Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00109 - 820 W 7th S - Rockwell Court Apts Bldg #7Permit Inspection Summary Permit Status of (Open) as of Report Date: 01/03/2020 12:23 pm Permit Details Permit Number: 12-00109 820 W 7th S - Rockwell Court Apts Bldg #7 820 W 7th S New Multi-Family Residence Permit Issued Date: 04/02/2014 Permit Inspection Statistics 22Total Inspections Completed: 19Total Inspections Passed: Inspection Pass Rate: 86.36% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 2/26: Exterior footings approved for pour - rebar per plansInspector Comments: 02/28/2013PassQuinton OwensFooting Inspection 2/28: Interior footings approved for pour - rebar per plans.Inspector Comments: 03/05/2013PassQuinton OwensFoundation Inspection #4 vert rebar at 16" oc. & 4- #4 horiz. rebar continuous. (partially formed - will pour remainder on 3/6) approved. Ufer installed on east side. Inspector Comments: 05/08/2013PassQuinton OwensSheeting Sheathing ok to cover.Inspector Comments: 06/20/2013FailQuinton OwensFraming/Structure Inspection 6/20: No drywall on partition behind tubs on1st floor of end units. Straps nailed only to rimboard at floor assembly-add blocking. Finish nailing hangers at LVL's. Hole in fire partition above tub (1st floor,East unit). Fix firecaulk around sprinkler pipe penetrating attic partition (East end). Firecaulk penetrations in attic separation between units and around stairwell. 2 West units missing stud in crawl space. Inspector Comments: 06/24/2013FailQuinton OwensInsulation Inspection East cavity above attic access missing insul (R-value? R21's ripped in half not ok). Window not sealed in upstairs of West end unit. Screws missing in attic drywall above entry to upper east side unit. DO NOT cram insulation in smaller cavities! Inspector Comments: 06/26/2013PassQuinton OwensFraming/Structure Inspection 06/26/2013PassQuinton OwensInsulation Inspection Framing and insulation items done. Ok to drywall. Inspector Comments: 7/1,QO: West end and middle 4 apts OK to tape.Inspector Comments: 07/03/2013PassQuinton OwensSheetrock/Drywall Inspection 7/3,QO: East end apt missing screws in stairway (correct then OK to tape).Inspector Comments: 09/05/2013PassQuinton OwensBuilding Final Page 1 of 2 (Continued) Permit Details Permit Number: 12-00109 820 W 7th S - Rockwell Court Apts Bldg #7 820 W 7th S New Multi-Family Residence Permit Status of (Open) as of Report Date: 01/03/2020 12:23 pm Permit Inspection Summary Electrical Inspection Type 06/20/2013PassBret StoddardCommercial Electrical Rough-in Approved for cover in all 6 units except the service wall on the east end-inspected the fire alarm on this inspection. Inspector Comments: 06/20/2013PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power-1 service.Inspector Comments: 09/05/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O. entire building electrical only.Inspector Comments: Fire Inspection Type 06/20/2013PassBret StoddardFire Alarm Rough-in Approved for cover-fire alarm-inspected the fire alarm at the same time as the electrical. Inspector Comments: 09/05/2013PassDale PickeringFire Sprinkler Final Inspection Action Required: need hydraulic cal plate(s)Inspector Comments: 09/06/2013PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O.-fire alarm system, witnessed the flow switch operation for system monitoring and gong, and all signalling and initiating devices. Witnessed 24 hour/ 5 minute test from 10:52AM 9/5 to 11:20AM 9/6 when AC power was restored. Fire alarm report is in file. Inspector Comments: Mechanical Inspection Type 06/07/2013PassQuinton OwensHVAC Rough-in HVAC ok. Fire separation requirements will be double checked at framing.Inspector Comments: 09/05/2013PassQuinton OwensHVAC Final Inspection Plumbing Inspection Type 07/09/2013PassDon AllenPlumbing Water Good to cover water line for apt 1,2,3,,7,8,9Inspector Comments: 09/04/2013FailDon AllenPlumbing Final Inspection The two end units need strainers put int he shower.Inspector Comments: 09/05/2013PassDon AllenPlumbing Final Inspection All good for the C/O.Inspector Comments: 09/24/2013PassDon AllenPlumbing Sewer 09/24/2013PassDon AllenPlumbing Rough-in 6/3/13 DA: all good to cover rough-in.Inspector Comments: Page 2 of 2