Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00228 - BYUI Central Heating PlantPermit Inspection Summary Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Issued Date: Permit Inspection Statistics 125Total Inspections Completed: 116Total Inspections Passed: Inspection Pass Rate: 92.80% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 12/6/13 TD: Rebar for footings - rebar as per plans.Inspector Comments: 12/11/13 TD: Rebar for footing - footing and beam pads rebar as per plans.Inspector Comments: 1/27/14 TD: Footing/foundation - approved.Inspector Comments: 02/05/2014PassTed DyeFooting Inspection 2/5/14 TD: Rebar (footings and walls) - footing starting at grid g and grid 5. Main electrical room. Exterior grid to 5.37 Found DB pm 3 tonel counter clockwise to D & 3.8. Inspector Comments: Inspection scheduled for 1pm on small section on south end. Arrived early, but already started pour (about 50% filled). Jacob, with Forsgren, was on site and had inspected and found reinforcement to be good. Inspector Comments: 02/26/2014PassQuinton OwensFooting Inspection Previous rebar inspections approved on 1/7/14 and 1/13/14.Inspector Comments: 03/05/2014PassTed DyeFoundation Inspection all rebar sized and spaced properly and held away from formInspector Comments: 03/14/2014PassQuinton OwensFooting Inspection Footings on west side of building. Also partial Grade Beam and footings on south east of existing heat plant. Inspector Comments: 03/25/2014PassQuinton OwensFoundation Inspection all rebar tied and correctly sized. pushed away from forms when there OK to pour Inspector Comments: 03/31/2014PassQuinton OwensFoundation Inspection Middle section of west wall.Inspector Comments: 03/31/2014PassQuinton OwensFooting Inspection Footing for stairs on South end.Inspector Comments: 04/04/2014PassQuinton OwensFoundation Inspection Missed due to scheduling error (requested for 4/3, not 4/4). Previous observations at slab during other inspections showed no issues with insulation. Special Inspector on site for pour said it all looked "good" Inspector Comments: Page 1 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary 04/28/2014PassQuinton OwensFoundation Inspection First four foot of interior masonry wall reinforcement bars in place and approved for grout pour. Special Inspector on site. Inspector Comments: 04/28/2014PassQuinton OwensFooting Inspection Grade beam on north end of west wall and 2 spread footings on west end of north wall. Approved for pour. Inspector Comments: 04/29/2014PassQuinton OwensFoundation Inspection Trench exterior Foundation on west end of North wall approved for pour.Inspector Comments: 05/07/2014PassQuinton OwensFoundation Inspection Masonry grout pour. Inspection not scheduled at requested time. Special Inspector verified compliance of work done. Inspector Comments: 05/21/2014PassQuinton OwensFoundation Inspection Masonry Grout for interior wall along grid D and grid C2 (between D1 & G), and grid 4 between A & C). Also Exterior East wall at top from C to G (included single #5 bar and embeds for connection to steel). Also viewed by special inspector. Inspector Comments: 05/22/2014PassQuinton OwensFoundation Inspection Grout pour on east half of south wall and some interior walls. Special Inspector on site. Horizontal rebar in place. Inspector Comments: 05/30/2014PassQuinton OwensFoundation Inspection Slab on grade-2nd levelInspector Comments: 06/12/2014PassTed DyeFoundation Inspection footing, floor combo on south end of building.Inspector Comments: 06/27/2014PassTed DyeFooting Inspection Slab on grade. Rebar is the correct size and spacing. Approved to pour. Inspector Comments: 06/27/2014PassTed DyeFoundation Inspection Grout pour. Horz.and vertical in place. Special inspector on site. Inspector Comments: 07/07/2014PassQuinton OwensFoundation Inspection Block wall grout pour, west and north side exterior wall.Inspector Comments: 07/15/2014PassQuinton OwensFoundation Inspection Masonry rebar & grout: Not completely ready at inspection. Special Inspector will be checking just prior to pour. Inspector Comments: 08/26/2014PassQuinton OwensCommercial Insulation Inspection wall between upper and lower roof on East Side insulated with vapor barrier approved to cover. Inspector Comments: Page 2 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary 06/26/2015PassQuinton OwensCommercial Footing Inspection Footings between grid 3 and C1.2 and between H1 & CF (exlcluding spot footings on grid 3.5 between J & H1). Column pier rebar not in yet. Special Inspector to arrive for pour and will also inspect rebar. Inspector Comments: 07/10/2015PassQuinton OwensFoundation Inspection Foundation between grids 3 and C1.2.Inspector Comments: 07/30/2015PassQuinton OwensCommercial Footing Inspection Exterior footing from SW corner (grid H/2) to grid K/3, and foundation wall along grid 3.6. Inspector Comments: 08/04/2015PassQuinton OwensFoundation Inspection Exterior foundation from SW corner (grid H/2) to grid K/3, and foundation wall along grid 3.6. Inspector Comments: 10/15/2015PassQuinton OwensCommercial Framing/Structure Inspection Exterior overhang framing approved for cover.Inspector Comments: 10/20/2015PassQuinton OwensFoundation Inspection Structural Masonry wall (west side of stairs to roof). Inspection of rebar at 4' level. Complete special inspections as required. Inspector Comments: 10/21/2015PassQuinton OwensFoundation Inspection Masonry bond beam about 8' a.f.f.Inspector Comments: 10/22/2015PassQuinton OwensFoundation Inspection Masonry bond beam at roof level.Inspector Comments: 11/09/2015FailQuinton OwensCommercial Framing/Structure Inspection Steel stud framing approved, except for backing to be added for grab bars in restrooms. Be sure toilet is centered 16" min. to 18" max. off side wall when finished. Inspector Comments: 12/09/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Missing screws in a few locations. Add as indicated to subcontractor. Hard ceilings not hung yet. Inspector Comments: Inspected on 2/10: No areas over 1,000 sf. Tie wires at 4' o.c. and lights with 2 wires each. Inspector Comments: 02/10/2016PassQuinton OwensSuspending Ceiling Inspection Note prior to requesting final inspection: Fire rated glass not installed as noted on plans, where is door fire rating label, remember to complete handrails and guardrails in tunnel and at stairway "S03". Inspector Comments: Page 3 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary 03/03/2016FailQuinton OwensCommercial Building Final Restroom signage not installed. Sprinkler heads still have covers. 1 hour window assembly does not have rated glass. No label on rated doors (104B, 112, 113C)- Pre-Existing rated doors? Missing 2nd handrail and guardrail on stairs in tunnel per plans. Exterior wall not finished around door to roof (door is also rated without closer). Interior light in exit sign above door 113A is not working. Multiple exterior doors are missing hardware. unprotected penetrations through rated wall between boiler area and administrative area. Inspector Comments: 03/03/2016PassQuinton OwensCommercial Framing/Structure Inspection Re-inspectionInspector Comments: 03/11/2016FailQuinton OwensCommercial Building Final ** Approved for Temporary Occupancy only. ** Temporary non-ADA restroom signage installed. Missing 2nd handrail and guardrail on stairs in tunnel per plans. Exterior wall not finished around door to roof. Multiple exterior doors are missing hardware. Protect penetrations between occupancies to resist the passage of smoke. Inspector Comments: 05/17/2016PassQuinton OwensCommercial Building Final Page 4 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary Electrical Inspection Type 01/13/2014Pass Electrical Underground Inspection Approved for cover-underground conduit on SE corner of project for emergency and control circuits to building on south end of project. Inspector Comments: 01/14/2014PassBret StoddardElectrical Underground Inspection 01/14/2014PassBret StoddardElectrical Underground Inspection Approved for cover for the next(middle) portion of conduit for the emergency and control circuits on the east side of the project. This is the same inspection as the other line with no notes-didn't save the first time. Inspector Comments: 01/16/2014PassBret StoddardElectrical Underground Inspection Approved for cover-underground conduit for emergency and control circuits-red concrete installed because of shallow depth-16". Inspector Comments: 02/05/2014PassBret StoddardElectrical Underground Inspection Approved to place concrete-ufer-22' copper, concrete encased electrode.Inspector Comments: 02/20/2014PassBret StoddardElectrical Underground Inspection 02/24/2014PassBret StoddardElectrical Underground Inspection 03/07/2014PassBret StoddardElectrical Underground Inspection 03/12/2014PassBret StoddardElectrical Underground Inspection 03/19/2014PassBret StoddardElectrical Underground Inspection 04/01/2014PassBret StoddardElectrical Underground Inspection 04/07/2014PassBret StoddardElectrical Underground Inspection 04/08/2014PassBret StoddardElectrical Underground Inspection 04/10/2014PassBret StoddardElectrical Underground Inspection 04/11/2014PassBret StoddardElectrical Underground Inspection 04/14/2014PassBret StoddardElectrical Underground Inspection 05/05/2014PassBret StoddardElectrical Underground Inspection 05/07/2014PassBret StoddardElectrical Underground Inspection 05/19/2014PassBret StoddardElectrical Underground Inspection 05/28/2014PassBret StoddardElectrical Underground Inspection 05/30/2014PassBret StoddardElectrical Underground Inspection 06/03/2014PassBret StoddardElectrical Underground Inspection 06/10/2014PassBret StoddardElectrical Underground Inspection Partial approval - grounding grid okay for cover, per Gabe Madrid.Inspector Comments: Page 5 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary 06/12/2014PassBret StoddardElectrical Underground Inspection 100' N of vault #1 250' S of vault #2 to vault #1 South side suspended slab an co-gen All okay for cover partial approval, per Gabe Madrid. Inspector Comments: 06/16/2014PassBret StoddardCommercial Electrical Rough-in 06/17/2014PassBret StoddardElectrical Underground Inspection 06/20/2014PassBret StoddardElectrical Underground Inspection 06/24/2014PassBret StoddardElectrical Underground Inspection 06/26/2014PassBret StoddardElectrical Underground Inspection 06/27/2014PassBret StoddardElectrical Underground Inspection 07/02/2014PassBret StoddardElectrical Underground Inspection 07/07/2014PassBret StoddardElectrical Underground Inspection 07/09/2014PassBret StoddardElectrical Underground Inspection 07/15/2014PassBret StoddardElectrical Underground Inspection 08/05/2014PassBret StoddardElectrical Underground Inspection 08/26/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 08/28/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/02/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/04/2014PassBret StoddardCommercial Electrical Rough-in 09/19/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/24/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 10/06/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 10/16/2014N/ABret StoddardElectrical Underground Inspection 10/21/2014PassBret StoddardCommercial Electrical Rough-in 11/07/2014PassBret StoddardElectrical Underground Inspection 11/17/2014PassBret StoddardCOM & MFR Electrical Service Inspection 12/04/2014PassBret StoddardElectrical Underground Inspection 12/09/2014PassBret StoddardElectrical Underground Inspection 12/10/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in Page 6 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary 02/27/2015PassBret StoddardElectrical Underground Inspection underground at substation **Completed by Jane Allred** Inspector Comments: 03/10/2015N/ABret StoddardElectrical Underground Inspection 05/13/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 06/18/2015PassBret StoddardElectrical Underground Inspection 06/23/2015PassBret StoddardElectrical Underground Inspection 07/21/2015PassBret StoddardElectrical Underground Inspection 08/13/2015PassBret StoddardElectrical Underground Inspection 08/20/2015PassBret StoddardElectrical Underground Inspection 08/24/2015PassBret StoddardElectrical Underground Inspection 08/25/2015PassBret StoddardElectrical Underground Inspection 09/24/2015PassBret StoddardElectrical Underground Inspection 10/12/2015PassBret StoddardElectrical Underground Inspection 10/22/2015PassBret StoddardElectrical Underground Inspection 11/10/2015PassBret StoddardCommercial Electrical Rough-in 11/30/2015PassBret StoddardCommercial Electrical Rough-in 12/07/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 02/04/2016PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 03/02/2016PassBret StoddardElectrical Final Inspection COM-A,R,T Fire Inspection Type 04/07/2015PassBret StoddardFire Sprinkler Rough-in 04/09/2015PassDale PickeringFire Sprinkler Rough-in 05/07/2015FailBret StoddardFire Alarm Final Inspection 02/03/2016PassDale PickeringFire Sprinkler Final Inspection 02/03/2016PassDale PickeringFire Sprinkler Hydro 02/18/2016PassBret StoddardFire Alarm Final Inspection Page 7 of 8 (Continued) Permit Details Permit Number: 13-00228 525 S Center - BYUI Central Heating Plant 525 S Center New Commercial Building Permit Status of (Open) as of Report Date: 09/30/2019 10:11 am Permit Inspection Summary Mechanical Inspection Type 11/03/2014PassDon AllenHVAC Rough-in The exhaust for the generator looks goodInspector Comments: 02/20/2015PassDon AllenHVAC Rough-in duct work for the generator looks good.Inspector Comments: 03/03/2016FailDon AllenHVAC Final Inspection THE GAS OUTLET FOR THE STOVE NEEDS A PLUG INSTALLED OR THE GAS DTOVE HOOKED UP. Inspector Comments: 05/18/2016PassDon AllenHVAC Final Inspection Plumbing Inspection Type 03/20/2014PassDon AllenPlumbing Underground Inspection good to cover 2nd ground workInspector Comments: 03/25/2014PassDon AllenPlumbing Underground Inspection all good to cover storm lineInspector Comments: 04/11/2014PassDon AllenPlumbing Underground Inspection ground work all good to coverInspector Comments: 07/31/2014PassDon AllenPlumbing Water Water test started at 200 lb at 10:12 am and 12:10 was at 198 lbInspector Comments: 10/09/2014PassDon AllenPlumbing Rough-in The low presser steam line held presser at 160 lbInspector Comments: 10/10/2014PassDon AllenPlumbing Rough-in water for the boilers held at 160 lbInspector Comments: 02/13/2015PassDon AllenPlumbing Final Inspection plumbingg good for the c/oInspector Comments: 08/24/2015PassDon AllenPlumbing Underground Inspection GOOD TO COVER GROUND WORK IN THE BATHROOM.Inspector Comments: 11/25/2015PassDon AllenPlumbing Rough-in central administration part of the building. dwv and the water are good to coverInspector Comments: 03/03/2016PassDon AllenPlumbing Final Inspection GOOD FOR THE C/OInspector Comments: Page 8 of 8