Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00179 - 60 S 5th W - Kennedy Elementary Addition & RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 11/26/2019 4:58 pm Permit Details Permit Number: 13-00179 Kennedy Elementary Addition & Remodel 60 S 5th W Commercial - Addition Permit Issued Date: 07/02/2013 Permit Inspection Statistics 32Total Inspections Completed: 24Total Inspections Passed: Inspection Pass Rate: 75.00% Permit Inspection History *Refer to Individual Inspection Report for more Details 05/23/2013PassQuinton OwensFooting Inspection 06/03/2013PassBret StoddardElectrical Underground Inspection 5/24,QO: Partial Foundation (South,West, & NW corner)rebar per plans.Inspector Comments: 5/29,QO: Remaining Foundation. Rebar per plans. Some bars do not have clearance; Forsgren on site to confirm correction. Inspector Comments: 06/11/2013PassQuinton OwensFoundation Inspection 6/11,QO: Interior footings/Slab. Rebar per plans. OK to pour.Inspector Comments: 07/19/2013PassDon AllenPlumbing Underground Inspection 07/23/2013PassBret StoddardElectrical Rough-in 08/08/2013PassJoel GrayPlumbing Water 08/12/2013PassTed DyeFraming/Structure Inspection 7/15,QO: Sheathing in hallway for masonry backing. OK to cover.Inspector Comments: 08/12/2013PassTed DyeSheeting 08/23/2013PassBret StoddardElectrical Rough-in Approved for cover-ceilings in the hallway and classrooms. J-box missing cover in the SW room-installing before left, inspected the electrical service on this inspection also(already energized). Inspector Comments: 08/23/2013PassBret StoddardElectrical Service Inspection Approved to remain energized for permanent power, inspected the electrical service on the ceiling inspection. Inspector Comments: 09/10/2013PassQuinton OwensHVAC Rough-in No request for rough mechanical inspection above ceilings. Approved based on that area being in the thermal envelope (no insulation required) and most duct is in the attic area. Inspector Comments: 09/11/2013PassBret StoddardElectrical Final Inspection Gym area not ready, several open junction boxes, panels not accessible to verify labeling, unable to verify GFCI protection on drinking fountains as water was not on, call for a re-inspect when ready. Inspector Comments: 09/11/2013PassDon AllenPlumbing Rough-in Page 1 of 3 (Continued) Permit Details Permit Number: 13-00179 Kennedy Elementary Addition & Remodel 60 S 5th W Commercial - Addition Permit Status of (Open) as of Report Date: 11/26/2019 4:58 pm Permit Inspection Summary 09/13/2013PassBret StoddardElectrical Final Inspection Approved for a temporary final for the classrooms only, the gym and upper level not done, inspected the fire alarm on this inspection (9/12 & 9/13)-witnessed the fire alarm signalling and initiating devices in the classrooms and hallways only, no 24 hour/ 5 minute test done, flow switch not tied into gong, not approved for a final-fire alarm system. Call for a re-inspect when ready. Inspector Comments: 10/17/2013FailBret StoddardElectrical Final Inspection Electrical junction boxes need covers and switches not done throughout the entire upstairs area and gym area. Inspector Comments: 10/17/2013FailBret StoddardFire Alarm Final Inspection Final fire alarm report not done yet, map of zones not done from fire alarm contractor for new portion-addition, horn strobe not mounted in the mechanical room upstairs, inspected the fire alarm on the final electrical inspection. 24 hour/5 minute test witnessed at 4:00PM 10/16-as per Troy with Omni shut off A/C power, 4:10PM 10/17 tested and restored A/C, witnessed operation of 2 duct detectors, 3 manual pull stations in gym area, and 2 tamper switches on the fire riser, also horn strobe operation upstairs and in gym area. Inspector Comments: 10/18/2013FailQuinton OwensBuilding Final 10/18: Handrails required at Accessible ramp (8% slope max). Where is tag for gas regulator? Regulator installed sideways without venting. Handrail non-compliant on North side of stairs (extension). 4 vents through roof not properly sealed (silicone instead of roofing membrane) Inspector Comments: 10/18/2013FailQuinton OwensHVAC Final Inspection 10/18: Tag missing on gas regulator installed sideways.Inspector Comments: 10/18/2013FailDale PickeringFire Sprinkler Final Inspection Seismic bracing missing in gymInspector Comments: 10/18/2013FailDale PickeringFire Department Final Inspection Storz required, Hydrant facing fie lane, service fire extinguishers, knox boxes missing, Riser Room signage Inspector Comments: 10/24/2013PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O.-zone map in main fire alarm panel, report in file from fire alarm contractor, horn added in mechanical room upstairs, inspected the electrical on this inspection also. Inspector Comments: 10/24/2013PassBret StoddardElectrical Final Inspection Approved for a final and C.O.-addition-inspected the fire alarm on this inspection also. Inspector Comments: 11/04/2013PassDale PickeringFire Department Final Inspection 11/04/2013PassDale PickeringFire Sprinkler Final Inspection Page 2 of 3 (Continued) Permit Details Permit Number: 13-00179 Kennedy Elementary Addition & Remodel 60 S 5th W Commercial - Addition Permit Status of (Open) as of Report Date: 11/26/2019 4:58 pm Permit Inspection Summary 11/20/2013PassSAUREY AMANDAInsulation Inspection No Insulation inspection was requested. We requested an insulation certificate from Barry Hayes Construction. They provided the certificate and approved the values. Inspector Comments: 11/20/2013PassTed DyeSheetrock/Drywall Inspection 7-26 Drywall 2nd floor hallway ceiling OK Rm A113 drywall OK to tape 7-29 Southwest class room ready for tape South entry ready for tape 7-30 South middle drywall approved for tape East class room approved for tape Inspector Comments: 08/25/2014PassDon AllenPlumbing Final Inspection All good for c/oInspector Comments: Building Inspection Type 08/25/2014FailQuinton OwensCommercial Building Final mechanical area not having access to public (likely only to be a few individuals at most for occasional maintenance), handrail on North is approved without extension with South handrail meeting required length. temporary paper bathroom signs not yet replaced. all other previous items are completed. Inspector Comments: 08/26/2014PassQuinton OwensCommercial Building Final 08/26/2014PassQuinton OwensSidewalk Inspection Sidewalks for discharge are completed. Handrail installed at ADA ramp at East entrance to addition. Inspector Comments: Mechanical Inspection Type 09/10/2013FailQuinton OwensCommercial Building Final 9/10: Ductwork only (classroom). Mechanical level Ductwork approved. Duct work above main level ceiling covered & could not inspect. Exhaust air from Restrooms goes through heat exchanger but is also connected to other return air duct (must exhaust outside). Remainder of mechanical level to be completed. Inspector Comments: 08/25/2014PassQuinton OwensHVAC Final Inspection gas pressure regulator is allowed in any position without venting to outside. heat exchanger pulling air from bathrooms and gym approved. mechanical final approved. Inspector Comments: Page 3 of 3