Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00186 - 141 S 1st W - NorthPointe Parking GaragePermit Inspection Summary Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm Permit Details Permit Number: 13-00186 141 S 1st W - NorthPointe Parking Garage 141 S 1st W New Commercial Building Permit Issued Date: 12/20/2013 Permit Inspection Statistics 27Total Inspections Completed: 22Total Inspections Passed: Inspection Pass Rate: 81.48% Permit Inspection History *Refer to Individual Inspection Report for more Details 08/06/2013PassBret StoddardElectrical Underground Inspection Approved for cover-level 1 parking floor.Inspector Comments: 08/20/2013PassBret StoddardElectrical Underground Inspection Approved for cover in ceiling of level 1 and floor of level 2, concrete being placed at 4:00AM tomorrow. Inspector Comments: 08/27/2013PassBret StoddardElectrical Underground Inspection Approved for cover-underground/deck-lights and horn strobes for second level ceiling. Inspector Comments: 09/12/2013PassBret StoddardElectrical Underground Inspection Approved for cover-underground/concrete of ceiling level 2 and floor level 3.Inspector Comments: 09/25/2013PassBret StoddardElectrical Underground Inspection Approved to place concrete on level 2 ceiling/level 3 floor for electrical and fire alarm conduits(ENT), also Approved for cover in the temporary construction walls in the framed areas for the construction offices in the lowest level of the parking garage structure-all outlets must be GFCI protected and will be as per Nathan with Standard electric as they are powering them up with a GFCI protected "spider" box. Inspector Comments: 10/10/2013PassBret StoddardElectrical Underground Inspection Approved for cover-level 4 floor concrete deck.Inspector Comments: 10/24/2013PassBret StoddardElectrical Underground Inspection Approved for cover in the concrete deck for electrical and fire alarm conduits, level 4 floor and third level ceiling. Inspector Comments: 11/05/2013PassBret StoddardElectrical Underground Inspection Approved for cover on 5th floor-fourth ceiling for fire alarm and electrical wiring conduits in concrete slab. Inspector Comments: 11/14/2013PassBret StoddardElectrical Underground Inspection Approved for cover for electrical and fire alarm wiring conduits installed in the 5th level floor and the fourth level ceiling. Ticket was written for building B originally. Inspector Comments: Page 1 of 5 (Continued) Permit Details Permit Number: 13-00186 141 S 1st W - NorthPointe Parking Garage 141 S 1st W New Commercial Building Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm Permit Inspection Summary 09/30/2014N/AJoel GrayPublic Works Final Inspection No final inspection needed, per Joel Gray. He will require all items to be complete that are outstanding prior to the North Pointe Retail building receiving a C of O. Inspector Comments: 09/30/2014N/ANatalie PowellPlanning and Zoning Final Inspection No P&Z final needed until the NorthPointe Retail building is finaled.Inspector Comments: Page 2 of 5 (Continued) Permit Details Permit Number: 13-00186 141 S 1st W - NorthPointe Parking Garage 141 S 1st W New Commercial Building Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm Permit Inspection Summary Building Inspection Type 04/07/2014FailQuinton OwensBuilding Final *Barrier required at level of exit discharge (both stair wells). Gap at end of guardrails is larger than 4 inches. No exit sign on 5th flr SE corner. Top tread needs repair by door to lvl 2, SE stairs. Stair 2, lvl 1, "exit this floor" has exit sign outside pointing to door. How are 2 exits accomplished for each tier (level of protection for emergency exit out south stair?). Rated shafts need to have rating protection at expansion joints. Tag on rated door to SW utility,level 2, is missing (others painted over). SW utility rooms, alarm cover still on (ongoing work creating dust?). Inspector Comments: 08/28/2014FailQuinton OwensCommercial Building Final Fire rate gap in wall at all levels where it is required to be rated and weather sealed at top level. Seal pvc pipe penetration South end top level. Fire rate sprinkler penetration in garage wall & penetrations on rated wall in utility rooms (all levels) and elevator shaft (B level). Seal pipe penetrations in fire riser room at basement level. Stair exiting guard is at wrong level on North stairway. Remove directional arrow on exit sign by West parking entrance. Finish painting parking stalls and required pedestrian walkways including crosswalk & egress at west entrance. Inspector Comments: 09/30/2014PassQuinton OwensCommercial Building Final previous deficiencies have been completed.Inspector Comments: 10/23/2017PassQuinton OwensCommercial Footing Inspection 5/17/13: South side footing & large spot footings on west side (Rebar as per plans) - approved. 5/24/13: Footing rebar as per plans - approved. 6/10/13: 3 spot footings in SE corner - approved. 6/14/13: NE corner footing - approved. 7-1-13: Slab on grade (Bottom parking level) 7-3-13: Footings approved Inspector Comments: All concrete: walls, columns, and slabs - foundation to top level.Inspector Comments: Page 3 of 5 (Continued) Permit Details Permit Number: 13-00186 141 S 1st W - NorthPointe Parking Garage 141 S 1st W New Commercial Building Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm Permit Inspection Summary 10/23/2017PassQuinton OwensFoundation Inspection 6/3/13: Elevator walls and exterior walls and columns - rebar as per plans (approved) 6/10/13: Exterior wall between grids D & C - approved. 6/26/13: North wall Grid B (approx) to between 4 & 3. Make correction to corner bar layout. - approved 8/6/13: South east corner slob on deck and Elevator shaft wall - approved 8/9: Stair walls (NE corner) - approved 8/12/13: Walls & Columns - approved 8/14: Rebar on East side - approved 8/15: East wall on 2nd level - approved 8/19: Slab & wall- approved 8/20: Wall -approved 8/23: Wall (CSW10): 2 #5 Vrt @ 16" oc & 2 #4 Hrz @16" oc 8/27: Slab -approved 8/28: East partition wall (South of Ctr shear wall) #5 Vrt @ 12" oc & #4 Hrz @ 14" oc. 8/29: West wall (South half)- #5 Vrt @16" oc and #4 Hrz @ 12" oc w/ #5 at T&B 9/3: South wall- #5 Vrt @16" oc and #4 Hrz @ 12" oc w/ #5 at T&B 9/4: Elevator walls - approved 9/5: Walls (SW corner) approved 9/6: Walls (SE corner, 3rd floor)- 2 #4 Hrz @ 16" oc & 2 #5 Vrt @ 16" oc (corner bars correct)-approved 9/10: Shear wall (East side) - approved. 9/11: Wall - approved 9/12: Wall - approved/ Slab on deck (3rd level)- approved 9/18: Shear wall - approved 9/24: Shear wall - approved 9/25: Slab on deck - approved 9/27/13: Wall on SE corner (Rebar as per plans) 10/2/13: Elevator shaft wall 2 #4 Hrz @ 16" w/2 #5 Top & Btm & #5 Vrt @ 16" (approved) 10/4: SE corner shear wall and columns: Approved for pour. 10/8: Parapet wall on North (East end) & Wall on North Stairs approved. 10/10: 2nd request for inspection done on 10/8 (All forms up and rebar clearance approved). 10/21: West wall (south end, level 4), Stairs' inner walls (SE corner level 4) 10/23: Rebar at South end (level 4)- approved. 11/6: ? approved 1/14/14: ? approved 1/15: Stem Wall: 2 rows of #4 between #5 bar T&B with #5 Vrt @12" oc. - approved Inspector Comments: Page 4 of 5 (Continued) Permit Details Permit Number: 13-00186 141 S 1st W - NorthPointe Parking Garage 141 S 1st W New Commercial Building Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm Permit Inspection Summary Electrical Inspection Type 12/05/2013PassBret StoddardElectrical Underground Inspection Approved for cover-underground conduits on the highest level(last) of parking structure. Inspector Comments: 02/11/2014PassBret StoddardResidential Electrical Service Inspection 04/08/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-parking structure only.Inspector Comments: 07/02/2014PassBret StoddardCOM & MFR Electrical Service Inspection Fire Inspection Type 04/11/2014PassBret StoddardFire Alarm Final Inspection 04/23/2014PassDale PickeringFire Sprinkler Rough-in 4/8 #200 Hydro on dry system @ 1100 & 1315 Riser 1#215, #215 2 #219, #224 3 #216, #220 4 #217, #216 5 #221, #221 6 #218, #217 7 #216, #216 Inspector Comments: 04/23/2014PassDale PickeringFire Sprinkler Final Inspection 04/23/2014PassDale PickeringFire Department Final Inspection Mechanical Inspection Type 04/07/2014PassQuinton OwensHVAC Final Inspection HVAC All good for c/oInspector Comments: Plumbing Inspection Type 07/18/2013PassDon AllenPlumbing Underground Inspection Good on ground work.Inspector Comments: 09/30/2014N/ADon AllenPlumbing Final Inspection Plumbing final not needed, per phone call with Don Allen.Inspector Comments: Page 5 of 5