Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY 2 - 13-00382 - 240 S 3rd E - Bathroom RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 09/20/2019 9:09 am Permit Details Permit Number: 13-00382 240 S 3rd E - Bathroom Remodel 240 S 3rd E Single Family Residential Remodel Permit Issued Date: 02/26/2014 Permit Inspection Statistics 5Total Inspections Completed: 5Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details 11/19/2013PassBret StoddardElectrical Rough-in Approved for cover in bathroom and closet area remodel on upper level-make sure that all closet lights are not to close to the shelving-will re-inspect this on the final inspection. Inspector Comments: Building Inspection Type 10/21/13 TD: Framing - inspected work done. Asked for drawing from engineer for the remainder of work and some that has already been finished. Inspector Comments: 10/30/2013PassTed DyeFraming/Structure Inspection 10/30/13 TD: Framing - approved.Inspector Comments: 10/27/2015PassTed DyeResidential Building Final Electrical Inspection Type 10/27/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Plumbing Inspection Type 06/19/2018PassDon AllenPlumbing Final Inspection Inspection was completed on 10/27/2015. Task was reopened and closed on 6/19/2018 due to the need to fix an error that locked the workflow and would not allow the "Permit Finaled" task to be entered and completed. Inspector Comments: