Loading...
HomeMy WebLinkAboutREVISED TRUSS PLANS - M19-00021 - Page - 2428 Little Town Dr - New SFRLUS24 LUS24 THJA26 THJA26 THJA26 HUS28LUS26 L U S 24 LUS24 L U S 24 L U S 24 LUS26 LUS24 L U S 26LUS24 L U S 24 LUS24 LUS26 LUS24 L U S 24 HH U S 2 8 -2 L U S 26 LUS26 L U S 24 HUS26 L U S 26 LUS24 HUS26 HUS26 L U S 24 LUS26 HUS26 L U S 24 HU S2 6 L U S 24 L U S 24LUS26LUS24 L U S 24 LUS24 LUS26 L U S 24 LUS24 LUS24 L U S 24 LUS26 LUS24 LUS24 L U S 24 HH U S 2 8 -2 HU S2 6 HUS26 L U S 26 L U S 24 LUS24 L U S 24 T H J A2 6 HGUS28-2 32 '11 "6 35 '6" 13 '9" 13 '3 "8 4 '1 "12 5' 4 '1 "12 10'2"14 15 '3" 3' 3' 3'3' 40'5" 20' 18'1" 22 ' 16'8"26'4" 29 '10 " 30 '2 "1 11'6" 11 ' 12'17'10"12 4 '10 " 37 '10 " 15' 13 '6 "8 8' 8' 43' 20'17' 10'6"9'3" 4 '9" 17 '3 "15 STAIRS C .L . O F 66 " W I ND OW BE A M D O WN VAULT C A N T I L EV E R LADDER FRAME BY OTHERS 5:12 VAULT CANTILEVER 12" COFFERFURR ASNEEDED FIELD FRAMEGABLE END FIELD FRAMEGABLE END VAULT B 06 B C 03 E02 E02 B11 E02(6) J 02 J02 J 02 J02 J 01 J01 J 01 J01 J 03 J03 J03 J 03 D 01 D 02 J C 01 J C 01 HD D 03 (3) D 04 (3) D 05 A 11 C01 C04 C05 C06 C07 CC3 CC2 C02(6) C03(8) F01 F03 F02(5) CC1(16) H01 H02 H03 G03 G05 G02(2) G04(2) J 01 J01 J02A J 0 2A B 01 B 02 B 03 B 04 B 05 JC02 J03A J 0 3A HB J02 J 02 J01 J 01 J03 J 03JC01B07 B08 B09 BC01 BC02 J 05 A 01 A 02 A 03 A 04 A 05 A C 01 A C 02 A C 03 A C 04 A C 05 A 06 (2) A 07 (3) A 08 (3) A 09 A 10 (8) B10(2) A C 06 (2) A C 07 (3) J04(4) J04(3) J 04 (2) J04A(2) PAGE NO: 1 OF 1 JOB NO: MAQ190012 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.75" o.c.Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 12.00 TC: From 17 plf at 12.00 to 17 plf at 21.71 BC: From 20 plf at 0.00 to 20 plf at 6.96 BC: From 5 plf at 6.96 to 5 plf at 21.54 BC: From 10 plf at 21.54 to 10 plf at 21.71 BC: 537 lb Conc. Load at 6.96, 8.96 BC: 524 lb Conc. Load at 10.96 BC: 1921 lb Conc. Load at 11.85 BC: 1026 lb Conc. Load at 13.85,15.85,17.85,19.85 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=21'5"9 uses the followingsupport conditions: 21'5"9Bearing G (21'5"9, 10'1"2) HHUS28-2 Supporting Member: (2)2x8 DF-L SS (22) 0.148"x3" nails into supporting member, (8) 0.148"x3" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 5023 /-/-/843 /536 /345 G 3799 /-/-/305 /202 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =2.3 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 263 -85 B - C 127-1146 C - D 63 -845 Chords Tens.Comp. D - E 77 -974 E - F 14 -41 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 93 -144 K - J 9 -169 J - I 9 -169 Chords Tens.Comp. I - H 827 -83 H - G 697 -53 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 243-1925 B - I 1293 -127 C - I 494 -152 C - H 104 0 Webs Tens.Comp. H - D 47 -460 H - E 1898 -133 E - G 121 -1583 F - G 14 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.046D 999 240 VERT(CL): 0.077D 999 240 HORZ(LL): 0.024C - - HORZ(TL): 0.041C - - Creep Factor: 2.0 Max TC CSI: 0.275 Max BC CSI: 0.654 Max Web CSI: 0.838 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A01 Ply: 2 Qty:1 Wgt: 400.4 lbs SEQN: 7700 / T5 / SPEC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 (a) A B C D E F GHIJK 10 12 3X4(A1) 3X4 4X8 4X6 4X6 4X8(R)6X10 4X6 6X12 2X3 3X6(R) 6'4"2 15'4"7 (J)Supporting Member: (2) 2x6 DF-L #2 6'6"14 6'6"14 12' 5'5"2 15'9"8 3'9"8 16'6"2 8"10 21'8"9 5'2"7 6'6"146'6"14 12'5'5"2 15'9"83'9"8 21'8"95'11"1 4"13 11 ' 10 '4 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.75" o.c.Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 12.00 TC: From 17 plf at 12.00 to 17 plf at 21.71 BC: From 20 plf at 0.00 to 20 plf at 6.96 BC: From 5 plf at 6.96 to 5 plf at 21.54 BC: From 10 plf at 21.54 to 10 plf at 21.71 BC: 537 lb Conc. Load at 6.96, 8.96 BC: 524 lb Conc. Load at 10.96 BC: 1921 lb Conc. Load at 11.85 BC: 1026 lb Conc. Load at 13.85,15.85,17.85,19.85 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=21'5"9 uses the followingsupport conditions: 21'5"9Bearing G (21'5"9, 10'1"2) HHUS28-2 Supporting Member: (2)2x8 DF-L SS (22) 0.148"x3" nails into supporting member, (8) 0.148"x3" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 5023 /-/-/843 /536 /345 G 3799 /-/-/305 /202 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =2.3 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 263 -85 B - C 127-1146 C - D 63 -845 Chords Tens.Comp. D - E 77 -974 E - F 14 -41 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 93 -144 K - J 9 -169 J - I 9 -169 Chords Tens.Comp. I - H 827 -83 H - G 697 -53 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 243-1925 B - I 1293 -127 C - I 494 -152 C - H 104 0 Webs Tens.Comp. H - D 47 -460 H - E 1898 -133 E - G 121 -1583 F - G 14 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.046D 999 240 VERT(CL): 0.077D 999 240 HORZ(LL): 0.024C - - HORZ(TL): 0.041C - - Creep Factor: 2.0 Max TC CSI: 0.275 Max BC CSI: 0.654 Max Web CSI: 0.838 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A01 Ply: 2 Qty:1 Wgt: 400.4 lbs SEQN: 7700 / T5 / SPEC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 (a) A B C D E F GHIJK 10 12 3X4(A1) 3X4 4X8 4X6 4X6 4X8(R)6X10 4X6 6X12 2X3 3X6(R) 6'4"2 15'4"7 (J)Supporting Member: (2) 2x6 DF-L #2 6'6"14 6'6"14 12' 5'5"2 15'9"8 3'9"8 16'6"2 8"10 21'8"9 5'2"7 6'6"146'6"14 12'5'5"2 15'9"83'9"8 21'8"95'11"1 4"13 11 ' 10 '4 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=21'5"9 uses the following support conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1369 /-/-/865 /-/287 G 617 /-/-/282 /26 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 525 -170 B - C 10 -402 C - D 45 -357 Chords Tens.Comp. D - E 36 -191 E - F 36 -190 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 182 -283 K - J 0 -328 J - I 0 -328 Chords Tens.Comp. I - H 204 -112 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 94-1198 B - I 535 0 D - I 35 -265 D - H 206 -37 Webs Tens.Comp. E - H 0 -336 H - F 490 -92 F - G 69 -578 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018K 999 240 VERT(CL): 0.032K 999 240 HORZ(LL):-0.005D - - HORZ(TL): 0.010B - - Creep Factor: 2.0 Max TC CSI: 0.560 Max BC CSI: 0.222 Max Web CSI: 0.683 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A02 Ply: 1 Qty:1 Wgt: 175.0 lbs SEQN: 7647 / T11 / COMN FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F GHIJK 10 12 3X4(B1) 2X3 3X6 3X4 3X4 6X6 3X4 2X3 3X8 3X4 2X3 6'4"2 15'4"7 (J)Supporting Member: (2) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=21'5"9 uses the following support conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1369 /-/-/865 /-/287 G 617 /-/-/282 /26 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 525 -170 B - C 10 -402 C - D 45 -357 Chords Tens.Comp. D - E 36 -191 E - F 36 -190 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 182 -283 K - J 0 -328 J - I 0 -328 Chords Tens.Comp. I - H 204 -112 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 94-1198 B - I 535 0 D - I 35 -265 D - H 206 -37 Webs Tens.Comp. E - H 0 -336 H - F 490 -92 F - G 69 -578 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018K 999 240 VERT(CL): 0.032K 999 240 HORZ(LL):-0.005D - - HORZ(TL): 0.010B - - Creep Factor: 2.0 Max TC CSI: 0.560 Max BC CSI: 0.222 Max Web CSI: 0.683 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A02 Ply: 1 Qty:1 Wgt: 175.0 lbs SEQN: 7647 / T11 / COMN FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F GHIJK 10 12 3X4(B1) 2X3 3X6 3X4 3X4 6X6 3X4 2X3 3X8 3X4 2X3 6'4"2 15'4"7 (J)Supporting Member: (2) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=21'5"9 uses the following support conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1369 /-/-/865 /-/319 G 617 /-/-/289 /71 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 525 -170 B - C 10 -402 C - D 45 -357 Chords Tens.Comp. D - E 45 -191 E - F 45 -190 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 182 -283 K - J 0 -309 J - I 0 -309 Chords Tens.Comp. I - H 204 -115 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 86-1198 B - I 535 0 D - I 34 -265 D - H 183 -37 Webs Tens.Comp. E - H 0 -336 H - F 490 -116 F - G 89 -578 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018K 999 240 VERT(CL): 0.032K 999 240 HORZ(LL):-0.006D - - HORZ(TL): 0.010B - - Creep Factor: 2.0 Max TC CSI: 0.560 Max BC CSI: 0.222 Max Web CSI: 0.683 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A03 Ply: 1 Qty:1 Wgt: 175.0 lbs SEQN: 7669 / T38 / COMN FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F GHIJK 10 12 3X4(B1) 2X3 3X6 3X4 3X4 6X6 3X4 2X3 3X8 3X4 3X4 6'4"2 15'4"7 (J) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=21'5"9 uses the following support conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1369 /-/-/865 /-/319 G 617 /-/-/289 /71 /- Wind reactions based on MWFRS K Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing K is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 525 -170 B - C 10 -402 C - D 45 -357 Chords Tens.Comp. D - E 45 -191 E - F 45 -190 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - K 182 -283 K - J 0 -309 J - I 0 -309 Chords Tens.Comp. I - H 204 -115 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - B 86-1198 B - I 535 0 D - I 34 -265 D - H 183 -37 Webs Tens.Comp. E - H 0 -336 H - F 490 -116 F - G 89 -578 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018K 999 240 VERT(CL): 0.032K 999 240 HORZ(LL):-0.006D - - HORZ(TL): 0.010B - - Creep Factor: 2.0 Max TC CSI: 0.560 Max BC CSI: 0.222 Max Web CSI: 0.683 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A03 Ply: 1 Qty:1 Wgt: 175.0 lbs SEQN: 7669 / T38 / COMN FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F GHIJK 10 12 3X4(B1) 2X3 3X6 3X4 3X4 6X6 3X4 2X3 3X8 3X4 3X4 6'4"2 15'4"7 (J) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=21'5"9 uses the followingsupport conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L*140 /-/-/94 /-/40 I 598 /-/-/285 /-/- G 226 /-/-/107 /32 /- Wind reactions based on MWFRS L Brg Width = 100 Min Req =- I Brg Width = 4.2 Min Req =1.5 G Brg Width = -Min Req =- Bearings L & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 519 -164 B - C 51 -154 C - D 202 -142 Chords Tens.Comp. D - E 98 -58 E - F 26 -24 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 176 -284 L - K 176 -277 K - J 0 -336 Chords Tens.Comp. J - I 0 -79 I - H 24 -28 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 4 -871 B - J 360 0 D - J 40 -242 D - I 112 -125 Webs Tens.Comp. I - E 0 -467 E - H 142 0 H - F 65 -68 F - G 44 -188 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.72 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.020L 999 240 VERT(CL): 0.034L 999 240 HORZ(LL):-0.008D - - HORZ(TL): 0.014D - - Creep Factor: 2.0 Max TC CSI: 0.611 Max BC CSI: 0.210 Max Web CSI: 0.492 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A04 Ply: 1 Qty:1 Wgt: 191.8 lbs SEQN: 7661 / T24 / COMN FROM:DRW: .../...07/31/2019 W1 (a)(a)(a)(a) (a) A B C D E F GHIJKL 10 12 3X4(B1) 2X3 3X4 3X4 3X4 4X8 3X4 3X4 3X4 3X4 3X4 2X3 6'4"2 8'6"6 6'10"1 (J) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 14'10"8 2'1"14 17'2"10 2'4"2 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=21'5"9 uses the followingsupport conditions: 21'5"9Bearing G (21'5"9, 10'1"2) LUS24 Supporting Member: (2)2x8 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L*140 /-/-/94 /-/40 I 598 /-/-/285 /-/- G 226 /-/-/107 /32 /- Wind reactions based on MWFRS L Brg Width = 100 Min Req =- I Brg Width = 4.2 Min Req =1.5 G Brg Width = -Min Req =- Bearings L & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 519 -164 B - C 51 -154 C - D 202 -142 Chords Tens.Comp. D - E 98 -58 E - F 26 -24 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 176 -284 L - K 176 -277 K - J 0 -336 Chords Tens.Comp. J - I 0 -79 I - H 24 -28 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 4 -871 B - J 360 0 D - J 40 -242 D - I 112 -125 Webs Tens.Comp. I - E 0 -467 E - H 142 0 H - F 65 -68 F - G 44 -188 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.72 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.020L 999 240 VERT(CL): 0.034L 999 240 HORZ(LL):-0.008D - - HORZ(TL): 0.014D - - Creep Factor: 2.0 Max TC CSI: 0.611 Max BC CSI: 0.210 Max Web CSI: 0.492 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A04 Ply: 1 Qty:1 Wgt: 191.8 lbs SEQN: 7661 / T24 / COMN FROM:DRW: .../...07/31/2019 W1 (a)(a)(a)(a) (a) A B C D E F GHIJKL 10 12 3X4(B1) 2X3 3X4 3X4 3X4 4X8 3X4 3X4 3X4 3X4 3X4 2X3 6'4"2 8'6"6 6'10"1 (J) 6'6"4 6'6"4 12'8"10 6'2"6 17'2"10 4'5"15 21'8"9 4'5"15 6'6"4 6'6"4 12'8"10 6'2"6 14'10"8 2'1"14 17'2"10 2'4"2 21'8"9 4'5"15 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2, W3, W5 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Additional Notes Negative reaction(s) of -454# MAX. from a non-windload case requires uplift connection. See Maximum Reactions. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 106 /-454 /-/266 /220 /383 L 1722 /-/-/1060/312 /- G 459 /-/-/266 /31 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req =1.5 L Brg Width = 5.5 Min Req =1.5 G Brg Width = 3.0 Min Req =1.5 Bearings A, L, & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 876 -546 B - C 6 -238 C - D 61 -223 Chords Tens.Comp. D - E 329 -1128 E - F 393 -1145 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 22 -617 L - K 18 -603 K - J 18 -603 Chords Tens.Comp. J - I 2 -1 H - G 36 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 452-1533 B - J 873 -116 D - J 308 -607 D - H 1130 -345 J - H 162 -198 Webs Tens.Comp. E - H 24 -336 H - I 40 0 H - F 1136 -400 F - G 71 -401 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.55 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.067E 999 240 VERT(CL): 0.118E 999 240 HORZ(LL): 0.059G - - HORZ(TL): 0.105G - - Creep Factor: 2.0 Max TC CSI: 0.621 Max BC CSI: 0.296 Max Web CSI: 0.874 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A05 Ply: 1 Qty:1 Wgt: 161.0 lbs SEQN: 7645 / T6 / COMN FROM:DRW: .../...07/31/2019 W2 W3 W5 W3 (a) A B C D E F GH IJKL 10 12 3X4(B1) 2X3 4X6 3X4 3X4 6X6 3X10 2X3 12X12 2X3 4X4 2X3 6'6"14 15'4"11 6'6"4 6'6"4 12'8"10 6'2"6 16'3"10 3'7" 21'11"9 5'7"15 6'6"4 6'6"4 12'8"10 6'2"6 16'3"10 3'7" 21'11"9 5'7"15 4"13 9 '1" 1 '11 " 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2, W3, W5 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Additional Notes Negative reaction(s) of -454# MAX. from a non-windload case requires uplift connection. See Maximum Reactions. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 106 /-454 /-/266 /220 /383 L 1722 /-/-/1060/312 /- G 459 /-/-/266 /31 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req =1.5 L Brg Width = 5.5 Min Req =1.5 G Brg Width = 3.0 Min Req =1.5 Bearings A, L, & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 876 -546 B - C 6 -238 C - D 61 -223 Chords Tens.Comp. D - E 329 -1128 E - F 393 -1145 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 22 -617 L - K 18 -603 K - J 18 -603 Chords Tens.Comp. J - I 2 -1 H - G 36 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 452-1533 B - J 873 -116 D - J 308 -607 D - H 1130 -345 J - H 162 -198 Webs Tens.Comp. E - H 24 -336 H - I 40 0 H - F 1136 -400 F - G 71 -401 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.55 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.067E 999 240 VERT(CL): 0.118E 999 240 HORZ(LL): 0.059G - - HORZ(TL): 0.105G - - Creep Factor: 2.0 Max TC CSI: 0.621 Max BC CSI: 0.296 Max Web CSI: 0.874 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A05 Ply: 1 Qty:1 Wgt: 161.0 lbs SEQN: 7645 / T6 / COMN FROM:DRW: .../...07/31/2019 W2 W3 W5 W3 (a) A B C D E F GH IJKL 10 12 3X4(B1) 2X3 4X6 3X4 3X4 6X6 3X10 2X3 12X12 2X3 4X4 2X3 6'6"14 15'4"11 6'6"4 6'6"4 12'8"10 6'2"6 16'3"10 3'7" 21'11"9 5'7"15 6'6"4 6'6"4 12'8"10 6'2"6 16'3"10 3'7" 21'11"9 5'7"15 4"13 9 '1" 1 '11 " 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W5, W6 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 494 /-/-/220 /-/412 M 634 /-/-/417 /47 /- J 793 /-/-/469 /168 /- H 156 /-/-/79 /-/- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 J Brg Width = 5.5 Min Req =1.5 H Brg Width = 3.0 Min Req =1.5 Bearings B, M, J, & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 66 -330 C - D 0 -357 Chords Tens.Comp. D - E 9 -304 E - F 40 -135 F - G 8 -37 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 155 -183 M - L 160 -184 L - K 160 -184 Chords Tens.Comp. K - J 147 -93 I - H 10 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 140 -485 C - K 156 -86 E - K 217 -50 E - J 218 -352 Webs Tens.Comp. J - I 39 -438 F - I 54 -394 I - G 3 -6 G - H 0 -116 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.005K 999 240 VERT(CL): 0.009K 999 240 HORZ(LL):-0.005H - - HORZ(TL): 0.009M - - Creep Factor: 2.0 Max TC CSI: 0.394 Max BC CSI: 0.251 Max Web CSI: 0.275 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A06 Ply: 1 Qty:2 Wgt: 155.4 lbs SEQN: 7657 / T65 / COMN FROM:DRW: .../...07/31/2019 W1 W5 W6 (a) (a) (a) A B C D E F G HI JKLM 10 12 3X4(A1) 2X3 3X4 3X4 3X4 4X6 3X4 3X6(R) 2X3 4X4 3X4 2X3 6'6"14 11'3"7 4'1"4 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 21'11"9 3'10"8 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 21'11"9 3'10"81'4" 4"13 9'1 " 1'1 1 " 11 ' 12 ' 1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W5, W6 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 494 /-/-/220 /-/412 M 634 /-/-/417 /47 /- J 793 /-/-/469 /168 /- H 156 /-/-/79 /-/- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 J Brg Width = 5.5 Min Req =1.5 H Brg Width = 3.0 Min Req =1.5 Bearings B, M, J, & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 66 -330 C - D 0 -357 Chords Tens.Comp. D - E 9 -304 E - F 40 -135 F - G 8 -37 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 155 -183 M - L 160 -184 L - K 160 -184 Chords Tens.Comp. K - J 147 -93 I - H 10 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 140 -485 C - K 156 -86 E - K 217 -50 E - J 218 -352 Webs Tens.Comp. J - I 39 -438 F - I 54 -394 I - G 3 -6 G - H 0 -116 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.005K 999 240 VERT(CL): 0.009K 999 240 HORZ(LL):-0.005H - - HORZ(TL): 0.009M - - Creep Factor: 2.0 Max TC CSI: 0.394 Max BC CSI: 0.251 Max Web CSI: 0.275 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A06 Ply: 1 Qty:2 Wgt: 155.4 lbs SEQN: 7657 / T65 / COMN FROM:DRW: .../...07/31/2019 W1 W5 W6 (a) (a) (a) A B C D E F G HI JKLM 10 12 3X4(A1) 2X3 3X4 3X4 3X4 4X6 3X4 3X6(R) 2X3 4X4 3X4 2X3 6'6"14 11'3"7 4'1"4 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 21'11"9 3'10"8 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 21'11"9 3'10"81'4" 4"13 9'1 " 1'1 1 " 11 ' 12 ' 1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W5, W6 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 494 /-/-/278 /-/452 M 634 /-/-/422 /40 /- J 795 /-/-/560 /231 /- H 157 /-/-/199 /38 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 J Brg Width = 5.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.5 Bearings B, M, J, & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 142 -331 C - D 47 -357 Chords Tens.Comp. D - E 82 -304 E - F 116 -192 F - G 207 -260 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 171 -194 M - L 173 -194 L - K 173 -194 Chords Tens.Comp. K - J 173 -144 I - H 11 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 140 -485 C - K 156 -86 E - K 217 -50 E - J 218 -352 Webs Tens.Comp. J - I 102 -440 F - I 54 -395 I - G 250 -221 G - H 59 -117 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.005K 999 240 VERT(CL): 0.009K 999 240 HORZ(LL):-0.008H - - HORZ(TL): 0.011H - - Creep Factor: 2.0 Max TC CSI: 0.394 Max BC CSI: 0.251 Max Web CSI: 0.853 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A07 Ply: 1 Qty:3 Wgt: 155.4 lbs SEQN: 7716 / T45 / COMN FROM:DRW: .../...07/31/2019 W1 W5 W6 (a) (a) (a) A B C D E F G HI JKLM 10 12 3X4(A1) 2X3 3X4 3X4 3X4 4X6 3X4 3X6(R) 2X3 4X4 3X4 2X3 6'6"14 11'3"7 4'1"12 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 22'0"1 3'11" 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 22'0"1 3'11"1'4" 4"13 9'1 " 1'1 1 " 11 ' 12 ' 1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W5, W6 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 494 /-/-/278 /-/452 M 634 /-/-/422 /40 /- J 795 /-/-/560 /231 /- H 157 /-/-/199 /38 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 J Brg Width = 5.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.5 Bearings B, M, J, & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 142 -331 C - D 47 -357 Chords Tens.Comp. D - E 82 -304 E - F 116 -192 F - G 207 -260 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 171 -194 M - L 173 -194 L - K 173 -194 Chords Tens.Comp. K - J 173 -144 I - H 11 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 140 -485 C - K 156 -86 E - K 217 -50 E - J 218 -352 Webs Tens.Comp. J - I 102 -440 F - I 54 -395 I - G 250 -221 G - H 59 -117 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.005K 999 240 VERT(CL): 0.009K 999 240 HORZ(LL):-0.008H - - HORZ(TL): 0.011H - - Creep Factor: 2.0 Max TC CSI: 0.394 Max BC CSI: 0.251 Max Web CSI: 0.853 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A07 Ply: 1 Qty:3 Wgt: 155.4 lbs SEQN: 7716 / T45 / COMN FROM:DRW: .../...07/31/2019 W1 W5 W6 (a) (a) (a) A B C D E F G HI JKLM 10 12 3X4(A1) 2X3 3X4 3X4 3X4 4X6 3X4 3X6(R) 2X3 4X4 3X4 2X3 6'6"14 11'3"7 4'1"12 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 22'0"1 3'11" 6'6"4 6'6"4 12'8"10 6'2"6 18'1"1 5'4"7 22'0"1 3'11"1'4" 4"13 9'1 " 1'1 1 " 11 ' 12 ' 1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 800 /-/-/421 /-/244 F 854 /-/-/410 /135 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 F Brg Width = 3.5 Min Req =1.5 Bearings A & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 9 -967 B - C 10 -533 Chords Tens.Comp. C - D 45 -489 D - E 1 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - I 651 -230 I - H 650 -230 Chords Tens.Comp. H - G 650 -230 G - F 282 -80 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - B 271 0 B - G 202 -495 D - G 530 -92 Webs Tens.Comp. D - F 194 -682 E - F 59 -165 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.79 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018I 999 240 VERT(CL): 0.030I 999 240 HORZ(LL): 0.010B - - HORZ(TL): 0.016B - - Creep Factor: 2.0 Max TC CSI: 0.393 Max BC CSI: 0.279 Max Web CSI: 0.421 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A08 Ply: 1 Qty:3 Wgt: 128.8 lbs SEQN: 7642 / T70 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a) A B C D E FGHI 10 12 3X4(B1) 2X3 3X4 3X4 3X4 4X6 3X4 2X3 3X6(R) 17'6"15 6'6"4 6'6"4 12'8"10 6'2"6 17'6"15 4'10"5 6'6"4 6'6"4 12'8"10 6'2"6 17'6"15 4'10"5 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 800 /-/-/421 /-/244 F 854 /-/-/410 /135 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 F Brg Width = 3.5 Min Req =1.5 Bearings A & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 9 -967 B - C 10 -533 Chords Tens.Comp. C - D 45 -489 D - E 1 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - I 651 -230 I - H 650 -230 Chords Tens.Comp. H - G 650 -230 G - F 282 -80 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - B 271 0 B - G 202 -495 D - G 530 -92 Webs Tens.Comp. D - F 194 -682 E - F 59 -165 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.79 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.018I 999 240 VERT(CL): 0.030I 999 240 HORZ(LL): 0.010B - - HORZ(TL): 0.016B - - Creep Factor: 2.0 Max TC CSI: 0.393 Max BC CSI: 0.279 Max Web CSI: 0.421 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A08 Ply: 1 Qty:3 Wgt: 128.8 lbs SEQN: 7642 / T70 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a) A B C D E FGHI 10 12 3X4(B1) 2X3 3X4 3X4 3X4 4X6 3X4 2X3 3X6(R) 17'6"15 6'6"4 6'6"4 12'8"10 6'2"6 17'6"15 4'10"5 6'6"4 6'6"4 12'8"10 6'2"6 17'6"15 4'10"5 4"13 11 ' **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 :B2 2x6 DF-L SS: Webs 2x4 DF-L #1&Bet. :W1 2x4 DF-L Stud::W2 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.50" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 13.42 TC: From 34 plf at 13.42 to 34 plf at 17.58 BC: From 20 plf at 0.00 to 20 plf at 13.42 BC: From 10 plf at 13.42 to 10 plf at 17.58 BC: 4734 lb Conc. Load at 13.42 BC: 1979 lb Conc. Load at 15.52 Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 2124 /-/-/409 /362 /367 F 5955 /-/-/507 /1012/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 F Brg Width = 3.5 Min Req =3.2 Bearings A & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 272-1483 B - C 257-1314 Chords Tens.Comp. C - D 241 -1264 D - E 24 -57 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - I 1096 -195 I - H 1096 -195 Chords Tens.Comp. H - G 1096 -195 G - F 893 -167 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - B 97 -3 B - G 103 -234 G - D 3049 -546 Webs Tens.Comp. D - F 486 -2594 E - F 25 -37 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.82 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053G 999 240 VERT(CL): 0.090G 999 240 HORZ(LL):-0.022E - - HORZ(TL): 0.038E - - Creep Factor: 2.0 Max TC CSI: 0.241 Max BC CSI: 0.841 Max Web CSI: 0.964 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A09 Ply: 2 Qty:1 Wgt: 296.8 lbs SEQN: 4600 / T44 / MONO FROM:DRW: .../...07/31/2019 2 Complete Trusses Required B2 W1 W2 (a) A B C D E FGHI 10 12 4X4(A1) 2X3 3X4 3X4 4X4 4X10(R) 6X10 2X3 3X10(R) 17'6"15 6'3"56'3"5 13'5"7'1"11 17'6"154'1"15 6'3"5 6'3"5 13'5" 7'1"11 17'6"15 4'1"15 4"13 15 '0 "9 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 :B2 2x6 DF-L SS: Webs 2x4 DF-L #1&Bet. :W1 2x4 DF-L Stud::W2 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.50" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 13.42 TC: From 34 plf at 13.42 to 34 plf at 17.58 BC: From 20 plf at 0.00 to 20 plf at 13.42 BC: From 10 plf at 13.42 to 10 plf at 17.58 BC: 4734 lb Conc. Load at 13.42 BC: 1979 lb Conc. Load at 15.52 Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 2124 /-/-/409 /362 /367 F 5955 /-/-/507 /1012/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 F Brg Width = 3.5 Min Req =3.2 Bearings A & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 272-1483 B - C 257-1314 Chords Tens.Comp. C - D 241 -1264 D - E 24 -57 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - I 1096 -195 I - H 1096 -195 Chords Tens.Comp. H - G 1096 -195 G - F 893 -167 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - B 97 -3 B - G 103 -234 G - D 3049 -546 Webs Tens.Comp. D - F 486 -2594 E - F 25 -37 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.82 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053G 999 240 VERT(CL): 0.090G 999 240 HORZ(LL):-0.022E - - HORZ(TL): 0.038E - - Creep Factor: 2.0 Max TC CSI: 0.241 Max BC CSI: 0.841 Max Web CSI: 0.964 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A09 Ply: 2 Qty:1 Wgt: 296.8 lbs SEQN: 4600 / T44 / MONO FROM:DRW: .../...07/31/2019 2 Complete Trusses Required B2 W1 W2 (a) A B C D E FGHI 10 12 4X4(A1) 2X3 3X4 3X4 4X4 4X10(R) 6X10 2X3 3X10(R) 17'6"15 6'3"56'3"5 13'5"7'1"11 17'6"154'1"15 6'3"5 6'3"5 13'5" 7'1"11 17'6"15 4'1"15 4"13 15 '0 "9 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing D (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 640 /-/-/309 /-/258 D 613 /-/-/383 /148 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 D Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 0 -706 Chords Tens.Comp. B - C 108 -173 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 449 -167 Chords Tens.Comp. E - D 447 -167 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - B 317 0 B - D 225 -601 Webs Tens.Comp. C - D 103 -168 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.03 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.007E 999 240 VERT(CL): 0.012E 999 240 HORZ(LL): 0.006E - - HORZ(TL): 0.011E - - Creep Factor: 2.0 Max TC CSI: 0.569 Max BC CSI: 0.336 Max Web CSI: 0.207 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A10 Ply: 1 Qty:8 Wgt: 86.8 lbs SEQN: 4326 / T52 / MONO FROM:DRW: .../...07/31/2019 W1 (a) (a) A B C DE 10 12 3X4(B1) 2X3 6X6 2X3 3X6(R) 13'3"8 (J) 6'9"11 6'9"11 13'3"8 6'5"13 6'9"11 6'9"11 13'3"8 6'5"13 4"13 11 '5 "12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing D (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 640 /-/-/309 /-/258 D 613 /-/-/383 /148 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 D Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 0 -706 Chords Tens.Comp. B - C 108 -173 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 449 -167 Chords Tens.Comp. E - D 447 -167 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - B 317 0 B - D 225 -601 Webs Tens.Comp. C - D 103 -168 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.03 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.007E 999 240 VERT(CL): 0.012E 999 240 HORZ(LL): 0.006E - - HORZ(TL): 0.011E - - Creep Factor: 2.0 Max TC CSI: 0.569 Max BC CSI: 0.336 Max Web CSI: 0.207 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A10 Ply: 1 Qty:8 Wgt: 86.8 lbs SEQN: 4326 / T52 / MONO FROM:DRW: .../...07/31/2019 W1 (a) (a) A B C DE 10 12 3X4(B1) 2X3 6X6 2X3 3X6(R) 13'3"8 (J) 6'9"11 6'9"11 13'3"8 6'5"13 6'9"11 6'9"11 13'3"8 6'5"13 4"13 11 '5 "12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing E (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 593 /-/-/316 /-/221 E 580 /-/-/349 /121 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 0 -673 B - C 0 -260 Chords Tens.Comp. C - D 1 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 434 -177 G - F 432 -177 Chords Tens.Comp. F - E 82 -29 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 261 0 B - F 200 -473 C - F 388 -93 Webs Tens.Comp. C - E 187 -527 D - E 27 -53 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.38 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010G 999 240 VERT(CL): 0.018G 999 240 HORZ(LL): 0.006B - - HORZ(TL): 0.011B - - Creep Factor: 2.0 Max TC CSI: 0.331 Max BC CSI: 0.244 Max Web CSI: 0.493 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A11 Ply: 1 Qty:1 Wgt: 105.0 lbs SEQN: 4457 / T47 / COMN FROM:DRW: .../...07/31/2019 W1 (a)(a) A B C D EFG 10 12 3X4(B1) 2X3 3X4 4X8 3X4 2X3 3X6(R) 13'3"8 (J)Supporting Member: (2) 2x6 DF-L #2 6'0"6 6'0"6 11'8"13 5'8"7 13'3"8 1'6"11 6'0"6 6'0"6 11'8"13 5'8"7 13'3"8 1'6"11 4"13 10 '2 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing E (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 593 /-/-/316 /-/221 E 580 /-/-/349 /121 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 0 -673 B - C 0 -260 Chords Tens.Comp. C - D 1 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 434 -177 G - F 432 -177 Chords Tens.Comp. F - E 82 -29 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 261 0 B - F 200 -473 C - F 388 -93 Webs Tens.Comp. C - E 187 -527 D - E 27 -53 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.38 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010G 999 240 VERT(CL): 0.018G 999 240 HORZ(LL): 0.006B - - HORZ(TL): 0.011B - - Creep Factor: 2.0 Max TC CSI: 0.331 Max BC CSI: 0.244 Max Web CSI: 0.493 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:A11 Ply: 1 Qty:1 Wgt: 105.0 lbs SEQN: 4457 / T47 / COMN FROM:DRW: .../...07/31/2019 W1 (a)(a) A B C D EFG 10 12 3X4(B1) 2X3 3X4 4X8 3X4 2X3 3X6(R) 13'3"8 (J)Supporting Member: (2) 2x6 DF-L #2 6'0"6 6'0"6 11'8"13 5'8"7 13'3"8 1'6"11 6'0"6 6'0"6 11'8"13 5'8"7 13'3"8 1'6"11 4"13 10 '2 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 5 /-13 /-/76 /29 /93 B*80 /-/-/62 /30 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 54.9 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 58 -185 B - C 40 -130 Chords Tens.Comp. C - D 36 -58 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 9 -6 Chords Tens.Comp. F - E 1 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 118 -164 Webs Tens.Comp. D - E 40 -61 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000C 999 240 VERT(CL): 0.001C 999 240 HORZ(LL):-0.001D - - HORZ(TL): 0.001D - - Creep Factor: 2.0 Max TC CSI: 0.042 Max BC CSI: 0.016 Max Web CSI: 0.033 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC01 Ply: 1 Qty:1 Wgt: 25.2 lbs SEQN: 7705 / T4 / SPEC FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(A1) 2X3 2X3 2X3 2X3 5'2"7 7"9 7"9 3'0"15 2'5"6 5'2"7 2'1"8 7"9 7"9 3'0"15 2'5"6 5'2"7 2'1"8 4 '2 "8 4 '0 "13 1"8 4 '2 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 5 /-13 /-/76 /29 /93 B*80 /-/-/62 /30 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 54.9 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 58 -185 B - C 40 -130 Chords Tens.Comp. C - D 36 -58 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 9 -6 Chords Tens.Comp. F - E 1 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 118 -164 Webs Tens.Comp. D - E 40 -61 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000C 999 240 VERT(CL): 0.001C 999 240 HORZ(LL):-0.001D - - HORZ(TL): 0.001D - - Creep Factor: 2.0 Max TC CSI: 0.042 Max BC CSI: 0.016 Max Web CSI: 0.033 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC01 Ply: 1 Qty:1 Wgt: 25.2 lbs SEQN: 7705 / T4 / SPEC FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(A1) 2X3 2X3 2X3 2X3 5'2"7 7"9 7"9 3'0"15 2'5"6 5'2"7 2'1"8 7"9 7"9 3'0"15 2'5"6 5'2"7 2'1"8 4 '2 "8 4 '0 "13 1"8 4 '2 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 17 /-/-/74 /16 /101 B*91 /-/-/42 /12 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 44 -149 B - C 54 -118 Chords Tens.Comp. C - D 68 -108 D - E 63 -105 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 0 -33 H - G 14 -68 Chords Tens.Comp. G - F 5 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 121 -152 G - D 70 -322 Webs Tens.Comp. E - F 64 -109 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000E 999 240 VERT(CL): 0.001E 999 240 HORZ(LL):-0.001E - - HORZ(TL): 0.001E - - Creep Factor: 2.0 Max TC CSI: 0.147 Max BC CSI: 0.084 Max Web CSI: 0.060 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC02 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 7708 / T51 / COMN FROM:DRW: .../...07/31/2019 A B C D E F GH 10 12 3X4(A1) 4X4 2X3 2X3 4X6 2X3 2X3 8'11"15 7"9 7"9 1'3"6 7"13 5'0"14 3'9"8 8'11"15 3'11"1 7"9 7"9 8'11"15 8'4"6 4 '2" 8 11 " 5 4 '0" 1 3 1"8 4 '2" 5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 17 /-/-/74 /16 /101 B*91 /-/-/42 /12 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 44 -149 B - C 54 -118 Chords Tens.Comp. C - D 68 -108 D - E 63 -105 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 0 -33 H - G 14 -68 Chords Tens.Comp. G - F 5 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 121 -152 G - D 70 -322 Webs Tens.Comp. E - F 64 -109 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000E 999 240 VERT(CL): 0.001E 999 240 HORZ(LL):-0.001E - - HORZ(TL): 0.001E - - Creep Factor: 2.0 Max TC CSI: 0.147 Max BC CSI: 0.084 Max Web CSI: 0.060 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC02 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 7708 / T51 / COMN FROM:DRW: .../...07/31/2019 A B C D E F GH 10 12 3X4(A1) 4X4 2X3 2X3 4X6 2X3 2X3 8'11"15 7"9 7"9 1'3"6 7"13 5'0"14 3'9"8 8'11"15 3'11"1 7"9 7"9 8'11"15 8'4"6 4 '2" 8 11 " 5 4 '0" 1 3 1"8 4 '2" 5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-97 /-/144 /85 /101 B*104 /-/-/51 /21 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 90 -208 B - C 26 -84 C - D 11 -44 Chords Tens.Comp. D - E 11 -43 E - F 61 -35 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 4 -1 Chords Tens.Comp. H - G 4 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - H 136 -326 Webs Tens.Comp. F - G 34 -105 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.013E 999 240 VERT(CL): 0.030E 999 240 HORZ(LL):-0.008F - - HORZ(TL): 0.014C - - Creep Factor: 2.0 Max TC CSI: 0.177 Max BC CSI: 0.091 Max Web CSI: 0.068 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC03 Ply: 1 Qty:1 Wgt: 40.6 lbs SEQN: 7667 / T26 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H 10 12 3X4(A1) 3X4 2X3 2X3 3X4 2X3 2X3 8'11"15 7"9 7"9 3'3"6 2'7"13 4'11"11 1'8"5 7'0"14 2'1"3 8'11"15 1'11"1 7"9 7"9 4'11"11 4'4"2 8'11"15 4'0"4 4 '2 "8 2 '7 "5 4 '0 "13 1"8 4 '2 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-97 /-/144 /85 /101 B*104 /-/-/51 /21 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 90 -208 B - C 26 -84 C - D 11 -44 Chords Tens.Comp. D - E 11 -43 E - F 61 -35 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 4 -1 Chords Tens.Comp. H - G 4 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - H 136 -326 Webs Tens.Comp. F - G 34 -105 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.89 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.013E 999 240 VERT(CL): 0.030E 999 240 HORZ(LL):-0.008F - - HORZ(TL): 0.014C - - Creep Factor: 2.0 Max TC CSI: 0.177 Max BC CSI: 0.091 Max Web CSI: 0.068 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC03 Ply: 1 Qty:1 Wgt: 40.6 lbs SEQN: 7667 / T26 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H 10 12 3X4(A1) 3X4 2X3 2X3 3X4 2X3 2X3 8'11"15 7"9 7"9 3'3"6 2'7"13 4'11"11 1'8"5 7'0"14 2'1"3 8'11"15 1'11"1 7"9 7"9 4'11"11 4'4"2 8'11"15 4'0"4 4 '2 "8 2 '7 "5 4 '0 "13 1"8 4 '2 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-108 /-/119 /93 /92 B*105 /-/-/51 /18 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 93 -180 B - C 77 -88 Chords Tens.Comp. C - D 6 -4 D - E 1 -4 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 4 -1 Chords Tens.Comp. G - F 4 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - G 142 -310 Webs Tens.Comp. E - F 38 -114 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.72 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001C 999 240 VERT(CL): 0.002C 999 240 HORZ(LL):-0.001C - - HORZ(TL): 0.002C - - Creep Factor: 2.0 Max TC CSI: 0.180 Max BC CSI: 0.091 Max Web CSI: 0.083 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC04 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 7637 / T20 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 3X42X3 2X3 2X3 2X3 8'11"15 7"9 7"9 4'7"6 3'11"13 8'11"15 4'4"9 7"9 7"9 4'11"11 4'4"2 8'11"15 4'0"4 3'8 "10 1"8 3'1 0 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-108 /-/119 /93 /92 B*105 /-/-/51 /18 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 100 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 93 -180 B - C 77 -88 Chords Tens.Comp. C - D 6 -4 D - E 1 -4 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 4 -1 Chords Tens.Comp. G - F 4 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - G 142 -310 Webs Tens.Comp. E - F 38 -114 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.72 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001C 999 240 VERT(CL): 0.002C 999 240 HORZ(LL):-0.001C - - HORZ(TL): 0.002C - - Creep Factor: 2.0 Max TC CSI: 0.180 Max BC CSI: 0.091 Max Web CSI: 0.083 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC04 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 7637 / T20 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 3X42X3 2X3 2X3 2X3 8'11"15 7"9 7"9 4'7"6 3'11"13 8'11"15 4'4"9 7"9 7"9 4'11"11 4'4"2 8'11"15 4'0"4 3'8 "10 1"8 3'1 0 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of rigid ceiling use purlins to brace BC @ 24"oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-101 /-/135 /114 /99 B*104 /-/-/56 /17 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 103 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 138 -193 B - C 88 -107 Chords Tens.Comp. C - D 46 -112 D - E 33 -81 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 16 -1 Chords Tens.Comp. G - F 8 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 116 -314 Webs Tens.Comp. E - F 25 -119 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.55 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014D 999 240 VERT(CL): 0.034D 999 240 HORZ(LL): 0.023E - - HORZ(TL): 0.053E - - Creep Factor: 2.0 Max TC CSI: 0.163 Max BC CSI: 0.097 Max Web CSI: 0.097 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC05 Ply: 1 Qty:1 Wgt: 44.8 lbs SEQN: 7643 / T59 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 9'2"15 7"9 7"9 5'1"3 4'5"10 6'7"6 1'6"3 9'2"15 2'7"9 7"9 7"9 5'1"3 4'5"10 9'2"15 4'1"12 3'8 "9 5'4 "10 1"8 5'6 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of rigid ceiling use purlins to brace BC @ 24"oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-101 /-/135 /114 /99 B*104 /-/-/56 /17 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 103 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 138 -193 B - C 88 -107 Chords Tens.Comp. C - D 46 -112 D - E 33 -81 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 16 -1 Chords Tens.Comp. G - F 8 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 116 -314 Webs Tens.Comp. E - F 25 -119 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.55 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014D 999 240 VERT(CL): 0.034D 999 240 HORZ(LL): 0.023E - - HORZ(TL): 0.053E - - Creep Factor: 2.0 Max TC CSI: 0.163 Max BC CSI: 0.097 Max Web CSI: 0.097 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC05 Ply: 1 Qty:1 Wgt: 44.8 lbs SEQN: 7643 / T59 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 9'2"15 7"9 7"9 5'1"3 4'5"10 6'7"6 1'6"3 9'2"15 2'7"9 7"9 7"9 5'1"3 4'5"10 9'2"15 4'1"12 3'8 "9 5'4 "10 1"8 5'6 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of rigid ceiling use purlins to brace BC @ 24"oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-136 /-/131 /116 /103 B*104 /-/-/56 /17 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 103 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 143 -190 B - C 94 -112 Chords Tens.Comp. C - D 50 -115 D - E 36 -91 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 16 -2 Chords Tens.Comp. G - F 10 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 122 -314 Webs Tens.Comp. E - F 30 -129 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014D 999 240 VERT(CL): 0.043D 999 240 HORZ(LL): 0.024E - - HORZ(TL): 0.070E - - Creep Factor: 2.0 Max TC CSI: 0.163 Max BC CSI: 0.097 Max Web CSI: 0.097 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC06 Ply: 1 Qty:2 Wgt: 44.8 lbs SEQN: 7655 / T64 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 9'2"15 7"9 7"9 5'1"3 4'5"10 6'11"2 1'9"15 9'2"15 2'3"13 7"9 7"9 5'1"3 4'5"10 9'2"15 4'1"12 3 '8" 9 5 '7" 1 2 1"8 5 '9" 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of rigid ceiling use purlins to brace BC @ 24"oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-136 /-/131 /116 /103 B*104 /-/-/56 /17 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 103 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 143 -190 B - C 94 -112 Chords Tens.Comp. C - D 50 -115 D - E 36 -91 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 16 -2 Chords Tens.Comp. G - F 10 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 122 -314 Webs Tens.Comp. E - F 30 -129 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014D 999 240 VERT(CL): 0.043D 999 240 HORZ(LL): 0.024E - - HORZ(TL): 0.070E - - Creep Factor: 2.0 Max TC CSI: 0.163 Max BC CSI: 0.097 Max Web CSI: 0.097 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC06 Ply: 1 Qty:2 Wgt: 44.8 lbs SEQN: 7655 / T64 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 9'2"15 7"9 7"9 5'1"3 4'5"10 6'11"2 1'9"15 9'2"15 2'3"13 7"9 7"9 5'1"3 4'5"10 9'2"15 4'1"12 3 '8" 9 5 '7" 1 2 1"8 5 '9" 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Additional Notes See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-98 /-/108 /104 /103 B*69 /-/-/37 /10 /- G 18 /-/-/7 /5 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 151 Min Req =- G Brg Width = 5.4 Min Req =1.5 Bearings A, B, & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 135 -172 B - C 53 -130 C - D 56 -113 Chords Tens.Comp. D - E 49 -98 E - F 21 -44 F - G 4 -12 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 39 -17 J - I 34 -16 Chords Tens.Comp. I - H 34 -16 H - F 35 -15 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - I 5 -85 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C - J 138 -234 Gables Tens.Comp. H - E 51 -94 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001J 999 240 VERT(CL): 0.001J 999 240 HORZ(LL):-0.001C - - HORZ(TL): 0.001J - - Creep Factor: 2.0 Max TC CSI: 0.089 Max BC CSI: 0.067 Max Web CSI: 0.064 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC07 Ply: 1 Qty:3 Wgt: 65.8 lbs SEQN: 7712 / T15 / GABL FROM:DRW: .../...07/31/2019 A B C D E F G HIJ 10 12 3X4(A1) 2X3 2X3 4X4 2X3 2X3 2X3 3X4(A1) 7"9 12'7"6 7"5 7"9 7"9 4'7"11 4'0"2 6'11"2 2'3"6 9'3"7 2'4"5 13'2"15 3'11"9 13'10"4 7"4 7"9 7"9 4'7"11 4'0"2 6'11"2 2'3"6 9'3"7 2'4"5 13'2"15 3'11"9 13'10"4 7"4 7"45"7 5 '7 "12 1"8 5 '9 "4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Additional Notes See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-98 /-/108 /104 /103 B*69 /-/-/37 /10 /- G 18 /-/-/7 /5 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 151 Min Req =- G Brg Width = 5.4 Min Req =1.5 Bearings A, B, & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 135 -172 B - C 53 -130 C - D 56 -113 Chords Tens.Comp. D - E 49 -98 E - F 21 -44 F - G 4 -12 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 39 -17 J - I 34 -16 Chords Tens.Comp. I - H 34 -16 H - F 35 -15 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - I 5 -85 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C - J 138 -234 Gables Tens.Comp. H - E 51 -94 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 18.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001J 999 240 VERT(CL): 0.001J 999 240 HORZ(LL):-0.001C - - HORZ(TL): 0.001J - - Creep Factor: 2.0 Max TC CSI: 0.089 Max BC CSI: 0.067 Max Web CSI: 0.064 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:AC07 Ply: 1 Qty:3 Wgt: 65.8 lbs SEQN: 7712 / T15 / GABL FROM:DRW: .../...07/31/2019 A B C D E F G HIJ 10 12 3X4(A1) 2X3 2X3 4X4 2X3 2X3 2X3 3X4(A1) 7"9 12'7"6 7"5 7"9 7"9 4'7"11 4'0"2 6'11"2 2'3"6 9'3"7 2'4"5 13'2"15 3'11"9 13'10"4 7"4 7"9 7"9 4'7"11 4'0"2 6'11"2 2'3"6 9'3"7 2'4"5 13'2"15 3'11"9 13'10"4 7"4 7"45"7 5 '7 "12 1"8 5 '9 "4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS :B1 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W10 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 12.06 TC: From 34 plf at 12.06 to 34 plf at 17.33 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 10.75 BC: From 10 plf at 10.75 to 10 plf at 17.33 BC: 901 lb Conc. Load at 8.01 BC: 335 lb Conc. Load at 10.06,12.06,14.06,16.06 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing H (17'0"15, 10'1"2) HUS26 Supporting Member: (2)2x8 DF-L SS (14) 0.148"x3" nails into supporting member, (6) 0.148"x3" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1662 /-/-/-/263 /- H 1966 /-/-/-/362 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.8 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 303-1971 C - D 547-3440 Chords Tens.Comp. D - E 404 -2324 E - F 283 -1592 F - G 282 -1586 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - N 1398 -209 N - M 80 -14 L - K 2684 -429 Chords Tens.Comp. K - I 1663 -283 J - H 45 -9 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 204-1187 C - L 1378 -236 N - L 1628 -239 L - M 67 -2 L - D 886 -86 D - K 151-1048 K - E 1294 -169 Webs Tens.Comp. E - I 27 -119 F - I 82 -378 I - J 549 -95 I - G 2079 -370 I - H 9 -46 G - H 265 -1438 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.066K 999 240 VERT(CL): 0.112K 999 240 HORZ(LL): 0.040H - - HORZ(TL): 0.068H - - Creep Factor: 2.0 Max TC CSI: 0.392 Max BC CSI: 0.694 Max Web CSI: 0.918 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B01 Ply: 1 Qty:1 Wgt: 150.5 lbs SEQN: 7693 / T16 / HIPM FROM:DRW: .../...07/31/2019 B1 W10 (a) DT -1"2 A B C D E F G H IJK LMN 10 12 4X6(B1) 3X6 4X6 6X8 3X4 3X6 4X6 4X6(R)2X3 8X8 3X10 4X8 3X8(R) 17'3"15 (J)Supporting Member: (2) 2x6 DF-L #2 1'8"15 1'8"15 3'5"8 1'8"9 8' 4'6"8 10'9" 2'9" 17'3"15 6'6"15 1'8"15 1'8"15 3'5"8 1'8"9 8' 4'6"8 10'9" 2'9" 17'3"15 6'6"151'4" 4"13 6 '11 "10 1' 7 '0 "13 8 '1 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS :B1 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W10 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 12.06 TC: From 34 plf at 12.06 to 34 plf at 17.33 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 10.75 BC: From 10 plf at 10.75 to 10 plf at 17.33 BC: 901 lb Conc. Load at 8.01 BC: 335 lb Conc. Load at 10.06,12.06,14.06,16.06 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing H (17'0"15, 10'1"2) HUS26 Supporting Member: (2)2x8 DF-L SS (14) 0.148"x3" nails into supporting member, (6) 0.148"x3" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1662 /-/-/-/263 /- H 1966 /-/-/-/362 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.8 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 303-1971 C - D 547-3440 Chords Tens.Comp. D - E 404 -2324 E - F 283 -1592 F - G 282 -1586 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - N 1398 -209 N - M 80 -14 L - K 2684 -429 Chords Tens.Comp. K - I 1663 -283 J - H 45 -9 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 204-1187 C - L 1378 -236 N - L 1628 -239 L - M 67 -2 L - D 886 -86 D - K 151-1048 K - E 1294 -169 Webs Tens.Comp. E - I 27 -119 F - I 82 -378 I - J 549 -95 I - G 2079 -370 I - H 9 -46 G - H 265 -1438 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.066K 999 240 VERT(CL): 0.112K 999 240 HORZ(LL): 0.040H - - HORZ(TL): 0.068H - - Creep Factor: 2.0 Max TC CSI: 0.392 Max BC CSI: 0.694 Max Web CSI: 0.918 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B01 Ply: 1 Qty:1 Wgt: 150.5 lbs SEQN: 7693 / T16 / HIPM FROM:DRW: .../...07/31/2019 B1 W10 (a) DT -1"2 A B C D E F G H IJK LMN 10 12 4X6(B1) 3X6 4X6 6X8 3X4 3X6 4X6 4X6(R)2X3 8X8 3X10 4X8 3X8(R) 17'3"15 (J)Supporting Member: (2) 2x6 DF-L #2 1'8"15 1'8"15 3'5"8 1'8"9 8' 4'6"8 10'9" 2'9" 17'3"15 6'6"15 1'8"15 1'8"15 3'5"8 1'8"9 8' 4'6"8 10'9" 2'9" 17'3"15 6'6"151'4" 4"13 6 '11 "10 1' 7 '0 "13 8 '1 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W5, W6, W7, W9 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent Simpson Strong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth of the supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing H (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/483 /17 /213 H 753 /-/-/360 /98 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 21 -912 C - D 289-1563 Chords Tens.Comp. D - E 485 -1779 E - F 131 -471 F - G 132 -464 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 618 -214 M - L 17 -17 Chords Tens.Comp. K - I 466 -145 J - H 0 -10 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 188 -533 C - K 694 -262 M - K 747 -248 D - K 248 -428 K - L 38 -1 K - E 1164 -429 Webs Tens.Comp. E - I 128 -113 F - I 139 -367 I - J 134 0 I - G 692 -197 I - H 10 0 G - H 207 -691 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.058K 999 240 VERT(CL): 0.102K 999 240 HORZ(LL): 0.044D - - HORZ(TL): 0.077D - - Creep Factor: 2.0 Max TC CSI: 0.396 Max BC CSI: 0.396 Max Web CSI: 0.723 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B02 Ply: 1 Qty:1 Wgt: 144.2 lbs SEQN: 7696 / T8 / HIPM FROM:DRW: .../...07/31/2019 W5 W6 W7 W9 W7 (a) DT -1"15 A B C D E F G H IJ KLM 10 12 3X4(A1) 3X4 3X4 2X3 6X8 2X3 4X6(R) 2X3 6X8 3X4 3X4 3X6(R) 17'3"15 (J)Supporting Member: (2) 2x8 DF-L SS 1'8"15 1'8"15 3'5"8 1'8"9 10' 6'6"8 17'3"15 7'3"15 1'8"15 1'8"15 3'5"8 1'8"9 10'9" 7'3"8 17'3"15 6'6"151'4" 4"13 8 '6 "14 1' 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W5, W6, W7, W9 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent Simpson Strong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth of the supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing H (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/483 /17 /213 H 753 /-/-/360 /98 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 21 -912 C - D 289-1563 Chords Tens.Comp. D - E 485 -1779 E - F 131 -471 F - G 132 -464 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - M 618 -214 M - L 17 -17 Chords Tens.Comp. K - I 466 -145 J - H 0 -10 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 188 -533 C - K 694 -262 M - K 747 -248 D - K 248 -428 K - L 38 -1 K - E 1164 -429 Webs Tens.Comp. E - I 128 -113 F - I 139 -367 I - J 134 0 I - G 692 -197 I - H 10 0 G - H 207 -691 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.058K 999 240 VERT(CL): 0.102K 999 240 HORZ(LL): 0.044D - - HORZ(TL): 0.077D - - Creep Factor: 2.0 Max TC CSI: 0.396 Max BC CSI: 0.396 Max Web CSI: 0.723 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B02 Ply: 1 Qty:1 Wgt: 144.2 lbs SEQN: 7696 / T8 / HIPM FROM:DRW: .../...07/31/2019 W5 W6 W7 W9 W7 (a) DT -1"15 A B C D E F G H IJ KLM 10 12 3X4(A1) 3X4 3X4 2X3 6X8 2X3 4X6(R) 2X3 6X8 3X4 3X4 3X6(R) 17'3"15 (J)Supporting Member: (2) 2x8 DF-L SS 1'8"15 1'8"15 3'5"8 1'8"9 10' 6'6"8 17'3"15 7'3"15 1'8"15 1'8"15 3'5"8 1'8"9 10'9" 7'3"8 17'3"15 6'6"151'4" 4"13 8 '6 "14 1' 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W9 2x4 DF-L #1&Bet.::W10, W11 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent Simpson Strong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth of the supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing I (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/488 /-/250 I 753 /-/-/390 /115 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 I Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -916 C - D 238-1517 D - E 56 -889 Chords Tens.Comp. E - F 76 -830 F - G 78 -514 G - H 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - Q 626 -236 Q - P 28 -9 O - N 1181 -424 N - L 611 -209 Chords Tens.Comp. M - K 117 -33 L - J 492 -177 K - I 281 -84 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 208 -527 C - O 590 -211 Q - O 739 -280 O - P 40 -2 O - D 472 -143 D - N 233 -612 N - F 310 -49 Webs Tens.Comp. F - J 186 -482 M - L 0 -61 J - K 222 0 J - G 482 -105 G - I 179 -597 H - I 63 -182 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.059M 999 240 VERT(CL): 0.103M 999 240 HORZ(LL): 0.096I - - HORZ(TL): 0.167I - - Creep Factor: 2.0 Max TC CSI: 0.392 Max BC CSI: 0.205 Max Web CSI: 0.423 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B03 Ply: 1 Qty:1 Wgt: 148.4 lbs SEQN: 7689 / T13 / HIPM FROM:DRW: .../...07/31/2019 W9 W10 W11 (a) (a) DT -1"15 A B C D E F G H I JKLMN OPQ 10 12 3X4(A1) 3X4 3X4 6X6 2X3 3X4 3X4 3X4 3X4 2X3 2X3 4X4 2X3 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 2x8 DF-L SS 1'8"15 1'8"15 3'5"8 1'8"9 7'7" 4'1"8 12' 4'5" 17'3"15 5'3"15 1'8"15 1'8"15 3'5"8 1'8"9 7'7" 4'1"8 10'9" 3'2" 11'8"8 11"8 17'3"15 5'7"71'4" 4"13 10 '2"1 4 1' 10 '4"1 3 11 '5" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W9 2x4 DF-L #1&Bet.::W10, W11 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent Simpson Strong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth of the supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing I (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/488 /-/250 I 753 /-/-/390 /115 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 I Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -916 C - D 238-1517 D - E 56 -889 Chords Tens.Comp. E - F 76 -830 F - G 78 -514 G - H 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - Q 626 -236 Q - P 28 -9 O - N 1181 -424 N - L 611 -209 Chords Tens.Comp. M - K 117 -33 L - J 492 -177 K - I 281 -84 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 208 -527 C - O 590 -211 Q - O 739 -280 O - P 40 -2 O - D 472 -143 D - N 233 -612 N - F 310 -49 Webs Tens.Comp. F - J 186 -482 M - L 0 -61 J - K 222 0 J - G 482 -105 G - I 179 -597 H - I 63 -182 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.059M 999 240 VERT(CL): 0.103M 999 240 HORZ(LL): 0.096I - - HORZ(TL): 0.167I - - Creep Factor: 2.0 Max TC CSI: 0.392 Max BC CSI: 0.205 Max Web CSI: 0.423 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B03 Ply: 1 Qty:1 Wgt: 148.4 lbs SEQN: 7689 / T13 / HIPM FROM:DRW: .../...07/31/2019 W9 W10 W11 (a) (a) DT -1"15 A B C D E F G H I JKLMN OPQ 10 12 3X4(A1) 3X4 3X4 6X6 2X3 3X4 3X4 3X4 3X4 2X3 2X3 4X4 2X3 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 2x8 DF-L SS 1'8"15 1'8"15 3'5"8 1'8"9 7'7" 4'1"8 12' 4'5" 17'3"15 5'3"15 1'8"15 1'8"15 3'5"8 1'8"9 7'7" 4'1"8 10'9" 3'2" 11'8"8 11"8 17'3"15 5'7"71'4" 4"13 10 '2"1 4 1' 10 '4"1 3 11 '5" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the following support conditions: 17'0"15Bearing G (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/489 /-/296 G 753 /-/-/425 /144 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -897 C - D 0 -423 Chords Tens.Comp. D - E 13 -331 E - F 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 585 -216 J - I 584 -217 Chords Tens.Comp. I - H 584 -217 H - G 175 -57 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 300 0 C - H 215 -544 H - E 476 -106 Webs Tens.Comp. E - G 207 -639 F - G 40 -113 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.017J 999 240 VERT(CL): 0.030J 999 240 HORZ(LL): 0.009C - - HORZ(TL): 0.016C - - Creep Factor: 2.0 Max TC CSI: 0.482 Max BC CSI: 0.327 Max Web CSI: 0.426 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B04 Ply: 1 Qty:1 Wgt: 133.0 lbs SEQN: 7635 / T41 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a) DT -1"15 A B C D E F GHIJ 10 12 3X4(A1) 2X3 3X4 3X4 3X4 3X4 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 7'1"15 7'1"15 14' 6'10"1 17'3"15 3'3"15 7'1"15 7'1"15 14' 6'10"1 17'3"15 3'3"151'4" 4"13 11 '10 "14 12 '0 "13 13 '1 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the following support conditions: 17'0"15Bearing G (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/489 /-/296 G 753 /-/-/425 /144 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -897 C - D 0 -423 Chords Tens.Comp. D - E 13 -331 E - F 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 585 -216 J - I 584 -217 Chords Tens.Comp. I - H 584 -217 H - G 175 -57 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 300 0 C - H 215 -544 H - E 476 -106 Webs Tens.Comp. E - G 207 -639 F - G 40 -113 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.017J 999 240 VERT(CL): 0.030J 999 240 HORZ(LL): 0.009C - - HORZ(TL): 0.016C - - Creep Factor: 2.0 Max TC CSI: 0.482 Max BC CSI: 0.327 Max Web CSI: 0.426 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B04 Ply: 1 Qty:1 Wgt: 133.0 lbs SEQN: 7635 / T41 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a) DT -1"15 A B C D E F GHIJ 10 12 3X4(A1) 2X3 3X4 3X4 3X4 3X4 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 7'1"15 7'1"15 14' 6'10"1 17'3"15 3'3"15 7'1"15 7'1"15 14' 6'10"1 17'3"15 3'3"151'4" 4"13 11 '10 "14 12 '0 "13 13 '1 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the following support conditions: 17'0"15Bearing H (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/484 /-/347 H 753 /-/-/466 /179 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -908 C - D 0 -724 Chords Tens.Comp. D - E 0 -622 E - F 0 -247 F - G 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 612 -249 K - J 358 -142 Chords Tens.Comp. J - I 358 -142 I - H 71 -23 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 162 -274 K - E 433 -92 E - I 236 -561 Webs Tens.Comp. I - F 594 -155 F - H 234 -719 G - H 16 -45 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.53 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023K 999 240 VERT(CL): 0.040K 999 240 HORZ(LL): 0.012C - - HORZ(TL): 0.021C - - Creep Factor: 2.0 Max TC CSI: 0.269 Max BC CSI: 0.413 Max Web CSI: 0.585 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B05 Ply: 1 Qty:1 Wgt: 159.6 lbs SEQN: 7586 / T49 / HIPM FROM:DRW: .../...07/31/2019 W1 1 1'4"1 3 (a) (a) (a) (a) DT -1"15 A B C D E F G HIJK 10 12 3X4(A1) 2X3 3X4 3X4 3X4 3X4 3X4 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 5'6"10 5'6"10 10'9"5 5'2"11 16' 5'2"11 17'3"15 1'3"15 8'1"15 8'1"15 16' 7'10"1 17'3"15 1'3"151'4" 4"13 13 '6 "14 13 '8 "13 14 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=17'0"15 uses the following support conditions: 17'0"15Bearing H (17'0"15, 10'1"2) LUS26 Supporting Member: (2)2x8 DF-L SS (4) 0.148"x3" nails into supporting member, (3) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 881 /-/-/484 /-/347 H 753 /-/-/466 /179 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -908 C - D 0 -724 Chords Tens.Comp. D - E 0 -622 E - F 0 -247 F - G 2 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 612 -249 K - J 358 -142 Chords Tens.Comp. J - I 358 -142 I - H 71 -23 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 162 -274 K - E 433 -92 E - I 236 -561 Webs Tens.Comp. I - F 594 -155 F - H 234 -719 G - H 16 -45 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.53 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023K 999 240 VERT(CL): 0.040K 999 240 HORZ(LL): 0.012C - - HORZ(TL): 0.021C - - Creep Factor: 2.0 Max TC CSI: 0.269 Max BC CSI: 0.413 Max Web CSI: 0.585 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B05 Ply: 1 Qty:1 Wgt: 159.6 lbs SEQN: 7586 / T49 / HIPM FROM:DRW: .../...07/31/2019 W1 1 1'4"1 3 (a) (a) (a) (a) DT -1"15 A B C D E F G HIJK 10 12 3X4(A1) 2X3 3X4 3X4 3X4 3X4 3X4 4X4 2X3 3X6(R) 17'3"15 (J)Supporting Member: (2) 5'6"10 5'6"10 10'9"5 5'2"11 16' 5'2"11 17'3"15 1'3"15 8'1"15 8'1"15 16' 7'10"1 17'3"15 1'3"151'4" 4"13 13 '6 "14 13 '8 "13 14 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud::W3 2x4 DF-L #1&Bet.: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 2 Rows @ 6.00" o.c. (Each Row) Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 17.33 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 17.33 BC: 952 lb Conc. Load at 2.06, 4.06, 6.06, 8.0610.06,12.06,14.06,16.06 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing G (17'0"15, 10'1"2) HHUS28-2 Supporting Member: (2)2x8 DF-L SS (22) 0.162"x3.5" nails into supporting member, (8) 0.162"x3.5" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 4546 /-/-/-/262 /- G 4707 /-/-/-/239 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.4 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 34 -9 B - C 145-2601 C - D 74-1159 Chords Tens.Comp. D - E 67 -1135 E - F 0 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 1958 -98 J - I 1942 -98 Chords Tens.Comp. I - H 1942 -98 H - G 826 -39 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 1704 -33 C - H 79-1513 E - H 2435 -79 Webs Tens.Comp. E - G 99 -2073 F - G 22 -78 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.061J 999 240 VERT(CL): 0.104J 999 240 HORZ(LL): 0.024C - - HORZ(TL): 0.041C - - Creep Factor: 2.0 Max TC CSI: 0.413 Max BC CSI: 0.807 Max Web CSI: 0.922 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B06 Ply: 2 Qty:1 Wgt: 282.8 lbs SEQN: 7729 / T34 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 W3 (a) A B C D E F GHIJ 10 12 3X8(B3) 3X10 4X8 3X4 H0510 6X8 4X8(R) 2X3 4X6(R) 17'3"15 (J)Supporting Member: (2) 2x6 DF-L #2 6'7"7 6'7"7 12'8"10 6'1"3 17'3"15 4'7"5 6'7"76'7"7 12'8"106'1"3 17'3"154'7"51'4" 4"13 11 ' 12 '1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud::W3 2x4 DF-L #1&Bet.: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 2 Rows @ 6.00" o.c. (Each Row) Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 17.33 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 17.33 BC: 952 lb Conc. Load at 2.06, 4.06, 6.06, 8.0610.06,12.06,14.06,16.06 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=17'0"15 uses the followingsupport conditions: 17'0"15Bearing G (17'0"15, 10'1"2) HHUS28-2 Supporting Member: (2)2x8 DF-L SS (22) 0.162"x3.5" nails into supporting member, (8) 0.162"x3.5" nails into supported member. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 4546 /-/-/-/262 /- G 4707 /-/-/-/239 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.4 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 34 -9 B - C 145-2601 C - D 74-1159 Chords Tens.Comp. D - E 67 -1135 E - F 0 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 1958 -98 J - I 1942 -98 Chords Tens.Comp. I - H 1942 -98 H - G 826 -39 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 1704 -33 C - H 79-1513 E - H 2435 -79 Webs Tens.Comp. E - G 99 -2073 F - G 22 -78 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.061J 999 240 VERT(CL): 0.104J 999 240 HORZ(LL): 0.024C - - HORZ(TL): 0.041C - - Creep Factor: 2.0 Max TC CSI: 0.413 Max BC CSI: 0.807 Max Web CSI: 0.922 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B06 Ply: 2 Qty:1 Wgt: 282.8 lbs SEQN: 7729 / T34 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 W3 (a) A B C D E F GHIJ 10 12 3X8(B3) 3X10 4X8 3X4 H0510 6X8 4X8(R) 2X3 4X6(R) 17'3"15 (J)Supporting Member: (2) 2x6 DF-L #2 6'7"7 6'7"7 12'8"10 6'1"3 17'3"15 4'7"5 6'7"76'7"7 12'8"106'1"3 17'3"154'7"51'4" 4"13 11 ' 12 '1 "1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Stud :W4 2x4 DF-L Standard::W5 2x4 DF-L #1&Bet.: Bracing (a) Continuous lateral restraint equally spaced onmember. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 TC: From 34 plf at 8.00 to 34 plf at 11.44 TC: From 68 plf at 11.44 to 68 plf at 23.50 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.06 BC: From 10 plf at 8.06 to 10 plf at 11.44 BC: From 20 plf at 11.44 to 20 plf at 23.50 BC: 335 lb Conc. Load at 8.06,10.06 BC: 1449 lb Conc. Load at 11.44 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=23'3" uses the followingsupport conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member.Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 2225 /-/-/-/247 /- H 1921 /-/-/-/178 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.4 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 356-2985 C - D 303-2794 Chords Tens.Comp. D - E 246 -2524 E - F 145 -1557 F - G 145 -1557 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 2224 -253 K - J 2074 -213 Chords Tens.Comp. J - I 2487 -244 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 53 -197 D - K 629 -58 D - J 1016 -76 J - E 843 -92 Webs Tens.Comp. E - I 151 -1418 F - I 136 -481 I - G 2311 -216 G - H 206 -1871 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.072J 999 240 VERT(CL): 0.124J 999 240 HORZ(LL): 0.023C - - HORZ(TL): 0.040C - - Creep Factor: 2.0 Max TC CSI: 0.455 Max BC CSI: 0.307 Max Web CSI: 0.520 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B07 Ply: 1 Qty:1 Wgt: 176.4 lbs SEQN: 7630 / T25 / HIPM FROM:DRW: .../...07/31/2019 W4 W5 (a) (a) A B C D E F G HIJK 10 12 3X10(B5R) 2X3 4X8 3X4 8X8 4X4 2X3 6X10 4X8(R) 3X6 23'6" (J)Supporting Member: (2) 4'1"15 4'1"15 8' 3'10"1 11'5"4 3'5"4 17'4"12 5'11"8 23'6" 6'1"4 8' 8' 11'5"4 3'5"4 17'4"12 5'11"8 23'6" 6'1"41'4" 4"13 7 '0" 1 3 8 '1" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Stud :W4 2x4 DF-L Standard::W5 2x4 DF-L #1&Bet.: Bracing (a) Continuous lateral restraint equally spaced onmember. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 TC: From 34 plf at 8.00 to 34 plf at 11.44 TC: From 68 plf at 11.44 to 68 plf at 23.50 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.06 BC: From 10 plf at 8.06 to 10 plf at 11.44 BC: From 20 plf at 11.44 to 20 plf at 23.50 BC: 335 lb Conc. Load at 8.06,10.06 BC: 1449 lb Conc. Load at 11.44 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=23'3" uses the followingsupport conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member.Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 2225 /-/-/-/247 /- H 1921 /-/-/-/178 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.4 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 356-2985 C - D 303-2794 Chords Tens.Comp. D - E 246 -2524 E - F 145 -1557 F - G 145 -1557 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 2224 -253 K - J 2074 -213 Chords Tens.Comp. J - I 2487 -244 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 53 -197 D - K 629 -58 D - J 1016 -76 J - E 843 -92 Webs Tens.Comp. E - I 151 -1418 F - I 136 -481 I - G 2311 -216 G - H 206 -1871 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.072J 999 240 VERT(CL): 0.124J 999 240 HORZ(LL): 0.023C - - HORZ(TL): 0.040C - - Creep Factor: 2.0 Max TC CSI: 0.455 Max BC CSI: 0.307 Max Web CSI: 0.520 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B07 Ply: 1 Qty:1 Wgt: 176.4 lbs SEQN: 7630 / T25 / HIPM FROM:DRW: .../...07/31/2019 W4 W5 (a) (a) A B C D E F G HIJK 10 12 3X10(B5R) 2X3 4X8 3X4 8X8 4X4 2X3 6X10 4X8(R) 3X6 23'6" (J)Supporting Member: (2) 4'1"15 4'1"15 8' 3'10"1 11'5"4 3'5"4 17'4"12 5'11"8 23'6" 6'1"4 8' 8' 11'5"4 3'5"4 17'4"12 5'11"8 23'6" 6'1"41'4" 4"13 7 '0" 1 3 8 '1" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing G (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/607 /50 /213 G 1026 /-/-/452 /112 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 170-1305 C - D 186-1060 Chords Tens.Comp. D - E 154 -655 E - F 153 -653 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 922 -295 J - I 727 -188 Chords Tens.Comp. I - H 727 -188 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 144 -249 J - D 411 -37 D - H 56 -126 Webs Tens.Comp. E - H 187 -545 H - F 1020 -239 F - G 249 -969 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030E 999 240 VERT(CL): 0.053E 999 240 HORZ(LL): 0.013C - - HORZ(TL): 0.023C - - Creep Factor: 2.0 Max TC CSI: 0.475 Max BC CSI: 0.478 Max Web CSI: 0.473 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B08 Ply: 1 Qty:1 Wgt: 155.4 lbs SEQN: 7672 / T33 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a)(a) DT -1"15 A B C D E F GHIJ 10 12 4X4(A2) 2X3 3X4 4X4 3X4 2X3 4X8 4X4 3X6 23'6" (J)Supporting Member: (2) 5'1"15 5'1"15 10' 4'10"1 16'7"4 6'7"4 23'6" 6'10"12 10' 10' 16'7"4 6'7"4 23'6" 6'10"121'4" 4"13 8 '6 "14 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing G (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/607 /50 /213 G 1026 /-/-/452 /112 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 170-1305 C - D 186-1060 Chords Tens.Comp. D - E 154 -655 E - F 153 -653 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 922 -295 J - I 727 -188 Chords Tens.Comp. I - H 727 -188 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 144 -249 J - D 411 -37 D - H 56 -126 Webs Tens.Comp. E - H 187 -545 H - F 1020 -239 F - G 249 -969 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030E 999 240 VERT(CL): 0.053E 999 240 HORZ(LL): 0.013C - - HORZ(TL): 0.023C - - Creep Factor: 2.0 Max TC CSI: 0.475 Max BC CSI: 0.478 Max Web CSI: 0.473 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B08 Ply: 1 Qty:1 Wgt: 155.4 lbs SEQN: 7672 / T33 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a)(a) DT -1"15 A B C D E F GHIJ 10 12 4X4(A2) 2X3 3X4 4X4 3X4 2X3 4X8 4X4 3X6 23'6" (J)Supporting Member: (2) 5'1"15 5'1"15 10' 4'10"1 16'7"4 6'7"4 23'6" 6'10"12 10' 10' 16'7"4 6'7"4 23'6" 6'10"121'4" 4"13 8 '6 "14 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/620 /32 /250 H 1026 /-/-/474 /124 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 115-1323 C - D 132 -943 Chords Tens.Comp. D - E 163 -874 E - F 121 -487 F - G 120 -485 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 918 -290 L - K 917 -291 K - J 917 -291 Chords Tens.Comp. J - I 615 -172 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - C 238 0 C - J 161 -402 J - E 400 -74 E - I 108 -266 Webs Tens.Comp. F - I 154 -453 I - G 950 -235 G - H 259 -979 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.032J 999 240 VERT(CL): 0.056J 999 240 HORZ(LL): 0.015C - - HORZ(TL): 0.026C - - Creep Factor: 2.0 Max TC CSI: 0.331 Max BC CSI: 0.270 Max Web CSI: 0.542 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B09 Ply: 1 Qty:1 Wgt: 169.4 lbs SEQN: 7663 / T72 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a)(a) DT -1"15 A B C D E F G HIJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 3X4 4X4 2X3 4X8 3X4(R) 3X6 23'6" (J) 6'1"15 6'1"15 12' 5'10"1 17'7"4 5'7"4 23'6" 5'10"12 6'1"15 6'1"15 12' 5'10"1 17'7"4 5'7"4 23'6" 5'10"121'4" 4"13 10 '2"1 4 10 '4"1 3 11 '5" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/620 /32 /250 H 1026 /-/-/474 /124 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 115-1323 C - D 132 -943 Chords Tens.Comp. D - E 163 -874 E - F 121 -487 F - G 120 -485 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 918 -290 L - K 917 -291 K - J 917 -291 Chords Tens.Comp. J - I 615 -172 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - C 238 0 C - J 161 -402 J - E 400 -74 E - I 108 -266 Webs Tens.Comp. F - I 154 -453 I - G 950 -235 G - H 259 -979 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.032J 999 240 VERT(CL): 0.056J 999 240 HORZ(LL): 0.015C - - HORZ(TL): 0.026C - - Creep Factor: 2.0 Max TC CSI: 0.331 Max BC CSI: 0.270 Max Web CSI: 0.542 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B09 Ply: 1 Qty:1 Wgt: 169.4 lbs SEQN: 7663 / T72 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a)(a) DT -1"15 A B C D E F G HIJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 3X4 4X4 2X3 4X8 3X4(R) 3X6 23'6" (J) 6'1"15 6'1"15 12' 5'10"1 17'7"4 5'7"4 23'6" 5'10"12 6'1"15 6'1"15 12' 5'10"1 17'7"4 5'7"4 23'6" 5'10"121'4" 4"13 10 '2"1 4 10 '4"1 3 11 '5" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/639 /-/291 H 1026 /-/-/531 /-/- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0-1317 C - D 0 -893 Chords Tens.Comp. D - E 25 -840 E - F 21 -421 F - G 21 -420 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 909 -231 L - K 907 -231 K - J 907 -231 Chords Tens.Comp. J - I 575 -95 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - C 266 0 C - J 184 -447 E - J 423 -83 E - I 164 -344 Webs Tens.Comp. I - G 935 -46 F - I 0 -410 G - H 26 -982 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.033J 999 240 VERT(CL): 0.057J 999 240 HORZ(LL): 0.016C - - HORZ(TL): 0.027C - - Creep Factor: 2.0 Max TC CSI: 0.325 Max BC CSI: 0.291 Max Web CSI: 0.524 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B10 Ply: 1 Qty:2 Wgt: 183.4 lbs SEQN: 7639 / T69 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F G HIJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 4X8 3X4 2X3 4X8 3X4(R) 2X3 23'6" (J) 6'6"4 6'6"4 12'8"10 6'2"6 18'1"5 5'4"11 23'6" 5'4"11 6'6"4 6'6"4 12'8"10 6'2"6 18'1"5 5'4"11 23'6" 5'4"111'4" 4"13 11 ' 12 '1" 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'3" uses the following support conditions: 23'3"Bearing H (23'3", 10'1"2) HUS26 Supporting Member: (2)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1152 /-/-/639 /-/291 H 1026 /-/-/531 /-/- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0-1317 C - D 0 -893 Chords Tens.Comp. D - E 25 -840 E - F 21 -421 F - G 21 -420 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 909 -231 L - K 907 -231 K - J 907 -231 Chords Tens.Comp. J - I 575 -95 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - C 266 0 C - J 184 -447 E - J 423 -83 E - I 164 -344 Webs Tens.Comp. I - G 935 -46 F - I 0 -410 G - H 26 -982 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.033J 999 240 VERT(CL): 0.057J 999 240 HORZ(LL): 0.016C - - HORZ(TL): 0.027C - - Creep Factor: 2.0 Max TC CSI: 0.325 Max BC CSI: 0.291 Max Web CSI: 0.524 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B10 Ply: 1 Qty:2 Wgt: 183.4 lbs SEQN: 7639 / T69 / HIPM FROM:DRW: .../...07/31/2019 W1 (a) (a) (a)(a) A B C D E F G HIJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 4X8 3X4 2X3 4X8 3X4(R) 2X3 23'6" (J) 6'6"4 6'6"4 12'8"10 6'2"6 18'1"5 5'4"11 23'6" 5'4"11 6'6"4 6'6"4 12'8"10 6'2"6 18'1"5 5'4"11 23'6" 5'4"111'4" 4"13 11 ' 12 '1" 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T1 2x4 DF-L #1&Bet.:Bot chord 2x8 DF-L SS :B3 2x8 DF-L #2: Webs 2x4 DF-L Standard :W1, W2, W3, W4 2x4 DF-L Stud::W5, W6, W10, W11 2x4 DF-L #1&Bet.::Lt Wedge 2x6 DF-L #2: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.25" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 37.29 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 37.29 TC: 459 lb Conc. Load at 31.56 TC: 156 lb Conc. Load at 33.56,35.56 BC: 1966 lb Conc. Load at 8.06 BC: 753 lb Conc. Load at 10.06,12.06,14.06,16.06 BC: 4707 lb Conc. Load at 16.88 BC: 3799 lb Conc. Load at 23.62 BC: 617 lb Conc. Load at 25.56,27.56 BC: 226 lb Conc. Load at 29.56 Plating Notes All plates are 4X6 except as noted. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Blocking Full Height Blocking reinforcement required toprevent buckling of members over the bearings: bearing 2 located at 36.83' Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 9752 /-/-/-/1031/- Z 9357 /-/-/-/712 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =5.2 Z Brg Width = 5.5 Min Req =5.0 Bearings B & Z are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 34 -9 B - C 755-7183 C - D 759-7199 D - E 699-6851 E - F 604-6274 F - G 627-6933 Chords Tens.Comp. G - H 579 -6700 H - I 518 -6278 I - J 518 -6278 J - K 518 -6278 K - L 371 -4521 L - M 189 -2391 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - Y 5482 -571 Y - X 5484 -571 X - W 5473 -570 W - V 5246 -529 V - U 5246 -529 U - T 6338 -607 Chords Tens.Comp. T - S 6915 -624 S - R 6670 -575 R - Q 4636 -381 Q - P 4636 -381 P - O 2546 -202 O - N 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. Y - C 41 -144 C - X 16 -105 X - D 765 -123 D - W 116 -622 W - E 1398 -205 E - U 2976 -217 U - F 89-1870 F - T 1874 -62 T - G 528 -105 G - S 131 -633 Webs Tens.Comp. S - H 863 -114 H - R 162 -1110 I - R 34 -115 R - K 3614 -301 K - P 314 -3380 P - L 4469 -381 L - O 388 -4526 O - M 5129 -405 M - N 367 -4646 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.73 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.294T 999 240 VERT(CL): 0.497T 896 240 HORZ(LL): 0.090D - - HORZ(TL): 0.153D - - Creep Factor: 2.0 Max TC CSI: 0.741 Max BC CSI: 0.863 Max Web CSI: 0.927 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B11 Ply: 2 Qty:1 Wgt: 868.0 lbs SEQN: 7753 / T35 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T1 B3 W1 W2 W3 W4 W5 W6 W10 W10 W11 W10 W11 (a)(a)(a)(a) A B C D E F G H I J K L M NOPQRSTUVWXYZ 10 12 6X12(B9R) 2X3 3X4 4X6 3X6 4X6 8X10 6X6 4X12(R) 4X8(R) 4X12(R) 3X4 4X4 4X4 2X3 10X10 4X6 H0612 4X12(R) 6X10(R) 6X10(R) 8X10(R) 6X12(R) H0510 37'3"8 4'2"10 4'2"10 8'0"12 3'10"2 10'5"1 2'4"5 13'8"10 3'3"10 16'10"8 3'1"14 20'3" 3'4"8 23'7"8 3'4"8 28'1"9 4'6"1 32'7"11 4'6"1 37'3"8 4'7"13 4'2"10 4'2"10 8'0"12 3'10"2 10'5"1 2'4"5 13'8"10 3'3"10 16'10"8 3'1"14 20'3" 3'4"8 23'7"8 3'4"8 28'1"9 4'6"1 32'7"11 4'6"1 37'3"8 4'7"131'4" 4"13 9 '1" 10 '2" 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T1 2x4 DF-L #1&Bet.:Bot chord 2x8 DF-L SS :B3 2x8 DF-L #2: Webs 2x4 DF-L Standard :W1, W2, W3, W4 2x4 DF-L Stud::W5, W6, W10, W11 2x4 DF-L #1&Bet.::Lt Wedge 2x6 DF-L #2: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 3.25" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 37.29 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 37.29 TC: 459 lb Conc. Load at 31.56 TC: 156 lb Conc. Load at 33.56,35.56 BC: 1966 lb Conc. Load at 8.06 BC: 753 lb Conc. Load at 10.06,12.06,14.06,16.06 BC: 4707 lb Conc. Load at 16.88 BC: 3799 lb Conc. Load at 23.62 BC: 617 lb Conc. Load at 25.56,27.56 BC: 226 lb Conc. Load at 29.56 Plating Notes All plates are 4X6 except as noted. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Blocking Full Height Blocking reinforcement required toprevent buckling of members over the bearings: bearing 2 located at 36.83' Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 9752 /-/-/-/1031/- Z 9357 /-/-/-/712 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =5.2 Z Brg Width = 5.5 Min Req =5.0 Bearings B & Z are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 34 -9 B - C 755-7183 C - D 759-7199 D - E 699-6851 E - F 604-6274 F - G 627-6933 Chords Tens.Comp. G - H 579 -6700 H - I 518 -6278 I - J 518 -6278 J - K 518 -6278 K - L 371 -4521 L - M 189 -2391 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - Y 5482 -571 Y - X 5484 -571 X - W 5473 -570 W - V 5246 -529 V - U 5246 -529 U - T 6338 -607 Chords Tens.Comp. T - S 6915 -624 S - R 6670 -575 R - Q 4636 -381 Q - P 4636 -381 P - O 2546 -202 O - N 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. Y - C 41 -144 C - X 16 -105 X - D 765 -123 D - W 116 -622 W - E 1398 -205 E - U 2976 -217 U - F 89-1870 F - T 1874 -62 T - G 528 -105 G - S 131 -633 Webs Tens.Comp. S - H 863 -114 H - R 162 -1110 I - R 34 -115 R - K 3614 -301 K - P 314 -3380 P - L 4469 -381 L - O 388 -4526 O - M 5129 -405 M - N 367 -4646 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.73 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.294T 999 240 VERT(CL): 0.497T 896 240 HORZ(LL): 0.090D - - HORZ(TL): 0.153D - - Creep Factor: 2.0 Max TC CSI: 0.741 Max BC CSI: 0.863 Max Web CSI: 0.927 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:B11 Ply: 2 Qty:1 Wgt: 868.0 lbs SEQN: 7753 / T35 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T1 B3 W1 W2 W3 W4 W5 W6 W10 W10 W11 W10 W11 (a)(a)(a)(a) A B C D E F G H I J K L M NOPQRSTUVWXYZ 10 12 6X12(B9R) 2X3 3X4 4X6 3X6 4X6 8X10 6X6 4X12(R) 4X8(R) 4X12(R) 3X4 4X4 4X4 2X3 10X10 4X6 H0612 4X12(R) 6X10(R) 6X10(R) 8X10(R) 6X12(R) H0510 37'3"8 4'2"10 4'2"10 8'0"12 3'10"2 10'5"1 2'4"5 13'8"10 3'3"10 16'10"8 3'1"14 20'3" 3'4"8 23'7"8 3'4"8 28'1"9 4'6"1 32'7"11 4'6"1 37'3"8 4'7"13 4'2"10 4'2"10 8'0"12 3'10"2 10'5"1 2'4"5 13'8"10 3'3"10 16'10"8 3'1"14 20'3" 3'4"8 23'7"8 3'4"8 28'1"9 4'6"1 32'7"11 4'6"1 37'3"8 4'7"131'4" 4"13 9 '1" 10 '2" 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3(**) except as noted. (**) 3 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 26 /-/-/15 /-/20 B*89 /-/-/32 /4 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 121 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 10 -30 B - C 13 -81 Chords Tens.Comp. C - D 3 -34 D - E 3 -32 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 56 -13 H - G 32 -3 Chords Tens.Comp. G - F 32 -3 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 42 -93 D - G 141 -400 Webs Tens.Comp. E - F 44 -125 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000D 999 240 VERT(CL): 0.000D 999 240 HORZ(LL): 0.000F - - HORZ(TL): 0.001F - - Creep Factor: 2.0 Max TC CSI: 0.240 Max BC CSI: 0.123 Max Web CSI: 0.074 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC01 Ply: 1 Qty:1 Wgt: 39.2 lbs SEQN: 7724 / T63 / HIPM FROM:DRW: .../...07/31/2019 DT -1"15 A B C D E F GH 10 12 3X4(A1) 4X4 2X3(**) 2X3(**) 2X3(**) 2X3 2X3 10'9"6 7"9 7"9 1'3"6 7"13 6'0"6 4'9" 10'9"6 4'9" 7"9 7"9 6'0"6 5'4"13 10'5"14 4'5"8 10'9"6 3"8 9" 6 11 " 5 1"8 1'0"13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3(**) except as noted. (**) 3 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 26 /-/-/15 /-/20 B*89 /-/-/32 /4 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 121 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 10 -30 B - C 13 -81 Chords Tens.Comp. C - D 3 -34 D - E 3 -32 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 56 -13 H - G 32 -3 Chords Tens.Comp. G - F 32 -3 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 42 -93 D - G 141 -400 Webs Tens.Comp. E - F 44 -125 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.69 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000D 999 240 VERT(CL): 0.000D 999 240 HORZ(LL): 0.000F - - HORZ(TL): 0.001F - - Creep Factor: 2.0 Max TC CSI: 0.240 Max BC CSI: 0.123 Max Web CSI: 0.074 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC01 Ply: 1 Qty:1 Wgt: 39.2 lbs SEQN: 7724 / T63 / HIPM FROM:DRW: .../...07/31/2019 DT -1"15 A B C D E F GH 10 12 3X4(A1) 4X4 2X3(**) 2X3(**) 2X3(**) 2X3 2X3 10'9"6 7"9 7"9 1'3"6 7"13 6'0"6 4'9" 10'9"6 4'9" 7"9 7"9 6'0"6 5'4"13 10'5"14 4'5"8 10'9"6 3"8 9" 6 11 " 5 1"8 1'0"13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 29 /-/-/45 /6 /60 B*89 /-/-/36 /7 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 121 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 27 -92 B - C 39 -75 C - D 6 -85 Chords Tens.Comp. D - E 3 -7 E - F 1 -3 F - G 1 -3 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 24 -12 K - J 3 -1 Chords Tens.Comp. J - I 3 -1 I - H 3 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 113 -223 E - J 109 -295 Webs Tens.Comp. F - I 77 -218 G - H 31 -10 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.53 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.008D 999 240 VERT(CL): 0.018D 999 240 HORZ(LL): 0.007E - - HORZ(TL): 0.015E - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.071 Max Web CSI: 0.060 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC02 Ply: 1 Qty:1 Wgt: 46.2 lbs SEQN: 7636 / T71 / HIPM FROM:DRW: .../...07/31/2019 DT -1"15 A B C D E F G H IJK 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 2X3 2X3 2X3 2X3 10'9"6 7"9 7"9 1'10"7 1'2"14 3'3"6 1'4"15 5'10"7 2'7"1 9'10"7 4' 10'9"6 10"15 7"9 7"9 1'10"7 1'2"14 5'10"7 4' 9'10"7 4' 10'9"6 10"15 2 '5 "6 2 '7 "5 1"8 2 '8 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 29 /-/-/45 /6 /60 B*89 /-/-/36 /7 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 121 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 27 -92 B - C 39 -75 C - D 6 -85 Chords Tens.Comp. D - E 3 -7 E - F 1 -3 F - G 1 -3 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 24 -12 K - J 3 -1 Chords Tens.Comp. J - I 3 -1 I - H 3 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 113 -223 E - J 109 -295 Webs Tens.Comp. F - I 77 -218 G - H 31 -10 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.53 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.008D 999 240 VERT(CL): 0.018D 999 240 HORZ(LL): 0.007E - - HORZ(TL): 0.015E - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.071 Max Web CSI: 0.060 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC02 Ply: 1 Qty:1 Wgt: 46.2 lbs SEQN: 7636 / T71 / HIPM FROM:DRW: .../...07/31/2019 DT -1"15 A B C D E F G H IJK 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 2X3 2X3 2X3 2X3 10'9"6 7"9 7"9 1'10"7 1'2"14 3'3"6 1'4"15 5'10"7 2'7"1 9'10"7 4' 10'9"6 10"15 7"9 7"9 1'10"7 1'2"14 5'10"7 4' 9'10"7 4' 10'9"6 10"15 2 '5 "6 2 '7 "5 1"8 2 '8 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nails in each row to avoid splitting. Plating Notes All plates are 2X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1 /-/-/-/-/- B*79 /-/-/-/-/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 47.7 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 9 0 B - C 17 -22 Chords Tens.Comp. C - D 4 -25 D - E 0 -3 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 4 0 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 0 -72 Webs Tens.Comp. E - F 0 -26 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 0.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001D 999 240 VERT(CL): 0.001D 999 240 HORZ(LL): 0.001E - - HORZ(TL): 0.001E - - Creep Factor: 2.0 Max TC CSI: 0.021 Max BC CSI: 0.004 Max Web CSI: 0.014 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC03 Ply: 2 Qty:1 Wgt: 47.6 lbs SEQN: 7674 / T12 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required DT -1"15 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 4'7"5 7"9 7"9 2'9"6 2'1"13 4'0"6 1'3" 4'7"5 6"15 7"9 7"9 2'9"6 2'1"13 4'7"5 1'9"15 3'0 "14 3'2 "13 1"8 3'4 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nails in each row to avoid splitting. Plating Notes All plates are 2X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlinsto brace all flat TC @ 24" oc, all BC @ 24" oc. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1 /-/-/-/-/- B*79 /-/-/-/-/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 47.7 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 9 0 B - C 17 -22 Chords Tens.Comp. C - D 4 -25 D - E 0 -3 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 4 0 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 0 -72 Webs Tens.Comp. E - F 0 -26 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 0.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001D 999 240 VERT(CL): 0.001D 999 240 HORZ(LL): 0.001E - - HORZ(TL): 0.001E - - Creep Factor: 2.0 Max TC CSI: 0.021 Max BC CSI: 0.004 Max Web CSI: 0.014 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:BC03 Ply: 2 Qty:1 Wgt: 47.6 lbs SEQN: 7674 / T12 / HIPM FROM:DRW: .../...07/31/2019 2 Complete Trusses Required DT -1"15 A B C D E F G 10 12 3X4(A1) 2X3 2X3 3X4 2X3 2X3 4'7"5 7"9 7"9 2'9"6 2'1"13 4'0"6 1'3" 4'7"5 6"15 7"9 7"9 2'9"6 2'1"13 4'7"5 1'9"15 3'0 "14 3'2 "13 1"8 3'4 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 2X3 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Additional Notes See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AB1540 /-/-/614 /102 /310 AR1540 /-/-/614 /102 /- Wind reactions based on MWFRS ABBrg Width = 5.5 Min Req =1.6 ARBrg Width = 5.5 Min Req =1.6 Bearings AB & AR are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. G - H 639-1169 N - O 259-1167 N - P 478 -376 A - B 70 0 B - C 117-1307 C - D 149-1372 D - E 169-1336 E - F 195-1347 F - G 484 -380 F - G 254-1192 G - F 261-1169 H - I 85 -263 Chords Tens.Comp. I - J 122 -80 J - K 172 -101 K - L 147 -73 L - M 113 -77 M - N 81 -253 O - P 252 -1190 P - Q 194 -1346 Q - R 168 -1335 R - S 148 -1371 S - T 116 -1307 T - U 70 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. AB-AA 321 -315 AA- Z 321 -315 Z -AF 1457 -913 Chords Tens.Comp. X - W 12 -5 AN- X 1555 -794 W - V 12 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B -AB 176-1311 B -AC 1000 -42 AD-AE 1005 -39 AE-AF 992 -42 AF- Z 955 -59 F - Z 387 0 H -AG 285 -957 AG-AH 280 -933 J -AH 71 -112 J -AJ 200 -209 AH-AI 280 -935 AI-AL 279 -934 Webs Tens.Comp. AJ-AK 203 -202 AK-AL 198 -215 AL- L 33 -47 AL-AM 284 -943 AM- N 289 -966 X - P 386 0 X -AN 955 -61 AN-AO 992 -45 AO-AP 1005 -42 AQ- T 1000 -45 T - V 176 -1312 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.280Y 999 240 VERT(CL): 0.431Y 733 240 HORZ(LL): 0.135F - - HORZ(TL): 0.209F - - Creep Factor: 2.0 Max TC CSI: 0.554 Max BC CSI: 0.536 Max Web CSI: 0.825 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C01 Ply: 1 Qty:1 Wgt: 315.0 lbs SEQN: 4624 / T55 / GABL FROM: Page 1 of 2 DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H IJ K LM N O P Q R S T U VWXYZAAAB AC AD AE AF AGAHAI AJ AK ALAM AN AO APAQ AR 10 12 3X6(R) 3X6 2X33X6 2X3 2X3 2X3 2X3 2X3 3X6(**) 4X12 4X62X3(R)3X4 3X4 3X6 3X4 2X3 2X3 6X6 2X3 2X3 2X3 2X3 4X6 2X3 2X3 2X3 2X3 3X4 4X6(R) 2X3 2X3 3X4 3X6 3X4 3X42X3(R) 4X6 4X12 3X6(**) 2X3 2X3 2X3 2X3 3X6 2X3 2X3 3X6(R) 3X6 26'4" 1'4" (TYP) 6'8"2'4"6'8" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0'26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4"1'4" 2'4 "13 15' 5'7 "5 8'2 " 9'1 " 11 ' 6 " **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 2X3 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Additional Notes See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AB1540 /-/-/614 /102 /310 AR1540 /-/-/614 /102 /- Wind reactions based on MWFRS ABBrg Width = 5.5 Min Req =1.6 ARBrg Width = 5.5 Min Req =1.6 Bearings AB & AR are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. G - H 639-1169 N - O 259-1167 N - P 478 -376 A - B 70 0 B - C 117-1307 C - D 149-1372 D - E 169-1336 E - F 195-1347 F - G 484 -380 F - G 254-1192 G - F 261-1169 H - I 85 -263 Chords Tens.Comp. I - J 122 -80 J - K 172 -101 K - L 147 -73 L - M 113 -77 M - N 81 -253 O - P 252 -1190 P - Q 194 -1346 Q - R 168 -1335 R - S 148 -1371 S - T 116 -1307 T - U 70 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. AB-AA 321 -315 AA- Z 321 -315 Z -AF 1457 -913 Chords Tens.Comp. X - W 12 -5 AN- X 1555 -794 W - V 12 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B -AB 176-1311 B -AC 1000 -42 AD-AE 1005 -39 AE-AF 992 -42 AF- Z 955 -59 F - Z 387 0 H -AG 285 -957 AG-AH 280 -933 J -AH 71 -112 J -AJ 200 -209 AH-AI 280 -935 AI-AL 279 -934 Webs Tens.Comp. AJ-AK 203 -202 AK-AL 198 -215 AL- L 33 -47 AL-AM 284 -943 AM- N 289 -966 X - P 386 0 X -AN 955 -61 AN-AO 992 -45 AO-AP 1005 -42 AQ- T 1000 -45 T - V 176 -1312 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.280Y 999 240 VERT(CL): 0.431Y 733 240 HORZ(LL): 0.135F - - HORZ(TL): 0.209F - - Creep Factor: 2.0 Max TC CSI: 0.554 Max BC CSI: 0.536 Max Web CSI: 0.825 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C01 Ply: 1 Qty:1 Wgt: 315.0 lbs SEQN: 4624 / T55 / GABL FROM: Page 1 of 2 DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H IJ K LM N O P Q R S T U VWXYZAAAB AC AD AE AF AGAHAI AJ AK ALAM AN AO APAQ AR 10 12 3X6(R) 3X6 2X33X6 2X3 2X3 2X3 2X3 2X3 3X6(**) 4X12 4X62X3(R)3X4 3X4 3X6 3X4 2X3 2X3 6X6 2X3 2X3 2X3 2X3 4X6 2X3 2X3 2X3 2X3 3X4 4X6(R) 2X3 2X3 3X4 3X6 3X4 3X42X3(R) 4X6 4X12 3X6(**) 2X3 2X3 2X3 2X3 3X6 2X3 2X3 3X6(R) 3X6 26'4" 1'4" (TYP) 6'8"2'4"6'8" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0'26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4"1'4" 2'4 "13 15' 5'7 "5 8'2 " 9'1 " 11 ' 6 " **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C -AC 62 -207 AA-AD 80 -281 D -AE 16 -36 E -AF 26 -110 I -AG 198 -69 AI-AJ 12 -61 Gables Tens.Comp. AK- K 23 -124 AM- M 187 -58 AN- Q 26 -110 AO- R 16 -36 AP- W 80 -280 AQ- S 62 -207 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C01 Ply: 1 Qty:1 Wgt: 315.0 lbs SEQN: 4624 / T55 / GABL FROM: Page 2 of 2 DRW: .../...07/31/2019 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 3X4 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL Q 1540 /-/-/614 /103 /311 T 1540 /-/-/614 /103 /- Wind reactions based on MWFRS Q Brg Width = 5.5 Min Req =1.6 T Brg Width = 5.5 Min Req =1.6 Bearings Q & T are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 632-1089 H - I 231-1049 H - J 434 -378 A - B 70 0 B - C 170-1410 C - D 436 -380 C - D 226-1074 Chords Tens.Comp. D - C 233 -1051 E - F 83 -223 F - G 179 -95 G - H 81 -211 I - J 225 -1072 J - K 170 -1410 K - L 70 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. Q - P 323 -316 Chords Tens.Comp. N - M 15 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - Q 221-1505 B - P 976 -47 C - P 291 -28 E - R 292 -978 F - R 80 -24 F - S 190 -193 Webs Tens.Comp. R - S 290 -969 S - G 124 -87 S - H 296 -988 N - J 291 -30 N - K 976 -50 K - M 220 -1504 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.313O 999 240 VERT(CL): 0.480O 658 240 HORZ(LL): 0.151C - - HORZ(TL): 0.231C - - Creep Factor: 2.0 Max TC CSI: 0.639 Max BC CSI: 0.577 Max Web CSI: 0.327 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C02 Ply: 1 Qty:6 Wgt: 270.2 lbs SEQN: 4627 / T42 / ATIC FROM:DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H I J K L MNOPQ R S T 10 12 3X6(R) 3X6 3X6(**) 4X12 4X62X3(R)3X4 3X4 3X6 3X4 6X6 2X3 2X3 H0510 2X3 2X3 3X4 4X6(R) 3X4 3X6 3X4 3X42X3(R) 4X6 4X12 3X6(**) 3X6(R) 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0'26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4"1'4" 2 '4"1 3 15' 5 '7"5 8 '2" 9 '1" 11 '6" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 3X4 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL Q 1540 /-/-/614 /103 /311 T 1540 /-/-/614 /103 /- Wind reactions based on MWFRS Q Brg Width = 5.5 Min Req =1.6 T Brg Width = 5.5 Min Req =1.6 Bearings Q & T are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 632-1089 H - I 231-1049 H - J 434 -378 A - B 70 0 B - C 170-1410 C - D 436 -380 C - D 226-1074 Chords Tens.Comp. D - C 233 -1051 E - F 83 -223 F - G 179 -95 G - H 81 -211 I - J 225 -1072 J - K 170 -1410 K - L 70 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. Q - P 323 -316 Chords Tens.Comp. N - M 15 -6 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - Q 221-1505 B - P 976 -47 C - P 291 -28 E - R 292 -978 F - R 80 -24 F - S 190 -193 Webs Tens.Comp. R - S 290 -969 S - G 124 -87 S - H 296 -988 N - J 291 -30 N - K 976 -50 K - M 220 -1504 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.313O 999 240 VERT(CL): 0.480O 658 240 HORZ(LL): 0.151C - - HORZ(TL): 0.231C - - Creep Factor: 2.0 Max TC CSI: 0.639 Max BC CSI: 0.577 Max Web CSI: 0.327 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C02 Ply: 1 Qty:6 Wgt: 270.2 lbs SEQN: 4627 / T42 / ATIC FROM:DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H I J K L MNOPQ R S T 10 12 3X6(R) 3X6 3X6(**) 4X12 4X62X3(R)3X4 3X4 3X6 3X4 6X6 2X3 2X3 H0510 2X3 2X3 3X4 4X6(R) 3X4 3X6 3X4 3X42X3(R) 4X6 4X12 3X6(**) 3X6(R) 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0'26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4"1'4" 2 '4"1 3 15' 5 '7"5 8 '2" 9 '1" 11 '6" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 3X4 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1543 /-/-/615 /102 /292 S 1428 /-/-/543 /84 /- Wind reactions based on MWFRS P Brg Width = 5.5 Min Req =1.6 S Brg Width = 5.5 Min Req =1.5 Bearings P & S are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 632-1080 H - I 208-1051 H - J 420 -371 A - B 70 0 B - C 169-1417 C - D 433 -380 C - D 227-1066 Chords Tens.Comp. D - C 234 -1043 E - F 83 -219 F - G 179 -91 G - H 80 -206 I - J 201 -1074 J - K 156 -1409 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 304 -280 Chords Tens.Comp. M - L 18 -7 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 220-1511 B - O 982 -46 C - O 293 -28 E - Q 292 -991 F - Q 81 -24 F - R 188 -191 Webs Tens.Comp. Q - R 289 -982 R - G 123 -86 R - H 297 -1000 M - J 289 -44 M - K 979 -30 K - L 158 -1388 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.316N 999 240 VERT(CL): 0.485N 651 240 HORZ(LL): 0.146C - - HORZ(TL): 0.225C - - Creep Factor: 2.0 Max TC CSI: 0.658 Max BC CSI: 0.579 Max Web CSI: 0.329 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C03 Ply: 1 Qty:8 Wgt: 266.0 lbs SEQN: 4630 / T56 / ATIC FROM:DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H I J K LMNOP Q R S 10 12 3X6(R) 3X6 3X6(**) 4X12 4X6 2X3(R)3X4 3X4 3X6 3X4 6X6 2X3 2X3 H0510 2X3 2X3 3X4 4X6(R) 3X4 3X6 3X4 3X4 2X3(R) 4X6 4X12 3X6(**) 3X6(R) 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0' 26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4" 2'4 "13 15' 5'7 "5 8'2 " 9'1 " 11 ' 6 " **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T4 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L #2 :B3 2x4 DF-L #1&Bet.: Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Plating Notes All plates are 3X4 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1543 /-/-/615 /102 /292 S 1428 /-/-/543 /84 /- Wind reactions based on MWFRS P Brg Width = 5.5 Min Req =1.6 S Brg Width = 5.5 Min Req =1.5 Bearings P & S are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 632-1080 H - I 208-1051 H - J 420 -371 A - B 70 0 B - C 169-1417 C - D 433 -380 C - D 227-1066 Chords Tens.Comp. D - C 234 -1043 E - F 83 -219 F - G 179 -91 G - H 80 -206 I - J 201 -1074 J - K 156 -1409 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 304 -280 Chords Tens.Comp. M - L 18 -7 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 220-1511 B - O 982 -46 C - O 293 -28 E - Q 292 -991 F - Q 81 -24 F - R 188 -191 Webs Tens.Comp. Q - R 289 -982 R - G 123 -86 R - H 297 -1000 M - J 289 -44 M - K 979 -30 K - L 158 -1388 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.316N 999 240 VERT(CL): 0.485N 651 240 HORZ(LL): 0.146C - - HORZ(TL): 0.225C - - Creep Factor: 2.0 Max TC CSI: 0.658 Max BC CSI: 0.579 Max Web CSI: 0.329 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C03 Ply: 1 Qty:8 Wgt: 266.0 lbs SEQN: 4630 / T56 / ATIC FROM:DRW: .../...07/31/2019 T4 B3 W3 W3 A B C D E F G H I J K LMNOP Q R S 10 12 3X6(R) 3X6 3X6(**) 4X12 4X6 2X3(R)3X4 3X4 3X6 3X4 6X6 2X3 2X3 H0510 2X3 2X3 3X4 4X6(R) 3X4 3X6 3X4 3X4 2X3(R) 4X6 4X12 3X6(**) 3X6(R) 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0' 26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4" 2'4 "13 15' 5'7 "5 8'2 " 9'1 " 11 ' 6 " **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T3 2x6 DF-L SS::T4 2x4 DF-L #1&Bet.: Bot chord 2x6 DF-L SS :B2 2x6 DF-L #2::B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @ 9.25" o.c.Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Plating Notes (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Attic room loading from 5-8-0 to 20-8-0: Live Load: 40 PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Collar-tie braced with continuous lateral bracing at24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 3446 /-/-/921 /159 /381 S 3273 /-/-/808 /129 /- Wind reactions based on MWFRS P Brg Width = 5.5 Min Req =1.8 S Brg Width = 5.5 Min Req =1.7 Bearings P & S are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 416-1258 H - I 161-1297 H - J 253 -236 A - B 52 0 B - C 147-1701 C - D 264 -242 C - D 178-1314 Chords Tens.Comp. D - C 183 -1295 E - F 131 -115 F - G 323 -26 G - H 146 -97 I - J 156 -1316 J - K 138 -1694 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 199 -180 Chords Tens.Comp. M - L 19 -4 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 181-1742 B - O 1208 -26 C - O 584 -20 E - Q 206-1401 F - Q 169 -17 F - R 105 -107 Webs Tens.Comp. Q - R 204 -1383 R - G 160 -46 R - H 210 -1415 M - J 580 -33 M - K 1206 -45 K - L 131 -1649 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 36.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.37 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420N 752 240 VERT(CL): 0.673N 469 240 HORZ(LL): 0.190C - - HORZ(TL): 0.346C - - Creep Factor: 2.0 Max TC CSI: 0.858 Max BC CSI: 0.730 Max Web CSI: 0.404 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C04 Ply: 2 Qty:1 Wgt: 532.0 lbs SEQN: 4633 / T29 / ATIC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T3 T4 T3 B2 B3 W3 W3 A B C D E F G H I J K LMNOP Q R S 10 12 4X6(R) 3X6 3X6(**) 4X12 4X83X4 3X4 3X4(R) 4X6 3X4 6X6 2X3 3X4 H0510 2X3 2X3 3X4 4X6(R) 3X4 4X6 3X4(R) 3X43X4 4X8 4X12 3X6(**) 4X6 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0' 26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4" 2 '4 "13 15' 5 '7 "5 8 '2" 9 '1" 11 '6" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T3 2x6 DF-L SS::T4 2x4 DF-L #1&Bet.: Bot chord 2x6 DF-L SS :B2 2x6 DF-L #2::B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W3 2x6 DF-L #2: Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @ 9.25" o.c.Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Plating Notes (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Attic room loading from 5-8-0 to 20-8-0: Live Load: 40 PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Collar-tie braced with continuous lateral bracing at24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 3446 /-/-/921 /159 /381 S 3273 /-/-/808 /129 /- Wind reactions based on MWFRS P Brg Width = 5.5 Min Req =1.8 S Brg Width = 5.5 Min Req =1.7 Bearings P & S are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. D - E 416-1258 H - I 161-1297 H - J 253 -236 A - B 52 0 B - C 147-1701 C - D 264 -242 C - D 178-1314 Chords Tens.Comp. D - C 183 -1295 E - F 131 -115 F - G 323 -26 G - H 146 -97 I - J 156 -1316 J - K 138 -1694 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 199 -180 Chords Tens.Comp. M - L 19 -4 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 181-1742 B - O 1208 -26 C - O 584 -20 E - Q 206-1401 F - Q 169 -17 F - R 105 -107 Webs Tens.Comp. Q - R 204 -1383 R - G 160 -46 R - H 210 -1415 M - J 580 -33 M - K 1206 -45 K - L 131 -1649 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 36.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.37 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420N 752 240 VERT(CL): 0.673N 469 240 HORZ(LL): 0.190C - - HORZ(TL): 0.346C - - Creep Factor: 2.0 Max TC CSI: 0.858 Max BC CSI: 0.730 Max Web CSI: 0.404 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C04 Ply: 2 Qty:1 Wgt: 532.0 lbs SEQN: 4633 / T29 / ATIC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T3 T4 T3 B2 B3 W3 W3 A B C D E F G H I J K LMNOP Q R S 10 12 4X6(R) 3X6 3X6(**) 4X12 4X83X4 3X4 3X4(R) 4X6 3X4 6X6 2X3 3X4 H0510 2X3 2X3 3X4 4X6(R) 3X4 4X6 3X4(R) 3X43X4 4X8 4X12 3X6(**) 4X6 3X6 26'4" 5'8" 5'8" 5'8" 0' 8'8"13 3'0"13 10'11" 2'2"3 15'5" 4'5"15 17'7"3 2'2"3 20'8" 3'0"13 20'8" 0' 26'4" 5'8" 5'8" 5'8" 10'11" 5'3" 15'5" 4'5"15 20'8" 5'3" 26'4" 5'8"1'4" 2 '4 "13 15' 5 '7 "5 8 '2" 9 '1" 11 '6" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L SS :T2 2x6 DF-L #2::T3 2x4 DF-L #1&Bet.: Bot chord 2x6 DF-L #2 :B1 2x6 DF-L SS::B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W4, W8 2x6 DF-L #2::W9, W11, W12 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint, equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @ 9.25" o.c.Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Loading Attic room loading from 5-8-0 to 20-8-0: Live Load: 40 PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Collar-tie braced with continuous lateral bracing at24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 3980 /-/-/1176/-/303 T 2672 /-/-/580 /208 /- Wind reactions based on MWFRS O Brg Width = 5.5 Min Req =1.7 T Brg Width = 5.5 Min Req =1.5 Bearing O is a rigid surface. Bearing T Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. C - D 677-1265 A - B 52 -331 B - C 65-1131 C - B 206 -896 D - E 95-1145 Chords Tens.Comp. E - F 101 -1706 F - G 101 -1704 G - H 23 -1592 H - I 41 -278 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 0 -19 O - N 373 -162 N - O 730 -600 Chords Tens.Comp. L - K 407 -156 K - L 1295 -1034 K - J 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 22 -242 A - O 423 -27 B - O 71-1460 C - N 664 -36 D - Q 687 -41 E - Q 39 -14 E - R 712 -51 Q - R 686 -41 F - R 94 -243 Webs Tens.Comp. R - G 155 -318 R - S 1262 -11 L - S 956 0 G - S 200 -268 S - H 1614 -16 S - K 371 -361 H - K 37 -1063 K - I 1219 -179 I - J 194 -1262 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 36.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.264M 991 240 VERT(CL): 0.457M 571 240 HORZ(LL):-0.295B - - HORZ(TL): 0.517B - - Creep Factor: 2.0 Max TC CSI: 0.745 Max BC CSI: 0.942 Max Web CSI: 0.573 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C05 Ply: 2 Qty:1 Wgt: 649.6 lbs SEQN: 4398 / T46 / ATIC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T2 T3 B1 B3 W4 W8 W9 W11 W12 W11 (a)(a) A B C D E F G H I JKLMNOP Q R S T 10 12 3X6(R) 2X3 3X4 4X4 3X6 3X6 3X42X3(R) 3X4(R) 3X6 3X4 6X6 2X3 3X4 H0510 2X3 2X3 2X3 3X8 3X4 3X4 3X6 3X6 H0510 4X6 4X10 4X4(R) 3X6 4'5"11 21'10"5 4'8"7 4'8"7 5'8" 11"9 8'8"13 3'0"13 10'11" 2'2"3 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 5'8" 5'8" 10'11" 5'3" 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2 '4 "13 11 '6" 9 '1" 15' 10 '3 "8 5 '7 "5 8 '2" 9 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L SS :T2 2x6 DF-L #2::T3 2x4 DF-L #1&Bet.: Bot chord 2x6 DF-L #2 :B1 2x6 DF-L SS::B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W4, W8 2x6 DF-L #2::W9, W11, W12 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint, equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @ 9.25" o.c.Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Loading Attic room loading from 5-8-0 to 20-8-0: Live Load: 40 PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Collar-tie braced with continuous lateral bracing at24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 3980 /-/-/1176/-/303 T 2672 /-/-/580 /208 /- Wind reactions based on MWFRS O Brg Width = 5.5 Min Req =1.7 T Brg Width = 5.5 Min Req =1.5 Bearing O is a rigid surface. Bearing T Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. C - D 677-1265 A - B 52 -331 B - C 65-1131 C - B 206 -896 D - E 95-1145 Chords Tens.Comp. E - F 101 -1706 F - G 101 -1704 G - H 23 -1592 H - I 41 -278 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 0 -19 O - N 373 -162 N - O 730 -600 Chords Tens.Comp. L - K 407 -156 K - L 1295 -1034 K - J 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 22 -242 A - O 423 -27 B - O 71-1460 C - N 664 -36 D - Q 687 -41 E - Q 39 -14 E - R 712 -51 Q - R 686 -41 F - R 94 -243 Webs Tens.Comp. R - G 155 -318 R - S 1262 -11 L - S 956 0 G - S 200 -268 S - H 1614 -16 S - K 371 -361 H - K 37 -1063 K - I 1219 -179 I - J 194 -1262 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 36.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.264M 991 240 VERT(CL): 0.457M 571 240 HORZ(LL):-0.295B - - HORZ(TL): 0.517B - - Creep Factor: 2.0 Max TC CSI: 0.745 Max BC CSI: 0.942 Max Web CSI: 0.573 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C05 Ply: 2 Qty:1 Wgt: 649.6 lbs SEQN: 4398 / T46 / ATIC FROM:DRW: .../...07/31/2019 2 Complete Trusses Required T2 T3 B1 B3 W4 W8 W9 W11 W12 W11 (a)(a) A B C D E F G H I JKLMNOP Q R S T 10 12 3X6(R) 2X3 3X4 4X4 3X6 3X6 3X42X3(R) 3X4(R) 3X6 3X4 6X6 2X3 3X4 H0510 2X3 2X3 2X3 3X8 3X4 3X4 3X6 3X6 H0510 4X6 4X10 4X4(R) 3X6 4'5"11 21'10"5 4'8"7 4'8"7 5'8" 11"9 8'8"13 3'0"13 10'11" 2'2"3 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 5'8" 5'8" 10'11" 5'3" 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2 '4 "13 11 '6" 9 '1" 15' 10 '3 "8 5 '7 "5 8 '2" 9 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T3 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L SS :B2 2x6 DF-L #2: :B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W5, W9 2x6 DF-L #2::W10, W12, W13 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Attic room loading from 5-8-0 to 20-8-0: Live Load: 40PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Collar-tie braced with continuous lateral bracing at24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 2440 /-/-/692 /10 /202 J 1979 /-/-/449 /139 /- Wind reactions based on MWFRS O Brg Width = 7.8 Min Req =2.6 J Brg Width = -Min Req =- Bearing O is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. C - D 281-1290 A - B 148 -19 B - C 103-1391 D - E 101 -979 Chords Tens.Comp. E - F 149 -1318 F - G 149 -1315 G - H 84 -899 H - I 56 -410 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 2 0 O - N 79 -264 L - K 1004 -220 Chords Tens.Comp. K - L 1539 -667 K - J 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 38 -13 A - O 41 -71 O - B 80-2621 B - N 1792 0 C - N 219 -199 D - Q 125 -414 E - Q 117 -11 E - R 649 -74 Q - R 124 -402 F - R 125 -344 Webs Tens.Comp. R - G 558 -424 R - S 569 -283 L - S 1495 0 G - S 269 -484 S - H 651 -144 S - K 517 -1837 H - K 74 -522 K - I 1800 -245 I - J 264 -1840 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.289M 984 240 VERT(CL): 0.497M 572 240 HORZ(LL): 0.042C - - HORZ(TL): 0.108C - - Creep Factor: 2.0 Max TC CSI: 0.286 Max BC CSI: 0.761 Max Web CSI: 0.879 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C06 Ply: 1 Qty:1 Wgt: 326.2 lbs SEQN: 4395 / T3 / ATIC FROM:DRW: .../...07/31/2019 T3 B2 B3 W5 W9 W10 W12 W13 W12 (a)(a)(a) (a) (a) A B C D E F G H I JKLMNOP Q R S 10 12 3X4 3X4 4X4(R) 6X8 3X6 6X12 2X3(R) 2X3(R) 3X4(R) 3X6 3X4(R) 6X6 2X3 3X4 H0510 2X3 3X4 2X3 3X8 3X4(R)3X4(R) 3X6 6X6 6X12 3X4 6X10 4X8 3X8 2'5"11 23'10"5 (J)Supporting Member: (2) 2x6 DF-L SS 2'9"9 2'9"9 5'8" 2'10"7 8'8"13 3'0"13 10'11" 2'2"3 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2'9"9 2'9"9 5'8" 2'10"7 10'11" 5'3" 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2 '4"1 3 11 '6" 9 '1" 15' 10 '3" 8 5 '7"5 8 '2" 9 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x6 DF-L #2 :T3 2x4 DF-L #1&Bet.:Bot chord 2x6 DF-L SS :B2 2x6 DF-L #2: :B3 2x4 DF-L #1&Bet.:Webs 2x4 DF-L Stud :W5, W9 2x6 DF-L #2::W10, W12, W13 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Attic room loading from 5-8-0 to 20-8-0: Live Load: 40PSF. Dead Load: 10 PSF Ceiling: 10 PSF, Kneewalls:10 PSF Truss designed for unbalanced snow loads. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Collar-tie braced with continuous lateral bracing at24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 2440 /-/-/692 /10 /202 J 1979 /-/-/449 /139 /- Wind reactions based on MWFRS O Brg Width = 7.8 Min Req =2.6 J Brg Width = -Min Req =- Bearing O is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. C - D 281-1290 A - B 148 -19 B - C 103-1391 D - E 101 -979 Chords Tens.Comp. E - F 149 -1318 F - G 149 -1315 G - H 84 -899 H - I 56 -410 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. P - O 2 0 O - N 79 -264 L - K 1004 -220 Chords Tens.Comp. K - L 1539 -667 K - J 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 38 -13 A - O 41 -71 O - B 80-2621 B - N 1792 0 C - N 219 -199 D - Q 125 -414 E - Q 117 -11 E - R 649 -74 Q - R 124 -402 F - R 125 -344 Webs Tens.Comp. R - G 558 -424 R - S 569 -283 L - S 1495 0 G - S 269 -484 S - H 651 -144 S - K 517 -1837 H - K 74 -522 K - I 1800 -245 I - J 264 -1840 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.289M 984 240 VERT(CL): 0.497M 572 240 HORZ(LL): 0.042C - - HORZ(TL): 0.108C - - Creep Factor: 2.0 Max TC CSI: 0.286 Max BC CSI: 0.761 Max Web CSI: 0.879 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C06 Ply: 1 Qty:1 Wgt: 326.2 lbs SEQN: 4395 / T3 / ATIC FROM:DRW: .../...07/31/2019 T3 B2 B3 W5 W9 W10 W12 W13 W12 (a)(a)(a) (a) (a) A B C D E F G H I JKLMNOP Q R S 10 12 3X4 3X4 4X4(R) 6X8 3X6 6X12 2X3(R) 2X3(R) 3X4(R) 3X6 3X4(R) 6X6 2X3 3X4 H0510 2X3 3X4 2X3 3X8 3X4(R)3X4(R) 3X6 6X6 6X12 3X4 6X10 4X8 3X8 2'5"11 23'10"5 (J)Supporting Member: (2) 2x6 DF-L SS 2'9"9 2'9"9 5'8" 2'10"7 8'8"13 3'0"13 10'11" 2'2"3 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2'9"9 2'9"9 5'8" 2'10"7 10'11" 5'3" 15'9"8 4'10"8 20'8" 4'10"8 23'8"12 3'0"12 26'4" 2'7"4 2 '4"1 3 11 '6" 9 '1" 15' 10 '3" 8 5 '7"5 8 '2" 9 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 Webs 2x4 DF-L Standard :W1, W2, W3, W4, W5 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 4.50" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 9.40 TC: From 34 plf at 9.40 to 34 plf at 26.33 BC: From 20 plf at 0.00 to 20 plf at 3.40 BC: From 10 plf at 3.40 to 10 plf at 5.67 BC: From 60 plf at 5.67 to 60 plf at 20.67 BC: From 10 plf at 20.67 to 10 plf at 26.33 BC: 573 lb Conc. Load at 3.40, 5.40 BC: 580 lb Conc. Load at 7.40, 9.40 BC: 613 lb Conc. Load at 11.40,13.40,15.40,17.4019.40,21.40,23.40,25.40 Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 4744 /-/-/-/924 /- H 4734 /-/-/-/1076/- Wind reactions based on MWFRS N Brg Width = 5.5 Min Req =2.2 H Brg Width = -Min Req =- Bearing N is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 27 -78 B - C 352-1702 C - D 398-1776 Chords Tens.Comp. D - E 306 -1347 E - F 213 -936 F - G 214 -937 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. O - N 2 0 N - M 182 -34 M - L 1565 -592 L - K 47 -174 Chords Tens.Comp. L - K 1449 -332 K - J 1498 -509 J - I 1374 -350 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - O 22 -126 A - N 97 -13 N - B 448-2115 B - M 1484 -306 C - L 82 -44 M - C 112 -246 D - L 924 -175 Webs Tens.Comp. D - J 77 -33 E - I 223 -991 J - E 834 -180 I - F 30 -172 I - G 2192 -500 G - H 463 -2019 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.075K 999 240 VERT(CL): 0.123K 999 240 HORZ(LL): 0.034C - - HORZ(TL): 0.055C - - Creep Factor: 2.0 Max TC CSI: 0.175 Max BC CSI: 0.630 Max Web CSI: 0.967 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C07 Ply: 2 Qty:1 Wgt: 596.4 lbs SEQN: 4331 / T50 / COMN FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 W2 W3 W4 W5 (a) (a) A B C D E F G HIJKLMNO 10 12 3X4 2X3 4X4(R) 4X8 4X10 3X4 2X3 2X3 4X6 4X12 4X4 2X3 2X3 3X12 3X4 2X32X3 10X12 2X3 4X8(R) 3X8 1'5"24'11" (J)Supporting Member: (2) 2x6 DF-L SS 1'7"12 1'7"12 5'5"9 3'9"13 10'11"2 5'5"9 16'1"5 5'2"3 21'1"13 5'0"7 26'4" 5'2"3 1'7"12 1'7"12 5'7"5 3'11"9 10'11"2 5'3"13 16'3"1 5'3"15 21'1"13 4'10"11 26'4" 5'2"3 2 '4 "13 11 '6 "1 5"8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 Webs 2x4 DF-L Standard :W1, W2, W3, W4, W5 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Nailnote Nail Schedule:0.131"x3", min. nailsTop Chord: 1 Row @12.00" o.c.Bot Chord: 1 Row @ 4.50" o.c. Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at 0.00 to 68 plf at 9.40 TC: From 34 plf at 9.40 to 34 plf at 26.33 BC: From 20 plf at 0.00 to 20 plf at 3.40 BC: From 10 plf at 3.40 to 10 plf at 5.67 BC: From 60 plf at 5.67 to 60 plf at 20.67 BC: From 10 plf at 20.67 to 10 plf at 26.33 BC: 573 lb Conc. Load at 3.40, 5.40 BC: 580 lb Conc. Load at 7.40, 9.40 BC: 613 lb Conc. Load at 11.40,13.40,15.40,17.4019.40,21.40,23.40,25.40 Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 4744 /-/-/-/924 /- H 4734 /-/-/-/1076/- Wind reactions based on MWFRS N Brg Width = 5.5 Min Req =2.2 H Brg Width = -Min Req =- Bearing N is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 27 -78 B - C 352-1702 C - D 398-1776 Chords Tens.Comp. D - E 306 -1347 E - F 213 -936 F - G 214 -937 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. O - N 2 0 N - M 182 -34 M - L 1565 -592 L - K 47 -174 Chords Tens.Comp. L - K 1449 -332 K - J 1498 -509 J - I 1374 -350 I - H 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - O 22 -126 A - N 97 -13 N - B 448-2115 B - M 1484 -306 C - L 82 -44 M - C 112 -246 D - L 924 -175 Webs Tens.Comp. D - J 77 -33 E - I 223 -991 J - E 834 -180 I - F 30 -172 I - G 2192 -500 G - H 463 -2019 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.05 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.075K 999 240 VERT(CL): 0.123K 999 240 HORZ(LL): 0.034C - - HORZ(TL): 0.055C - - Creep Factor: 2.0 Max TC CSI: 0.175 Max BC CSI: 0.630 Max Web CSI: 0.967 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:C07 Ply: 2 Qty:1 Wgt: 596.4 lbs SEQN: 4331 / T50 / COMN FROM:DRW: .../...07/31/2019 2 Complete Trusses Required W1 W2 W3 W4 W5 (a) (a) A B C D E F G HIJKLMNO 10 12 3X4 2X3 4X4(R) 4X8 4X10 3X4 2X3 2X3 4X6 4X12 4X4 2X3 2X3 3X12 3X4 2X32X3 10X12 2X3 4X8(R) 3X8 1'5"24'11" (J)Supporting Member: (2) 2x6 DF-L SS 1'7"12 1'7"12 5'5"9 3'9"13 10'11"2 5'5"9 16'1"5 5'2"3 21'1"13 5'0"7 26'4" 5'2"3 1'7"12 1'7"12 5'7"5 3'11"9 10'11"2 5'3"13 16'3"1 5'3"15 21'1"13 4'10"11 26'4" 5'2"3 2 '4 "13 11 '6 "1 5"8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(A1) except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 20 /-/-/34 /24 /40 B*148 /-/-/48 /4 /- E 20 /-/-/7 /-/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 38.8 Min Req =- E Brg Width = 5.5 Min Req =1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 55 -53 B - C 28 -69 Chords Tens.Comp. C - D 28 -69 D - E 20 -13 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 28 -9 Chords Tens.Comp. F - D 28 -9 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 3 -39 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000F 999 240 VERT(CL): 0.000F 999 240 HORZ(LL): 0.000F - - HORZ(TL): 0.000F - - Creep Factor: 2.0 Max TC CSI: 0.018 Max BC CSI: 0.023 Max Web CSI: 0.007 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC1 Ply: 1 Qty:16 Wgt: 16.8 lbs SEQN: 4297 / T40 / COMN FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(A1) 4X4 2X3 3X4(A1) 7"9 3'2"13 7"9 7"9 7"9 2'3" 1'7"7 3'10"6 1'7"7 4'5"15 7"9 7"9 7"9 2'3" 1'7"7 3'10"6 1'7"7 4'5"15 7"9 7"95"7 1 '9" 1"8 1 '10 "8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(A1) except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 20 /-/-/34 /24 /40 B*148 /-/-/48 /4 /- E 20 /-/-/7 /-/- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 38.8 Min Req =- E Brg Width = 5.5 Min Req =1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 55 -53 B - C 28 -69 Chords Tens.Comp. C - D 28 -69 D - E 20 -13 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 28 -9 Chords Tens.Comp. F - D 28 -9 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 3 -39 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.30 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000F 999 240 VERT(CL): 0.000F 999 240 HORZ(LL): 0.000F - - HORZ(TL): 0.000F - - Creep Factor: 2.0 Max TC CSI: 0.018 Max BC CSI: 0.023 Max Web CSI: 0.007 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC1 Ply: 1 Qty:16 Wgt: 16.8 lbs SEQN: 4297 / T40 / COMN FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(A1) 4X4 2X3 3X4(A1) 7"9 3'2"13 7"9 7"9 7"9 2'3" 1'7"7 3'10"6 1'7"7 4'5"15 7"9 7"9 7"9 2'3" 1'7"7 3'10"6 1'7"7 4'5"15 7"9 7"95"7 1 '9" 1"8 1 '10 "8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-84 /-/102 /63 /82 B*96 /-/-/39 /12 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 177 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 76 -153 B - C 42 -98 C - D 1 -3 Chords Tens.Comp. D - E 0 -2 E - F 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 14 -6 J - I 2 0 Chords Tens.Comp. I - H 2 0 H - G 2 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 92 -192 D - I 118 -324 Webs Tens.Comp. E - H 97 -260 F - G 32 -94 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001D 999 240 VERT(CL): 0.002D 999 240 HORZ(LL): 0.001J - - HORZ(TL): 0.001J - - Creep Factor: 2.0 Max TC CSI: 0.156 Max BC CSI: 0.049 Max Web CSI: 0.074 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC2 Ply: 1 Qty:1 Wgt: 64.4 lbs SEQN: 4379 / T57 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G HIJ 10 12 3X4(A1) 4X4 2X3 2X3 2X3 2X3 2X3 2X3 2X3 15'5" 7"9 7"9 4'0"2 3'4"9 8'2"4 4'2"2 12'2"4 4' 15'5" 3'2"12 7"9 7"9 4'2"4 3'6"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 3' 2 " 9 1"8 3'4 " 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-84 /-/102 /63 /82 B*96 /-/-/39 /12 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 177 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 76 -153 B - C 42 -98 C - D 1 -3 Chords Tens.Comp. D - E 0 -2 E - F 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 14 -6 J - I 2 0 Chords Tens.Comp. I - H 2 0 H - G 2 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 92 -192 D - I 118 -324 Webs Tens.Comp. E - H 97 -260 F - G 32 -94 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:0.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.001D 999 240 VERT(CL): 0.002D 999 240 HORZ(LL): 0.001J - - HORZ(TL): 0.001J - - Creep Factor: 2.0 Max TC CSI: 0.156 Max BC CSI: 0.049 Max Web CSI: 0.074 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC2 Ply: 1 Qty:1 Wgt: 64.4 lbs SEQN: 4379 / T57 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G HIJ 10 12 3X4(A1) 4X4 2X3 2X3 2X3 2X3 2X3 2X3 2X3 15'5" 7"9 7"9 4'0"2 3'4"9 8'2"4 4'2"2 12'2"4 4' 15'5" 3'2"12 7"9 7"9 4'2"4 3'6"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 3' 2 " 9 1"8 3'4 " 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-54 /-/49 /29 /40 B*94 /-/-/34 /8 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 177 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 57 -77 B - C 5 -72 C - D 2 -8 Chords Tens.Comp. D - E 2 -8 E - F 2 -8 F - G 2 -8 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 8 -2 K - J 8 -2 Chords Tens.Comp. J - I 8 -2 I - H 8 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - K 98 -259 E - J 101 -277 Webs Tens.Comp. F - I 99 -269 G - H 32 -86 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.93 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004C 999 240 VERT(CL): 0.009C 999 240 HORZ(LL): 0.004C - - HORZ(TL): 0.008C - - Creep Factor: 2.0 Max TC CSI: 0.135 Max BC CSI: 0.064 Max Web CSI: 0.053 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC3 Ply: 1 Qty:1 Wgt: 57.4 lbs SEQN: 4376 / T48 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H IJK 10 12 3X4(A1) 3X4 2X3 2X3 2X3 2X3 2X3 2X3 2X3 2X3 15'5" 7"9 7"9 2'1"10 1'6"1 4'2"4 2'0"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 7"9 7"9 4'2"4 3'6"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 1 '7 "13 1"8 1 '9 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-54 /-/49 /29 /40 B*94 /-/-/34 /8 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 B Brg Width = 177 Min Req =- Bearings A & B are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 57 -77 B - C 5 -72 C - D 2 -8 Chords Tens.Comp. D - E 2 -8 E - F 2 -8 F - G 2 -8 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - K 8 -2 K - J 8 -2 Chords Tens.Comp. J - I 8 -2 I - H 8 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - K 98 -259 E - J 101 -277 Webs Tens.Comp. F - I 99 -269 G - H 32 -86 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 17.93 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004C 999 240 VERT(CL): 0.009C 999 240 HORZ(LL): 0.004C - - HORZ(TL): 0.008C - - Creep Factor: 2.0 Max TC CSI: 0.135 Max BC CSI: 0.064 Max Web CSI: 0.053 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:CC3 Ply: 1 Qty:1 Wgt: 57.4 lbs SEQN: 4376 / T48 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H IJK 10 12 3X4(A1) 3X4 2X3 2X3 2X3 2X3 2X3 2X3 2X3 2X3 15'5" 7"9 7"9 2'1"10 1'6"1 4'2"4 2'0"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 7"9 7"9 4'2"4 3'6"10 8'2"4 4' 12'2"4 4' 15'5" 3'2"12 1 '7 "13 1"8 1 '9 "5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 TC: From 34 plf at 8.00 to 34 plf at 14.00 TC: From 68 plf at 14.00 to 68 plf at 23.52 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.01 BC: From 10 plf at 8.01 to 10 plf at 13.99 BC: From 20 plf at 13.99 to 20 plf at 22.00 BC: From 5 plf at 22.00 to 5 plf at 23.52 BC: 877 lb Conc. Load at 8.01,13.99 BC: 335 lb Conc. Load at 10.06,11.94 Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 2155 /-/-/-/325 /- F 2155 /-/-/-/325 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.3 F Brg Width = 5.5 Min Req =2.3 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 472-2866 C - D 325-2074 Chords Tens.Comp. D - E 325 -2073 E - F 472 -2865 F - G 67 -18 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 2074 -325 J - I 2055 -321 Chords Tens.Comp. I - H 2055 -321 H - F 2074 -325 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 1328 -162 J - D 46 -11 Webs Tens.Comp. D - H 45 -11 E - H 1327 -162 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.061D 999 240 VERT(CL): 0.104D 999 240 HORZ(LL): 0.023H - - HORZ(TL): 0.039H - - Creep Factor: 2.0 Max TC CSI: 0.822 Max BC CSI: 0.802 Max Web CSI: 0.444 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D01 Ply: 1 Qty:1 Wgt: 133.0 lbs SEQN: 4642 / T36 / HIPS FROM:DRW: .../...07/31/2019 DT -1"2 A B C D E F GHIJ 10 12 4X6(A1) 6X6 4X8(R)H0510 3X4 6X6 4X8(R) 4X6(A1) 22' 8' 8' 11' 3' 14' 3' 22' 8' 8' 8' 14' 6' 22' 8'1'4"1'4" 4"13 7 '0" 1 3 8 '1" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L #2 Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 TC: From 34 plf at 8.00 to 34 plf at 14.00 TC: From 68 plf at 14.00 to 68 plf at 23.52 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.01 BC: From 10 plf at 8.01 to 10 plf at 13.99 BC: From 20 plf at 13.99 to 20 plf at 22.00 BC: From 5 plf at 22.00 to 5 plf at 23.52 BC: 877 lb Conc. Load at 8.01,13.99 BC: 335 lb Conc. Load at 10.06,11.94 Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 2155 /-/-/-/325 /- F 2155 /-/-/-/325 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =2.3 F Brg Width = 5.5 Min Req =2.3 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -18 B - C 472-2866 C - D 325-2074 Chords Tens.Comp. D - E 325 -2073 E - F 472 -2865 F - G 67 -18 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 2074 -325 J - I 2055 -321 Chords Tens.Comp. I - H 2055 -321 H - F 2074 -325 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 1328 -162 J - D 46 -11 Webs Tens.Comp. D - H 45 -11 E - H 1327 -162 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.061D 999 240 VERT(CL): 0.104D 999 240 HORZ(LL): 0.023H - - HORZ(TL): 0.039H - - Creep Factor: 2.0 Max TC CSI: 0.822 Max BC CSI: 0.802 Max Web CSI: 0.444 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D01 Ply: 1 Qty:1 Wgt: 133.0 lbs SEQN: 4642 / T36 / HIPS FROM:DRW: .../...07/31/2019 DT -1"2 A B C D E F GHIJ 10 12 4X6(A1) 6X6 4X8(R)H0510 3X4 6X6 4X8(R) 4X6(A1) 22' 8' 8' 11' 3' 14' 3' 22' 8' 8' 8' 14' 6' 22' 8'1'4"1'4" 4"13 7 '0" 1 3 8 '1" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1075 /-/-/538 /70 /250 G 1075 /-/-/538 /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 196-1191 C - D 211 -944 D - E 203 -631 Chords Tens.Comp. E - F 209 -938 F - G 196 -1190 G - H 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 838 -75 J - I 629 -33 Chords Tens.Comp. I - G 838 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 151 -271 J - D 309 -63 D - I 117 -109 Webs Tens.Comp. E - I 307 -58 I - F 151 -270 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.024J 999 240 VERT(CL): 0.042J 999 240 HORZ(LL): 0.012I - - HORZ(TL): 0.021I - - Creep Factor: 2.0 Max TC CSI: 0.196 Max BC CSI: 0.469 Max Web CSI: 0.199 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D02 Ply: 1 Qty:1 Wgt: 142.8 lbs SEQN: 4305 / T31 / HIPS FROM:DRW: .../...07/31/2019 W1 W1 DT -1"15 A B C D E F G HIJ 10 12 3X4(A1) 2X3 3X4 4X4 4X4 6X8 2X3 3X4(A1) 22' 5'1"15 5'1"15 10' 4'10"1 12' 2' 16'10"1 4'10"1 22' 5'1"15 10' 10' 12' 2' 22' 10'1'4"1'4" 4"13 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1 2x4 DF-L Stud: Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1075 /-/-/538 /70 /250 G 1075 /-/-/538 /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 196-1191 C - D 211 -944 D - E 203 -631 Chords Tens.Comp. E - F 209 -938 F - G 196 -1190 G - H 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 838 -75 J - I 629 -33 Chords Tens.Comp. I - G 838 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 151 -271 J - D 309 -63 D - I 117 -109 Webs Tens.Comp. E - I 307 -58 I - F 151 -270 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: varies Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.024J 999 240 VERT(CL): 0.042J 999 240 HORZ(LL): 0.012I - - HORZ(TL): 0.021I - - Creep Factor: 2.0 Max TC CSI: 0.196 Max BC CSI: 0.469 Max Web CSI: 0.199 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D02 Ply: 1 Qty:1 Wgt: 142.8 lbs SEQN: 4305 / T31 / HIPS FROM:DRW: .../...07/31/2019 W1 W1 DT -1"15 A B C D E F G HIJ 10 12 3X4(A1) 2X3 3X4 4X4 4X4 6X8 2X3 3X4(A1) 22' 5'1"15 5'1"15 10' 4'10"1 12' 2' 16'10"1 4'10"1 22' 5'1"15 10' 10' 12' 2' 22' 10'1'4"1'4" 4"13 8 '8 "13 9 '9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2 2x4 DF-L Standard: Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1157 /-/-/536 /68 /270 H 1157 /-/-/536 /68 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = 5.5 Min Req =1.5 Bearings B & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 177-1346 C - D 233-1203 D - E 269-1191 Chords Tens.Comp. E - F 269 -1192 F - G 233 -1204 G - H 177 -1347 H - I 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 942 -76 L - K 638 -39 Chords Tens.Comp. K - J 638 -39 J - H 942 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - L 175 -291 L - E 544 -123 Webs Tens.Comp. E - J 546 -123 J - G 174 -291 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.035J 999 240 VERT(CL): 0.057J 999 240 HORZ(LL): 0.017C - - HORZ(TL): 0.028C - - Creep Factor: 2.0 Max TC CSI: 0.239 Max BC CSI: 0.395 Max Web CSI: 0.241 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D03 Ply: 1 Qty:3 Wgt: 120.4 lbs SEQN: 4645 / T32 / COMN FROM:DRW: .../...07/31/2019 W2 W2 A B CD E FG H IJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 4X4 3X4 3X42X3 4X4(A2) 22' 5'7"15 5'7"15 11' 5'4"1 16'4"1 5'4"1 22' 5'7"15 7'5"5 7'5"5 14'6"11 7'1"6 22' 7'5"51'4"1'4" 4"13 9 '6 "13 10 '7 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2 2x4 DF-L Standard: Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1157 /-/-/536 /68 /270 H 1157 /-/-/536 /68 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 H Brg Width = 5.5 Min Req =1.5 Bearings B & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 177-1346 C - D 233-1203 D - E 269-1191 Chords Tens.Comp. E - F 269 -1192 F - G 233 -1204 G - H 177 -1347 H - I 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 942 -76 L - K 638 -39 Chords Tens.Comp. K - J 638 -39 J - H 942 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - L 175 -291 L - E 544 -123 Webs Tens.Comp. E - J 546 -123 J - G 174 -291 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.035J 999 240 VERT(CL): 0.057J 999 240 HORZ(LL): 0.017C - - HORZ(TL): 0.028C - - Creep Factor: 2.0 Max TC CSI: 0.239 Max BC CSI: 0.395 Max Web CSI: 0.241 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D03 Ply: 1 Qty:3 Wgt: 120.4 lbs SEQN: 4645 / T32 / COMN FROM:DRW: .../...07/31/2019 W2 W2 A B CD E FG H IJKL 10 12 4X4(A2) 2X3 3X4 3X4 3X4 4X4 3X4 3X42X3 4X4(A2) 22' 5'7"15 5'7"15 11' 5'4"1 16'4"1 5'4"1 22' 5'7"15 7'5"5 7'5"5 14'6"11 7'1"6 22' 7'5"51'4"1'4" 4"13 9 '6 "13 10 '7 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing F (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 704 /-/-/375 /4 /191 F 573 /-/-/334 /73 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 14 -666 Chords Tens.Comp. C - D 51 -295 D - E 68 -193 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 424 -149 H - G 423 -150 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 238 0 C - G 161 -397 D - G 70 -66 Webs Tens.Comp. G - E 435 -104 E - F 143 -561 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010H 999 240 VERT(CL): 0.017H 999 240 HORZ(LL): 0.004C - - HORZ(TL): 0.008C - - Creep Factor: 2.0 Max TC CSI: 0.231 Max BC CSI: 0.208 Max Web CSI: 0.560 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D04 Ply: 1 Qty:3 Wgt: 102.2 lbs SEQN: 4648 / T7 / COMN FROM:DRW: .../...07/31/2019 W1 W2 (a) A B C D E FGH 10 12 3X4(A1) 2X3 6X8 4X4 3X8 3X4 3X4 13'3"8 (J)Supporting Member: (2) 2x6 DF-L #2 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"81'4" 4"13 7 '7"1 4 9 '6"1 3 10 '7" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing F (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 704 /-/-/375 /4 /191 F 573 /-/-/334 /73 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 14 -666 Chords Tens.Comp. C - D 51 -295 D - E 68 -193 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 424 -149 H - G 423 -150 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 238 0 C - G 161 -397 D - G 70 -66 Webs Tens.Comp. G - E 435 -104 E - F 143 -561 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010H 999 240 VERT(CL): 0.017H 999 240 HORZ(LL): 0.004C - - HORZ(TL): 0.008C - - Creep Factor: 2.0 Max TC CSI: 0.231 Max BC CSI: 0.208 Max Web CSI: 0.560 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D04 Ply: 1 Qty:3 Wgt: 102.2 lbs SEQN: 4648 / T7 / COMN FROM:DRW: .../...07/31/2019 W1 W2 (a) A B C D E FGH 10 12 3X4(A1) 2X3 6X8 4X4 3X8 3X4 3X4 13'3"8 (J)Supporting Member: (2) 2x6 DF-L #2 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"81'4" 4"13 7 '7"1 4 9 '6"1 3 10 '7" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing E (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 593 /-/-/299 /-/163 E 580 /-/-/340 /76 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 21 -680 B - C 54 -299 Chords Tens.Comp. C - D 69 -196 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 441 -159 G - F 440 -159 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 241 0 B - F 172 -419 C - F 73 -57 Webs Tens.Comp. F - D 437 -105 D - E 146 -566 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.08 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009G 999 240 VERT(CL): 0.016G 999 240 HORZ(LL): 0.005B - - HORZ(TL): 0.008B - - Creep Factor: 2.0 Max TC CSI: 0.259 Max BC CSI: 0.213 Max Web CSI: 0.566 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D05 Ply: 1 Qty:1 Wgt: 100.8 lbs SEQN: 4324 / T43 / COMN FROM:DRW: .../...07/31/2019 W1 W2 (a) A B C D EFG 10 12 3X4(B1) 2X3 3X4 4X4 3X8 3X4 3X4 13'3"8 (J) 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 4"13 7'7 "14 9'6 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :W1, W2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=13'0"8 uses the following support conditions: 13'0"8Bearing E (13'0"8, 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 593 /-/-/299 /-/163 E 580 /-/-/340 /76 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 21 -680 B - C 54 -299 Chords Tens.Comp. C - D 69 -196 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 441 -159 G - F 440 -159 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 241 0 B - F 172 -419 C - F 73 -57 Webs Tens.Comp. F - D 437 -105 D - E 146 -566 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.08 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009G 999 240 VERT(CL): 0.016G 999 240 HORZ(LL): 0.005B - - HORZ(TL): 0.008B - - Creep Factor: 2.0 Max TC CSI: 0.259 Max BC CSI: 0.213 Max Web CSI: 0.566 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:D05 Ply: 1 Qty:1 Wgt: 100.8 lbs SEQN: 4324 / T43 / COMN FROM:DRW: .../...07/31/2019 W1 W2 (a) A B C D EFG 10 12 3X4(B1) 2X3 3X4 4X4 3X8 3X4 3X4 13'3"8 (J) 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 5'7"15 5'7"15 11' 5'4"1 13'3"8 2'3"8 4"13 7'7 "14 9'6 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W4 2x4 DF-L #1&Bet.: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing K (0', 10'1"2) LUS26 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 952 /-/-/462 /30 /206 F 960 /-/-/474 /34 /- Wind reactions based on MWFRS K Brg Width = -Min Req =- F Brg Width = 3.5 Min Req =3.5 Bearing F is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 185-2297 B - C 0-2902 Chords Tens.Comp. C - D 0 -2887 D - E 142 -2183 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. K - J 313 -310 J - I 2272 -159 Chords Tens.Comp. I - H 2158 -39 H - G 47 -93 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - K 115 -887 A - J 1826 -76 J - B 116 -607 B - I 450 0 C - I 3247 0 Webs Tens.Comp. I - D 682 -240 D - H 95 -635 H - E 1759 -47 G - F 93 -959 G - E 99 -868 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.88 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.173I 999 240 VERT(CL): 0.327I 738 240 HORZ(LL): 0.310G - - HORZ(TL): 0.584G - - Creep Factor: 2.0 Max TC CSI: 0.358 Max BC CSI: 0.392 Max Web CSI: 0.611 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:E02 Ply: 1 Qty:8 Wgt: 130.2 lbs SEQN: 7460 / T17 / SPEC FROM:DRW: .../...07/31/2019 W4 A B C D E F G H I J K 10 12 10 124X6 3X4 4X6 3X4 4X6(R) 6X8(R)3X4 4X4 3X4 4X4 20'3"8 (J)Supporting Member: (2) 2x6 DF-L SS 5'3"3 5'3"3 10'6"6 5'3"3 15'3"3 4'8"13 20'3"8 5'0"5 3"8 3"8 5'3"3 4'11"11 10'6"6 5'3"3 15'3"3 4'8"13 20' 4'8"13 20'3"8 3"8 7"11 2'4 "13 3'0 "8 8'6 "6 11 ' 2 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W4 2x4 DF-L #1&Bet.: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing K (0', 10'1"2) LUS26 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. End verticals not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 952 /-/-/462 /30 /206 F 960 /-/-/474 /34 /- Wind reactions based on MWFRS K Brg Width = -Min Req =- F Brg Width = 3.5 Min Req =3.5 Bearing F is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 185-2297 B - C 0-2902 Chords Tens.Comp. C - D 0 -2887 D - E 142 -2183 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. K - J 313 -310 J - I 2272 -159 Chords Tens.Comp. I - H 2158 -39 H - G 47 -93 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - K 115 -887 A - J 1826 -76 J - B 116 -607 B - I 450 0 C - I 3247 0 Webs Tens.Comp. I - D 682 -240 D - H 95 -635 H - E 1759 -47 G - F 93 -959 G - E 99 -868 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 16.88 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.173I 999 240 VERT(CL): 0.327I 738 240 HORZ(LL): 0.310G - - HORZ(TL): 0.584G - - Creep Factor: 2.0 Max TC CSI: 0.358 Max BC CSI: 0.392 Max Web CSI: 0.611 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:E02 Ply: 1 Qty:8 Wgt: 130.2 lbs SEQN: 7460 / T17 / SPEC FROM:DRW: .../...07/31/2019 W4 A B C D E F G H I J K 10 12 10 124X6 3X4 4X6 3X4 4X6(R) 6X8(R)3X4 4X4 3X4 4X4 20'3"8 (J)Supporting Member: (2) 2x6 DF-L SS 5'3"3 5'3"3 10'6"6 5'3"3 15'3"3 4'8"13 20'3"8 5'0"5 3"8 3"8 5'3"3 4'11"11 10'6"6 5'3"3 15'3"3 4'8"13 20' 4'8"13 20'3"8 3"8 7"11 2'4 "13 3'0 "8 8'6 "6 11 ' 2 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1275 /-/-/592 /109 /347 P 1275 /-/-/592 /109 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 P Brg Width = 5.5 Min Req =1.5 Bearings B & P are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 91 0 B - C 198-2430 C - D 236-2318 D - E 267-2251 E - F 54-1793 F - G 103-1753 G - H 138-1721 H - I 144-1557 Chords Tens.Comp. I - J 144 -1557 J - K 139 -1721 K - L 104 -1753 L - M 55 -1793 M - N 290 -2251 N - O 259 -2318 O - P 216 -2430 P - Q 91 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B -AB 1844 -218 AB-AA 1869 -215 AA- Z 1883 -211 Z - Y 1876 -196 Y - X 1854 -195 X - W 1899 -202 Chords Tens.Comp. W - V 1899 -33 V - U 1854 -13 U - T 1876 -11 T - S 1883 -53 S - R 1869 -49 R - P 1844 -46 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - Z 67 -103 E -AC 270 -409 AC-AD 269 -415 AD-AE 269 -420 AE-AF 273 -429 AF- W 273 -419 I - W 1561 -70 Webs Tens.Comp. W -AG 266 -419 AG-AH 266 -429 AH-AI 263 -420 AI-AJ 262 -415 AJ- M 263 -409 T - M 116 -96 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C -AB 68 -71 D -AA 41 -32 AC- Y 74 0 Gables Tens.Comp. AG- J 117 -17 AH- K 36 -95 V -AI 103 -88 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.155K 999 240 VERT(CL): 0.250K 949 240 HORZ(LL): 0.159R - - HORZ(TL): 0.256R - - Creep Factor: 2.0 Max TC CSI: 0.545 Max BC CSI: 0.637 Max Web CSI: 0.522 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F01 Ply: 1 Qty:1 Wgt: 155.4 lbs SEQN: 4213 / T58 / GABL FROM: Page 1 of 2 DRW: .../...07/31/2019 A B C D E F G H I J K L M N O P Q R STU V W X YZAA AB AC AD AEAF AG AH AI AJ 10 12 5 123X6(F1) 2X3 2X3 2X3 2X3 3X4 2X3 2X3(**) 2X3 2X3 3X6 2X3 2X3 2X3 2X3 2X3 4X4(R) 6X6 2X3 2X3 2X3 2X3 2X3 3X6 2X3 2X3 2X3(**) 2X3 3X4 2X3 2X3 2X3 2X3 3X6(F1) 20' 2'8"1'4"(TYP) 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 1'4"1'4" 4"13 3 '11 " 1 1 8 '8"1 3 9 '9" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. (**) 2 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1275 /-/-/592 /109 /347 P 1275 /-/-/592 /109 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 P Brg Width = 5.5 Min Req =1.5 Bearings B & P are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 91 0 B - C 198-2430 C - D 236-2318 D - E 267-2251 E - F 54-1793 F - G 103-1753 G - H 138-1721 H - I 144-1557 Chords Tens.Comp. I - J 144 -1557 J - K 139 -1721 K - L 104 -1753 L - M 55 -1793 M - N 290 -2251 N - O 259 -2318 O - P 216 -2430 P - Q 91 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B -AB 1844 -218 AB-AA 1869 -215 AA- Z 1883 -211 Z - Y 1876 -196 Y - X 1854 -195 X - W 1899 -202 Chords Tens.Comp. W - V 1899 -33 V - U 1854 -13 U - T 1876 -11 T - S 1883 -53 S - R 1869 -49 R - P 1844 -46 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - Z 67 -103 E -AC 270 -409 AC-AD 269 -415 AD-AE 269 -420 AE-AF 273 -429 AF- W 273 -419 I - W 1561 -70 Webs Tens.Comp. W -AG 266 -419 AG-AH 266 -429 AH-AI 263 -420 AI-AJ 262 -415 AJ- M 263 -409 T - M 116 -96 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C -AB 68 -71 D -AA 41 -32 AC- Y 74 0 Gables Tens.Comp. AG- J 117 -17 AH- K 36 -95 V -AI 103 -88 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.155K 999 240 VERT(CL): 0.250K 949 240 HORZ(LL): 0.159R - - HORZ(TL): 0.256R - - Creep Factor: 2.0 Max TC CSI: 0.545 Max BC CSI: 0.637 Max Web CSI: 0.522 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F01 Ply: 1 Qty:1 Wgt: 155.4 lbs SEQN: 4213 / T58 / GABL FROM: Page 1 of 2 DRW: .../...07/31/2019 A B C D E F G H I J K L M N O P Q R STU V W X YZAA AB AC AD AEAF AG AH AI AJ 10 12 5 123X6(F1) 2X3 2X3 2X3 2X3 3X4 2X3 2X3(**) 2X3 2X3 3X6 2X3 2X3 2X3 2X3 2X3 4X4(R) 6X6 2X3 2X3 2X3 2X3 2X3 3X6 2X3 2X3 2X3(**) 2X3 3X4 2X3 2X3 2X3 2X3 3X6(F1) 20' 2'8"1'4"(TYP) 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 1'4"1'4" 4"13 3 '11 " 1 1 8 '8"1 3 9 '9" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org F -AD 76 -104 AD- X 104 -88 G -AE 36 -95 H -AF 117 -3 AI- L 75 -104 U -AJ 74 0 S - N 42 -32 R - O 69 -71 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F01 Ply: 1 Qty:1 Wgt: 155.4 lbs SEQN: 4213 / T58 / GABL FROM: Page 2 of 2 DRW: .../...07/31/2019 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1004 /-/-/498 /58 /250 F 1004 /-/-/498 /58 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = 5.5 Min Req =1.5 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 121-1917 C - D 56-1426 Chords Tens.Comp. D - E 56 -1426 E - F 135 -1917 F - G 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 1485 -123 J - I 1512 -114 Chords Tens.Comp. I - H 1512 0 H - F 1485 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 170 0 C - I 190 -350 D - I 1330 0 Webs Tens.Comp. I - E 185 -350 H - E 170 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.100I 999 240 VERT(CL): 0.175I 999 240 HORZ(LL): 0.115H - - HORZ(TL): 0.202H - - Creep Factor: 2.0 Max TC CSI: 0.374 Max BC CSI: 0.515 Max Web CSI: 0.445 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F02 Ply: 1 Qty:5 Wgt: 107.8 lbs SEQN: 4199 / T28 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H I J 10 12 5 124X4(F1) 3X4 2X3 4X4(R) 6X6 2X3 3X4 4X4(F1) 20' 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 1'4"1'4" 4"13 3'1 1 "11 8'8 "13 9'9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1004 /-/-/498 /58 /250 F 1004 /-/-/498 /58 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = 5.5 Min Req =1.5 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 121-1917 C - D 56-1426 Chords Tens.Comp. D - E 56 -1426 E - F 135 -1917 F - G 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - J 1485 -123 J - I 1512 -114 Chords Tens.Comp. I - H 1512 0 H - F 1485 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 170 0 C - I 190 -350 D - I 1330 0 Webs Tens.Comp. I - E 185 -350 H - E 170 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.100I 999 240 VERT(CL): 0.175I 999 240 HORZ(LL): 0.115H - - HORZ(TL): 0.202H - - Creep Factor: 2.0 Max TC CSI: 0.374 Max BC CSI: 0.515 Max Web CSI: 0.445 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F02 Ply: 1 Qty:5 Wgt: 107.8 lbs SEQN: 4199 / T28 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H I J 10 12 5 124X4(F1) 3X4 2X3 4X4(R) 6X6 2X3 3X4 4X4(F1) 20' 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 1'4"1'4" 4"13 3'1 1 "11 8'8 "13 9'9 "14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 899 /-/-/425 /39 /195 E 899 /-/-/425 /39 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = 5.5 Min Req =1.5 Bearings A & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 202-1970 B - C 118-1452 Chords Tens.Comp. C - D 118 -1452 D - E 202 -1970 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - H 1538 -99 H - G 1562 -88 Chords Tens.Comp. G - F 1562 -88 F - E 1538 -99 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - H 173 0 B - G 193 -379 C - G 1368 -43 Webs Tens.Comp. G - D 193 -379 F - D 173 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.095G 999 240 VERT(CL): 0.172G 999 240 HORZ(LL): 0.109F - - HORZ(TL): 0.196F - - Creep Factor: 2.0 Max TC CSI: 0.315 Max BC CSI: 0.480 Max Web CSI: 0.458 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F03 Ply: 1 Qty:1 Wgt: 102.2 lbs SEQN: 4206 / T19 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H 10 12 5 12 4X4(F1) 3X4 2X3 4X4(R) 6X6 2X3 3X4 4X4(F1) 20' 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 4"13 3 '11 " 1 1 8 '8"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 899 /-/-/425 /39 /195 E 899 /-/-/425 /39 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 E Brg Width = 5.5 Min Req =1.5 Bearings A & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 202-1970 B - C 118-1452 Chords Tens.Comp. C - D 118 -1452 D - E 202 -1970 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - H 1538 -99 H - G 1562 -88 Chords Tens.Comp. G - F 1562 -88 F - E 1538 -99 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - H 173 0 B - G 193 -379 C - G 1368 -43 Webs Tens.Comp. G - D 193 -379 F - D 173 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.095G 999 240 VERT(CL): 0.172G 999 240 HORZ(LL): 0.109F - - HORZ(TL): 0.196F - - Creep Factor: 2.0 Max TC CSI: 0.315 Max BC CSI: 0.480 Max Web CSI: 0.458 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:F03 Ply: 1 Qty:1 Wgt: 102.2 lbs SEQN: 4206 / T19 / COMN FROM:DRW: .../...07/31/2019 A B C D E F G H 10 12 5 12 4X4(F1) 3X4 2X3 4X4(R) 6X6 2X3 3X4 4X4(F1) 20' 5' 5' 10' 5' 15' 5' 20' 5' 5"8 5"8 5' 4'6"8 10' 5' 15' 5' 19'6"8 4'6"8 20' 5"8 4"13 3 '11 " 1 1 8 '8"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 654 /-/-/340 /7 /167 F 530 /-/-/297 /60 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = 5.5 Min Req =1.5 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 165-1008 Chords Tens.Comp. C - D 223 -839 D - E 52 -49 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 767 -271 Chords Tens.Comp. G - F 154 -36 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 174 -265 G - D 808 -235 Webs Tens.Comp. D - F 109 -457 F - E 43 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030C 999 240 VERT(CL): 0.054C 999 240 HORZ(LL): 0.030F - - HORZ(TL): 0.053F - - Creep Factor: 2.0 Max TC CSI: 0.246 Max BC CSI: 0.262 Max Web CSI: 0.270 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G02 Ply: 1 Qty:2 Wgt: 84.0 lbs SEQN: 7499 / T21 / COMN FROM:DRW: .../...07/31/2019 W3 (a) A B C D E F G 10 12 5 12 3X4(F1) 2X3 4X6(R) 4X6(R) 3X4(R) 2X3 12' 4'11"11 4'11"11 9'8"6 4'8"11 12' 2'3"10 5"8 5"8 6' 5'6"8 11'6"8 5'6"8 12' 5"81'4" 4"13 6 '6"1 2 2 '3"1 1 8 '5"1 3 9 '6" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 654 /-/-/340 /7 /167 F 530 /-/-/297 /60 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = 5.5 Min Req =1.5 Bearings B & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 165-1008 Chords Tens.Comp. C - D 223 -839 D - E 52 -49 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 767 -271 Chords Tens.Comp. G - F 154 -36 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 174 -265 G - D 808 -235 Webs Tens.Comp. D - F 109 -457 F - E 43 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030C 999 240 VERT(CL): 0.054C 999 240 HORZ(LL): 0.030F - - HORZ(TL): 0.053F - - Creep Factor: 2.0 Max TC CSI: 0.246 Max BC CSI: 0.262 Max Web CSI: 0.270 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G02 Ply: 1 Qty:2 Wgt: 84.0 lbs SEQN: 7499 / T21 / COMN FROM:DRW: .../...07/31/2019 W3 (a) A B C D E F G 10 12 5 12 3X4(F1) 2X3 4X6(R) 4X6(R) 3X4(R) 2X3 12' 4'11"11 4'11"11 9'8"6 4'8"11 12' 2'3"10 5"8 5"8 6' 5'6"8 11'6"8 5'6"8 12' 5"81'4" 4"13 6 '6"1 2 2 '3"1 1 8 '5"1 3 9 '6" 1 4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the following support conditions: 0'Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 541 /-/-/265 /-/138 E 537 /-/-/303 /62 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = 5.5 Min Req =1.5 Bearing E is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 179-1037 B - C 238 -870 Chords Tens.Comp. C - D 52 -49 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - F 801 -287 Chords Tens.Comp. F - E 157 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - F 181 -278 F - C 845 -254 Webs Tens.Comp. C - E 114 -467 E - D 43 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028F 999 240 VERT(CL): 0.051F 999 240 HORZ(LL): 0.028E - - HORZ(TL): 0.051E - - Creep Factor: 2.0 Max TC CSI: 0.222 Max BC CSI: 0.252 Max Web CSI: 0.283 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G03 Ply: 1 Qty:1 Wgt: 81.2 lbs SEQN: 7502 / T1 / COMN FROM:DRW: .../...07/31/2019 W3 (a) A B C D E F 10 12 5 12 3X4(F2) 2X3 4X6(R) 4X6(R) 3X4(R) 2X3 12' (J)Supporting Member: (2) 4'11"11 4'11"11 9'8"6 4'8"11 12' 2'3"10 5"8 5"8 6' 5'6"8 11'6"8 5'6"8 12' 5"8 4"13 6 '6"1 2 2 '3" 1 1 8 '5"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Bracing (a) Continuous lateral restraint equally spaced onmember. Hangers / Ties Simpson Construction Hardware is specified based on the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the following support conditions: 0'Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 541 /-/-/265 /-/138 E 537 /-/-/303 /62 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = 5.5 Min Req =1.5 Bearing E is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 179-1037 B - C 238 -870 Chords Tens.Comp. C - D 52 -49 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - F 801 -287 Chords Tens.Comp. F - E 157 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - F 181 -278 F - C 845 -254 Webs Tens.Comp. C - E 114 -467 E - D 43 -79 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028F 999 240 VERT(CL): 0.051F 999 240 HORZ(LL): 0.028E - - HORZ(TL): 0.051E - - Creep Factor: 2.0 Max TC CSI: 0.222 Max BC CSI: 0.252 Max Web CSI: 0.283 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G03 Ply: 1 Qty:1 Wgt: 81.2 lbs SEQN: 7502 / T1 / COMN FROM:DRW: .../...07/31/2019 W3 (a) A B C D E F 10 12 5 12 3X4(F2) 2X3 4X6(R) 4X6(R) 3X4(R) 2X3 12' (J)Supporting Member: (2) 4'11"11 4'11"11 9'8"6 4'8"11 12' 2'3"10 5"8 5"8 6' 5'6"8 11'6"8 5'6"8 12' 5"8 4"13 6 '6"1 2 2 '3" 1 1 8 '5"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing E (11'9", 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 541 /-/-/265 /-/138 E 537 /-/-/303 /62 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = -Min Req =- Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 145 -954 B - C 80 -284 Chords Tens.Comp. C - D 77 -222 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 712 -241 G - F 693 -228 Chords Tens.Comp. F - E 19 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 630 -138 B - F 284 -757 F - C 105 -38 Webs Tens.Comp. F - D 364 -76 E - D 130 -516 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021G 999 240 VERT(CL): 0.037G 999 240 HORZ(LL): 0.021E - - HORZ(TL): 0.038E - - Creep Factor: 2.0 Max TC CSI: 0.249 Max BC CSI: 0.204 Max Web CSI: 0.427 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G04 Ply: 1 Qty:2 Wgt: 86.8 lbs SEQN: 7509 / T39 / SPEC FROM:DRW: .../...07/31/2019 W3 A B C D E F G 10 12 5 12 3X4(F2) 4X6(R) 3X4 3X8 4X4 3X4 3X4 12' (J)Supporting Member: (1) 2x6 DF-L SS (J)Supporting Member: (2) 2x6 DF-L SS 6' 6' 9'8"6 3'8"6 12' 2'3"10 5"8 5"8 6' 5'6"8 9'8"6 3'8"6 11'6"8 1'10"2 12' 5"8 4"13 6 '6"1 2 2 '3" 1 1 8 '5"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W3 2x4 DF-L Standard: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing E (11'9", 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 541 /-/-/265 /-/138 E 537 /-/-/303 /62 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = -Min Req =- Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 145 -954 B - C 80 -284 Chords Tens.Comp. C - D 77 -222 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - G 712 -241 G - F 693 -228 Chords Tens.Comp. F - E 19 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - B 630 -138 B - F 284 -757 F - C 105 -38 Webs Tens.Comp. F - D 364 -76 E - D 130 -516 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021G 999 240 VERT(CL): 0.037G 999 240 HORZ(LL): 0.021E - - HORZ(TL): 0.038E - - Creep Factor: 2.0 Max TC CSI: 0.249 Max BC CSI: 0.204 Max Web CSI: 0.427 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G04 Ply: 1 Qty:2 Wgt: 86.8 lbs SEQN: 7509 / T39 / SPEC FROM:DRW: .../...07/31/2019 W3 A B C D E F G 10 12 5 12 3X4(F2) 4X6(R) 3X4 3X8 4X4 3X4 3X4 12' (J)Supporting Member: (1) 2x6 DF-L SS (J)Supporting Member: (2) 2x6 DF-L SS 6' 6' 9'8"6 3'8"6 12' 2'3"10 5"8 5"8 6' 5'6"8 9'8"6 3'8"6 11'6"8 1'10"2 12' 5"8 4"13 6 '6"1 2 2 '3" 1 1 8 '5"1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2 2x4 DF-L Standard: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing E (11'9", 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 535 /-/-/269 /-/138 E 524 /-/-/303 /63 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = -Min Req =- Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 45 -562 B - C 52 -309 Chords Tens.Comp. C - D 66 -222 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - F 373 -155 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - F 170 -300 C - F 141 -5 Webs Tens.Comp. F - D 422 -77 E - D 117 -567 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006F 999 240 VERT(CL): 0.016F 999 240 HORZ(LL): 0.005F - - HORZ(TL): 0.012F - - Creep Factor: 2.0 Max TC CSI: 0.288 Max BC CSI: 0.480 Max Web CSI: 0.423 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G05 Ply: 1 Qty:1 Wgt: 82.6 lbs SEQN: 7762 / T18 / SPEC FROM:DRW: .../...07/31/2019 W2 A B C D EF 10 12 3X4(B1) 2X3 4X4 3X8 3X4 3X4 12' (J)Supporting Member: (1) 2x6 DF-L SS (J)Supporting Member: (2) 2x6 DF-L SS 5'0"2 5'0"2 9'8"6 4'8"4 12' 2'3"10 9'8"6 9'8"6 12' 2'3"10 4"13 6 '6"1 2 8 '5" 1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W2 2x4 DF-L Standard: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=0' uses the followingsupport conditions: 0' Bearing A (0', 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing E (11'9", 10'1"2) LUS24 Supporting Member: (2)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 535 /-/-/269 /-/138 E 524 /-/-/303 /63 /- Wind reactions based on MWFRS A Brg Width = -Min Req =- E Brg Width = -Min Req =- Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 45 -562 B - C 52 -309 Chords Tens.Comp. C - D 66 -222 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - F 373 -155 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - F 170 -300 C - F 141 -5 Webs Tens.Comp. F - D 422 -77 E - D 117 -567 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006F 999 240 VERT(CL): 0.016F 999 240 HORZ(LL): 0.005F - - HORZ(TL): 0.012F - - Creep Factor: 2.0 Max TC CSI: 0.288 Max BC CSI: 0.480 Max Web CSI: 0.423 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:G05 Ply: 1 Qty:1 Wgt: 82.6 lbs SEQN: 7762 / T18 / SPEC FROM:DRW: .../...07/31/2019 W2 A B C D EF 10 12 3X4(B1) 2X3 4X4 3X8 3X4 3X4 12' (J)Supporting Member: (1) 2x6 DF-L SS (J)Supporting Member: (2) 2x6 DF-L SS 5'0"2 5'0"2 9'8"6 4'8"4 12' 2'3"10 9'8"6 9'8"6 12' 2'3"10 4"13 6 '6"1 2 8 '5" 1 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 659 /-/-/333 /242 /201 H 659 /-/-/333 /242 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.5 Bearings B & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 91 0 B - C 100 -509 C - D 141 -434 D - E 202 -399 Chords Tens.Comp. E - F 202 -399 F - G 141 -434 G - H 100 -509 H - I 91 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - N 307 -65 N - M 304 -64 M - L 301 -63 Chords Tens.Comp. L - K 301 -63 K - J 304 -62 J - H 307 -62 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - L 223 -139 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C - N 55 -47 D - M 81 -86 Gables Tens.Comp. K - F 81 -86 J - G 55 -47 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.012K 999 240 VERT(CL): 0.019K 999 240 HORZ(LL): 0.008G - - HORZ(TL): 0.013C - - Creep Factor: 2.0 Max TC CSI: 0.205 Max BC CSI: 0.221 Max Web CSI: 0.075 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H01 Ply: 1 Qty:1 Wgt: 56.0 lbs SEQN: 4484 / T30 / GABL FROM:DRW: .../...07/31/2019 A B C D E F G H IJKLMN 10 12 3X4(A1) 2X3 2X3 2X3 2X3 4X4 2X3 2X3 2X3 2X3 2X3 3X4(A1) 9'3" 1'11"8 1'4" (TYP) 2'8" 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"81'4"1'4" 4"13 4 '3 "1 5 '4 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 2X3 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 659 /-/-/333 /242 /201 H 659 /-/-/333 /242 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.5 Bearings B & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 91 0 B - C 100 -509 C - D 141 -434 D - E 202 -399 Chords Tens.Comp. E - F 202 -399 F - G 141 -434 G - H 100 -509 H - I 91 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - N 307 -65 N - M 304 -64 M - L 301 -63 Chords Tens.Comp. L - K 301 -63 K - J 304 -62 J - H 307 -62 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - L 223 -139 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. C - N 55 -47 D - M 81 -86 Gables Tens.Comp. K - F 81 -86 J - G 55 -47 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.012K 999 240 VERT(CL): 0.019K 999 240 HORZ(LL): 0.008G - - HORZ(TL): 0.013C - - Creep Factor: 2.0 Max TC CSI: 0.205 Max BC CSI: 0.221 Max Web CSI: 0.075 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H01 Ply: 1 Qty:1 Wgt: 56.0 lbs SEQN: 4484 / T30 / GABL FROM:DRW: .../...07/31/2019 A B C D E F G H IJKLMN 10 12 3X4(A1) 2X3 2X3 2X3 2X3 4X4 2X3 2X3 2X3 2X3 2X3 3X4(A1) 9'3" 1'11"8 1'4" (TYP) 2'8" 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"81'4"1'4" 4"13 4 '3 "1 5 '4 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 513 /-/-/273 /38 /144 D 513 /-/-/273 /38 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 67 -404 Chords Tens.Comp. C - D 68 -404 D - E 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 236 -40 Chords Tens.Comp. F - D 236 -40 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 198 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003F 999 240 VERT(CL): 0.005F 999 240 HORZ(LL): 0.001F - - HORZ(TL): 0.002F - - Creep Factor: 2.0 Max TC CSI: 0.130 Max BC CSI: 0.115 Max Web CSI: 0.061 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H02 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 4477 / T23 / COMN FROM:DRW: .../...07/31/2019 A B C D EF 10 12 3X4(A1) 4X4 2X3 3X4(A1) 9'3" 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"81'4"1'4" 4"13 4 '3" 1 5 '4" 2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 513 /-/-/273 /38 /144 D 513 /-/-/273 /38 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 67 -404 Chords Tens.Comp. C - D 68 -404 D - E 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 236 -40 Chords Tens.Comp. F - D 236 -40 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 198 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003F 999 240 VERT(CL): 0.005F 999 240 HORZ(LL): 0.001F - - HORZ(TL): 0.002F - - Creep Factor: 2.0 Max TC CSI: 0.130 Max BC CSI: 0.115 Max Web CSI: 0.061 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H02 Ply: 1 Qty:1 Wgt: 42.0 lbs SEQN: 4477 / T23 / COMN FROM:DRW: .../...07/31/2019 A B C D EF 10 12 3X4(A1) 4X4 2X3 3X4(A1) 9'3" 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"81'4"1'4" 4"13 4 '3" 1 5 '4" 2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(B1) except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*239 /-/-/100 /9 /90 F 87 /-/-/80 /9 /- C 510 /-/-/266 /40 /- Wind reactions based on MWFRS A Brg Width = 16.7 Min Req =- F Brg Width = 5.5 Min Req =1.5 C Brg Width = 3.5 Min Req =1.5 Bearings A, F, & C are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 75 -392 B - C 79 -397 Chords Tens.Comp. C - D 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 464 -84 Chords Tens.Comp. E - C 232 -42 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 167 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003E 999 240 VERT(CL): 0.005E 999 240 HORZ(LL): 0.001E - - HORZ(TL): 0.002E - - Creep Factor: 2.0 Max TC CSI: 0.139 Max BC CSI: 0.104 Max Web CSI: 0.051 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H03 Ply: 1 Qty:1 Wgt: 40.6 lbs SEQN: 7756 / T22 / COMN FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(B1) 4X4 2X3 3X4(A1) 1'7"8 7'7"8 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"8 1'4" 4"13 4 '3 "1 5 '4 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(B1) except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*239 /-/-/100 /9 /90 F 87 /-/-/80 /9 /- C 510 /-/-/266 /40 /- Wind reactions based on MWFRS A Brg Width = 16.7 Min Req =- F Brg Width = 5.5 Min Req =1.5 C Brg Width = 3.5 Min Req =1.5 Bearings A, F, & C are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 75 -392 B - C 79 -397 Chords Tens.Comp. C - D 67 0 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 464 -84 Chords Tens.Comp. E - C 232 -42 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 167 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003E 999 240 VERT(CL): 0.005E 999 240 HORZ(LL): 0.001E - - HORZ(TL): 0.002E - - Creep Factor: 2.0 Max TC CSI: 0.139 Max BC CSI: 0.104 Max Web CSI: 0.051 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:H03 Ply: 1 Qty:1 Wgt: 40.6 lbs SEQN: 7756 / T22 / COMN FROM:DRW: .../...07/31/2019 A B C D E F 10 12 3X4(B1) 4X4 2X3 3X4(A1) 1'7"8 7'7"8 4'7"8 4'7"8 9'3" 4'7"8 4'7"8 4'7"8 9'3" 4'7"8 1'4" 4"13 4 '3 "1 5 '4 "2 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :M1, M2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X3 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Additional Notes Right end vertical not designed to be exposed to windpressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*129 /-/-/-/-/- Wind reactions based on MWFRS A Brg Width = 110 Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 43 -76 B - C 72 -107 C - D 87 -104 Chords Tens.Comp. D - E 93 -110 E - F 0 -92 F - G 5 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 24 0 L - K 13 0 K - J 7 0 Chords Tens.Comp. J - I 3 0 I - H 0 0 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. B - L 0 -198 C - K 0 -226 D - J 0 -251 Gables Tens.Comp. E - I 0 -234 G - H 0 -69 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 0.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: -CAT: - Pf: 23.1 Ce: - Lu: -Cs: - Snow Duration: - Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002F 999 240 VERT(CL): 0.004F 999 240 HORZ(LL): 0.002F - - HORZ(TL): 0.004F - - Creep Factor: 2.0 Max TC CSI: 0.063 Max BC CSI: 0.027 Max Web CSI: 0.046 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:HB Ply: 1 Qty:1 Wgt: 89.6 lbs SEQN: 7633 / T53 / GABL FROM:DRW: .../...07/31/2019 M1 M2 (a) (a) A B C D E FG HIJKL 15.62 12 3X4(D1) 2X3 2X3 2X3 2X3 2X3 2X3 2X3 2X3 3X4 2X3 2X3 9'2"13 1'11"13 2'(TYP) 1'1"4 8'7"14 8'7"14 9'2"13 6"15 9'2"13 9'2"13 0"4 11 '3"7 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Standard :M1, M2 2x4 DF-L Stud: Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X3 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Additional Notes Right end vertical not designed to be exposed to windpressure. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*129 /-/-/-/-/- Wind reactions based on MWFRS A Brg Width = 110 Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 43 -76 B - C 72 -107 C - D 87 -104 Chords Tens.Comp. D - E 93 -110 E - F 0 -92 F - G 5 -1 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - L 24 0 L - K 13 0 K - J 7 0 Chords Tens.Comp. J - I 3 0 I - H 0 0 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. B - L 0 -198 C - K 0 -226 D - J 0 -251 Gables Tens.Comp. E - I 0 -234 G - H 0 -69 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: EXP: CKzt: NA Mean Height: 0.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 0.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: -CAT: - Pf: 23.1 Ce: - Lu: -Cs: - Snow Duration: - Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002F 999 240 VERT(CL): 0.004F 999 240 HORZ(LL): 0.002F - - HORZ(TL): 0.004F - - Creep Factor: 2.0 Max TC CSI: 0.063 Max BC CSI: 0.027 Max Web CSI: 0.046 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:HB Ply: 1 Qty:1 Wgt: 89.6 lbs SEQN: 7633 / T53 / GABL FROM:DRW: .../...07/31/2019 M1 M2 (a) (a) A B C D E FG HIJKL 15.62 12 3X4(D1) 2X3 2X3 2X3 2X3 2X3 2X3 2X3 2X3 3X4 2X3 2X3 9'2"13 1'11"13 2'(TYP) 1'1"4 8'7"14 8'7"14 9'2"13 6"15 9'2"13 9'2"13 0"4 11 '3"7 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(D1) except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IBC-12 section1607. Wind ***** Gust Wind Speed lower than required for ID. Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*116 /-/-/49 /34 /9 Wind reactions based on MWFRS A Brg Width = 69.7 Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 110 -99 Chords Tens.Comp. B - C 110 -99 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - D 86 -29 Chords Tens.Comp. D - C 86 -29 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. B - D 121 -268 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:90 mph Enclosure: Open Risk Category: II EXP: B Kzt: NA Mean Height: 15.00 ft TCDL: 0.0 psf BCDL: 0.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.00 Wind Duration: 1.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.54 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IBC 2012 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.003D 999 240 VERT(CL): 0.004D 999 240 HORZ(LL): 0.003D - - HORZ(TL): 0.004D - - Creep Factor: 2.0 Max TC CSI: 0.122 Max BC CSI: 0.088 Max Web CSI: 0.050 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:HD Ply: 1 Qty:1 Wgt: 28.0 lbs SEQN: 4430 / T37 / GABL FROM:DRW: .../...07/31/2019 A B C D 15.62 12 3X4(D1) 4X4 2X3 3X4(D1) 5'9"11 2'10"14 2'10"14 5'9"11 2'10"14 2'10"14 2'10"14 5'9"11 2'10"14 0"4 3 '9 "10 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4(D1) except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IBC-12 section1607. Wind ***** Gust Wind Speed lower than required for ID. Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*116 /-/-/49 /34 /9 Wind reactions based on MWFRS A Brg Width = 69.7 Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 110 -99 Chords Tens.Comp. B - C 110 -99 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - D 86 -29 Chords Tens.Comp. D - C 86 -29 Maximum Gable Forces Per Ply (lbs) GablesTens.Comp. B - D 121 -268 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:90 mph Enclosure: Open Risk Category: II EXP: B Kzt: NA Mean Height: 15.00 ft TCDL: 0.0 psf BCDL: 0.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.00 Wind Duration: 1.00 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.54 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IBC 2012 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.003D 999 240 VERT(CL): 0.004D 999 240 HORZ(LL): 0.003D - - HORZ(TL): 0.004D - - Creep Factor: 2.0 Max TC CSI: 0.122 Max BC CSI: 0.088 Max Web CSI: 0.050 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:HD Ply: 1 Qty:1 Wgt: 28.0 lbs SEQN: 4430 / T37 / GABL FROM:DRW: .../...07/31/2019 A B C D 15.62 12 3X4(D1) 4X4 2X3 3X4(D1) 5'9"11 2'10"14 2'10"14 5'9"11 2'10"14 2'10"14 2'10"14 5'9"11 2'10"14 0"4 3 '9 "10 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 247 /-/-/160 /21 /62 D 30 /-/-/25 /3 /- C 19 /-/-/21 /11 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 14 -61 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.001D - - HORZ(TL): 0.001D - - Creep Factor: 2.0 Max TC CSI: 0.121 Max BC CSI: 0.021 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J01 Ply: 1 Qty:8 Wgt: 9.8 lbs SEQN: 4439 / T62 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 1'10"15 1'10"151'4" 4"13 1 '11 "15 3 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 247 /-/-/160 /21 /62 D 30 /-/-/25 /3 /- C 19 /-/-/21 /11 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 14 -61 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.001D - - HORZ(TL): 0.001D - - Creep Factor: 2.0 Max TC CSI: 0.121 Max BC CSI: 0.021 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J01 Ply: 1 Qty:8 Wgt: 9.8 lbs SEQN: 4439 / T62 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 1'10"15 1'10"151'4" 4"13 1 '11 "15 3 '1" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 308 /-/-/182 /1 /100 D 70 /-/-/48 /-/- C 104 /-/-/47 /41 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 66 -94 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL): 0.001D - - HORZ(TL): 0.002D - - Creep Factor: 2.0 Max TC CSI: 0.131 Max BC CSI: 0.093 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J02 Ply: 1 Qty:6 Wgt: 16.8 lbs SEQN: 4442 / T61 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 3'10"15 3'10"151'4" 4"13 3 '7 "15 4 '9" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 308 /-/-/182 /1 /100 D 70 /-/-/48 /-/- C 104 /-/-/47 /41 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 66 -94 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL): 0.001D - - HORZ(TL): 0.002D - - Creep Factor: 2.0 Max TC CSI: 0.131 Max BC CSI: 0.093 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J02 Ply: 1 Qty:6 Wgt: 16.8 lbs SEQN: 4442 / T61 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 3'10"15 3'10"151'4" 4"13 3 '7 "15 4 '9" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 308 /-/-/182 /1 /100 E 70 /-/-/50 /-/- D 99 /-/-/46 /38 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 E Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 1 -108 Chords Tens.Comp. C - D 63 -67 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 13 -11 C - G 11 -12 Chords Tens.Comp. G - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - F 63 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009G 999 240 VERT(CL): 0.015G 999 240 HORZ(LL): 0.008G - - HORZ(TL): 0.013G - - Creep Factor: 2.0 Max TC CSI: 0.121 Max BC CSI: 0.068 Max Web CSI: 0.045 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J02A Ply: 1 Qty:2 Wgt: 23.8 lbs SEQN: 7681 / T66 / JACK FROM:DRW: .../...07/31/2019 A B C D EFG 10 12 3X4(A1) 2X3 3X4 3X4 3'5"8 3'5"8 3'10"15 5"71'4" 2 '4 "7 4"13 3 '7 "15 1' 4 '9" HB 5"7 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Plating Notes All plates are 3X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 308 /-/-/182 /1 /100 E 70 /-/-/50 /-/- D 99 /-/-/46 /38 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 E Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 1 -108 Chords Tens.Comp. C - D 63 -67 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - F 13 -11 C - G 11 -12 Chords Tens.Comp. G - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - F 63 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009G 999 240 VERT(CL): 0.015G 999 240 HORZ(LL): 0.008G - - HORZ(TL): 0.013G - - Creep Factor: 2.0 Max TC CSI: 0.121 Max BC CSI: 0.068 Max Web CSI: 0.045 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J02A Ply: 1 Qty:2 Wgt: 23.8 lbs SEQN: 7681 / T66 / JACK FROM:DRW: .../...07/31/2019 A B C D EFG 10 12 3X4(A1) 2X3 3X4 3X4 3'5"8 3'5"8 3'10"15 5"71'4" 2 '4 "7 4"13 3 '7 "15 1' 4 '9" HB 5"7 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 386 /-/-/221 /-/136 C 170 /-/-/83 /66 /- D 107 /-/-/72 /-/- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 C Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 109 -137 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL): 0.007D - - HORZ(TL): 0.011D - - Creep Factor: 2.0 Max TC CSI: 0.355 Max BC CSI: 0.225 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J03 Ply: 1 Qty:6 Wgt: 22.4 lbs SEQN: 4448 / T10 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 5'10"15 5'10"151'4" 4"13 5 '3 "5 6 '4 "6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&C member design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 386 /-/-/221 /-/136 C 170 /-/-/83 /66 /- D 107 /-/-/72 /-/- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 C Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 Chords Tens.Comp. B - C 109 -137 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - D 0 0 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL): 0.007D - - HORZ(TL): 0.011D - - Creep Factor: 2.0 Max TC CSI: 0.355 Max BC CSI: 0.225 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J03 Ply: 1 Qty:6 Wgt: 22.4 lbs SEQN: 4448 / T10 / JACK FROM:DRW: .../...07/31/2019 A B C D 10 12 3X4(A1) 5'10"15 5'10"151'4" 4"13 5 '3 "5 6 '4 "6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 388 /-/-/221 /-/137 E 160 /-/-/114 /27 /- D 78 /-/-/41 /28 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 E Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -241 Chords Tens.Comp. C - D 50 -61 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 123 -63 G - F 178 -92 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - H 61 0 G - C 113 0 Webs Tens.Comp. C - F 117 -225 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.011G 999 240 VERT(CL): 0.018G 999 240 HORZ(LL): 0.014F - - HORZ(TL): 0.024F - - Creep Factor: 2.0 Max TC CSI: 0.131 Max BC CSI: 0.075 Max Web CSI: 0.509 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J03A Ply: 1 Qty:2 Wgt: 32.2 lbs SEQN: 7673 / T67 / JACK FROM:DRW: .../...07/31/2019 A B C D EF GH 10 12 3X4(A1)3X4 2X3 3X4 3X4 3'5"8 3'5"8 5'10"15 2'5"7 3'5"8 3'5"8 5'9"3 2'3"11 5'10"15 1"121'4" 4"13 5 '3"1 5 1' 6 '5" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 388 /-/-/221 /-/137 E 160 /-/-/114 /27 /- D 78 /-/-/41 /28 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 E Brg Width = 1.5 Min Req =- D Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -241 Chords Tens.Comp. C - D 50 -61 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 123 -63 G - F 178 -92 Chords Tens.Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - H 61 0 G - C 113 0 Webs Tens.Comp. C - F 117 -225 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.011G 999 240 VERT(CL): 0.018G 999 240 HORZ(LL): 0.014F - - HORZ(TL): 0.024F - - Creep Factor: 2.0 Max TC CSI: 0.131 Max BC CSI: 0.075 Max Web CSI: 0.509 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J03A Ply: 1 Qty:2 Wgt: 32.2 lbs SEQN: 7673 / T67 / JACK FROM:DRW: .../...07/31/2019 A B C D EF GH 10 12 3X4(A1)3X4 2X3 3X4 3X4 3'5"8 3'5"8 5'10"15 2'5"7 3'5"8 3'5"8 5'9"3 2'3"11 5'10"15 1"121'4" 4"13 5 '3"1 5 1' 6 '5" **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. (J) Hanger Support Required, by othersBearing G (7'9", 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing G (7'9", 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 476 /-/-/266 /-/176 F 335 /-/-/220 /78 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -303 Chords Tens.Comp. C - D 63 -102 D - E 0 -6 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 181 -110 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 149 -245 Webs Tens.Comp. D - G 80 -108 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.007D 999 240 VERT(CL): 0.018E 999 240 HORZ(LL): 0.006E - - HORZ(TL): 0.020E - - Creep Factor: 2.0 Max TC CSI: 0.149 Max BC CSI: 0.378 Max Web CSI: 0.113 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J04 Ply: 1 Qty:9 Wgt: 47.6 lbs SEQN: 7759 / T60 / EJAC FROM:DRW: .../...07/31/2019 A B C DE FG 10 12 3X4(A1) 2X3 2X3 4X4 8' (J) 4'1"15 4'1"15 7'10"4 3'8"5 8' 1"12 7'10"4 7'10"4 8' 1"12 1'4" 4"13 7 '0"1 3 8 '1"1 4 HB 1"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. (J) Hanger Support Required, by othersBearing G (7'9", 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.Bearing G (7'9", 10'1"2) LUS24 Supporting Member: (1)2x6 DF-L #2 (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 476 /-/-/266 /-/176 F 335 /-/-/220 /78 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -303 Chords Tens.Comp. C - D 63 -102 D - E 0 -6 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - G 181 -110 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 149 -245 Webs Tens.Comp. D - G 80 -108 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.007D 999 240 VERT(CL): 0.018E 999 240 HORZ(LL): 0.006E - - HORZ(TL): 0.020E - - Creep Factor: 2.0 Max TC CSI: 0.149 Max BC CSI: 0.378 Max Web CSI: 0.113 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J04 Ply: 1 Qty:9 Wgt: 47.6 lbs SEQN: 7759 / T60 / EJAC FROM:DRW: .../...07/31/2019 A B C DE FG 10 12 3X4(A1) 2X3 2X3 4X4 8' (J) 4'1"15 4'1"15 7'10"4 3'8"5 8' 1"12 7'10"4 7'10"4 8' 1"12 1'4" 4"13 7 '0"1 3 8 '1"1 4 HB 1"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W1 2x4 DF-L #1&Bet.: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=7'9" uses the followingsupport conditions: 7'9" Bearing G (7'9", 11'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.(J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 476 /-/-/265 /-/176 F 335 /-/-/219 /78 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -389 Chords Tens.Comp. C - D 86 -110 D - E 0 -6 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - I 246 -121 H - G 363 -177 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - I 62 0 H - C 156 0 Webs Tens.Comp. C - G 192 -394 D - G 95 -145 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025H 999 240 VERT(CL): 0.043H 999 240 HORZ(LL): 0.026G - - HORZ(TL): 0.044G - - Creep Factor: 2.0 Max TC CSI: 0.215 Max BC CSI: 0.205 Max Web CSI: 0.436 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J04A Ply: 1 Qty:2 Wgt: 51.8 lbs SEQN: 7659 / T68 / EJAC FROM:DRW: .../...07/31/2019 W1 A B C DE FG HI 10 12 3X4(A1)3X4 2X3 3X4 2X3 4X4 8' (J)Supporting Member: (1) 2x6 DF-L SS 3'5"8 3'5"8 7'10"4 4'4"12 8' 1"12 3'5"8 3'5"8 7'10"4 4'4"12 8' 1"12 1'4" 4"13 1' 6 '0"1 3 7 '0"1 3 8 '1"1 4 HB 1"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W1 2x4 DF-L #1&Bet.: Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based on manufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturer publication for additional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=7'9" uses the followingsupport conditions: 7'9" Bearing G (7'9", 11'1"2) LUS24 Supporting Member: (1)2x6 DF-L SS (4) 0.148"x3" nails into supporting member, (2) 0.148"x3" nails into supported member.(J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section 301.5. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 476 /-/-/265 /-/176 F 335 /-/-/219 /78 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 0 B - C 0 -389 Chords Tens.Comp. C - D 86 -110 D - E 0 -6 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - I 246 -121 H - G 363 -177 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - I 62 0 H - C 156 0 Webs Tens.Comp. C - G 192 -394 D - G 95 -145 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025H 999 240 VERT(CL): 0.043H 999 240 HORZ(LL): 0.026G - - HORZ(TL): 0.044G - - Creep Factor: 2.0 Max TC CSI: 0.215 Max BC CSI: 0.205 Max Web CSI: 0.436 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J04A Ply: 1 Qty:2 Wgt: 51.8 lbs SEQN: 7659 / T68 / EJAC FROM:DRW: .../...07/31/2019 W1 A B C DE FG HI 10 12 3X4(A1)3X4 2X3 3X4 2X3 4X4 8' (J)Supporting Member: (1) 2x6 DF-L SS 3'5"8 3'5"8 7'10"4 4'4"12 8' 1"12 3'5"8 3'5"8 7'10"4 4'4"12 8' 1"12 1'4" 4"13 1' 6 '0"1 3 7 '0"1 3 8 '1"1 4 HB 1"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.00 BC: 541 lb Conc. Load at 1.17, 3.17, 5.17 BC: 535 lb Conc. Load at 7.17 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=7'9" uses the followingsupport conditions: 7'9"Bearing D (7'9", 10'1"2) HUS26 Supporting Member: (1)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1416 /-/-/187 /28 /148 D 1449 /-/-/229 /81 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 D Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 43-1318 Chords Tens.Comp. B - C 63 -102 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 967 -108 Chords Tens.Comp. E - D 946 -108 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - B 1355 0 B - D 147-1288 Webs Tens.Comp. C - D 66 -98 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014E 999 240 VERT(CL): 0.024E 999 240 HORZ(LL):-0.005C - - HORZ(TL): 0.009C - - Creep Factor: 2.0 Max TC CSI: 0.223 Max BC CSI: 0.393 Max Web CSI: 0.586 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J05 Ply: 1 Qty:1 Wgt: 56.0 lbs SEQN: 7621 / T27 / EJAC FROM:DRW: .../...07/31/2019 A B C DE 10 12 4X4(A1) 3X8 3X10 2X3 3X6(R) 8' (J) 4'1"15 4'1"15 8' 3'10"1 4'1"15 4'1"15 8' 3'10"1 4"13 7'0 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x6 DF-L SS Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 68 plf at -1.52 to 68 plf at 8.00 BC: From 5 plf at -1.52 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 8.00 BC: 541 lb Conc. Load at 1.17, 3.17, 5.17 BC: 535 lb Conc. Load at 7.17 Hangers / Ties Simpson Construction Hardware is specified basedon the most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require differentconnections than indicated. Refer to manufacturerpublication for additional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=7'9" uses the followingsupport conditions: 7'9"Bearing D (7'9", 10'1"2) HUS26 Supporting Member: (1)2x6 DF-L SS (14) 0.148"x3" nails into supporting member, (4) 0.148"x3" nails into supported member. Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1416 /-/-/187 /28 /148 D 1449 /-/-/229 /81 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req =1.5 D Brg Width = -Min Req =- Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 43-1318 Chords Tens.Comp. B - C 63 -102 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. A - E 967 -108 Chords Tens.Comp. E - D 946 -108 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - B 1355 0 B - D 147-1288 Webs Tens.Comp. C - D 66 -98 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 0.93 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014E 999 240 VERT(CL): 0.024E 999 240 HORZ(LL):-0.005C - - HORZ(TL): 0.009C - - Creep Factor: 2.0 Max TC CSI: 0.223 Max BC CSI: 0.393 Max Web CSI: 0.586 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:J05 Ply: 1 Qty:1 Wgt: 56.0 lbs SEQN: 7621 / T27 / EJAC FROM:DRW: .../...07/31/2019 A B C DE 10 12 4X4(A1) 3X8 3X10 2X3 3X6(R) 8' (J) 4'1"15 4'1"15 8' 3'10"1 4'1"15 4'1"15 8' 3'10"1 4"13 7'0 "13 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.03 to 66 plf at -0.15 TC: From 2 plf at -0.15 to 2 plf at 11.25 BC: From 0 plf at -2.03 to 5 plf at -0.15 BC: From 2 plf at -0.15 to 2 plf at 5.64 BC: From 20 plf at 5.64 to 20 plf at 11.25 TC: 39 lb Conc. Load at 2.81 TC: 208 lb Conc. Load at 5.64 TC: 339 lb Conc. Load at 8.38 BC: 60 lb Conc. Load at 2.81 BC: 140 lb Conc. Load at 5.64 Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 612 /-/-/-/70 /- F 542 /-/-/-/71 /- Wind reactions based on MWFRS B Brg Width = 7.8 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -9 B - C 95 -650 Chords Tens.Comp. C - D 65 -114 D - E 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 557 -83 H - G 552 -84 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 257 0 C - G 101 -665 Webs Tens.Comp. D - G 42 -132 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.011H 999 240 VERT(CL): 0.021H 999 240 HORZ(LL):-0.005E - - HORZ(TL): 0.011E - - Creep Factor: 2.0 Max TC CSI: 0.654 Max BC CSI: 0.242 Max Web CSI: 0.461 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:JC01 Ply: 1 Qty:3 Wgt: 63.0 lbs SEQN: 7624 / T14 / HIP_ FROM:DRW: .../...07/31/2019 A B C DE FGH 7.07 12 3X4(A1) 2X3 3X4 2X3 4X4 11'3" (J) 5'10"4 5'10"4 11'3" 5'4"13 5'10"4 5'10"4 11'3" 5'4"131'10"10 4"6 6 '11 "15 8 '0 "15 HB 0"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.03 to 66 plf at -0.15 TC: From 2 plf at -0.15 to 2 plf at 11.25 BC: From 0 plf at -2.03 to 5 plf at -0.15 BC: From 2 plf at -0.15 to 2 plf at 5.64 BC: From 20 plf at 5.64 to 20 plf at 11.25 TC: 39 lb Conc. Load at 2.81 TC: 208 lb Conc. Load at 5.64 TC: 339 lb Conc. Load at 8.38 BC: 60 lb Conc. Load at 2.81 BC: 140 lb Conc. Load at 5.64 Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 612 /-/-/-/70 /- F 542 /-/-/-/71 /- Wind reactions based on MWFRS B Brg Width = 7.8 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -9 B - C 95 -650 Chords Tens.Comp. C - D 65 -114 D - E 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - H 557 -83 H - G 552 -84 Chords Tens.Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 257 0 C - G 101 -665 Webs Tens.Comp. D - G 42 -132 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.011H 999 240 VERT(CL): 0.021H 999 240 HORZ(LL):-0.005E - - HORZ(TL): 0.011E - - Creep Factor: 2.0 Max TC CSI: 0.654 Max BC CSI: 0.242 Max Web CSI: 0.461 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:JC01 Ply: 1 Qty:3 Wgt: 63.0 lbs SEQN: 7624 / T14 / HIP_ FROM:DRW: .../...07/31/2019 A B C DE FGH 7.07 12 3X4(A1) 2X3 3X4 2X3 4X4 11'3" (J) 5'10"4 5'10"4 11'3" 5'4"13 5'10"4 5'10"4 11'3" 5'4"131'10"10 4"6 6 '11 "15 8 '0 "15 HB 0"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W4 2x4 DF-L #1&Bet.: Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.03 to 66 plf at -0.15 TC: From 2 plf at -0.15 to 2 plf at 11.19 BC: From 0 plf at -2.03 to 5 plf at -0.15 BC: From 2 plf at -0.15 to 2 plf at 11.19 TC: 39 lb Conc. Load at 2.75 TC: 197 lb Conc. Load at 5.58 TC: 156 lb Conc. Load at 8.40 BC: 60 lb Conc. Load at 2.75 BC: 140 lb Conc. Load at 5.58 BC: 321 lb Conc. Load at 8.40 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 610 /-/-/-/78 /- G 566 /-/-/-/99 /- Wind reactions based on MWFRS B Brg Width = 7.0 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -9 B - C 95 -608 C - D 196-1087 Chords Tens.Comp. D - E 118 -581 E - F 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 495 -76 L - K 26 -5 J - I 1016 -192 Chords Tens.Comp. I - H 0 0 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - L 50 -268 C - J 536 -120 L - J 540 -80 J - K 37 -1 Webs Tens.Comp. J - D 304 -10 D - I 153 -732 I - E 775 -122 E - H 95 -540 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.022J 999 240 VERT(CL): 0.039J 999 240 HORZ(LL): 0.009I - - HORZ(TL): 0.016I - - Creep Factor: 2.0 Max TC CSI: 0.470 Max BC CSI: 0.279 Max Web CSI: 0.312 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:JC02 Ply: 1 Qty:1 Wgt: 74.2 lbs SEQN: 7686 / T2 / HIP_ FROM:DRW: .../...07/31/2019 W4 A B C D EF GHI JKL 7.07 12 3X4(A1) 3X4 3X4 6X6 2X3 3X4 3X4 4X4 3X4 11'2"4 (J) 2'8"4 2'8"4 4'9"15 2'1"11 11'2"4 6'4"5 2'8"4 2'8"4 4'9"15 2'1"11 7'11"12 3'1"13 11'2"4 3'2"91'10"10 4"13 1' 5 '11 "15 6 '11 "15 8 '0 "8 HB 0"12 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord 2x4 DF-L #1&Bet.Bot chord 2x4 DF-L #1&Bet. Webs 2x4 DF-L Stud :W4 2x4 DF-L #1&Bet.: Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.03 to 66 plf at -0.15 TC: From 2 plf at -0.15 to 2 plf at 11.19 BC: From 0 plf at -2.03 to 5 plf at -0.15 BC: From 2 plf at -0.15 to 2 plf at 11.19 TC: 39 lb Conc. Load at 2.75 TC: 197 lb Conc. Load at 5.58 TC: 156 lb Conc. Load at 8.40 BC: 60 lb Conc. Load at 2.75 BC: 140 lb Conc. Load at 5.58 BC: 321 lb Conc. Load at 8.40 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-15 section301.5. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 610 /-/-/-/78 /- G 566 /-/-/-/99 /- Wind reactions based on MWFRS B Brg Width = 7.0 Min Req =1.5 G Brg Width = -Min Req =- Bearing B is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) ChordsTens.Comp. A - B 67 -9 B - C 95 -608 C - D 196-1087 Chords Tens.Comp. D - E 118 -581 E - F 0 -2 Maximum Bot Chord Forces Per Ply (lbs) ChordsTens.Comp. B - L 495 -76 L - K 26 -5 J - I 1016 -192 Chords Tens.Comp. I - H 0 0 H - G 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - L 50 -268 C - J 536 -120 L - J 540 -80 J - K 37 -1 Webs Tens.Comp. J - D 304 -10 D - I 153 -732 I - E 775 -122 E - H 95 -540 Loading Criteria (psf) TCLL:25.00 TCDL: 7.00 BCLL: 0.00 BCDL:10.00 Des Ld:42.00 NCBCLL:10.00 Soffit: 2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-10 Speed:115 mph Enclosure: Closed Risk Category: II EXP: CKzt: NA Mean Height: 15.00 ft TCDL: 4.2 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 25.0 Ct: 1.1 CAT: II Pf: 23.1 Ce: 1.2 Lu: -Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code:IRC 2015 TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.022J 999 240 VERT(CL): 0.039J 999 240 HORZ(LL): 0.009I - - HORZ(TL): 0.016I - - Creep Factor: 2.0 Max TC CSI: 0.470 Max BC CSI: 0.279 Max Web CSI: 0.312 Mfg Specified Camber: VIEW Ver: 18.02.01A.0205.19 Job Number:MAQ190012A Page Residence-FINAL Truss Label:JC02 Ply: 1 Qty:1 Wgt: 74.2 lbs SEQN: 7686 / T2 / HIP_ FROM:DRW: .../...07/31/2019 W4 A B C D EF GHI JKL 7.07 12 3X4(A1) 3X4 3X4 6X6 2X3 3X4 3X4 4X4 3X4 11'2"4 (J) 2'8"4 2'8"4 4'9"15 2'1"11 11'2"4 6'4"5 2'8"4 2'8"4 4'9"15 2'1"11 7'11"12 3'1"13 11'2"4 3'2"91'10"10 4"13 1' 5 '11 "15 6 '11 "15 8 '0 "8 HB 0"12