Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm
Permit Details Permit Number: 13-00186
141 S 1st W - NorthPointe Parking Garage
141 S 1st W
New Commercial Building
Permit Issued Date: 12/20/2013
Permit Inspection Statistics
27Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 81.48%
Permit Inspection History *Refer to Individual Inspection Report for more Details
08/06/2013PassBret StoddardElectrical Underground Inspection
Approved for cover-level 1 parking floor.Inspector Comments:
08/20/2013PassBret StoddardElectrical Underground Inspection
Approved for cover in ceiling of level 1 and floor of level 2, concrete being placed
at 4:00AM tomorrow.
Inspector Comments:
08/27/2013PassBret StoddardElectrical Underground Inspection
Approved for cover-underground/deck-lights and horn strobes for second level
ceiling.
Inspector Comments:
09/12/2013PassBret StoddardElectrical Underground Inspection
Approved for cover-underground/concrete of ceiling level 2 and floor level 3.Inspector Comments:
09/25/2013PassBret StoddardElectrical Underground Inspection
Approved to place concrete on level 2 ceiling/level 3 floor for electrical and fire
alarm conduits(ENT), also Approved for cover in the temporary construction walls
in the framed areas for the construction offices in the lowest level of the parking
garage structure-all outlets must be GFCI protected and will be as per Nathan
with Standard electric as they are powering them up with a GFCI protected
"spider" box.
Inspector Comments:
10/10/2013PassBret StoddardElectrical Underground Inspection
Approved for cover-level 4 floor concrete deck.Inspector Comments:
10/24/2013PassBret StoddardElectrical Underground Inspection
Approved for cover in the concrete deck for electrical and fire alarm conduits,
level 4 floor and third level ceiling.
Inspector Comments:
11/05/2013PassBret StoddardElectrical Underground Inspection
Approved for cover on 5th floor-fourth ceiling for fire alarm and electrical wiring
conduits in concrete slab.
Inspector Comments:
11/14/2013PassBret StoddardElectrical Underground Inspection
Approved for cover for electrical and fire alarm wiring conduits installed in the 5th
level floor and the fourth level ceiling. Ticket was written for building B originally.
Inspector Comments:
Page 1 of 5
(Continued)
Permit Details Permit Number: 13-00186
141 S 1st W - NorthPointe Parking Garage
141 S 1st W
New Commercial Building
Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm
Permit
Inspection
Summary
09/30/2014N/AJoel GrayPublic Works Final Inspection
No final inspection needed, per Joel Gray. He will require all items to be
complete that are outstanding prior to the North Pointe Retail building receiving a
C of O.
Inspector Comments:
09/30/2014N/ANatalie PowellPlanning and Zoning Final Inspection
No P&Z final needed until the NorthPointe Retail building is finaled.Inspector Comments:
Page 2 of 5
(Continued)
Permit Details Permit Number: 13-00186
141 S 1st W - NorthPointe Parking Garage
141 S 1st W
New Commercial Building
Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm
Permit
Inspection
Summary
Building Inspection Type
04/07/2014FailQuinton OwensBuilding Final
*Barrier required at level of exit discharge (both stair wells). Gap at end of
guardrails is larger than 4 inches. No exit sign on 5th flr SE corner. Top tread
needs repair by door to lvl 2, SE stairs. Stair 2, lvl 1, "exit this floor" has exit sign
outside pointing to door. How are 2 exits accomplished for each tier (level of
protection for emergency exit out south stair?).
Rated shafts need to have rating protection at expansion joints. Tag on rated
door to SW utility,level 2, is missing (others painted over). SW utility rooms,
alarm cover still on (ongoing work creating dust?).
Inspector Comments:
08/28/2014FailQuinton OwensCommercial Building Final
Fire rate gap in wall at all levels where it is required to be rated and weather
sealed at top level. Seal pvc pipe penetration South end top level. Fire rate
sprinkler penetration in garage wall & penetrations on rated wall in utility rooms
(all levels) and elevator shaft (B level). Seal pipe penetrations in fire riser room
at basement level. Stair exiting guard is at wrong level on North stairway.
Remove directional arrow on exit sign by West parking entrance. Finish painting
parking stalls and required pedestrian walkways including crosswalk & egress at
west entrance.
Inspector Comments:
09/30/2014PassQuinton OwensCommercial Building Final
previous deficiencies have been completed.Inspector Comments:
10/23/2017PassQuinton OwensCommercial Footing Inspection
5/17/13: South side footing & large spot footings on west side (Rebar as per
plans) - approved.
5/24/13: Footing rebar as per plans - approved.
6/10/13: 3 spot footings in SE corner - approved.
6/14/13: NE corner footing - approved.
7-1-13: Slab on grade (Bottom parking level)
7-3-13: Footings approved
Inspector Comments:
All concrete: walls, columns, and slabs - foundation to top level.Inspector Comments:
Page 3 of 5
(Continued)
Permit Details Permit Number: 13-00186
141 S 1st W - NorthPointe Parking Garage
141 S 1st W
New Commercial Building
Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm
Permit
Inspection
Summary
10/23/2017PassQuinton OwensFoundation Inspection
6/3/13: Elevator walls and exterior walls and columns - rebar as per plans
(approved)
6/10/13: Exterior wall between grids D & C - approved.
6/26/13: North wall Grid B (approx) to between 4 & 3. Make correction to corner
bar layout. - approved
8/6/13: South east corner slob on deck and Elevator shaft wall - approved
8/9: Stair walls (NE corner) - approved
8/12/13: Walls & Columns - approved
8/14: Rebar on East side - approved
8/15: East wall on 2nd level - approved
8/19: Slab & wall- approved
8/20: Wall -approved
8/23: Wall (CSW10): 2 #5 Vrt @ 16" oc & 2 #4 Hrz @16" oc
8/27: Slab -approved
8/28: East partition wall (South of Ctr shear wall) #5 Vrt @ 12" oc & #4 Hrz @
14" oc.
8/29: West wall (South half)- #5 Vrt @16" oc and #4 Hrz @ 12" oc w/ #5 at T&B
9/3: South wall- #5 Vrt @16" oc and #4 Hrz @ 12" oc w/ #5 at T&B
9/4: Elevator walls - approved
9/5: Walls (SW corner) approved
9/6: Walls (SE corner, 3rd floor)- 2 #4 Hrz @ 16" oc & 2 #5 Vrt @ 16" oc (corner
bars correct)-approved
9/10: Shear wall (East side) - approved.
9/11: Wall - approved
9/12: Wall - approved/ Slab on deck (3rd level)- approved
9/18: Shear wall - approved
9/24: Shear wall - approved
9/25: Slab on deck - approved
9/27/13: Wall on SE corner (Rebar as per plans)
10/2/13: Elevator shaft wall 2 #4 Hrz @ 16" w/2 #5 Top & Btm & #5 Vrt @ 16"
(approved)
10/4: SE corner shear wall and columns: Approved for pour.
10/8: Parapet wall on North (East end) & Wall on North Stairs approved.
10/10: 2nd request for inspection done on 10/8 (All forms up and rebar clearance
approved).
10/21: West wall (south end, level 4), Stairs' inner walls (SE corner level 4)
10/23: Rebar at South end (level 4)- approved.
11/6: ? approved
1/14/14: ? approved
1/15: Stem Wall: 2 rows of #4 between #5 bar T&B with #5 Vrt @12" oc. -
approved
Inspector Comments:
Page 4 of 5
(Continued)
Permit Details Permit Number: 13-00186
141 S 1st W - NorthPointe Parking Garage
141 S 1st W
New Commercial Building
Permit Status of (Open) as of Report Date: 11/27/2019 1:33 pm
Permit
Inspection
Summary
Electrical Inspection Type
12/05/2013PassBret StoddardElectrical Underground Inspection
Approved for cover-underground conduits on the highest level(last) of parking
structure.
Inspector Comments:
02/11/2014PassBret StoddardResidential Electrical Service Inspection
04/08/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-parking structure only.Inspector Comments:
07/02/2014PassBret StoddardCOM & MFR Electrical Service Inspection
Fire Inspection Type
04/11/2014PassBret StoddardFire Alarm Final Inspection
04/23/2014PassDale PickeringFire Sprinkler Rough-in
4/8 #200 Hydro on dry system @ 1100 & 1315
Riser 1#215, #215
2 #219, #224
3 #216, #220
4 #217, #216
5 #221, #221
6 #218, #217
7 #216, #216
Inspector Comments:
04/23/2014PassDale PickeringFire Sprinkler Final Inspection
04/23/2014PassDale PickeringFire Department Final Inspection
Mechanical Inspection Type
04/07/2014PassQuinton OwensHVAC Final Inspection
HVAC All good for c/oInspector Comments:
Plumbing Inspection Type
07/18/2013PassDon AllenPlumbing Underground Inspection
Good on ground work.Inspector Comments:
09/30/2014N/ADon AllenPlumbing Final Inspection
Plumbing final not needed, per phone call with Don Allen.Inspector Comments:
Page 5 of 5