HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00022 - 76 E 1st S - SFR RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 12/18/2019 9:50 am
Permit Details Permit Number: 12-00022
76 E 1st S - SFR Remodel
76 E 1st S
Single Family - Remodel
Permit Issued Date: 07/08/2014
Permit Inspection Statistics
17Total Inspections Completed:
14Total Inspections Passed:
Inspection Pass Rate: 82.35%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
03/13/2012FailQuinton OwensFraming/Structure Inspection
Header missing above window (2x's on side do not count as header)
Better sealant around window framing (caulking cracked already -outside also)
Insulate around basement window.
Smoke Det. missing outside bedroom.
Inspector Comments:
03/13/2012PassQuinton OwensInsulation Inspection
Insulate (foam) around bsmt window
Better sealant around window framing needed
Header missing above window
Smoke det. outside bedroom
Inspector Comments:
03/23/2012PassQuinton OwensFraming/Structure Inspection
03/23/2012PassQuinton OwensSheetrock/Drywall Inspection
2 hr ceiling and walls between Office space and apt.
Will need fire rings around plastic pipe penetrations.
Inspector Comments:
04/13/2012FailQuinton OwensBuilding Final
Handrail return to wall (top&bottom) 34-38" high. Fire ring around ABS pipes in
mech. room behind tub (Fire caulk upper pipe if too big for fire ring). Window
well egress ladder. Corridor openings-doors (20 min. rating). Underside of stairs
OK - not enclosed (framing only, no drywall).
Inspector Comments:
10/30/2012PassQuinton OwensBuilding Final
11/01/2012PassQuinton OwensSidewalk Inspection
Existing. no inspection required.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 12-00022
76 E 1st S - SFR Remodel
76 E 1st S
Single Family - Remodel
Permit Status of (Open) as of Report Date: 12/18/2019 9:50 am
Permit
Inspection
Summary
Electrical Inspection Type
03/07/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover-basement remodel-service is Approved to be energized for
permanent power-existing service reused-no separate ticket was written for the
service inspection-inspected this on the rough-in.
Inspector Comments:
03/07/2012PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power-inspected this on the rough-in.Inspector Comments:
04/12/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Need to install K.O. seals in the junction box in the ceiling above the panel, need
to install covers on the junction box in the storage room and the one above the
panel, range wire only approved for 40A max breaker size-50A installed(#8),
outlets in the bedroom not working(4), verify that the heaters in the unit have
double pole thermostats-breaker locks required if not, call for a re-inspect when
ready.
Inspector Comments:
04/13/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O.-basement remodel-the side under the eye center
only.
Inspector Comments:
Mechanical Inspection Type
03/09/2012PassQuinton OwensHVAC Rough-in
Mech Rough-in OKInspector Comments:
Plumbing Inspection Type
02/22/2012PassDon AllenPlumbing Underground Inspection
All good to coverInspector Comments:
03/14/2012PassDon AllenPlumbing Rough-in
Roughin all good.Inspector Comments:
05/01/2012PassDon AllenPlumbing Final Inspection
All good for c/oInspector Comments:
05/01/2012PassDon AllenPlumbing Sewer
05/01/2012PassDon AllenPlumbing Water
Page 2 of 2