Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00007 - 160 W 2 S - Namaste Salon Tenant FinishPermit Inspection Summary Permit Status of (Open) as of Report Date: 12/10/2019 11:28 am Permit Details Permit Number: 12-00007 160 W 2 S - Namaste Salon Tenant Finish 160 W 2 S Commercial Tenant Finish Permit Issued Date: 07/03/2014 Permit Inspection Statistics 15Total Inspections Completed: 14Total Inspections Passed: Inspection Pass Rate: 93.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 03/27/2012PassPLL ADMINFraming/Structure Inspection As Per Jon BerryInspector Comments: 03/27/2012PassPLL ADMINSheetrock/Drywall Inspection As Per Jon BerryInspector Comments: 04/20/2012PassPLL ADMINBuilding Final As Per Jon Berry Install Fire Ext. by entry door. Temp C/OInspector Comments: Electrical Inspection Type 03/07/2012PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in Approved for cover throughout the remodeled space.Inspector Comments: 03/13/2012PassBret StoddardCOM & MFR Electrical Service Inspection Approved to energize the feeder from the meter main to the panel in the occupant space (salon). Inspector Comments: 04/18/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-electrician on site-made corrections, labeled all breakers in panel-as per Jane Shaw. Inspector Comments: Fire Inspection Type 04/17/2012PassPLL ADMINFire Alarm Final Inspection As Per Jon Berry-No pulls in unit Alarm/strobes tested goodInspector Comments: 04/17/2012PassPLL ADMINFire Sprinkler Final Inspection As Per Jon BerryInspector Comments: 04/20/2012PassPLL ADMINFire Department Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 12-00007 160 W 2 S - Namaste Salon Tenant Finish 160 W 2 S Commercial Tenant Finish Permit Status of (Open) as of Report Date: 12/10/2019 11:28 am Permit Inspection Summary Mechanical Inspection Type 03/06/2012FailPLL ADMINHVAC Rough-in As Per Jon Berry Jon Berry- 3/6/12-Seal ducting between duct and units (2) Inspector Comments: 04/18/2012PassBret StoddardHVAC Final Inspection Approved for a final and C.O.-electrician on site-made corrections, labeled all breakers in panel-as per Jane Shaw. Inspector Comments: 05/04/2012PassPLL ADMINHVAC Rough-in As Per Jon BerryInspector Comments: Plumbing Inspection Type 03/07/2012PassDon AllenPlumbing Rough-in 05/01/2012PassDon AllenPlumbing Sewer Also Approved Water on 5/1/12 As Per Don AllenInspector Comments: 05/01/2012PassDon AllenPlumbing Final Inspection Page 2 of 2