HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00035 - 249 E Poleline - Verizon Wireless Monopole TowerPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 12/18/2019 1:52 pm
Permit Details Permit Number: 12-00035
249 E Poleline - Verizon Wireless Monopole Tower
249 E Poleline
New Commercial Building
Permit Issued Date: 06/11/2014
Permit Inspection Statistics
2Total Inspections Completed:
2Total Inspections Passed:
Inspection Pass Rate: 100.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
06/22/2012PassPLL ADMINBuilding Final
Not Required head replacement only
As per Jon Berry
Inspector Comments:
Electrical Inspection Type
06/22/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final-changed out the Heliax cabling up the tower and the heads
at the top.
Inspector Comments: