Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00342 - 650 S 1st W - BYUI Student AptsPermit Inspection Summary Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Issued Date: 02/19/2014 Permit Inspection Statistics 156Total Inspections Completed: 121Total Inspections Passed: Inspection Pass Rate: 77.56% Permit Inspection History *Refer to Individual Inspection Report for more Details 09/25/2014PassQuinton OwensCommercial Framing/Structure Inspection South wall sheathing floors 1, 2, & 3. Fix nailing at marked locations and finish nailing sheets under windows on 2nd floor. Follow up on next inspection. Inspector Comments: 01/22/2015FailDale PickeringFire Underground Inspection Underground hydro, failed to hold pressure. Pressure dropping 10-15 lbs in 2 hours. Inspector Comments: 09/04/2015PassJoel GrayPublic Works Final Inspection See Permit # 13-00274 for notes.Inspector Comments: Building Inspection Type 02/03/2014PassTed DyeFooting Inspection Rebar good. Conditions: snowing wind blowing Action: blowing and melting snow out of footing ahead of pour. Stata engineering onsite. Inspector Comments: 03/05/2014PassTed DyeFoundation Inspection Foundation inspection in conjunction with footing inspection same day performed by Ted. (Underground plumbing insp. accidentally entered on original foundation insp. scheduled for 3/5/14). Inspector Comments: 03/05/2014PassTed DyeFooting Inspection 03/11/2014PassTed DyeFoundation Inspection 1st underground section 1 good to coverInspector Comments: 03/24/2014PassTed DyeFoundation Inspection 3 north-south wall with wings located between2.C and 4.C/D.C andB.C APPROVED TO POUR Inspector Comments: 04/02/2014PassQuinton OwensFoundation Inspection Approved. Extra busy morning. Special inspector on site and said foundation wall was compliant after a few form adjustments. Inspector Comments: 04/09/2014PassQuinton OwensFoundation Inspection Foundation at North end around Stairs & Elevator. Special inspector on site.Inspector Comments: Page 1 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 04/22/2014PassTed DyeFoundation Inspection Inspected west wall which is AA from 4-A to 6A and then around the corner on south wall which is 6-A from A-A to D-A and then around the corner on D-A 8 ft. Inspector Comments: building C Level 2 on West wing Some sheeting has missed being nailed to studs. Those sheets missed have been marked with Floresent green spray paint. Please call for re-inspect when those areas are corrected. Inspector Comments: 09/08/2014FailTed DyeSheeting area inspected was from 1-C to 7-CInspector Comments: 09/08/2014PassTed DyeSheeting building C Level 1: That area inspected, 1-C to 7-C Level one is OK to tyveck and cover. Inspector Comments: 10/08/2014PassTed DyeSheeting Inspected walls on grid line G.C from grid lines 8.C through 9.C. Wall 1.C from Gridline C.C through G.C Exterior Roofing. . Gridlines H.6, and 6.C through 8.C Upper roof H.6 between G.C and F.C. All passed. Inspector Comments: 10/09/2014PassTed DyeCommercial Framing/Structure Inspection 10/10/2014PassTed DyeCommercial Framing/Structure Inspection 10/16/2014PassTed DyeCommercial Framing/Structure Inspection 10/20/2014PassQuinton OwensCommercial Framing/Structure Inspection Roof sheathing North wing from grid 3 up to stair enclosure. Very North end yet to be completed. Inspector Comments: 10/29/2014PassQuinton OwensSheeting Inspected sheathing on North side of east wing by retaining wall (1st floor pop out only). Sheathing edge not nailed on inside corner because of concrete wall (should be able to toenail into nearest stud). Inspector Comments: 11/04/2014FailQuinton OwensSheeting West wall, 4th floor: A lot of nails are too deep. Some nails are missing (marked with green paint). Some vertical joints not on stud. All of west side is not yet completed. Inspector Comments: 11/04/2014FailQuinton OwensCommercial Framing/Structure Inspection Roof framing and Walls behind tubs/showers prior to drywall: Electrical penetrations in partition walls at roof framing must be fire blocked, Fire rate roof joist penetrations in shaft walls as needed. Inspector Comments: 11/06/2014PassTed DyeSheeting East and South wall of commons area. All 3 levelsInspector Comments: Page 2 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 11/07/2014FailQuinton OwensSheeting 4th floor, east & north wall: Several locations have nails too deep (mostly on north wall). Some studs missed (marked in green paint. Some edges at window need closer spacing. Inspector Comments: 11/10/2014FailQuinton OwensSheeting Level 1 & 2, east & north wall: Several missed locations (marked in green paint). Some joints missing backing. Inspector Comments: 11/12/2014PassQuinton OwensCommercial Insulation Inspection Insulation with vapor barrier under roof deck. Roof fully insulated on top. Penetrations at roof joist fire blocked between units as required. Inspector Comments: 11/17/2014PassTed DyeSheeting sheeting inspected on level four, north and east walls. West wall on level 4 was not ready and will be inspected at a later date. Other areas were looked at on levels 1 through 3 that needed to be checked and they passed Inspector Comments: 11/20/2014PassTed DyeSheeting sheeting on west wall of building C is approved on all levels.Inspector Comments: For your records took me a while to get this to you. Sorry i hope it didn't cause any problems. Inspector Comments: 11/20/2014N/AQuinton OwensSheeting 4th level sheathing on west wall approved by Ted. See 11/20 sheeting inspection for approval. Inspector Comments: 11/26/2014PassQuinton OwensCommercial Insulation Inspection 4th floor, South wing exterior walls. (done on 11/26).Inspector Comments: 12/03/2014PassQuinton OwensCommercial Insulation Inspection Sound insulation (with Interior Framing) on East 2 Units on south side of south wing. with ceiling and exterior walls of south west unit of west wing and main corridor. Inspector Comments: 12/05/2014FailQuinton OwensCommercial Sheetrock/Drywall Inspection Corrections not completed in concealed locations. Only insulation inspected today (12/5). Inspector Comments: 12/05/2014PassQuinton OwensCommercial Insulation Inspection Remaining South wing units' sound insulation approved.Inspector Comments: 12/10/2014FailQuinton OwensCommercial Insulation Inspection Apt. 406, 409, 411, 412, 413, 417 Insulation approved for cover. Not Ready- 415, 408, 410. Inspector Comments: Page 3 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 12/10/2014FailQuinton OwensCommercial Sheetrock/Drywall Inspection Apt. 401, 402, 403, 404, 405, 407: Joints to be taped on fire rated walls behind tubs (all to be uncovered for inspection). Fire stop system needed at 4" roof drain penetrations at roof assembly and rated wall penetrations (check with Architect if needed). Inspector Comments: 12/16/2014FailQuinton OwensCommercial Insulation Inspection 415: missing some vapor barrier and insulation on ext. wall. Party wall not done. 410: party wall not done. Broken stud between 410 & 412. 408: Party wall not completed for insulation, and 417 party wall not insulated. Inspector Comments: 12/18/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection Upper ceiling and walls inspected in 401, 402, 403 and approved to hang lower ceiling. Concealed areas ok to cover in 401, 402, 403, 404, 405, 407, 409, & 411 only. Inspector Comments: 12/18/2014PassQuinton OwensCommercial Insulation Inspection Remaining apartments on west wing approved for insulation. North wall of 217 may be inspected from north side. Inspector Comments: 12/19/2014FailQuinton OwensCommercial Framing/Structure Inspection 3rd floor, South wing: Cut stud just outside entry to 301, fire caulk/tape at concealed locations (typ), 303: insulate exterior at former dryer vent penetration. shaft rated walls should extend to floor deck BOTH sides (typ), various penetrations at party wall in floor assembly still need fire blocking. Seal tub drain penetration. Web joists forming the fire barrier at a shaft location need to be rated on the ends between drywall and joist web. Inspector Comments: 12/22/2014PassQuinton OwensCommercial Framing/Structure Inspection 3rd floor south wing re-inspectInspector Comments: 12/31/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection 407 & 409 Drywall and upper ceiling penetrations inspected and approved to hang lower ceiling. Inspector Comments: 01/06/2015PassQuinton OwensCommercial Framing/Structure Inspection North wing, 1st & 2nd floor exterior wall framing inspected. Only 2nd floor exterior walls approved for insulation. 1st floor exterior walls missing anchor bolts, nuts, & washers - not approved for insulation. Room 117 (or 115) is missing doubled up stud on North end of exterior wall. Found trimmer studs on interior doorways not sufficiently nailed (will inspect with rest of interior framing) Inspector Comments: 01/06/2015FailQuinton OwensCommercial Framing/Structure Inspection North wing, 3rd floor: need to finish fire caulking penetrations. Fireblocking needed above south party wall in 309 in bathroom. Finish 2 hour rating on underside of joists in exhaust shafts. Finish rating end gaps between drywall and joist web at shaft locations. (Pictures emailed for clarification) Inspector Comments: Page 4 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 312 n exterior wall insulation 317 shaft rating needed. 309 and 313 gaps in rated ceiling Inspector Comments: 01/08/2015FailTed DyeCommercial Framing/Structure Inspection 312 n exterior wall insulation 317 shaft rating needed. 309 and 313 gaps in rated ceiling Inspector Comments: 01/09/2015FailQuinton OwensCommercial Framing/Structure Inspection 406, 408, & 411 Upper ceiling & wall penetration and sheetrock inspection to hang lower ceiling. Closets by entry already have lower ceiling hung and were not inspected (often have penetrations in upper ceiling). Reinspect front closet upper ceilings. Rest of these 3 units are approved to hang lower ceiling. 404 and 405 never called for inspection on upper ceiling. Inspector Comments: 01/14/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Drywall and upper ceiling inspection approved in 410, 413, and 415. Missing some screws in wall above closet in south bdrm of 415, and at top of back closet wall in north bdrm of 412. 412 & 417 not ready. Inspector Comments: Rooms 412 and417 ceilings fire caulking approved to be covered. 2nd floor framing, fire caulking, is not complete. Inspection will be called for on 1-16-15 Inspector Comments: 01/15/2015FailTed DyeCommercial Framing/Structure Inspection North west stair well and shaft approved to insulate. All bolts tightened and structure good. Inspector Comments: 01/16/2015PassTed DyeCommercial Insulation Inspection 01/16/2015PassTed DyeCommercial Framing/Structure Inspection rooms203, 204, 205 and 207 along with commons rooms approved to insulate. room 202 has one consealed area around drain pipes that needs to be sealed up. Inspector Comments: 01/21/2015FailQuinton OwensCommercial Framing/Structure Inspection Fix fire rating at concealed locations as indicated during inspection. Water line top plate penetration in Storage room, Enclose pipes in Roxul insulation above tub in 209, All drywall around pipes or eclose pipes in 211 same as 209, Drywall above closet in ADA bathroom of 213, no roxul insulation along joist in 215 & 212 (see emailed pictures). Inspector Comments: 01/21/2015PassQuinton OwensCommercial Insulation Inspection 2nd floor, North wing Exterior wall insulation.Inspector Comments: 01/26/2015FailQuinton OwensCommercial Framing/Structure Inspection Inspected rated penetrations above dropped ceilings (302, 303, 304 approved). 301 Drain pipe penetration of shaft wall and corridor wall not rated (by apartment entry). Ok to hang Lower ceiling. Access to make correction is available. Inspector Comments: Page 5 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 01/27/2015PassQuinton OwensCommercial Framing/Structure Inspection 305, 307, 309 Drywall and rated penetration inspection above lower ceiling.Inspector Comments: Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments: Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments: Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments: Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments: 01/29/2015FailTed DyeCommercial Framing/Structure Inspection Ok to insulate units 102, 104 and 107, all but demissing wallInspector Comments: 02/02/2015PassTed DyeCommercial Framing/Structure Inspection Items have been corrected in rooms 102, 104 and 107. units 306, 308, 311 and 313 ceilig penetrations above droped ceiling and top plates Passed. Inspector Comments: 02/04/2015PassTed DyeCommercial Framing/Structure Inspection 02/06/2015PassTed DyeCommercial Framing/Structure Inspection 02/09/2015FailQuinton OwensCommercial Framing/Structure Inspection 2/11: 202,203,204,205,207 approved for taping. Upper ceiling penetrations completed for rating. Inspector Comments: 02/12/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection 2/12: 209 approved for taping and upper ceiling penetrations completedInspector Comments: 02/12/2015PassQuinton OwensCommercial Framing/Structure Inspection Framing on North stair done and correction to East stair done. Approved for insulation. Inspector Comments: 02/13/2015PassTed DyeCommercial Sheetrock/Drywall Inspection Units 206, 208, 210, 211 and 213, the drywall in the rooms and fire caulking above the lowered ceiling passed. Inspector Comments: 02/18/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Apt 215 drywall and upper ceiling rated penetrations. Add screws missing in bedroom closet. Inspector Comments: 02/18/2015PassQuinton OwensCommercial Framing/Structure Inspection Elevator shaft, 2nd floorInspector Comments: 02/24/2015FailQuinton OwensCommercial Framing/Structure Inspection Elevator shaft framing on 1st level and basement. Add and tighten nuts on anchor bolts to steel at BASEMENT level. Inspector Comments: 02/26/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection 03/05/2015PassTed DyeCommercial Sheetrock/Drywall Inspection Units 102, 104, 107 and 109 Had corrections made and approved. See other notes for those things that have not been corrected. Inspector Comments: Page 6 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 03/11/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection 3/10: North wing drywall inspection failed. Several apartments have some screws spaced too far apart or missed lines of screws completely. Mechanical also incomplete and not ready to cover. Penetrations are fire caulked as required. 3/11: 106, 108, 110, 112, 111, 113, 115, & 117 Re-inspection completed. Ok to hang lower ceiling (pending mechanical rough-in approval) and tape drywall. Inspector Comments: 03/24/2015PassQuinton OwensCommercial Framing/Structure Inspection Basement level framingInspector Comments: 04/21/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection 1st floor hallway fire rating above dropped hard ceilings. Corrections made during inspection. Inspector Comments: 05/11/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection 4th Floor corridor above acoustical ceilings. Seal 2 small holes in south wing and Fire caulk penetrations through beam enclosure on North end of hall by stairs. Add missing screws on north wall by elevator. Inspector Comments: 05/13/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Third & Fourth floor corridor rated ceiling above acoustical ceiling approved to cover. EXCEPT north and east ends (grid not completed yet and/or not all penetrations fire caulked). Inspector Comments: 06/09/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection Level 2 Corridor ceiling, Level 3 & 4 North common area ceiling approved for cover. (2 wall receptacles to be rated) Common area between C200A and corridor NOTAPPROVED for cover. Inspector Comments: 06/10/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection 1st floor corridor approved for cover except last section on north & elevator lobby. Inspector Comments: 07/22/2015FailQuinton OwensCommercial Building Final Building B & C called in together without allowing much time and a lot of work still undone in building C. Will start building C when done with items on B. Inspector Comments: Page 7 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 07/30/2015FailQuinton OwensCommercial Building Final *** PARTIAL LIST *** INSPECTION TO BE CONTINUED Penetration(s) not fire rated in MC117, MC112, MC113, 109 (finish under bthrm sink) Gas odor in MC112 Install metal plate clean out cover under kitchen sink in 113 (same in other ADA units) 113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab bar to be 36"min (same in all similar ADA units). 10 units need fire caulking under various sinks (should be done - to be reinspected) Mechanical vent piping to have annular space cut in and filled with fire caulk (MC200B(fire collars), MC203, MC209) Other rooms needing penetrations rated (MC106, Janitor's room on 1st & 2nd floor, CC200L, SC200P, MC209) East common area ceiling still closed up - cannot reinspect corrections. Bathroom in east common area unfinished. Fire rated glazing in doors on east end of corridor is missing. Still no rated glazing in center stair door on 2nd floor. Seal base of tubs/showers in all units. Fire rate all penetrations in ceiling and bearing wall in basement rooms and hall. No stair identification signs. Levels 1 and 3 do not have unit #'s posted. Common area restroom signs to be posted. Inspector Comments: 08/13/2015FailQuinton OwensCommercial Building Final *** Partial Inspection *** continuing inspection Penetration(s) not fire rated in 109 (finish under bthrm sink), 107 (under west bathroom sink) 113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab bar to be 36"min (same in all similar ADA units). Other rooms needing penetrations rated (SC200D surrounding walls all rated) Fire rated glazing in door on east end of corridor is missing. Fire rate all penetrations in ceiling wall in basement rooms and hall (intumescent caulk needed at plastic pipes) some not caulked or inspected before plywood wall sheathing installed on south end of storage room. No stair identification signs. Common area restroom sign to be posted. Inspector Comments: Page 8 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 08/17/2015FailQuinton OwensCommercial Building Final Corrections required for C.O.: Penetration(s) not fire rated in 109 (finish under bthrm sink), 107 (under west bathroom sink). Fire rate all penetrations in ceiling wall in basement rooms and hall (intumescent caulk needed at plastic pipes) some not caulked or inspected before plywood wall sheathing installed on south end of storage room. No stair identification signs. Other rooms needing penetrations rated (SC200D surrounding walls all rated) North stair sprinkler pipe and brace penetration (taping over holes are not rated!) No Fire rating at TV mounts with metal trim piece removed (office by common area and 3rd floor study) CC200L: west wall is fire rated - rate penetrations on both sides. 2nd level center stair: hole in rated wall by emergency light. Seal penetrations above access opening in west vestibule. Level 1 center stairs: Repair fire door glazing trim' Voids by stair landings in rated walls (multiple locations). Fire caulking needed at ceiling penetrations inside and outside elevator equipment room East common area kitchen west wall fire rated - properly rate penetrations. (Also: FACP sign to be posted as required and all fire alarm covers removed - several still on as of last week) Corrections (not life safety) required before project completion (complete C.O.): 113: Finish and seal edge of ADA shower, pipe protectors under sink, & rear grab bar to be 36"min (same in all similar ADA units). Common area restroom sign to be posted. North exit door requires too much force to open (air balancing needed?) Need steps at roof access door and protect fire rating of structural element. Toe clearance under sinks in type A units is 9" min. up to 17" from front of counter. Dryer vent termination cover missing on west wall (first floor) Building Identification to be posted as required by code. Fix exterior stair tread between A & C. and install handrails. Parking to be completed. Inspector Comments: Page 9 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 08/18/2015FailQuinton OwensCommercial Building Final Corrections required for C.O.: FACP sign to be posted as required Corrections (not life safety) required before project completion (complete C.O.): Type A units: rear grab bar to be 36"min. Common area restroom sign to be posted. North exit door requires too much force to open (air balancing needed?) Need steps at roof access door and protect fire rating of structural element. Dryer vent termination cover missing on west wall (first floor) Building Identification to be posted as required by code. Fix exterior stair tread between A & C. and install handrails. Parking to be completed. Correct stair identification signs posted as per building code. Inspector Comments: 09/02/2015PassQuinton OwensCommercial Building Final Corrections completedInspector Comments: Page 10 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary Electrical Inspection Type 01/31/2014PassBret StoddardElectrical Underground Inspection Approved for cover-building C large conduits going under footings after bedding with sand where rocks are under conduits-as per Destry they are going to bed with sand anyways. Inspector Comments: 11/03/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 11/07/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 11/19/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/01/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/03/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/10/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/17/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/18/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/23/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Electrical ceiling rough-in on units #404 and #405, approved per Gabe Madrid.Inspector Comments: 12/30/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/08/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/14/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/16/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/20/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/26/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 01/27/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 01/30/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/03/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 02/05/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/13/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/17/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 02/19/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 03/09/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 04/16/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Page 11 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 05/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 06/11/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 06/12/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 06/16/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 06/17/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 07/08/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Page 12 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary Fire Inspection Type 12/24/2014PassDale PickeringFire Sprinkler Rough-in 12/24/2014PassDale PickeringFire Sprinkler Rough-in 4th floor hydro, #210 @ 1425, #210 @ 1700, Pass 3rd floor hydro, #208 @ 1425, #205 @ 1700, Pass Rough-in, Pass Inspector Comments: 01/06/2015PassDale PickeringFire Sprinkler Rough-in Building C, North portion of floor 4, PassInspector Comments: 01/06/2015PassDale PickeringFire Sprinkler Hydro Building C, North portion of floor 4, #205 @ 1345, #205 @ 1545, PassInspector Comments: 01/09/2015PassDale PickeringFire Sprinkler Hydro This inspection was for an underground flush for building C, PassInspector Comments: 01/15/2015FailDale PickeringFire Underground Inspection 01/15/2015PassDale PickeringFire Sprinkler Rough-in Building C, floor 2 rough-in, Pass Hydro, #204 @ 1115, #185 @ 1325, Fail Inspector Comments: 01/22/2015PassDale PickeringFire Sprinkler Hydro 01/22/2015FailDale PickeringFire Underground Inspection 02/02/2015PassDale PickeringFire Sprinkler Hydro 02/17/2015PassDale PickeringFire Sprinkler Hydro 02/19/2015PassDale PickeringFire Sprinkler Rough-in Rough-in inspection was for standpipes only.Inspector Comments: 05/26/2015PassDale PickeringFire Sprinkler Hydro 06/04/2015PassDale PickeringFire Sprinkler Rough-in 08/05/2015N/ABret StoddardFire Alarm Final Inspection 08/10/2015PassQuinton OwensFire Alarm Final Inspection 08/13/2015PassDale PickeringFire Sprinkler Final Inspection 08/18/2015PassBret StoddardFire Alarm Final Inspection 09/03/2015PassDale PickeringFire Department Final Inspection Page 13 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary Mechanical Inspection Type 12/04/2014PassDon AllenHVAC Rough-in the first 3 rooms starting on the east side are all good to cover the duct shafts. fire calking looks good on all the duct work going throw the walls of the shaft. Inspector Comments: 12/09/2014PassDon AllenHVAC Rough-in the mechanical shafts in the hall way that run east and west in building c can be covered they look good Inspector Comments: 12/22/2014PassDon AllenHVAC Rough-in Fire calking in rooms 404,405 looks good on the mechanicalInspector Comments: 01/02/2015PassDon AllenHVAC Rough-in the 2 rooms that are located on the south west coner of the building ate good to cover Inspector Comments: 01/06/2015PassDon AllenHVAC Rough-in All the mechanical rooms that run north and south on the top floor of building c are good to cover. Still need to look at the last 2 apt. on the north end of the to floor Inspector Comments: 01/15/2015PassDon AllenHVAC Rough-in All the mechanical rough in on the 4th floor of building c looks goodInspector Comments: 01/27/2015PassDon AllenHVAC Rough-in All the mechanical chases in the mechanical rooms on the 2nd floor of building c are good to cover. Inspector Comments: 01/27/2015PassDon AllenHVAC Rough-in all good to cover the mechanical rough in on 3rd floor in the wing that runs east and west. Inspector Comments: 01/29/2015PassDon AllenHVAC Rough-in All the mechanical chases in the apt on the 3 floor are good to cover.Inspector Comments: 02/03/2015PassDon AllenHVAC Rough-in All the apt. on the 3rd floor look good to cover. Still need to look at the common rooms. Inspector Comments: 02/11/2015PassDon AllenHVAC Rough-in 02/26/2015FailDon AllenHVAC Rough-in joints om the duct need to be covered, the flex needs to be ran in the bath roomInspector Comments: 04/28/2015PassDon AllenHVAC Rough-in Page 14 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary 07/31/2015FailDon AllenHVAC Final Inspection NEED TO SUPORT COPPER AND PVC LINES IN MECH.ROOMS C411,MC302 NEED POOKY FIXED NEED GRILL COVERS IN EQUMINT ROOMS SC400P CC3001 DOORS LOCKED CHECK ALL VENT PIPING FOR BACKGRADING CHECK VENT COVERS AND HANGERS IN JANITORS ROOMS CHECK DUCT SEAL ON ALL JOINTS(SOME MISSING, SOME NOT DONE ALL THE WAY) FINISH TRIM IN THE BATHROOMS IN COMMONS AREA BASEMENT CORNER APT NEEDS GRILL ABOVE THE WASHER STORE ROOM IN BASEMENT NEEDS DUCT SEALED NEED TO FINISH TRIMING THE ROOF Inspector Comments: 08/20/2015PassDon AllenHVAC Final Inspection GOOD FOR THE C/OInspector Comments: Page 15 of 16 (Continued) Permit Details Permit Number: 13-00342 650 S 1st W - BYU-Idaho Student Apts, Bldg C; 56 Units 650 S 1st W New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 09/20/2019 10:05 am Permit Inspection Summary Plumbing Inspection Type 03/11/2014PassDon AllenPlumbing Underground Inspection "1st underground section 1 good to cover" per Don Allen. Mistakenly entered on FOUNDATION inspection scheduled for 3/5/2014. Inspector Comments: 03/17/2014PassDon AllenPlumbing Underground Inspection all good to cover section 2Inspector Comments: 03/20/2014PassDon AllenPlumbing Underground Inspection all good to cover section3Inspector Comments: 04/24/2014PassDon AllenPlumbing Underground Inspection good to cover the ground work in lower sectionInspector Comments: 04/30/2014PassDon AllenPlumbing Underground Inspection 05/08/2014PassDon AllenPlumbing Underground Inspection good to cover the ground workInspector Comments: 09/18/2014PassDon AllenPlumbing Rough-in 12/01/2014PassDon AllenPlumbing Rough-in 12/17/2014PassDon AllenPlumbing Rough-in Water lines on floor 4 on building bInspector Comments: 02/26/2015PassDon AllenPlumbing Water water line held at 100 lbInspector Comments: 04/08/2015PassDon AllenPlumbing Water main water line that runs down the hallways on the 1st floor is good to coverInspector Comments: 07/31/2015FailDon AllenPlumbing Final Inspection NEED TO FINISH TRIMING OUT THE ADA ROOMS 2 ND FLOOR COMMONS BATH ROOMS AND DRINKING FOUNTAIN NEED TO BE TRIMED OUT 2 ND FLOOR COMMONS BAR SINK NEEDS TO BE TRIMED WHEN CABNETS ARE DONE. GOOD FOR C/O JUST CALL IN REINSPECTION WHEN FINISHED Inspector Comments: Page 16 of 16