) on member(s). 4-5, 8-9, 5-16, 16-17, 8-17; Wall dead load (5.0psf) on member(s).4-15, 9-13
11) Bottom chord live load (40.0 psf) and additional bottom chord dead load (10.0 psf) applied only to room. 13-15
12) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 258 lb uplift at joint 2 and 258 lb uplift at
joint 11.
13) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
14) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
Continued on page 2
Job
B0008-20
Truss
A1G
Truss Type
GABLE
Qty
2
Ply
1
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:03 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-5Xt9gKlSSfWrSKZrwFGxdOO?OoGZsYuFNzfyeyzy2kk
NOTES-
15) Attic room checked for L/360 deflection.
LOAD CASE(S) Standard
Job
B0008-20
Truss
A2
Truss Type
ATTIC
Qty
31
Ply
1
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:04 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-ZkRXugm5Dzei3U82UynAAbx3zBdabx_OcdOWAOzy2kj
Scale = 1:71.8
T2
T3
T4
B1
W1 W2
B2 B1
W3
W2
T1 T1B3
W1
W4
W5
W4
1
2
3
4
5
6 7
8
9
10
11
12151413
16 17
18
19
20 21
22
23
8x10
8x16 M18SHS 8x16 M18SHS
8x10
4x8
10x10
7x8
10x10 10x10
4x8
3x6 3x6
7x8
2x4 4x4
19-6-0
2-
1
0
-
4
8-
1
-
1
4
4-4-4
4-4-4
11-0-13
6-8-9
17-5-3
6-4-6
24-1-12
6-8-9
28-6-0
4-4-4
-2-0-0
2-0-0
2-5-10
2-5-10
4-4-4
1-10-10
8-11-1
4-6-13
9-11-6
1-0-5
11-0-13
1-1-7
17-5-3
6-4-6
18-6-10
1-1-7
19-6-15
1-0-5
24-1-12
4-6-13
26-0-6
1-10-10
28-6-0
2-5-10
30-6-0
2-0-0
0-
5
-
3
11
-
6
-
0
13
-
5
-
1
2
0-
5
-
3
11
-
6
-
0
12.00 12
Plate Offsets (X,Y)-- [2:0-8-0,0-0-15], [4:0-1-0,0-4-4], [6:0-1-9,Edge], [7:0-1-9,Edge], [9:0-1-4,0-4-8], [11:0-8-0,0-0-15], [13:0-4-12,0-4-0], [15:0-4-12,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-R
0.85
0.71
0.41
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
Wind(LL)
in
-0.63
-0.95
0.05
0.05
(loc)
13-15
13-15
11
13-15
l/defl
>532
>354
n/a
>999
L/d
360
240
n/a
240
PLATES
MT20
M18SHS
Weight: 296 lb FT = 0%
GRIP
137/130
220/195
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except*
T2,T4: 2x10 DF SS
BOT CHORD 2x8 DF SS *Except*
B2,B3: 1-1/2X11-7/8 LP-LSL 1.75E
WEBS 2x4 DF Stud/Std *Except*
W2,W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 6-7.
BOT CHORD Rigid ceiling directly applied or 6-2-2 oc bracing.
WEBS 2 Rows at 1/3 pts 5-8
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size) 2=1942/0-5-8 (min. 0-2-7), 11=1942/0-5-8 (min. 0-2-7)
Max Horz2=-235(LC 10)
Max Grav2=2285(LC 18), 11=2285(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-18=-3293/0, 3-18=-3195/0, 3-4=-3185/0, 4-19=-1712/6, 5-19=-1440/63, 5-6=-433/359,
6-20=-129/875, 20-21=-129/875, 7-21=-129/875, 7-8=-416/379, 8-22=-1445/62,
9-22=-1716/6, 9-10=-3178/0, 10-23=-3189/0, 11-23=-3287/0
BOT CHORD 2-15=0/2346, 14-15=0/1644, 13-14=0/1661, 11-13=0/2276
WEBS 3-15=-1269/0, 4-15=0/2526, 5-16=-2241/0, 16-17=-2211/0, 8-17=-2279/0, 9-13=0/2507,
10-13=-1252/0, 6-16=0/265, 6-17=-325/278, 7-17=0/310
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=29ft; eave=4ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -2-1-4 to 0-10-12, Interior(1) 0-10-12 to 11-0-13, Exterior(2) 11-0-13 to
15-3-11, Interior(1) 15-3-11 to 17-5-3, Exterior(2) 17-5-3 to 21-8-2, Interior(1) 21-8-2 to 30-7-4 zone; cantilever left and right exposed ;
end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) All plates are MT20 plates unless otherwise indicated.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
7) Ceiling dead load (7.0 psf) on member(s). 4-5, 8-9, 5-16, 16-17, 8-17; Wall dead load (5.0psf) on member(s).4-15, 9-13
8) Bottom chord live load (40.0 psf) and additional bottom chord dead load (10.0 psf) applied only to room. 13-15
9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11) Attic room checked for L/360 deflection.
LOAD CASE(S) Standard
Job
B0008-20
Truss
A3
Truss Type
ATTIC
Qty
2
Ply
4
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:05 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-1w?v5?nj_HmZhejE2gIPjpTCbb1iKNJYqH83jrzy2ki
Scale = 1:72.3
T2
T3
T2
B1W1W2
B1
W3
W2
T1 T1
W1
W4
W5
W4
1
2
3
4
5
6 7
8
9
10
11
12151413
16 17
18
19
20 21
22
23
8x10
9x10 M18SHS 9x10 M18SHS
8x10
6x8
10x18 MT20HS8x10
4x12
6x8
3x6 3x6
4x12
8x10
2x4 4x4
19-6-0
2-
1
0
-
4
8-
1
-
1
4
4-4-4
4-4-4
11-0-13
6-8-9
17-5-3
6-4-6
24-1-12
6-8-9
28-6-0
4-4-4
-2-0-0
2-0-0
2-5-10
2-5-10
4-4-4
1-10-10
8-11-1
4-6-13
9-11-6
1-0-5
11-0-13
1-1-7
17-5-3
6-4-6
18-6-10
1-1-7
19-6-15
1-0-5
24-1-12
4-6-13
26-0-6
1-10-10
28-6-0
2-5-10
30-6-0
2-0-0
0-
5
-
3
11
-
6
-
0
13
-
5
-
1
2
0-
5
-
3
11
-
6
-
0
12.00 12
Plate Offsets (X,Y)-- [2:0-4-0,0-0-15], [4:0-10-12,0-1-0], [6:0-1-6,Edge], [7:0-1-6,Edge], [9:0-10-12,0-1-0], [11:0-1-15,0-3-0], [13:0-3-8,0-6-0], [15:0-3-8,0-6-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
7-0-0
1.15
1.15
NO
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-R
0.92
0.46
0.47
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
Wind(LL)
in
-0.51
-0.77
0.02
0.04
(loc)
13-15
13-15
11
13-15
l/defl
>665
>438
n/a
>999
L/d
360
240
n/a
240
PLATES
MT20
MT20HS
M18SHS
Weight: 1291 lb FT = 0%
GRIP
137/130
110/93
220/195
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except*
T2: 2x10 DF SS
BOT CHORD 1-1/2X11-7/8 LP-LSL 1.75E
WEBS 2x4 DF Stud/Std *Except*
W2,W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
BRACING-
TOP CHORD 2-0-0 oc purlins (6-0-0 max.)
(Switched from sheeted: Spacing > 2-0-0).
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
JOINTS 1 Brace at Jt(s): 6, 7, 16, 17
REACTIONS.(lb/size) 2=6805/0-5-8 (min. 0-1-8), 11=6805/0-5-8 (min. 0-1-8)
Max Horz2=-823(LC 10)
Max Grav2=8038(LC 18), 11=8038(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=0/489, 2-18=-12429/0, 3-18=-12101/0, 3-4=-12174/0, 4-19=-6139/0, 5-19=-5189/181,
5-6=-1466/1405, 6-20=-321/3338, 20-21=-321/3338, 7-21=-321/3338, 7-8=-1407/1480,
8-22=-5195/182, 9-22=-6146/0, 9-10=-12133/0, 10-23=-12061/0, 11-23=-12389/0,
11-12=0/489
BOT CHORD 2-15=0/9127, 14-15=0/6029, 13-14=0/6029, 11-13=0/8996
WEBS 3-15=-5227/0, 4-15=0/9894, 5-16=-8274/0, 16-17=-8163/0, 8-17=-8383/0, 9-13=0/9839,
10-13=-5187/0, 6-16=0/962, 6-17=-1007/850, 7-17=0/1085
NOTES-
1) 4-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x10 - 2 rows staggered at 0-9-0 oc.
Bottom chords connected as follows: 1-1/2x11-7/8 - 3 rows staggered at 0-9-0 oc.
Webs connected as follows: 2x4 - 1 row at 0-9-0 oc.
Attach TC w/ 1/2" diam. bolts (ASTM A-307) in the center of the member w/washers at 4-0-0 oc.
Attach BC w/ 1/2" diam. bolts (ASTM A-307) in the center of the member w/washers at 4-0-0 oc.
2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply
connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3) Unbalanced roof live loads have been considered for this design.
4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=29ft; eave=4ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -2-1-4 to 0-10-12, Interior(1) 0-10-12 to 11-0-13, Exterior(2) 11-0-13 to
15-3-11, Interior(1) 15-3-11 to 17-5-3, Exterior(2) 17-5-3 to 21-8-2, Interior(1) 21-8-2 to 30-7-4 zone; cantilever left and right exposed ;
end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
5) Provide adequate drainage to prevent water ponding.
6) All plates are MT20 plates unless otherwise indicated.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
9) Ceiling dead load (7.0 psf) on member(s). 4-5, 8-9, 5-16, 16-17, 8-17; Wall dead load (5.0psf) on member(s).4-15, 9-13
10) Bottom chord live load (40.0 psf) and additional bottom chord dead load (10.0 psf) applied only to room. 13-15
11) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
Continued on page 2
Job
B0008-20
Truss
A3
Truss Type
ATTIC
Qty
2
Ply
4
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:05 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-1w?v5?nj_HmZhejE2gIPjpTCbb1iKNJYqH83jrzy2ki
NOTES-
12) Attic room checked for L/360 deflection.
LOAD CASE(S) Standard
Job
B0008-20
Truss
PB01
Truss Type
Piggyback
Qty
2
Ply
1
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:06 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-W6YHILoLlauQJoIQbNpeF00a1?UY3wQh3xtcFHzy2kh
Scale = 1:20.6
T1 T1
B1
ST1
12
3
45
6
4x4
2x4 2x4 2x4
6-4-6
6-4-6
3-2-3
3-2-3
6-4-6
3-2-3
0-
5
-
3
3-
0
-
1
1
0-
1
-
8
3-
1
-
1
5
0-
5
-
3
0-
1
-
8
12.00 12
Plate Offsets (X,Y)-- [2:0-2-6,0-1-0], [4:0-2-6,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.11
0.04
0.03
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 22 lb FT = 0%
GRIP
220/195
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
OTHERS 2x4 DF Stud/Std
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size) 2=194/5-3-0 (min. 0-1-8), 4=194/5-3-0 (min. 0-1-8), 6=180/5-3-0 (min. 0-1-8)
Max Horz2=-52(LC 10)
Max Uplift2=-32(LC 12), 4=-32(LC 12)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Gable requires continuous bottom chord bearing.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 2 and 32 lb uplift at joint 4.
7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
Job
B0008-20
Truss
PB02
Truss Type
Piggyback
Qty
31
Ply
1
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:06 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-W6YHILoLlauQJoIQbNpeF00a1?UY3wQh3xtcFHzy2kh
Scale = 1:20.6
T1 T1
B1
ST1
12
3
45
6
4x4
2x4 2x4 2x4
6-4-6
6-4-6
3-2-3
3-2-3
6-4-6
3-2-3
0-
5
-
3
3-
0
-
1
1
0-
1
-
8
3-
1
-
1
5
0-
5
-
3
0-
1
-
8
12.00 12
Plate Offsets (X,Y)-- [2:0-2-6,0-1-0], [4:0-2-6,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.11
0.04
0.03
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 22 lb FT = 0%
GRIP
220/195
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
OTHERS 2x4 DF Stud/Std
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size) 2=194/5-3-0 (min. 0-1-8), 4=194/5-3-0 (min. 0-1-8), 6=180/5-3-0 (min. 0-1-8)
Max Horz2=-52(LC 10)
Max Uplift2=-32(LC 12), 4=-32(LC 12)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Gable requires continuous bottom chord bearing.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 2 and 32 lb uplift at joint 4.
7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
Job
B0008-20
Truss
PB03
Truss Type
Piggyback
Qty
2
Ply
3
Marsh Craner(DW1/6)
Job Reference (optional)
Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Mon Jan 6 13:13:07 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:5fEN3VSEeq2Ez9OvJSqdVszy3xJ-_J6fWhpzWu0Hwytc95KtoEZmuPq9oN?rIbdAnjzy2kg
Scale = 1:20.6
T1 T1
B1
ST1
12
3
45
6
4x4
2x4 2x4 2x4
6-4-6
6-4-6
3-2-3
3-2-3
6-4-6
3-2-3
0-
5
-
3
3-
0
-
1
1
0-
1
-
8
3-
1
-
1
5
0-
5
-
3
0-
1
-
8
12.00 12
Plate Offsets (X,Y)-- [2:0-2-6,0-1-0], [4:0-2-6,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
35.0
7.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2015/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.04
0.01
0.01
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 67 lb FT = 0%
GRIP
220/195
LUMBER-
TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr
OTHERS 2x4 DF Stud/Std
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size) 2=194/5-3-0 (min. 0-1-8), 4=194/5-3-0 (min. 0-1-8), 6=180/5-3-0 (min. 0-1-8)
Max Horz2=-52(LC 10)
Max Uplift2=-32(LC 12), 4=-32(LC 12)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) 3-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply
connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3) Unbalanced roof live loads have been considered for this design.
4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II;
Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit
between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 2 and 32 lb uplift at joint 4.
9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
10) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard