Loading...
HomeMy WebLinkAboutRESCHECK - M19-00141 - McBride - 990 River Run - New SFRGenerated by REScheck-Web Software Compliance Certificate Project Landon & Kim McBride Energy Code: 2009 IECC Location: Madison County, Idaho Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 4,018 ft2 Glazing Area 19% Climate Zone: 6 (8999 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 990 River Run Josh & Marcy Garner Justin Stevens Sugar City, ID 83448 330 Oaktrail Drive Stevens Homes Rexburg, ID 83440 PO Box 2759 Idaho Falls, ID 83403 justin@stevenshomes.com Compliance:trade-off Compliance: 13.8% Better Than Code Maximum UA: 536 Your UA: 462 The % Better or worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Envelope Assemblies t_emng: rlat (-ening or 5clssor Truss 4,018 0.0 50.0 0.019 76 Wall: Wood Frame, 16" o.c. 2,350 19.0 0.0 0.060 110 Doors Main Floor: Glass Door (over 50% glazing) 82 0.350 29 Windows Main Floor: Vinyl Frame 432 0.280 121 Wall Second Floor: Wood Frame, 16" D.C. 1,020 19.0 0.0 0.060 54 Window: Vinyl Frame 120 0.280 34 Crawl: Solid Concrete or Masonry 1,112 0.0 19.0 0.046 38 Wall height: 4.0' Depth below grade: 3.0' Insulation depth: 4.0' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version : REScheck-Web and to comply with the r9andk'Ory req Irements list din "'REScheck Inspection Checklist. r✓ffs� rI > f �l/t'iCS ;��-PSS �4 7� �/ Name - Title Slgg3tLo Date Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 1 of 7 r4REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req.ID Pre-Inspection/Plan Review Plans Verified Value Field Verified Value Complies? Comments/Assum tions p 103.2 Construction drawings and ❑Complies [PR111 documentation demonstrate ❑Does Not g, energy code compliance for the building envelope. ❑Not Observable ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation demonstrate []Does Not [PR3]1 energy code compliance for lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR2]2 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not on loads per ACCA Manual J or other approved methods. Cooling: g: Cooling: g: ❑ Not Observable Btu /hr Btu/hrlin ❑Not Applicable Additional Comments/Assumptions: E1 JHigh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 2 of 7 F+uumionat Lomments/Assumptions: 11 High Impact (Tier 1) 2 MediumImpact (Tier 2) 3 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 3 of 7 ESection # ea.ID Foundation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 402.2.9 (FO7]1 Unvented crawl space wall R- insulation R -value. R- ❑Complies See the Envelope Assemblies R- R- []Does Not table for values. *t ❑Not Observable —� ❑Not Applicable 303.2 Unvented crawl space wall ❑Complies [FO8]1 insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.9 Unvented crawl space continuous ❑Complies [FO9]1 vapor retarder installed over ❑Does Not exposed earth, joints overlapped by 6 in. and sealed, extending at ❑Not Observable least 6 in. up and attached to the ❑Not Applicable wall. 402.2.9 [FO10]1 Unvented crawl space wall in. insulation depth of burial or in. ❑Complies See the Envelope Assemblies distance from top of wall. ❑Does Not table for values. - ❑Not Observable — ❑Not Applicable 303.2. z A protective covering is installed ❑Complies [F011] to protect exposed exterior ❑Does Not insulation and extends a minimum of 6 in. below grade. ❑Not Observable ❑Not Applicable 403.8 Snow- and ice -melting system ❑Complies [FO12]2 controls installed. ❑Does Not ❑Not Observable ❑Not Applicable F+uumionat Lomments/Assumptions: 11 High Impact (Tier 1) 2 MediumImpact (Tier 2) 3 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 3 of 7 Section # Framing / Rough-In Inspection Plans Verified Field Verified & Req.ID Value Value Complies? Comments/Assumptions 402.1.1, 402.3.1, Glazing U-factor (area-weighted U- average). U_ ❑ Complies See the Envelope Assemblies 402.3.3, []Does Not table for values. 402.5 []Not Observable [FR2]1 ❑Not Applicable t? 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not 1, with the NFRC test procedure or taken from the default table. []Not Observable []Not Applicable 402.4.4 [FR20]1 Fenestration that is not site built is listed ❑Complies and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/l.5.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not I, and labeled to indicate <_2.0 cfm - leakage at 75 Pa. [-]Not Observable ❑Not Applicable 403.2.1 Supply ducts in attics are R- [FR12]1 insulated to >_R-8. All other ducts R- ❑Complies H in R- unconditioned spaces or R- ❑Does Not outside the building envelope are ❑Not Observable — insulated to >_R-6. ❑Not Applicable 403.2.2 All joints and seams of air ducts, ❑Complies [FR13]1 air handlers, filter boxes, and ❑Does Not building cavities used as return ducts are sealed. ❑Not Observable ❑Not Applicable 403.2.3 Building cavities are not used for ❑Complies [FR15]3 supply ducts. ❑Does Not :,. ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R_ R- ❑Complies [FR17]2 above 105 °F or chilled fluids ❑Does Not U. below 55 °F are insulated to >_R- 3• ❑Not Observable ❑Not Applicable 403.4 Circulating service hot water R- R- _ ❑Complies [FR18]2 pipes are insulated to R-2. ❑Does Not ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. []Not Observable �NNn,-avic Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 Medium Impact (Tier 2) 3 Low Impact (Tier 3) i Project Title: Landon & Kim McBride Data filename: Report date: 10/21/19 Page 4 of 7 Section IPlans # Insulation Inspection Verified Value Field Verified Value Complies? Comments/Assumptions & Re .ID 303.1 All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.4, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.5 [IN3]1 wall insulation on the wall exterior, the exterior insulation E] Mass mass ❑Not Observable ^ requirement applies. E] Steel Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not - ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 12 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 5 of 7 Section Re .ID F___ Final Inspection Provisions Plans Verified Value Field Verified Value Complies? Comments/Assumptions 402.1.1, 402.2.1, Ceiling insulation R -value. Where > R-30 is required, R-30 can be R- R- F-1 Wood F1 Wood ❑Complies See the Envelope assemblies ❑Does Not table for values. 402.2.2 [FI1]1 used if insulation is not compressed at eaves. R-30 may Steel Steel ❑Not Observable ,, - be used for 500 ft2 or 20% ❑Not Applicable (whichever is less) where sufficient space is not available. 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 [FI2]1 manufacturer's instructions. Blown insulation marked every ❑Does Not 300 ft2. ❑Not Observable ❑Not Applicable 402.2.3 [F13]1 Attic access hatch and door insulation >R -value of the R- R- ❑Complies V, adjacent assembly. ❑Does Not ❑Not Observable ❑Not Applicable 402.4.2, Building envelope tightness 402.4.2.1 verified by blower door test result _ ACH 50 = ACH 50 = ❑Complies [F117]1 of <7 ACH at 50 Pa. This ❑Does Not requirement may instead be met ❑Not Observable via visual inspection, in which ❑Not Applicable case verification may need to occur during Insulation _ Inspection. 403.2.2 Post construction duct tightness cfm cfm ❑Complies [FI4]1 test result of 58 cfm to outdoors, ❑Does Not or <12 cfm across systems. Or, rough -in test result of s6 cfm []Not Observable across systems or 54 cfm ❑Not Applicable without air handler. Rough -in test verification may need to occur during FramingInspection. _ 403.1.1 Programmable thermostats ❑Complies [F19] installed on forced air furnaces. ❑Does Not ❑Not Observable []Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.4 Circulating service hot water ❑Complies [FI11]2 systems have automatic or ❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 404.1 50% of lamps in permanent [FI6]1 fixtures are high efficacy lamps. ❑Complies ❑Does Not ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies [F17]z ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for [FI18]3 mechanical and water heating ❑Complies equipment have been provided. ❑Does Not ❑Not Observable MAI ..4 A__1:__�1_ Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 6 of 7 I I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Landon & Kim McBride Report date: 10/21/19 Data filename: Page 7 of 7 �(2009 IECC Energy j Efficiency Certificate Above -Grade Wall 19.00 Below -Grade Wall 19.00 Floor 0.00 Ceiling / Roof 50.00 Ductwork (unconditioned spaces): Window 0.28 Door 0.35 Heating System: Cooling System: Water Heater: Name: Date• Comments