HomeMy WebLinkAboutINSPECTION SUMMARY 2 - 13-00382 - 240 S 3rd E - Bathroom RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 09/20/2019 9:09 am
Permit Details Permit Number: 13-00382
240 S 3rd E - Bathroom Remodel
240 S 3rd E
Single Family Residential Remodel
Permit Issued Date: 02/26/2014
Permit Inspection Statistics
5Total Inspections Completed:
5Total Inspections Passed:
Inspection Pass Rate: 100.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
11/19/2013PassBret StoddardElectrical Rough-in
Approved for cover in bathroom and closet area remodel on upper level-make
sure that all closet lights are not to close to the shelving-will re-inspect this on
the final inspection.
Inspector Comments:
Building Inspection Type
10/21/13 TD: Framing - inspected work done.
Asked for drawing from engineer for the remainder of work and some that has
already been finished.
Inspector Comments:
10/30/2013PassTed DyeFraming/Structure Inspection
10/30/13 TD: Framing - approved.Inspector Comments:
10/27/2015PassTed DyeResidential Building Final
Electrical Inspection Type
10/27/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Plumbing Inspection Type
06/19/2018PassDon AllenPlumbing Final Inspection
Inspection was completed on 10/27/2015. Task was reopened and closed on
6/19/2018 due to the need to fix an error that locked the workflow and would not
allow the "Permit Finaled" task to be entered and completed.
Inspector Comments: