Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00035 - 249 E Poleline - Verizon Wireless Monopole TowerPermit Inspection Summary Permit Status of (Open) as of Report Date: 12/18/2019 1:52 pm Permit Details Permit Number: 12-00035 249 E Poleline - Verizon Wireless Monopole Tower 249 E Poleline New Commercial Building Permit Issued Date: 06/11/2014 Permit Inspection Statistics 2Total Inspections Completed: 2Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/22/2012PassPLL ADMINBuilding Final Not Required head replacement only As per Jon Berry Inspector Comments: Electrical Inspection Type 06/22/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final-changed out the Heliax cabling up the tower and the heads at the top. Inspector Comments: