Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Issued Date: 02/19/2014
Permit Inspection Statistics
156Total Inspections Completed:
121Total Inspections Passed:
Inspection Pass Rate: 77.56%
Permit Inspection History *Refer to Individual Inspection Report for more Details
09/25/2014PassQuinton OwensCommercial Framing/Structure Inspection
South wall sheathing floors 1, 2, & 3. Fix nailing at marked locations and finish
nailing sheets under windows on 2nd floor. Follow up on next inspection.
Inspector Comments:
01/22/2015FailDale PickeringFire Underground Inspection
Underground hydro, failed to hold pressure. Pressure dropping 10-15 lbs in 2
hours.
Inspector Comments:
09/04/2015PassJoel GrayPublic Works Final Inspection
See Permit # 13-00274 for notes.Inspector Comments:
Building Inspection Type
02/03/2014PassTed DyeFooting Inspection
Rebar good.
Conditions: snowing wind blowing
Action: blowing and melting snow out of footing ahead of pour.
Stata engineering onsite.
Inspector Comments:
03/05/2014PassTed DyeFoundation Inspection
Foundation inspection in conjunction with footing inspection same day performed
by Ted. (Underground plumbing insp. accidentally entered on original foundation
insp. scheduled for 3/5/14).
Inspector Comments:
03/05/2014PassTed DyeFooting Inspection
03/11/2014PassTed DyeFoundation Inspection
1st underground section 1 good to coverInspector Comments:
03/24/2014PassTed DyeFoundation Inspection
3 north-south wall with wings located between2.C and 4.C/D.C andB.C
APPROVED TO POUR
Inspector Comments:
04/02/2014PassQuinton OwensFoundation Inspection
Approved. Extra busy morning. Special inspector on site and said foundation wall
was compliant after a few form adjustments.
Inspector Comments:
04/09/2014PassQuinton OwensFoundation Inspection
Foundation at North end around Stairs & Elevator. Special inspector on site.Inspector Comments:
Page 1 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
04/22/2014PassTed DyeFoundation Inspection
Inspected west wall which is AA from 4-A to 6A and then around the corner on
south wall which is 6-A from A-A to D-A and then around the corner on D-A 8 ft.
Inspector Comments:
building C Level 2 on West wing
Some sheeting has missed being nailed to studs.
Those sheets missed have been marked with Floresent green spray paint.
Please call for re-inspect when those areas are corrected.
Inspector Comments:
09/08/2014FailTed DyeSheeting
area inspected was from 1-C to 7-CInspector Comments:
09/08/2014PassTed DyeSheeting
building C Level 1: That area inspected, 1-C to 7-C
Level one is OK to tyveck and cover.
Inspector Comments:
10/08/2014PassTed DyeSheeting
Inspected walls on grid line G.C from grid lines 8.C through 9.C.
Wall 1.C from Gridline C.C through G.C
Exterior Roofing. .
Gridlines H.6, and 6.C through 8.C
Upper roof H.6 between G.C and F.C.
All passed.
Inspector Comments:
10/09/2014PassTed DyeCommercial Framing/Structure Inspection
10/10/2014PassTed DyeCommercial Framing/Structure Inspection
10/16/2014PassTed DyeCommercial Framing/Structure Inspection
10/20/2014PassQuinton OwensCommercial Framing/Structure Inspection
Roof sheathing North wing from grid 3 up to stair enclosure. Very North end yet
to be completed.
Inspector Comments:
10/29/2014PassQuinton OwensSheeting
Inspected sheathing on North side of east wing by retaining wall (1st floor pop
out only). Sheathing edge not nailed on inside corner because of concrete wall
(should be able to toenail into nearest stud).
Inspector Comments:
11/04/2014FailQuinton OwensSheeting
West wall, 4th floor: A lot of nails are too deep. Some nails are missing (marked
with green paint). Some vertical joints not on stud. All of west side is not yet
completed.
Inspector Comments:
11/04/2014FailQuinton OwensCommercial Framing/Structure Inspection
Roof framing and Walls behind tubs/showers prior to drywall: Electrical
penetrations in partition walls at roof framing must be fire blocked, Fire rate roof
joist penetrations in shaft walls as needed.
Inspector Comments:
11/06/2014PassTed DyeSheeting
East and South wall of commons area. All 3 levelsInspector Comments:
Page 2 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
11/07/2014FailQuinton OwensSheeting
4th floor, east & north wall: Several locations have nails too deep (mostly on
north wall). Some studs missed (marked in green paint. Some edges at window
need closer spacing.
Inspector Comments:
11/10/2014FailQuinton OwensSheeting
Level 1 & 2, east & north wall: Several missed locations (marked in green paint).
Some joints missing backing.
Inspector Comments:
11/12/2014PassQuinton OwensCommercial Insulation Inspection
Insulation with vapor barrier under roof deck. Roof fully insulated on top.
Penetrations at roof joist fire blocked between units as required.
Inspector Comments:
11/17/2014PassTed DyeSheeting
sheeting inspected on level four, north and east walls. West wall on level 4 was
not ready and will be inspected at a later date.
Other areas were looked at on levels 1 through 3 that needed to be checked and
they passed
Inspector Comments:
11/20/2014PassTed DyeSheeting
sheeting on west wall of building C is approved on all levels.Inspector Comments:
For your records
took me a while to get this to you.
Sorry i hope it didn't cause any problems.
Inspector Comments:
11/20/2014N/AQuinton OwensSheeting
4th level sheathing on west wall approved by Ted. See 11/20 sheeting inspection
for approval.
Inspector Comments:
11/26/2014PassQuinton OwensCommercial Insulation Inspection
4th floor, South wing exterior walls. (done on 11/26).Inspector Comments:
12/03/2014PassQuinton OwensCommercial Insulation Inspection
Sound insulation (with Interior Framing) on East 2 Units on south side of south
wing. with ceiling and exterior walls of south west unit of west wing and main
corridor.
Inspector Comments:
12/05/2014FailQuinton OwensCommercial Sheetrock/Drywall Inspection
Corrections not completed in concealed locations. Only insulation inspected today
(12/5).
Inspector Comments:
12/05/2014PassQuinton OwensCommercial Insulation Inspection
Remaining South wing units' sound insulation approved.Inspector Comments:
12/10/2014FailQuinton OwensCommercial Insulation Inspection
Apt. 406, 409, 411, 412, 413, 417 Insulation approved for cover.
Not Ready- 415, 408, 410.
Inspector Comments:
Page 3 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
12/10/2014FailQuinton OwensCommercial Sheetrock/Drywall Inspection
Apt. 401, 402, 403, 404, 405, 407: Joints to be taped on fire rated walls behind
tubs (all to be uncovered for inspection). Fire stop system needed at 4" roof drain
penetrations at roof assembly and rated wall penetrations (check with Architect if
needed).
Inspector Comments:
12/16/2014FailQuinton OwensCommercial Insulation Inspection
415: missing some vapor barrier and insulation on ext. wall. Party wall not done.
410: party wall not done. Broken stud between 410 & 412. 408: Party wall not
completed for insulation, and 417 party wall not insulated.
Inspector Comments:
12/18/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Upper ceiling and walls inspected in 401, 402, 403 and approved to hang lower
ceiling. Concealed areas ok to cover in 401, 402, 403, 404, 405, 407, 409, & 411
only.
Inspector Comments:
12/18/2014PassQuinton OwensCommercial Insulation Inspection
Remaining apartments on west wing approved for insulation. North wall of 217
may be inspected from north side.
Inspector Comments:
12/19/2014FailQuinton OwensCommercial Framing/Structure Inspection
3rd floor, South wing:
Cut stud just outside entry to 301, fire caulk/tape at concealed locations (typ),
303: insulate exterior at former dryer vent penetration. shaft rated walls should
extend to floor deck BOTH sides (typ), various penetrations at party wall in floor
assembly still need fire blocking. Seal tub drain penetration. Web joists forming
the fire barrier at a shaft location need to be rated on the ends between drywall
and joist web.
Inspector Comments:
12/22/2014PassQuinton OwensCommercial Framing/Structure Inspection
3rd floor south wing re-inspectInspector Comments:
12/31/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection
407 & 409 Drywall and upper ceiling penetrations inspected and approved to
hang lower ceiling.
Inspector Comments:
01/06/2015PassQuinton OwensCommercial Framing/Structure Inspection
North wing, 1st & 2nd floor exterior wall framing inspected. Only 2nd floor
exterior walls approved for insulation. 1st floor exterior walls missing anchor
bolts, nuts, & washers - not approved for insulation. Room 117 (or 115) is
missing doubled up stud on North end of exterior wall. Found trimmer studs on
interior doorways not sufficiently nailed (will inspect with rest of interior framing)
Inspector Comments:
01/06/2015FailQuinton OwensCommercial Framing/Structure Inspection
North wing, 3rd floor: need to finish fire caulking penetrations. Fireblocking
needed above south party wall in 309 in bathroom. Finish 2 hour rating on
underside of joists in exhaust shafts. Finish rating end gaps between drywall and
joist web at shaft locations. (Pictures emailed for clarification)
Inspector Comments:
Page 4 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
312 n exterior wall insulation
317 shaft rating needed.
309 and 313 gaps in rated ceiling
Inspector Comments:
01/08/2015FailTed DyeCommercial Framing/Structure Inspection
312 n exterior wall insulation
317 shaft rating needed.
309 and 313 gaps in rated ceiling
Inspector Comments:
01/09/2015FailQuinton OwensCommercial Framing/Structure Inspection
406, 408, & 411 Upper ceiling & wall penetration and sheetrock inspection to
hang lower ceiling. Closets by entry already have lower ceiling hung and were not
inspected (often have penetrations in upper ceiling). Reinspect front closet upper
ceilings. Rest of these 3 units are approved to hang lower ceiling. 404 and 405
never called for inspection on upper ceiling.
Inspector Comments:
01/14/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Drywall and upper ceiling inspection approved in 410, 413, and 415.
Missing some screws in wall above closet in south bdrm of 415, and at top of
back closet wall in north bdrm of 412.
412 & 417 not ready.
Inspector Comments:
Rooms 412 and417 ceilings fire caulking approved to be covered.
2nd floor framing, fire caulking, is not complete. Inspection will be called for on
1-16-15
Inspector Comments:
01/15/2015FailTed DyeCommercial Framing/Structure Inspection
North west stair well and shaft approved to insulate. All bolts tightened and
structure good.
Inspector Comments:
01/16/2015PassTed DyeCommercial Insulation Inspection
01/16/2015PassTed DyeCommercial Framing/Structure Inspection
rooms203, 204, 205 and 207 along with commons rooms approved to insulate.
room 202 has one consealed area around drain pipes that needs to be sealed up.
Inspector Comments:
01/21/2015FailQuinton OwensCommercial Framing/Structure Inspection
Fix fire rating at concealed locations as indicated during inspection. Water line
top plate penetration in Storage room, Enclose pipes in Roxul insulation above
tub in 209, All drywall around pipes or eclose pipes in 211 same as 209, Drywall
above closet in ADA bathroom of 213, no roxul insulation along joist in 215 & 212
(see emailed pictures).
Inspector Comments:
01/21/2015PassQuinton OwensCommercial Insulation Inspection
2nd floor, North wing Exterior wall insulation.Inspector Comments:
01/26/2015FailQuinton OwensCommercial Framing/Structure Inspection
Inspected rated penetrations above dropped ceilings (302, 303, 304 approved).
301 Drain pipe penetration of shaft wall and corridor wall not rated (by
apartment entry). Ok to hang Lower ceiling. Access to make correction is
available.
Inspector Comments:
Page 5 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
01/27/2015PassQuinton OwensCommercial Framing/Structure Inspection
305, 307, 309 Drywall and rated penetration inspection above lower ceiling.Inspector Comments:
Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments:
Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments:
Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments:
Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments:
01/29/2015FailTed DyeCommercial Framing/Structure Inspection
Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments:
02/02/2015PassTed DyeCommercial Framing/Structure Inspection
Items have been corrected in rooms 102, 104 and 107.
units 306, 308, 311 and 313 ceilig penetrations above droped ceiling and top
plates Passed.
Inspector Comments:
02/04/2015PassTed DyeCommercial Framing/Structure Inspection
02/06/2015PassTed DyeCommercial Framing/Structure Inspection
02/09/2015FailQuinton OwensCommercial Framing/Structure Inspection
2/11: 202,203,204,205,207 approved for taping. Upper ceiling penetrations
completed for rating.
Inspector Comments:
02/12/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
2/12: 209 approved for taping and upper ceiling penetrations completedInspector Comments:
02/12/2015PassQuinton OwensCommercial Framing/Structure Inspection
Framing on North stair done and correction to East stair done. Approved for
insulation.
Inspector Comments:
02/13/2015PassTed DyeCommercial Sheetrock/Drywall Inspection
Units 206, 208, 210, 211 and 213, the drywall in the rooms and fire caulking
above the lowered ceiling passed.
Inspector Comments:
02/18/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Apt 215 drywall and upper ceiling rated penetrations.
Add screws missing in bedroom closet.
Inspector Comments:
02/18/2015PassQuinton OwensCommercial Framing/Structure Inspection
Elevator shaft, 2nd floorInspector Comments:
02/24/2015FailQuinton OwensCommercial Framing/Structure Inspection
Elevator shaft framing on 1st level and basement. Add and tighten nuts on
anchor bolts to steel at BASEMENT level.
Inspector Comments:
02/26/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection
03/05/2015PassTed DyeCommercial Sheetrock/Drywall Inspection
Units 102, 104, 107 and 109 Had corrections made and approved.
See other notes for those things that have not been corrected.
Inspector Comments:
Page 6 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
03/11/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
3/10: North wing drywall inspection failed. Several apartments have some screws
spaced too far apart or missed lines of screws completely. Mechanical also
incomplete and not ready to cover. Penetrations are fire caulked as required.
3/11: 106, 108, 110, 112, 111, 113, 115, & 117 Re-inspection completed. Ok to
hang lower ceiling (pending mechanical rough-in approval) and tape drywall.
Inspector Comments:
03/24/2015PassQuinton OwensCommercial Framing/Structure Inspection
Basement level framingInspector Comments:
04/21/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
1st floor hallway fire rating above dropped hard ceilings. Corrections made during
inspection.
Inspector Comments:
05/11/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection
4th Floor corridor above acoustical ceilings. Seal 2 small holes in south wing and
Fire caulk penetrations through beam enclosure on North end of hall by stairs.
Add missing screws on north wall by elevator.
Inspector Comments:
05/13/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Third & Fourth floor corridor rated ceiling above acoustical ceiling approved to
cover.
EXCEPT north and east ends (grid not completed yet and/or not all penetrations
fire caulked).
Inspector Comments:
06/09/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection
Level 2 Corridor ceiling, Level 3 & 4 North common area ceiling approved for
cover. (2 wall receptacles to be rated)
Common area between C200A and corridor NOTAPPROVED for cover.
Inspector Comments:
06/10/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection
1st floor corridor approved for cover except last section on north & elevator
lobby.
Inspector Comments:
07/22/2015FailQuinton OwensCommercial Building Final
Building B & C called in together without allowing much time and a lot of work
still undone in building C. Will start building C when done with items on B.
Inspector Comments:
Page 7 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
07/30/2015FailQuinton OwensCommercial Building Final
*** PARTIAL LIST *** INSPECTION TO BE CONTINUED
Penetration(s) not fire rated in MC117, MC112, MC113, 109 (finish under bthrm
sink)
Gas odor in MC112
Install metal plate clean out cover under kitchen sink in 113 (same in other ADA
units)
113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab
bar to be 36"min (same in all similar ADA units).
10 units need fire caulking under various sinks (should be done - to be
reinspected)
Mechanical vent piping to have annular space cut in and filled with fire caulk
(MC200B(fire collars), MC203, MC209)
Other rooms needing penetrations rated (MC106, Janitor's room on 1st & 2nd
floor, CC200L, SC200P, MC209)
East common area ceiling still closed up - cannot reinspect corrections.
Bathroom in east common area unfinished.
Fire rated glazing in doors on east end of corridor is missing. Still no rated glazing
in center stair door on 2nd floor.
Seal base of tubs/showers in all units.
Fire rate all penetrations in ceiling and bearing wall in basement rooms and hall.
No stair identification signs.
Levels 1 and 3 do not have unit #'s posted.
Common area restroom signs to be posted.
Inspector Comments:
08/13/2015FailQuinton OwensCommercial Building Final
*** Partial Inspection *** continuing inspection
Penetration(s) not fire rated in 109 (finish under bthrm sink), 107 (under west
bathroom sink)
113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab
bar to be 36"min (same in all similar ADA units).
Other rooms needing penetrations rated (SC200D surrounding walls all rated)
Fire rated glazing in door on east end of corridor is missing.
Fire rate all penetrations in ceiling wall in basement rooms and hall (intumescent
caulk needed at plastic pipes) some not caulked or inspected before plywood
wall sheathing installed on south end of storage room.
No stair identification signs.
Common area restroom sign to be posted.
Inspector Comments:
Page 8 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
08/17/2015FailQuinton OwensCommercial Building Final
Corrections required for C.O.:
Penetration(s) not fire rated in 109 (finish under bthrm sink), 107 (under west
bathroom sink).
Fire rate all penetrations in ceiling wall in basement rooms and hall (intumescent
caulk needed at plastic pipes) some not caulked or inspected before plywood wall
sheathing installed on south end of storage room.
No stair identification signs.
Other rooms needing penetrations rated (SC200D surrounding walls all rated)
North stair sprinkler pipe and brace penetration (taping over holes are not rated!)
No Fire rating at TV mounts with metal trim piece removed (office by common
area and 3rd floor study)
CC200L: west wall is fire rated - rate penetrations on both sides.
2nd level center stair: hole in rated wall by emergency light.
Seal penetrations above access opening in west vestibule.
Level 1 center stairs: Repair fire door glazing trim'
Voids by stair landings in rated walls (multiple locations).
Fire caulking needed at ceiling penetrations inside and outside elevator
equipment room
East common area kitchen west wall fire rated - properly rate penetrations.
(Also: FACP sign to be posted as required and all fire alarm covers removed -
several still on as of last week)
Corrections (not life safety) required before project completion (complete C.O.):
113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab
bar to be 36"min (same in all similar ADA units).
Common area restroom sign to be posted.
North exit door requires too much force to open (air balancing needed?)
Need steps at roof access door and protect fire rating of structural element.
Toe clearance under sinks in type A units is 9" min. up to 17" from front of
counter.
Dryer vent termination cover missing on west wall (first floor)
Building Identification to be posted as required by code.
Fix exterior stair tread between A & C. and install handrails.
Parking to be completed.
Inspector Comments:
Page 9 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
08/18/2015FailQuinton OwensCommercial Building Final
Corrections required for C.O.:
FACP sign to be posted as required
Corrections (not life safety) required before project completion (complete C.O.):
Type A units: rear grab bar to be 36"min.
Common area restroom sign to be posted.
North exit door requires too much force to open (air balancing needed?)
Need steps at roof access door and protect fire rating of structural element.
Dryer vent termination cover missing on west wall (first floor)
Building Identification to be posted as required by code.
Fix exterior stair tread between A & C. and install handrails.
Parking to be completed.
Correct stair identification signs posted as per building code.
Inspector Comments:
09/02/2015PassQuinton OwensCommercial Building Final
Corrections completedInspector Comments:
Page 10 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
Electrical Inspection Type
01/31/2014PassBret StoddardElectrical Underground Inspection
Approved for cover-building C large conduits going under footings after bedding
with sand where rocks are under conduits-as per Destry they are going to bed
with sand anyways.
Inspector Comments:
11/03/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
11/07/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
11/19/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/01/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/03/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/10/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/17/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/18/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
12/23/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Electrical ceiling rough-in on units #404 and #405, approved per Gabe Madrid.Inspector Comments:
12/30/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/08/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/14/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/16/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/20/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/26/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
01/27/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
01/30/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
02/03/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
02/05/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
02/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
02/13/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
02/17/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
02/19/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
03/09/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
04/16/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Page 11 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
05/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
06/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
06/12/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
06/16/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
06/17/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
07/08/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Page 12 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
Fire Inspection Type
12/24/2014PassDale PickeringFire Sprinkler Rough-in
12/24/2014PassDale PickeringFire Sprinkler Rough-in
4th floor hydro, #210 @ 1425, #210 @ 1700, Pass
3rd floor hydro, #208 @ 1425, #205 @ 1700, Pass
Rough-in, Pass
Inspector Comments:
01/06/2015PassDale PickeringFire Sprinkler Rough-in
Building C, North portion of floor 4, PassInspector Comments:
01/06/2015PassDale PickeringFire Sprinkler Hydro
Building C, North portion of floor 4, #205 @ 1345, #205 @ 1545, PassInspector Comments:
01/09/2015PassDale PickeringFire Sprinkler Hydro
This inspection was for an underground flush for building C, PassInspector Comments:
01/15/2015FailDale PickeringFire Underground Inspection
01/15/2015PassDale PickeringFire Sprinkler Rough-in
Building C, floor 2 rough-in, Pass
Hydro, #204 @ 1115, #185 @ 1325, Fail
Inspector Comments:
01/22/2015PassDale PickeringFire Sprinkler Hydro
01/22/2015FailDale PickeringFire Underground Inspection
02/02/2015PassDale PickeringFire Sprinkler Hydro
02/17/2015PassDale PickeringFire Sprinkler Hydro
02/19/2015PassDale PickeringFire Sprinkler Rough-in
Rough-in inspection was for standpipes only.Inspector Comments:
05/26/2015PassDale PickeringFire Sprinkler Hydro
06/04/2015PassDale PickeringFire Sprinkler Rough-in
08/05/2015N/ABret StoddardFire Alarm Final Inspection
08/10/2015PassQuinton OwensFire Alarm Final Inspection
08/13/2015PassDale PickeringFire Sprinkler Final Inspection
08/18/2015PassBret StoddardFire Alarm Final Inspection
09/03/2015PassDale PickeringFire Department Final Inspection
Page 13 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
Mechanical Inspection Type
12/04/2014PassDon AllenHVAC Rough-in
the first 3 rooms starting on the east side are all good to cover the duct shafts.
fire calking looks good on all the duct work going throw the walls of the shaft.
Inspector Comments:
12/09/2014PassDon AllenHVAC Rough-in
the mechanical shafts in the hall way that run east and west in building c can be
covered they look good
Inspector Comments:
12/22/2014PassDon AllenHVAC Rough-in
Fire calking in rooms 404,405 looks good on the mechanicalInspector Comments:
01/02/2015PassDon AllenHVAC Rough-in
the 2 rooms that are located on the south west coner of the building ate good to
cover
Inspector Comments:
01/06/2015PassDon AllenHVAC Rough-in
All the mechanical rooms that run north and south on the top floor of building c
are good to cover. Still need to look at the last 2 apt. on the north end of the to
floor
Inspector Comments:
01/15/2015PassDon AllenHVAC Rough-in
All the mechanical rough in on the 4th floor of building c looks goodInspector Comments:
01/27/2015PassDon AllenHVAC Rough-in
All the mechanical chases in the mechanical rooms on the 2nd floor of building c
are good to cover.
Inspector Comments:
01/27/2015PassDon AllenHVAC Rough-in
all good to cover the mechanical rough in on 3rd floor in the wing that runs east
and west.
Inspector Comments:
01/29/2015PassDon AllenHVAC Rough-in
All the mechanical chases in the apt on the 3 floor are good to cover.Inspector Comments:
02/03/2015PassDon AllenHVAC Rough-in
All the apt. on the 3rd floor look good to cover. Still need to look at the common
rooms.
Inspector Comments:
02/11/2015PassDon AllenHVAC Rough-in
02/26/2015FailDon AllenHVAC Rough-in
joints om the duct need to be covered, the flex needs to be ran in the bath roomInspector Comments:
04/28/2015PassDon AllenHVAC Rough-in
Page 14 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
07/31/2015FailDon AllenHVAC Final Inspection
NEED TO SUPORT COPPER AND PVC LINES IN MECH.ROOMS
C411,MC302 NEED POOKY FIXED
NEED GRILL COVERS IN EQUMINT ROOMS
SC400P CC3001 DOORS LOCKED
CHECK ALL VENT PIPING FOR BACKGRADING
CHECK VENT COVERS AND HANGERS IN JANITORS ROOMS
CHECK DUCT SEAL ON ALL JOINTS(SOME MISSING, SOME NOT DONE ALL THE
WAY)
FINISH TRIM IN THE BATHROOMS IN COMMONS AREA
BASEMENT CORNER APT NEEDS GRILL ABOVE THE WASHER
STORE ROOM IN BASEMENT NEEDS DUCT SEALED
NEED TO FINISH TRIMING THE ROOF
Inspector Comments:
08/20/2015PassDon AllenHVAC Final Inspection
GOOD FOR THE C/OInspector Comments:
Page 15 of 16
(Continued)
Permit Details Permit Number: 13-00342
650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units
650 S 1st W
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am
Permit
Inspection
Summary
Plumbing Inspection Type
03/11/2014PassDon AllenPlumbing Underground Inspection
"1st underground section 1 good to cover" per Don Allen. Mistakenly entered on
FOUNDATION inspection scheduled for 3/5/2014.
Inspector Comments:
03/17/2014PassDon AllenPlumbing Underground Inspection
all good to cover section 2Inspector Comments:
03/20/2014PassDon AllenPlumbing Underground Inspection
all good to cover section3Inspector Comments:
04/24/2014PassDon AllenPlumbing Underground Inspection
good to cover the ground work in lower sectionInspector Comments:
04/30/2014PassDon AllenPlumbing Underground Inspection
05/08/2014PassDon AllenPlumbing Underground Inspection
good to cover the ground workInspector Comments:
09/18/2014PassDon AllenPlumbing Rough-in
12/01/2014PassDon AllenPlumbing Rough-in
12/17/2014PassDon AllenPlumbing Rough-in
Water lines on floor 4 on building bInspector Comments:
02/26/2015PassDon AllenPlumbing Water
water line held at 100 lbInspector Comments:
04/08/2015PassDon AllenPlumbing Water
main water line that runs down the hallways on the 1st floor is good to coverInspector Comments:
07/31/2015FailDon AllenPlumbing Final Inspection
NEED TO FINISH TRIMING OUT THE ADA ROOMS
2 ND FLOOR COMMONS BATH ROOMS AND DRINKING FOUNTAIN NEED TO BE
TRIMED OUT
2 ND FLOOR COMMONS BAR SINK NEEDS TO BE TRIMED WHEN CABNETS ARE
DONE.
GOOD FOR C/O JUST CALL IN REINSPECTION WHEN FINISHED
Inspector Comments: