Loading...
HomeMy WebLinkAboutSTRUCTURAL CALCULATIONS - 19-00718 - Valleywide Coop - Commercial BuldingFROST Structural Engineering 1020 Lincoln Road Phone: 208.227.8404 Idaho Falls, ID 83401 Fax: 208.227.8405 www.frost-structural.com Project: North Pointe Metal Building Client: Teton West Project No.: IF19-397 Date: Engineer : SEAL: FSE STRUCTURAL CALCULATIONS DBP December 5, 2019 December 5, 2019 < * > < * > < * > < * > < * > 50'-0" 2 0 0 ' - 0 " 1 2 6 " 2 4 ' - 6 " 2 5 ' - 0 " 2 5 ' - 0 " 2 5 ' - 0 " 2 5 ' - 0 " 2 5 ' - 0 " 2 5 ' - 0 " 2 4 ' - 6 " 6 " 3 4 ABLBCBL 1 B L 2 3 4 5 6 7 8 9 B L 1 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building REACTION KEY PLAN 1 - A P = 1 3 . 3 3 U = 4 . 7 4 H = 6 . 4 4 1 - B P = 0 . 1 4 U = 2 . 6 6 H = 2 . 3 9 1 - C P = 1 3 . 4 2 U = 4 . 6 1 H = 6 . 4 4 9 - A P = 4 . 0 8 U = 1 . 4 3 H = 0 . 8 5 9 - B P = 1 5 . 9 8 U = 6 . 7 0 H = 2 . 4 4 9 - C P = 6 . 4 6 U = 2 . 9 0 H = 2 . 5 2 2 - A P = 2 5 . 6 2 U = 7 . 4 4 H = 1 0 . 7 8 2 - C P = 2 5 . 7 3 U = 7 . 0 7 H = 1 0 . 7 8 3 - A P = 2 5 . 8 7 U = 7 . 5 8 H = 1 0 . 8 8 3 - C P = 2 5 . 9 8 U = 7 . 8 4 H = 1 0 . 8 8 4 - A P = 2 5 . 8 7 U = 7 . 5 6 H = 1 0 . 8 8 4 - C P = 2 5 . 9 8 U = 7 . 8 5 H = 1 0 . 8 8 5 - A P = 2 5 . 8 7 U = 7 . 2 4 H = 1 0 . 8 8 5 - C P = 2 5 . 9 8 U = 6 . 8 7 H = 1 0 . 8 8 6 - A P = 2 5 . 8 7 U = 7 . 2 4 H = 1 0 . 8 8 6 - C P = 2 5 . 9 8 U = 6 . 8 7 H = 1 0 . 8 8 7 - A P = 2 5 . 8 7 U = 7 . 5 8 H = 1 0 . 8 8 7 - C P = 2 5 . 9 8 U = 7 . 8 4 H = 1 0 . 8 8 8 - A P = 2 5 . 6 2 U = 7 . 7 3 H = 1 0 . 7 8 8 - C P = 2 5 . 7 3 U = 8 . 0 5 H = 1 0 . 7 8 BU I L D I N G M A R K : No r t h P o i n t e EN G I N E E R I N G P R O P E R T I E S : Al l o w a b l e B e a r i n g P r e s s u r e = Fr o s t D e p t h o r d e p t h o f F o o t i n g = So i l W e i g h t = Co n t i n u o u s F o o t i n g W i d t h = Pa s s i v e s o i l P r e s s u r e = Co n t i n u o u s F o o t i n g T h i c k n e s s = Fr i c t i o n C o e f f i c i e n t = Fo o t i n g S t e m W i d t h = Co n t r i b u t i n g S l a b / F o o t i n g L e n g t h = Sl a b T h i c k n e s s = Fy = S l a b R e i n f o r c e m e n t A r e a p e r F o o t = FO O T I N G D E S I G N : Gr i d l i n e s / N a m e Ve r t i c a l Fo r c e ( k i p s ) Up l i f t F o r c e (k i p s ) Ho r i z o n t a l Fo r c e - O u t (k i p s ) Co l u m n Lo c a t i o n Fo o t i n g Th i c k n e s s (i n ) Fo o t i n g Wi d t h ( f t ) Co l u m n De a d L o a d (k i p s ) Be a r i n g Pr o v i d e d (k i p s ) Re s i s t i n g Up l i f t ( k i p s ) Re s i s t i n g Ho r i z o n t a l Fo r c e ( k i p s ) B e a r i n g U p l i f t H o r i z o n t a l Ha i r p i n to b e Us e d ? Ha i r p i n Ba r S i z e Ha i r p i n An g l e (T y p i c a l l y 0 o r 6 0 ) Ha i r p i n Re q u i r e d Ba r A e a ( 1 le g ) Re q u i r e d Ha i r p i n L e g Le n g t h ( f t ) Sl a b A r e a Re q u i r e d f o r Ha i r p i n - N o Re b a r i n S l a b H a i r p i n 1- A 13 . 3 4 . 7 6 . 4 E x t e r i o r C o r n e r 10 3 1. 3 3 13 . 5 7 . 4 2 . 3 ok o k - Ye s 4 0 0. 1 3 G r a d e B e a m 4 7 2 . 0 6 ok 1- B 0. 1 2 . 7 2 . 4 E x t e r i o r W a l l 12 4 0. 0 1 24 . 0 1 1 . 5 4 . 2 ok o k o k 0. 0 5 G r a d e B e a m 0 . 0 0 1- C 13 . 4 4 . 6 6 . 4 E x t e r i o r C o r n e r 10 3 1. 3 4 13 . 5 7 . 4 2 . 3 ok o k - Ye s 4 0 0. 1 3 G r a d e B e a m 4 6 9 . 8 4 ok 2- A 25 . 6 7 . 4 1 0 . 8 E x t e r i o r W a l l 12 4 . 5 2. 5 6 30 . 4 1 3 . 2 4 . 3 ok o k - Ye s 5 0 0. 2 2 G r a d e B e a m 7 5 7 . 8 9 ok 2- C 25 . 7 7 . 1 1 0 . 8 E x t e r i o r W a l l 12 4 . 5 2. 5 7 30 . 4 1 3 . 2 4 . 4 ok o k - Ye s 5 0 0. 2 2 G r a d e B e a m 7 5 1 . 8 0 ok 3- A 25 . 9 7 . 6 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 5 9 30 . 4 1 3 . 2 4 . 3 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 6 9 . 3 3 ok 3- C 26 . 0 7 . 8 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 6 0 30 . 4 1 3 . 2 4 . 2 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 7 3 . 3 2 ok 4- A 25 . 9 7 . 6 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 5 9 30 . 4 1 3 . 2 4 . 3 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 6 9 . 0 1 ok 4- C 26 . 0 7 . 9 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 6 0 30 . 4 1 3 . 2 4 . 2 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 7 3 . 4 8 ok 5- A 25 . 9 7 . 2 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 5 9 30 . 4 1 3 . 2 4 . 4 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 6 3 . 8 9 ok 5- C 26 . 0 6 . 9 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 6 0 30 . 4 1 3 . 2 4 . 5 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 5 7 . 8 0 ok 6- A 25 . 9 7 . 2 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 5 9 30 . 4 1 3 . 2 4 . 4 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 6 3 . 8 9 ok 6- C 26 . 0 6 . 9 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 6 0 30 . 4 1 3 . 2 4 . 5 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 5 7 . 8 0 ok 7- A 25 . 9 7 . 6 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 5 9 30 . 4 1 3 . 2 4 . 3 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 6 9 . 3 3 ok 7- C 26 . 0 7 . 8 1 0 . 9 E x t e r i o r W a l l 12 4 . 5 2. 6 0 30 . 4 1 3 . 2 4 . 2 ok o k - Ye s 5 0 0. 2 3 G r a d e B e a m 7 7 3 . 3 2 ok 8- A 25 . 6 7 . 7 1 0 . 8 E x t e r i o r W a l l 12 4 . 5 2. 5 6 30 . 4 1 3 . 2 4 . 3 ok o k - Ye s 5 0 0. 2 2 G r a d e B e a m 7 6 2 . 5 3 ok 8- C 25 . 7 8 . 1 1 0 . 8 E x t e r i o r W a l l 12 4 . 5 2. 5 7 30 . 4 1 3 . 2 4 . 2 ok o k - Ye s 5 0 0. 2 2 G r a d e B e a m 7 6 7 . 4 8 ok 9- A 4. 1 1 . 4 0 . 9 E x t e r i o r C o r n e r 10 3 0. 4 1 13 . 5 7 . 4 2 . 9 ok o k o k 0. 0 2 G r a d e B e a m 0 . 0 0 9- B 16 . 0 6 . 7 2 . 4 E x t e r i o r W a l l 12 4 1. 6 0 24 . 0 1 1 . 5 3 . 6 ok o k o k 0. 0 5 G r a d e B e a m 0 . 0 0 9- C 6. 5 2 . 9 2 . 5 E x t e r i o r C o r n e r 10 3 0. 6 5 13 . 5 7 . 4 2 . 6 ok o k - Ye s 4 0 0. 0 5 G r a d e B e a m 7 7 . 2 9 ok 0. 2 5 16 ' ' 10 ' ' 11 0 p c f 20 0 p s f / f t 5' ' ME T A L B U I L D I N G F O U N D A T I O N D E S I G N 36 ' ' 15 0 0 p s f 8' ' 3. 0 ' 60 k s i 0. 0 0 0 i n ^ 2 / f t 2 o f 2 2 F R O S T S t r u c t u r a l E n g i n e e r i n g P r o j e c t N a m e : P r o j e c t N o . : E n g . : D a t e : S h e e t : D B P F S E 1 2 / 0 5 / 1 9 I F 1 9 - 3 9 7 N o r t h P o i n t e M e t a l B u i l d i n g Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.33 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =12.00 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 20.8 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >84 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >15 OK q min (psf) =1481 q max (psf) =1481 OK qu-max (psf) =2311 qu at edge of base (psf) =2311 qu-min (psf) =2311 qu at edge of base (psf) =2311 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.16 area of bar = 0.20 Min p =0.0006 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 94 Use p =0.0006 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 0.58 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 189 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-A Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 3 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.01 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.13 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.2 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >1 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >0 OK q min (psf) =9 q max (psf) =9 OK qu-max (psf) =14 qu at edge of base (psf) =14 qu-min (psf) =14 qu at edge of base (psf) =14 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.02 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 9230 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.01 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 18461 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 1-B Use: w/ 1 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 1-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.34 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =12.08 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 20.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >85 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >15 OK q min (psf) =1491 q max (psf) =1491 OK qu-max (psf) =2326 qu at edge of base (psf) =2326 qu-min (psf) =2326 qu at edge of base (psf) =2326 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.16 area of bar = 0.20 Min p =0.0006 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 93 Use p =0.0006 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 0.58 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 187 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-C Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 5 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.56 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.06 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >168 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1265 q max (psf) =1265 OK qu-max (psf) =1974 qu at edge of base (psf) =1974 qu-min (psf) =1974 qu at edge of base (psf) =1974 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.02 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.51 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 93 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 2-A Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 2-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 6 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.57 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.16 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >169 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1271 q max (psf) =1271 OK qu-max (psf) =1982 qu at edge of base (psf) =1982 qu-min (psf) =1982 qu at edge of base (psf) =1982 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.04 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.52 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 93 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 2-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 2-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 7 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.59 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.28 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1278 q max (psf) =1278 OK qu-max (psf) =1993 qu at edge of base (psf) =1993 qu-min (psf) =1993 qu at edge of base (psf) =1993 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.05 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 3-A Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 3-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 8 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >35 OK q min (psf) =1283 q max (psf) =1283 OK qu-max (psf) =2001 qu at edge of base (psf) =2001 qu-min (psf) =2001 qu at edge of base (psf) =2001 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.06 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 3-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 3-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 9 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.59 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.28 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1278 q max (psf) =1278 OK qu-max (psf) =1993 qu at edge of base (psf) =1993 qu-min (psf) =1993 qu at edge of base (psf) =1993 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.05 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 4-A Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 4-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 10 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >35 OK q min (psf) =1283 q max (psf) =1283 OK qu-max (psf) =2001 qu at edge of base (psf) =2001 qu-min (psf) =2001 qu at edge of base (psf) =2001 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.06 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 4-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 4-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 11 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.59 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.28 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1278 q max (psf) =1278 OK qu-max (psf) =1993 qu at edge of base (psf) =1993 qu-min (psf) =1993 qu at edge of base (psf) =1993 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.05 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 5-A Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 5-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 12 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >35 OK q min (psf) =1283 q max (psf) =1283 OK qu-max (psf) =2001 qu at edge of base (psf) =2001 qu-min (psf) =2001 qu at edge of base (psf) =2001 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.06 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 5-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 5-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 13 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.59 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.28 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1278 q max (psf) =1278 OK qu-max (psf) =1993 qu at edge of base (psf) =1993 qu-min (psf) =1993 qu at edge of base (psf) =1993 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.05 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 6-A Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 6-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 14 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >35 OK q min (psf) =1283 q max (psf) =1283 OK qu-max (psf) =2001 qu at edge of base (psf) =2001 qu-min (psf) =2001 qu at edge of base (psf) =2001 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.06 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 6-C Use: w/ 2 #4 Top and Bottom 6-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 15 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.59 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.28 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1278 q max (psf) =1278 OK qu-max (psf) =1993 qu at edge of base (psf) =1993 qu-min (psf) =1993 qu at edge of base (psf) =1993 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.05 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 7-A Use: w/ 2 #4 Top and Bottom 7-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 16 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >170 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >35 OK q min (psf) =1283 q max (psf) =1283 OK qu-max (psf) =2001 qu at edge of base (psf) =2001 qu-min (psf) =2001 qu at edge of base (psf) =2001 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.06 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.53 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 92 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 7-C Use: w/ 2 #4 Top and Bottom 7-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 17 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.56 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.06 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >168 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1265 q max (psf) =1265 OK qu-max (psf) =1974 qu at edge of base (psf) =1974 qu-min (psf) =1974 qu at edge of base (psf) =1974 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.02 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.51 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 93 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 8-A Use: w/ 2 #4 Top and Bottom 8-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 18 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.57 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.16 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >169 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >34 OK q min (psf) =1271 q max (psf) =1271 OK qu-max (psf) =1982 qu at edge of base (psf) =1982 qu-min (psf) =1982 qu at edge of base (psf) =1982 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 3.04 area of bar = 0.20 Min p =0.0010 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.08 Spacing (in) = 46 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.52 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 93 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.3 OK 8-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 8-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 19 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.41 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =3.67 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 6.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >26 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >5 OK q min (psf) =453 q max (psf) =453 OK qu-max (psf) =707 qu at edge of base (psf) =707 qu-min (psf) =707 qu at edge of base (psf) =707 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.35 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 309 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.18 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 618 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 9-A Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 9-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 20 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.60 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =14.38 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 24.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >100 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >20 OK q min (psf) =999 q max (psf) =999 OK qu-max (psf) =1558 qu at edge of base (psf) =1558 qu-min (psf) =1558 qu at edge of base (psf) =1558 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.75 area of bar = 0.20 Min p =0.0006 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 80 Use p =0.0006 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.88 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 161 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 9-B Use: w/ 2 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 9-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 21 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 1.09 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.00 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =6.46 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 11.6 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >47 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >8 OK q min (psf) =839 q max (psf) =839 OK qu-max (psf) =1293 qu at edge of base (psf) =1293 qu-min (psf) =1293 qu at edge of base (psf) =1293 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 0.65 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 168 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.32 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 338 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 9-C Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 9-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 22 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE12/05/19IF19-397North Pointe Metal Building