HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00105 - 820 W 7th S - Rockwell Court Apts Bldg #3Permit
Inspection
Summary
Permit Status of (Open) as of Report Date: 01/03/2020 11:08 am
Permit Details Permit Number: 12-00105
820 W 7th S - Rockwell Court Apts Bldg #3
820 W 7th S
New Multi-Family Residence
Permit Issued Date: 04/01/2014
Permit Inspection Statistics
20Total Inspections Completed:
18Total Inspections Passed:
Inspection Pass Rate: 90.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
02/25/2013PassQuinton OwensFoundation Inspection
2/22: Partial foundation (South, West, & partial North). Ufer installed. approved.
2/25: Remaining foundation ok to pour - rebar per plans.
Inspector Comments:
02/28/2013PassQuinton OwensFooting Inspection
2/20: Exterior footings w/ 3 #4 bar cont - approved (int. footings. not ready)
Interior ok (2/28)
Inspector Comments:
4/25 - missed nailing a few locations (as marked).
Action Required: reinspect with framing.
Inspector Comments:
5/21 - Missed locations marked with red crayon.
Action required: reinspect.
Inspector Comments:
05/24/2013PassQuinton OwensSheeting
5/24 - Exterior locations corrected.Inspector Comments:
6/5,QO: Some penetrations not firecaulked. Blocking needed at rim board for
bldg straps.
Inspector Comments:
6/10,QO: Firecaulk vent pipe at intersecting wall (East end unit). Concealed
locations at ceiling not rated yet. Seal penetrations at truss over stairwell
separation. Truss blocks on east end unit at upper floor interior.
Inspector Comments:
06/17/2013PassQuinton OwensFraming/Structure Inspection
6/17,QO: Framing items done (except sealing around truss penetrations at
stairwell not inspected)
Inspector Comments:
6/17,QO: Upper floor & West end units approved for taping.Inspector Comments:
06/19/2013PassQuinton OwensSheetrock/Drywall Inspection
6/19,QO: Lower and East end units approved.Inspector Comments:
08/21/2013FailQuinton OwensBuilding Final
Vapor barrier not done (3104,3103). Vents missing connecting lower to upper
attic (3104). Stud missing in crawl space (NE portion of 3102).
Inspector Comments:
6/10,QO: Vent baffles needed between lower & upper attics in end units.Inspector Comments:
6/17,QO: Vent baffles not in at conjunction between lower and upper roof on end
units.
Inspector Comments:
08/23/2013PassQuinton OwensInsulation Inspection
8/23,QO: baffles installed at final reinspect.Inspector Comments:
08/23/2013PassQuinton OwensBuilding Final
Page 1 of 2
(Continued)
Permit Details Permit Number: 12-00105
820 W 7th S - Rockwell Court Apts Bldg #3
820 W 7th S
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 01/03/2020 11:08 am
Permit
Inspection
Summary
Electrical Inspection Type
06/03/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover-inspected the electrical service, and fire alarm wiring for
cover on this inspection.
Inspector Comments:
06/03/2013PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power-inspected the electrical service
on the rough-in inspection and no separate ticket was written.
Inspector Comments:
08/21/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-inspected the fire alarm also on this
inspection-inspected yesterday for the final electrical and changes were done that
were needed.
Inspector Comments:
Fire Inspection Type
06/03/2013PassBret StoddardFire Alarm Rough-in
Approved for cover-inspected the fire alarm wiring on the electrical rough-in
inspection and no separate ticket was written.
Inspector Comments:
08/21/2013PassBret StoddardFire Alarm Final Inspection
Approved for a final and C.O.-inspected the fire alarm on the electrical
final-witnessed 24 hour/5 minute test and all functions of initiating and signalling
devices-fire alarm contractor report in file-flow switch was 42 seconds.
Inspector Comments:
Mechanical Inspection Type
05/15/2013PassQuinton OwensHVAC Rough-in
Venting for water heater not installed yet. One gas line below 20 psi. (Plumbers
working on it)
Inspector Comments:
08/21/2013FailQuinton OwensHVAC Final Inspection
Insulate supply boot under back right bdrm in 3102.Inspector Comments:
08/23/2013PassQuinton OwensHVAC Final Inspection
Plumbing Inspection Type
07/02/2013PassDon AllenPlumbing Rough-in
5/30 - all good to cover rough in.Inspector Comments:
07/09/2013PassDon AllenPlumbing Water
good to cover water line for apt 1,2,3,7,8,9Inspector Comments:
09/03/2013PassDon AllenPlumbing Sewer
09/03/2013PassDon AllenPlumbing Final Inspection
8/13/13 - all good for the C/OInspector Comments: