HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00341 - 650 S 1st W - BYUI Student AptsPermit Inspection Summary Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Issued Date: 02/26/2014 Permit Inspection Statistics 130Total Inspections Completed: 108Total Inspections Passed: Inspection Pass Rate: 83.08% Permit Inspection History *Refer to Individual Inspection Report for more Details 06/15/2014PassDon AllenPlumbing Underground Inspection All good to cover the ground workInspector Comments: 08/26/2014PassBret StoddardElectrical Underground Inspection Approved to backfill duct bank on east side of east building to the end of the south portion of that building. Inspector Comments: 08/27/2014PassQuinton OwensCommercial Framing/Structure Inspection Framing inspection on 1st floor south of breeze way. Framing and fire caulking completed. Inspector Comments: 09/19/2014PassDale PickeringFire Underground Inspection 09/04/2015PassJoel GrayPublic Works Final Inspection See Permit # 13-00274 for notes.Inspector Comments: Building Inspection Type 10/14/2013PassQuinton OwensFooting Inspection 11/1/2013: North end up to grid 3.B. Rebar as per plans installation approved.Inspector Comments: Bldg B north footings Ok to pour Rebar as plans. Inspector Comments: 10/17: Spot footing rebar is required in ADDITION to continuous footing rebar (added during inspection). Strata inspector is on site for pour. Inspector Comments: 10/24/2013PassTed DyeFooting Inspection 11/12/13: Footing pour inspected and approved. Strata inspector on-site.Inspector Comments: 11/26/13 TD: Foundation - foundation rebar in place.Inspector Comments: 12/11/2013PassTed DyeFoundation Inspection 12/11/13 TD: Wall/Rebar - 7-b to 6b pourInspector Comments: 04/30/2014PassTed DyeSheeting Building B. Inspected roof sheeting going from grid line 6.B to 9.B and D.B to A.B. nail patterns looked. 4" max. edges,on truss and blocks, and about 8" in fields. The inspection was to see if every thing was all right before they got to far and had to come back and fix it if it was wrong. All looked good Inspector Comments: Page 1 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 05/05/2014PassTed DyeSheeting Roof of the North half of building B.(lower side)Inspector Comments: 05/22/2014PassQuinton OwensInsulation Inspection 3 units insulated at ceiling with vapor barrier (1 on west side and 2 on east side) are approved for drywall on upper ceiling. A couple of concealed cavities need vapor barrier. OTHER UNITS NOT READY FOR INSPECTION. Inspector Comments: 05/28/2014PassTed DyeInsulation Inspection roof insulationInspector Comments: 06/04/2014FailQuinton OwensInsulation Inspection 4th floor (North half): Exterior & Sound walls incomplete at tie down system locations and some cavities behind tubs. Corridor ceiling approved for cover. fill gaps between dryer vents and insulation. Windows need to be sealed around perimeter. call for reinspection. Inspector Comments: 06/18/2014FailTed DyeFraming/Structure Inspection Framing looks good. Fire caulking and fire blocking needs to be done. Call for reinspect when completed. Inspector Comments: 06/20/2014FailTed DyeInsulation Inspection Cut 3/4" gap around 4" pipe and then fire caulk.Inspector Comments: 06/23/2014PassTed DyeSheetrock/Drywall Inspection Rooms B 401 and B402 drywall approvedInspector Comments: 06/25/2014PassTed DyeFraming/Structure Inspection Inspected the roof sheeting in the area that is between grid lines just before 5B to 6B. This is that area is over the center stairs, elevator and elevator equipment room, electrical and janitorial closet, and the study and commons area. Roof is approved is approved too be covered. Inspector Comments: 06/30/2014PassQuinton OwensFraming/Structure Inspection Exterior wall & roof framing "5th floor" (south half). Nail sheeting at missed locations pointed out during inspection. OK to Insulate ceiling and exterior walls. Inspector Comments: 07/07/2014PassTed DyeInsulation Inspection Units 301, 302 and 303 passed insulation inspection. OK to Hand drywallInspector Comments: 07/07/2014PassTed DyeFraming/Structure Inspection Units 302, 304 and 306 Framing Passed. OK to insulateInspector Comments: 07/09/2014FailQuinton OwensSheetrock/Drywall Inspection 4th floor units 403, 404, 405, 406. Drywall approved for taping. Re-inspect for Fire caulking on fire separation and bearing walls above dropped ceilings. Units 301-306 need re-inspection for drywall in concealed locations behind tubs. Inspector Comments: Page 2 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 07/09/2014PassQuinton OwensInsulation Inspection 5th floor roof insulation approved for cover, 3rd floor sound insulation approved (units B303,305,306) **Missing drywall behind tubs/showers on rated walls on 301-306 to be corrected and re-inspected. Inspector Comments: 07/18/2014FailQuinton OwensCommercial Insulation Inspection 2nd floor Insulation (only 201 ready and approved) 5th floor sound insulation approved, but some assemblies not rated as required in concealed locations. Windows not yet sealed. Inspector Comments: 07/22/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection 403, 404, 405,406 Drywall prerock inspection of penetrations approved for lower ceiling installation. 507 - 512 Drywall in concealed locations approved for cover. Inspector Comments: 07/22/2014PassQuinton OwensCommercial Insulation Inspection Ceiling sound insulation in 201, 202,203,204,205 approved for drywall cover.Inspector Comments: Not ready at time of inspection. Moved to Friday.Inspector Comments: 07/25/2014PassQuinton OwensResidential Framing/Structure Inspection 4th floor framing from breeze way south is complete.Inspector Comments: 07/29/2014FailQuinton OwensCommercial Framing/Structure Inspection North wing 3rd floor: Fire caulk top & bottom plates in non-rated walls. Finish Fire rated walls behind tubs either up to rated ceiling or to floor deck above. Framers added 2x's and closed off gap to slide drywall behind tub. Make corrections and have reinspection before covering. Inspector Comments: 07/30/2014PassTed DyeResidential Insulation Inspection 07/30/2014PassTed DyeCommercial Sheetrock/Drywall Inspection all of main area is okay to tape and texture the mechanical shaft will be hung taped anb textured when the mechanical is finished. OK to tape and texture main area's on level four. Inspector Comments: 08/01/2014PassQuinton OwensCommercial Framing/Structure Inspection South stair enclosure framing approved for insulation. Middle stair enclosure framing approved for insulation. Common areas on floors 3,4,&5 near center stairs approved for insulation. 2nd floor common area not ready and utility rooms need to finish replacing anchor bolts and add missing nuts & washers to others. Inspector Comments: 08/06/2014PassQuinton OwensCommercial Insulation Inspection 2nd floor north SOUND insulation.Inspector Comments: 3rd floor (South) Thermal Insulation approved for cover.Inspector Comments: 08/12/2014PassQuinton OwensCommercial Insulation Inspection 4th floor (South) sound insulation.Inspector Comments: Page 3 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 08/12/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection 3rd floor (North): Mechanical Shaft penetrations. Double layered 5/8" type x, taped, penetrations fire caulked, and dampers installed. Inspector Comments: 08/13/2014PassQuinton OwensCommercial Framing/Structure Inspection 2nd floor South ceiling framing (8/12) apartments approved. 4th floor North Upper ceiling and wall approved to cover (at hard ceilings) 1st floor South apartment ceilings approved for insulation. Inspector Comments: 08/13/2014PassQuinton OwensCommercial Insulation Inspection South Stair Insulation approved for cover at exterior framed walls. EXCEPT foundation level not done. Inspector Comments: Units 301, 302, 303, 304, and 305 fire caulking has been approved at the pre-rock level, in the bearing wall and fire walls and is approved to be covered. Unit 306 has a sprinkler line that is being replace and after being replaced it will need fire caulked. also the whole that was made to gain access will need to be repaired Inspector Comments: 08/19/2014FailTed DyeCommercial Sheetrock/Drywall Inspection Units 301, 302, 303, 304, and 305 fire caulking has been approved at the pre-rock level, in the bearing wall and fire walls and is approved to be covered. Unit 306 has a sprinkler line that is being replace and after being replaced it will need fire caulked. also the whole that was made to gain access will need to be repaired Inspector Comments: 08/21/2014PassTed DyeCommercial Framing/Structure Inspection !st floor - north end or side Framing looks good. -Exterior walls good. -interior framing good but needs to have fire caulking checked when completed. -Vapor barrier good on north end ceiling. 3rd LEVEL South side -Sound insulation good Inspector Comments: 08/27/2014PassTed DyeCommercial Framing/Structure Inspection Framing inspection on 1st floor south of breeze way. Framing and fire caulking completed. Inspector Comments: 08/29/2014PassTed DyeCommercial Insulation Inspection Sound insulation on the 1st and 2nd floor, Approved for cover.Inspector Comments: 09/03/2014PassTed DyeCommercial Insulation Inspection Clarification; 1st level on north side of breeze way, 2nd , or main level on south side of breeze way Inspector Comments: 09/10/2014PassQuinton OwensCommercial Framing/Structure Inspection 5th floor south wing, upper ceiling penetrations inspected and approved.Inspector Comments: Page 4 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 09/17/2014PassTed DyeCommercial Sheetrock/Drywall Inspection Building B 4th floor on south 1/2 fire tape in pre-rock and concealed ceilings. approved for cover Inspector Comments: 10/01/2014PassTed DyeCommercial Framing/Structure Inspection Fire caulking in prerock above the hard lid and the framing looked good. The location is on the 3rd level of buildings on the south of the breeze way. Inspector Comments: 10/20/2014PassQuinton OwensCommercial Framing/Structure Inspection North half of 2nd floor apartments: fire caulk inspection for above ceiling penetrations approved. Inspector Comments: 10/21/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection 2nd floor apartments (north half) rated penetrations inspection above dropped ceilings. Inspector Comments: 10/30/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection Inspected 2nd floor south apartment rated penetrations above dropped ceilings and drywall installation. Fire caulk remaining gaps around drain pipes above bathrooms. Inspector Comments: 11/04/2014PassSAUREY AMANDAFoundation Inspection 11/4: North end up to wall at grid 3.B. Rebar as per plans installation approved.Inspector Comments: 11/06/2014PassQuinton OwensCommercial Framing/Structure Inspection 1st floor rated penetration inspection above dropped ceiling (in apartments only)Inspector Comments: 02/06/2015PassTed DyeCommercial Framing/Structure Inspection Corridor inspection passed. Commons area was not finished so will require an inspection at the time of completion. Inspector Comments: 02/18/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection third floor corridor: drywall patches in North half and commons area need double layer. south half approved. Inspector Comments: 02/20/2015FailQuinton OwensCommercial Framing/Structure Inspection 3rd floor corridor upper rated ceilings above tile grid approved. Common area needs beam pocket by stairs to be protected. 2nd floor corridor upper rated ceiling above tile grid approved Inspector Comments: 03/02/2015PassTed DyeCommercial Sheetrock/Drywall Inspection 1st level firecalk and sheetrock inspection above tileInspector Comments: Page 5 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 04/10/2015N/AQuinton OwensCommercial Building Final A walk through to give you an idea of what had been missed and what to look for. I looked at Level 2 North of the breeze way. In all units the vanities on the corridor walls had no fire caulking around drains or supplies? 205 Drain line and supplies under kitchen sink need fire caulked Fire caulk under bathroom sinks. Mechanical rooms; -room between 203 and 205;Fire caulk behind drain lines. - room between205 and riser room;Fire tape or fire caulk seam at ceiling, on far left corner. Fire caulk lines just left of door on same wall as door near ceiling(fire caulk pulled out when lines were moved). Inspector Comments: 04/20/2015FailTed DyeCommercial Building Final MB512; OK B512 Fire caulk around toilet supply in end bathroom (separation wall) MB510; OK B510; Fire caulk around toilet supply in end bathroom (separation wall) Fire caulk around supply under left double sink. MB508; Fire caulk empty support hole in ceiling. B508 Fire caulk around toilet supply in end bathroom (separation wall) Fire caulk supplies under double sinks EB500C; OK CB500D Fire caulk around sprinkler line through corridor wall. Finish sprinkller alarm wiring. MB500E; Fire caulk around electrical conduits. Cover hole in back wall. MB507;Fire caulk hole in ceiling on abandon support hole. Patch wall in lower back corner at floor level. B507; Fire caulk around toilet supply in end bathroom (separation wall) Fire caulk around supplies under double sinks. MB509; Fire caulk around conduit in ceiling in back left corner. Fire caulk around hanger support on ceiling, left side about the middle. B509; Fire caulk around toilet supply in end bathroom (separation wall) Fire caulk around supplies under double sinks. MB511; OK B511; Fire caulk around toilet supply in end bathroom (separation wall) Fire caulk around supplies under double sinks. Fire caulk drain line under double sink. Fire caulk supply under back bathroom sink. Inspector Comments: Page 6 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 04/21/2015FailTed DyeCommercial Building Final LEVEL 5 Units completed and passed are; B507, MB507, B508, MB508, B509, MB509, B510, MB510, B511, MB511, B512, EB500C, and CB500D, --MB500E needs fire caulking around conduits --Study, by the center window there is a fire sprinkler cover missing. Inspector Comments: 04/28/2015PassQuinton OwensCommercial Building Final 5th floor Fire rating incomplete around shaft in electrical room on east side of bldg. Fire rate penetrations in stair enclosure. Building final inspection incomplete and will need to be continued to cover all items for final. Approval for owner to move in appliances and furnishings. Inspector Comments: 07/30/2015FailQuinton OwensCommercial Building Final MB500E; NEEDS FIRE CAULKING AROUND CONDUITS B401 FIRE CAULK ABOVE DISPOSAL OUTLET UNDER KITCHEN SINK MB405 FIRE CAULK CORNERS AT CEILING ON RIGHT WALL. FIRE CAULK AROUND DRAIN LINES ON RIGHT WALL. MB302 FIRE CAULK PIPES IN UPPER LEFT CORNER THROUGH CEILING MB305 DOUBLE LAYER OF DRYWALL ON THE CEILING, AROUND PIPES. GOING THROUGH THE CEILING IS MISSING. B311 THE SUPPLY UNDER RIGHT DOUBLE VANITY NEEDS FIRE CAULK OR AND ESCUTCHEON THAT FITS BETTER. MB311 FIRE CAULK EMPTY SUPPORT HOLES ON CEILING. Inspector Comments: 08/07/2015FailQuinton OwensCommercial Building Final Items needed for C.O.: required stair identification signs posted, fire rated penetrations into shaft in 5th floor electrical room, fire caulk 2 penetrations at top level of center stairs, MB207 caulk around vent pipes not in large enough annular space, if at all (a previous item that appears uncorrected). Items required for building B by end of project (last building): Grab bars and dispnsers and signage for ADA restroom on 1st floor, Janitor closet service sinks require smooth, non-absorbant surface 48" above floor and extending 24" beyond sides (typ), building identification on outside, seal voids around dryer vents penetrating masonry, and handrails on front steps on east side. ELEVATOR FLOOR NUMBERS NEED TO MATCH ROOM NUMBERS (they are numbered so that the first # of the unit is the floor #) Inspector Comments: Page 7 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary 08/18/2015FailQuinton OwensCommercial Building Final Items required for building B by end of project (last building): Janitor closet service sinks require smooth, non-absorbant surface 48" above floor and extending 24" beyond sides (typ), building identification on outside, seal voids around dryer vents penetrating masonry, and handrails on front steps on east side. Permanent stair identification signs posted as required by code. ELEVATOR FLOOR NUMBERS NEED TO MATCH ROOM NUMBERS (they are numbered so that the first # of the unit is the floor #) Inspector Comments: 09/01/2015PassQuinton OwensCommercial Building Final Corrections completed.Inspector Comments: 09/17/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection First floor North apartments. Inspection of penetrations in dropped ceiling area of apartments. Corrections made during inspection, return inspection for the bigger corrections later in day. Approved to hang lower ceiling in apartments. Inspector Comments: 09/17/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection 09/17/2015PassQuinton OwensCommercial Insulation Inspection 09/17/2015PassQuinton OwensCommercial Insulation Inspection 09/17/2015PassQuinton OwensCommercial Insulation Inspection 09/17/2015PassQuinton OwensSheeting 09/17/2015PassQuinton OwensSheeting 09/17/2015PassQuinton OwensCommercial Framing/Structure Inspection 4th floor North mechanical chases.Inspector Comments: 09/17/2015PassQuinton OwensCommercial Framing/Structure Inspection 09/17/2015PassQuinton OwensCommercial Framing/Structure Inspection Page 8 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary Electrical Inspection Type 12/05/2013PassBret StoddardElectrical Underground Inspection Approved for cover-main switchgear area for building B underground conduits.Inspector Comments: 04/04/2014N/ABret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 05/19/2014PassBret StoddardCommercial Electrical Rough-in 05/29/2014PassBret StoddardCommercial Electrical Rough-in 06/16/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 06/18/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 07/01/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 07/11/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 07/21/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 08/19/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 09/11/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved units #507 thru #512 on ceiling, per Jane Allred.Inspector Comments: 09/17/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 10/01/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 10/16/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 10/30/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 11/07/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/05/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 02/09/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 02/18/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/25/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 02/26/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 04/14/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Page 9 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary Fire Inspection Type 06/19/2014PassDale PickeringFire Sprinkler Rough-in 6/19 Demo rooms hydro #208 @ 1410, #205 /2 1620, Pass, DPInspector Comments: 06/26/2014PassDale PickeringFire Sprinkler Rough-in 6/25, Building B, North end of level 3, Hydro, #211 @ 1330, #210 @ 1530, Pass Rough-in for same, Pass, DP Inspector Comments: 07/10/2014PassDale PickeringFire Sprinkler Rough-in 7/10 Building B, South portion of 3rd floor and all of 2nd floor, rough-in, Pass, DPInspector Comments: 07/10/2014PassDale PickeringFire Sprinkler Hydro 7/10 Building B, 2nd and 3rd floor #200 hydro. 2nd floor #203 @ 0809, #203 @ 1015, Pass. 3rd floor #210 @ 0850, #209 @ 1050, Pass, DP Inspector Comments: 07/21/2014PassDale PickeringFire Sprinkler Hydro 212# 10am 210# 12pm Inspector Comments: 09/19/2014PassDale PickeringFire Sprinkler Rough-in 09/19/2014PassDale PickeringFire Sprinkler Rough-in 09/19/2014PassDale PickeringFire Sprinkler Rough-in 11/03/2014PassDale PickeringFire Sprinkler Rough-in 10/29 Standpipe hydro, #205 @ 1030, #203 @ 1245. PassInspector Comments: 11/03/2014PassDale PickeringFire Department Inspection 10/29 Standpipe hydro, #205 @ 1030, #203 @ 1245, PassInspector Comments: 12/24/2014PassDale PickeringFire Sprinkler Rough-in 4th floor corridor finish/heads cut in, PassInspector Comments: 12/24/2014PassDale PickeringFire Sprinkler Rough-in 3rd floor finish/heads cut in, PassInspector Comments: 02/17/2015PassDale PickeringFire Sprinkler Rough-in 04/13/2015FailBret StoddardFire Alarm Final Inspection 04/16/2015PassDale PickeringFire Sprinkler Rough-in Building B relocate 5th floor control valve out of elevator room into janitor closet, Pass Inspector Comments: 05/21/2015FailBret StoddardFire Alarm Final Inspection 09/03/2015PassDale PickeringFire Department Final Inspection Page 10 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary Mechanical Inspection Type 04/10/2014PassDon AllenHVAC Rough-in under ground on hvac is all good to coverInspector Comments: 06/18/2014PassDon AllenHVAC Rough-in rooms 401,402 all good to cover the hvac rough inInspector Comments: All good to cover the rough in on the 4th floorInspector Comments: 08/06/2014PassDon AllenHVAC Rough-in Good to cover the hvac in the chases on the 4th floorInspector Comments: 08/12/2014FailDon AllenHVAC Final Inspection Need to install the furnaces. The rest of the rooms look good.Inspector Comments: 08/14/2014PassDon AllenHVAC Rough-in All good on the rough in on 3rd floorInspector Comments: 09/02/2014PassDon AllenHVAC Rough-in All good in the heat chases on building c on the top floorInspector Comments: 09/17/2014PassDon AllenHVAC Rough-in 3 floor an the south side of building b the hvac is all good to cover.Inspector Comments: 09/25/2014PassDon AllenHVAC Rough-in The hvac rough in on floor 2 of building b is all good to cover.Inspector Comments: 10/06/2014PassDon AllenHVAC Rough-in Hvac looks good. The calking around the duck looks good also.Inspector Comments: 10/13/2014PassDon AllenHVAC Rough-in All good to cover the rough in on the 2nd floor of building bInspector Comments: All good to cover the duct work on the 1st floor on the north end of building bInspector Comments: All good to cover the duct work on the first floor on the north end of building B.Inspector Comments: 11/03/2014PassQuinton OwensHVAC Rough-in All good to cover the duct work on the first floor on the north end of building B.Inspector Comments: 04/08/2015FailDon AllenHVAC Final Inspection fire caulking in the mech.rooms between the exhaust and intake lines finish duct work in mech. room around the floor drains. need to duct sill andput covers on in the electrical rooms need to finish the a lines on the roof Inspector Comments: 04/13/2015PassDon AllenHVAC Final Inspection ALL GOOD FOR THE C/OInspector Comments: Page 11 of 12 (Continued) Permit Details Permit Number: 13-00341 650 S 1st W - BYU-Idaho Student Apts Bldg B; 44 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:06 am Permit Inspection Summary Plumbing Inspection Type 02/20/2014PassDon AllenPlumbing Underground Inspection all good to cover the under groundInspector Comments: 06/05/2014PassDon AllenPlumbing Rough-in 06/25/2014PassDon AllenPlumbing Rough-in 07/15/2014PassDon AllenPlumbing Rough-in 11/26/2014PassDon AllenWater Meter Inspection Water meter looks goodInspector Comments: 12/09/2014FailDon AllenPlumbing Rough-in Need to fire calk the water lines where the go throw the top plate in the rooms.Inspector Comments: 04/08/2015FailDon AllenPlumbing Final Inspection Drain lines in the electrical on the mimisplits back flow devices need to be checked need to finish the condensate drains on the furnices Inspector Comments: 04/13/2015PassDon AllenPlumbing Final Inspection ALL GOOD FOR THE C/OInspector Comments: Page 12 of 12