Loading...
HomeMy WebLinkAboutPLANS 2 - M19-00107 - Ricks - 3731 Cedar Cove - New SFRINDEX OF SHEETS G-101 C-101 A-101 A-102 A-201 A-202 A-301 S-101 S-102 S-103 S-201 S-202 S-301 R-101 E-101 E-102 COVER SHEET SITE MAIN FLOOR SECOND FLOOR ELEVATIONS ELEVATIONS SECTIONS FOUNDATION WALL FRAMING WALL FRAMING FLOOR FRAMING FLOOR FRAMING ROOF FRAMING DETAILS MEP MARKUP PLAN MEP MARKUP PLAN FINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGE ID MAIN FLOOR SECOND FLOOR AREA 2,145.61 1,912.71 4,058.32 sq ft UNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGE ID GARAGE AREA 1,041.50 1,041.50 sq ft LOCATION: REXBURG, IDAHO SNOW LOAD: 35 PSF (ROOF) WIND SPEED: 115 MPH FROST DEPTH: 36" SEISMIC: D1 REGULATION: IRC 2015 RICKS MANORRICKS MANORRICKS MANORRICKS MANOR DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E CO V E R S H E E T SH E E T T I T L E : G-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O N 1 0 0 ' S E P T I C S E P T I C D R A I N F I E L D W E L L 28 0.0 0' 1 6 7 .5 5 ' 2 6 8 . 5 3 ' 2 3 2 .4 5 ' 1 0 ' S E T B A C K 1 0 ' S E T B A C K 25' SET BACK 5 0 ' S E T B A C K DR I V E W A Y Parcel Number: RP0RVRK0030150 Primary Owner: RICKS DANNY Secondary Owner:RICKS ANGELA Site Address: 3731 Cedar Cove, Rexburg Mailing Address: 401 E APPALOOSA DR SUGAR CITY, ID 83448 Acreage: 1.09 GIS Square Feet: 47719.3038 Legal Description: RIVER ROCK ESTATES DIV NO. 1 LOT 15 BLK 3 CEDAR COVE 1 SITE PLANSITE PLANSITE PLANSITE PLAN SCALE: SCALE: SCALE: SCALE: 1" = 20'1" = 20'1" = 20'1" = 20' SITE PLAN NOTE: 1. U.N.O. THE SITE PLAN IS BASED ON MEASUREMENTS OBTAINED FROM PUBLIC RECORD DOCUMENTS OR GIS SYSTEM INFORMATION AND MAY NOT BE EXACT. 2. IT IS THE OWNERS/CONTRACTORS RESPONSIBILITY TO OBTAIN NECESSARY SURVEY DATA, INCLUDING TOPOGRAPHICAL INFORMATION 3. LOCATION OF UTILITIES SHOULD BE CONFIRMED BY THE CONTRACTOR PRIOR TO EXCAVATION 4. WHERE SEPTIC AND/OR FRESH WATER WELLS ARE NECESSARY, PERMITS AND LOCATION SHOULD BE OBTAINED FROM THE AUTHORITY HAVING JURISDICTION (TYPICALLY HEALTH DEPT) 5. INDICATED LOCATIONS OF SEPTIC, WELL, AND/OR UTILITIES ARE ASSUMED OR SUGGESTED AND SHOULD BE VERIFIED AND APPROVED BY THE OWNER/CONTRACTOR AND THE AUTHORITY HAVING JURISDICTION DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E SI T E SH E E T T I T L E : C-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 6 DW IIIIL G E A AA J J C 11 10 K K 5 4 5 B B 3 2 6 6 66 6 6 D D9 J C 6 F F DRW 72'-6" 60 ' 2 A- 3 0 1 2 A- 3 0 1 1 A-301 1 A-301 MASTER BATH SHOWER 1/2 BATH DESK KING MECHANICAL HI D D E N PA N T R Y D O O R UP 2 CAR GARAGE BAY 1 21'-0" x 28'-6" 3 CAR GARAGE BAY 2 13'-5" x 24'-6" PANTRY 13'-6" x 9'-0" KITCHEN 12'-0" x 19'-8"DINING 10'-0" x 19'-8" LIVING ROOM 18'-6" x 19'-8" PIANO ROOM 11'-7" x 12'-0"ENTRY 7'-0" x 14'-4" W.I.C. 14'-5" x 5'-5" MASTER BEDROOM 14'-5" x 17'-7" LAUNDRY 8'-4" x 9'-11" MUD ROOM 7'-7" x 9'-11" WINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULE ID A B C D E F G H I J K L TYPE TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD QTY 3 2 2 2 1 2 1 1 4 8 2 1 HEIGHT 8' 8'-8" 6'-8" 8'-8" 8'-8" 6'-8" 8'-8" 7'-8" 8'-8" 6'-8" 4'-8" 8'-8" SIZE W 2' 2' 3' 3' 4' 4' 4' 4' 4' 5' 5' 10' HT 2' 6' 4' 7' 2' 2' 4' 4' 7' 4' 4' 7' NOTES DOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULE ID 1 2 3 4 5 6 7 8 9 10 11 QTY 1 1 1 1 2 15 2 4 1 1 1 LOCATION Interior Interior Interior Exterior Exterior Interior Interior Interior Exterior Exterior Exterior FIRE RATING YES DOOR W 1'-6" 2'-4" 2'-6" 3' 3' 3' 5' 6' 6' 9' 18' HT 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 7'-8" 9' 9' NOTES FINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGEFINISHED SQUARE FOOTAGE ID MAIN FLOOR SECOND FLOOR AREA 2,145.61 1,912.71 4,058.32 sq ft UNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGEUNFINISHED SQUARE FOOTAGE ID GARAGE AREA 1,041.50 1,041.50 sq ft 1 MAIN LEVEL PLANMAIN LEVEL PLANMAIN LEVEL PLANMAIN LEVEL PLAN SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E MA I N F L O O R SH E E T T I T L E : A-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O J J J JF F J H 6 8 6 6 66 6 8 8 6 1 8 7 7 2 A- 3 0 1 1 A-301 1 A-301 56'-6" 39 ' OPEN TO BELOW FULL FULL FULL FULL BATH BATH LINEN LINEN STORAGE FOOSBALL TABLE 5'X10' FLOOR SPACE LINEN DO W N BEDROOM #2 14'-7" x 12'-4" BEDROOM #3 14'-7" x 13'-6" BEDROOM #4 12'-7" x 13'-6" FAMILY ROOM 30'-7" x 22'-2" BEDROOM #5 12'-7" x 13'-6" WINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULE ID A B C D E F G H I J K L TYPE TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD QTY 3 2 2 2 1 2 1 1 4 8 2 1 HEIGHT 8' 8'-8" 6'-8" 8'-8" 8'-8" 6'-8" 8'-8" 7'-8" 8'-8" 6'-8" 4'-8" 8'-8" SIZE W 2' 2' 3' 3' 4' 4' 4' 4' 4' 5' 5' 10' HT 2' 6' 4' 7' 2' 2' 4' 4' 7' 4' 4' 7' NOTES DOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULE ID 1 2 3 4 5 6 7 8 9 10 11 QTY 1 1 1 1 2 15 2 4 1 1 1 LOCATION Interior Interior Interior Exterior Exterior Interior Interior Interior Exterior Exterior Exterior FIRE RATING YES DOOR W 1'-6" 2'-4" 2'-6" 3' 3' 3' 5' 6' 6' 9' 18' HT 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 7'-8" 9' 9' NOTES 1 SECOND FLOORSECOND FLOORSECOND FLOORSECOND FLOOR SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E SE C O N D F L O O R SH E E T T I T L E : A-102 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 9 12 9 12 9 12 9 12 J A A A H 5 J J C J 10 C 4 12 LIIII9DD J F J J 1 FRONT ELEVATIONFRONT ELEVATIONFRONT ELEVATIONFRONT ELEVATION SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 2 REAR ELEVATIONREAR ELEVATIONREAR ELEVATIONREAR ELEVATION SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E EL E V A T I O N S SH E E T T I T L E : A-201 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 4 12 6 12 3 12 B B G E F J 6 12 6 12 6 12 312 11 K K 5 1 LEFT ELEVATIONLEFT ELEVATIONLEFT ELEVATIONLEFT ELEVATION SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 2 RIGHT ELEVATIONRIGHT ELEVATIONRIGHT ELEVATIONRIGHT ELEVATION SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E EL E V A T I O N S SH E E T T I T L E : A-202 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 10 ' - 1 1 / 8 " -5'-10 1/8" BOTTOM OF FOOTER 0" FINISHED MAIN FLOOR 10'-1 1/8" DBL TOP PLATE 20'-2 3/8" DBL TOP PLATE 31'-5/8" BUILDING HEIGHT RISE 7-7/16" RUN 11" TO BE FIELD VERIFIED MANUFACTURED TRUSSES MANUFACTURED TRUSSES 3 CAR GARAGE BAY 2 KITCHEN DINING ENTRY FAMILY ROOM MASTER BEDROOM BEDROOM #3 CLOSET LINENOPEN TO ENTRY BELOW CRAWL SPACE 6 12 3 12 MANUFACTURED TRUSSES ENTRY FAMILY ROOM CRAWL SPACE KITCHEN & DINING BEDROOM #4 1111 2222 3333 4444 55556666 7777 88889999 10101010 11111111 12121212 CEILING OF NEXT LEVEL KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - 6'8" HEAD CLEARANCE ENTIRETY OF STAIRS 2 - HANDRAIL 36" FROM STAIR NOISING 3 - 7-3/4" MAX RISE 4 - 10" MIN RUN 5 - 2X CLEAT. PRESSURE TREATED IF FLOOR IS CONCRETE 6 - DRY WALL 7 - LVL STRINGER 8 - SIMPSON SLOPABLE HANGER 9- FLOOR FRAMING 10 - RIM BOARD 11 - LVL DROPPED TO MATCH STRINGERS 12 - FILLER BLOCK 1 SECTION @ STAIRSSECTION @ STAIRSSECTION @ STAIRSSECTION @ STAIRS SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 2 SECTION @ ENTRYSECTION @ ENTRYSECTION @ ENTRYSECTION @ ENTRY SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 3 TYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMING NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E SE C T I O N S SH E E T T I T L E : A-301 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 11" 8'8'6'-8"8'8'3'-6" 11 " 8' - 6 " 8' 9' 1' - 2 " 8'-7"70'-6" 79'-1" 44'-1"20'15' 2' 23 ' 37 ' 62 ' 11 ' - 8 " 79'-1" 2' 14 ' - 5 " 27 ' - 7 " 18 ' 62 ' 11 ' - 8 " 6'-5"2'15'8'-4"11'-4" 6' - 5 " 2' 6' 13 ' - 2 " 6'-5"2'-2" 5' - 1 0 " 7' - 5 " 4' - 5 " 6" 17 ' - 8 " 21'-4"14' 14'-7"10'-2"10'4'-5"5'-7"10'-5" 8 2'- 5 " 12 ' 11 ' 24 ' 13 ' 43'-1"6'10'6'14' 79'-1" 7'7' 12 ' - 8 " 8' - 4 " 9' - 4 " 5' - 1 1 " 4' - 2 " 4' - 2 " 2' 2X WALL 5/8"REDHEAD ANCORS @ 32" O.C. (TYP) F3F3F3F3 F2F2F2F2 F2F2F2F2 F2F2F2F2 F1F1F1F1 F1F1F1F1 F1F1F1F1 F1F1F1F1 F2F2F2F2 F2F2F2F2 F2F2F2F2 F2F2F2F2 F1F1F1F1 F3F3F3F3 F2F2F2F2 F2F2F2F2 F2F2F2F2 F3F3F3F3 F3F3F3F3F3F3F3F3 F3F3F3F3 F3F3F3F3 F2F2F2F2 F3F3F3F3 F2F2F2F2 F2F2F2F2 F2F2F2F2 F2F2F2F2 F2F2F2F2 F2F2F2F2 F2F2F2F2 F4F4F4F4 F4F4F4F4 F2F2F2F2 1 1 1 1 1 1 1 1 22 2 2 333333 3 3 3 FW1FW1FW1FW1 FW1FW1FW1FW1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW1FW1FW1FW1 FW 1 FW 1 FW 1 FW 1 FW1FW1FW1FW1 FW1FW1FW1FW1 FW 1 FW 1 FW 1 FW 1 FW1FW1FW1FW1 FW1FW1FW1FW1 FW1FW1FW1FW1 FW1FW1FW1FW1FW1FW1FW1FW1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW 1 FW1FW1FW1FW1 FW 1 FW 1 FW 1 FW 1 FW1FW1FW1FW1 F2F2F2F2 2 2" PORCH CAP LEDGE 2" PORCH CAP LEDGE2" PORCH CAP LEDGE F2F2F2F2 FW 1 FW 1 FW 1 FW 1 COMPACTED FILL BELOW, 8" CONCRETE PORCH CAP W/ #4 BAR @ 24" O.C. BOTH WAYS CO M P A C T E D F I L L B E L O W , 8" C O N C R E T E P O R C H C A P W / #4 B A R @ 2 4 " O . C . B O T H W A Y S 2 A- 3 0 1 2 A- 3 0 1 1 A-301 1 A-301 2" PORCH CAP LEDGE2" PORCH CAP LEDGE SIMPSON TIESSIMPSON TIESSIMPSON TIESSIMPSON TIES SYMSYMSYMSYM IDIDIDID 1 2 3 #### 8 5 9 TYPETYPETYPETYPE HDU5 STHD10RJ ABU FOUNDATION WALLSFOUNDATION WALLSFOUNDATION WALLSFOUNDATION WALLS WALL IDWALL IDWALL IDWALL ID FW1 THICKTHICKTHICKTHICK 8" HEIGHTHEIGHTHEIGHTHEIGHT 4' VERT BARVERT BARVERT BARVERT BAR #4 VERT SPACINGVERT SPACINGVERT SPACINGVERT SPACING 24" O.C. HORIZ BARHORIZ BARHORIZ BARHORIZ BAR #4 HORIZ SPACINGHORIZ SPACINGHORIZ SPACINGHORIZ SPACING 24" O.C. BAR IN TOP 12"BAR IN TOP 12"BAR IN TOP 12"BAR IN TOP 12" (1) J-BOLT SIZEJ-BOLT SIZEJ-BOLT SIZEJ-BOLT SIZE 5/8" W/7" EMBED J-BOLT SPACINGJ-BOLT SPACINGJ-BOLT SPACINGJ-BOLT SPACING 48" O.C. FOOTING SCHEDULEFOOTING SCHEDULEFOOTING SCHEDULEFOOTING SCHEDULE IDIDIDID F1 F2 F3 F4 DEPTHDEPTHDEPTHDEPTH 8" 8" 10" --- WIDTHWIDTHWIDTHWIDTH 16" 18" 24" --- TYPETYPETYPETYPE CONT CONT CONT BIGFOOT 36 # OF BARS# OF BARS# OF BARS# OF BARS (2) (2) (2) (4) BAR SIZEBAR SIZEBAR SIZEBAR SIZE #4 #4 #5 #5 PIER (IF REQUIRED)PIER (IF REQUIRED)PIER (IF REQUIRED)PIER (IF REQUIRED) --- --- --- 14" SONOTUBE (4) #5 BAR #3 TIES 8" O.C. 1 2 3 4 5 KEY NOTESKEY NOTESKEY NOTESKEY NOTES 1 - CONCRETE PORCH CAP 2 - REBAR TO EXTEND INTO CAP 3 - FRAME WALL 4 - FLOOR FRAMING 5 - FOUNDATION 2 FOUNDATION PLANFOUNDATION PLANFOUNDATION PLANFOUNDATION PLAN SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 5 PORCH CAP LEDGEPORCH CAP LEDGEPORCH CAP LEDGEPORCH CAP LEDGE NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE FOUNDATION NOTE:FOUNDATION NOTE:FOUNDATION NOTE:FOUNDATION NOTE: 1. SEE FOUNDATION WALL SCHEDULE FOR FOUNDATION WALL SIZE, REBAR SPACING, & J-BOLT/ ANCHOR LOCATIONS. 2. PRESSURE TREATED SILL PLATE AT PERIMETER OF FOUNDATION 3. SEE FOOTING SCHEDULE FOR FOOTING SIZE AND REBAR PLACEMENT. ALL FOOTINGS TO BEAR ON APPROVED STRUCTURAL FILL OR UNDISTURBED SOIL. 4. FOOTING DESIGN IS BASED ON SOIL LOAD-BEARING CAPACITY OF 1500 PSF. IF CONTRACTORS ENCOUNTER EXPANSIVE SOILS OR OTHER PROBLEMS, THE SITE MUST BE APPROVED BY A SOILS ENGINEER PRIOR TO POURING FOOTINGS IN THAT AREA. 5. CONCRETE FOR FOOTINGS AND FOUNDATION WALLS TO HAVE A 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI. 2500 PSI USED IN DESIGN, THEREFORE NO SPECIAL INSPECTIONS. 6. LAP REBAR SPLICES 30 BAR DIAMETERS U.N.O. 7. REINFORCING STEEL SHALL BE GRADE 60 FOR #4 BAR & LARGER BUT MAY BE GRADE 40 FOR #3 AND SMALLER BARS. 8. DAMP PROOFING PER 2012 IBC SECTION 403.2 9. CRAWL SPACE VENTALATION @ 1:150 RATIO & PLACE (1) VENT WITHIN 3' OF EACH CORNER. 10. 18" X 24" MINIMUM CRAWLSPACE ACCESS HOLE. 11. THE THICKNESS OF CONCRETE FLOOR SLABS SUPPORTED DIRECTLY ON THE GROUND SHALL NOT BE LESS THAN 3.5" (98 MM). A6-MIL (0.006 INCH; 0.15 MM) POLYETHYLENE VAPOR RETARDER. CONTROL JOINTS @ 25' O.C. MAX EA. DIR. OR CENTERED PER OWNER PREFERENCE. DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E FO U N D A T I O N SH E E T T I T L E : S-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 6 2'-6"5'5'2'-6"4'4'5'-9"5'-9"3'3'5'5'3'3'7'7' 10 ' 4' - 3 " 6' - 9 " 2' 6' 3' - 6 " 6' - 6 " 3' 4' - 6 " 9' 4' - 6 " 2'8'10'5'5'5'6'6'4'21'-6" 12 ' 11 ' 9' 8' 7' 13 ' IIIIL G E A AA J J C 11 10 K K 5 4 5 B B 3 2 6 6 66 6 6 D D9 J C 6 62 ' 2' 23 ' 37 ' 2'15'8'11'-6"6'10'6'14' 6'-9"72'-6" 6'-9"72'-6" 2' 21 ' 8' 13 ' 18 ' 62 ' 2' 6' 4' 2' - 6 " 5' - 1 0 1/ 2 " 5' - 2 1/ 2 " 6' 6' - 5 1/ 2 " 9'-6"5'-1/2" 14'-61/2" 2'-4" 38'-81/2"14' 3' 1'-6" 5'-2"1'-10"5'-1/2" 27 ' 9' - 1 " 6' 10 ' - 4 " 10 ' - 8 " 9' - 1 " 6' 6' - 4 " 8" 3' - 4 " 11'-8"4'-10"16'-81/2"14' 7'-1" 111/2" 15'-10"8'8'-81/2" 22 ' - 6 1/ 2 " PF W ( S E E D E T A I L ) PFW(SEE DETAIL) 2 A- 3 0 1 2 A- 3 0 1 1 A-301 1 A-301 C8C8C8C8C8C8C8C8 C5C5C5C5 C6C6C6C6 C6C6C6C6 C9C9C9C9 H1H1H1H1 H1H1H1H1 H3H3H3H3 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1H1H1H1H1 H1H1H1H1H1H1H1H1H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H3H3H3H3 H2H2H2H2 H5H5H5H5 H4H4H4H4 H1H1H1H1 C1C1C1C1 C1C1C1C1 C3C3C3C3 C8C8C8C8 C2C2C2C2C2C2C2C2 H3H3H3H3 BALOON FRAME WALLS BALOON FRAME WALLS BALOON FRAME WALLS SW1SW1SW1SW1SW1SW1SW1SW1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW1SW1SW1SW1 SW1SW1SW1SW1 SW1SW1SW1SW1 SW 1 SW 1 SW 1 SW 1 SW1SW1SW1SW1 SW1SW1SW1SW1 SW 1 SW 1 SW 1 SW 1 SW1SW1SW1SW1 SW1SW1SW1SW1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 SW 1 CRAWL SPACE ACCESS & STORAGE BELOW STAIRS MASTER BATH SHOWER 1/2 BATH MECHANICAL 2 CAR GARAGE BAY 1 21'-0" x 28'-6" 3 CAR GARAGE BAY 2 13'-5" x 24'-6" PANTRY 13'-6" x 9'-0" KITCHEN 12'-0" x 19'-8"DINING 10'-0" x 19'-8" LIVING ROOM 18'-6" x 19'-8" PIANO ROOM 11'-7" x 12'-0"ENTRY 7'-0" x 14'-4" W.I.C. 14'-5" x 5'-5" MASTER BEDROOM 14'-5" x 17'-7" LAUNDRY 8'-4" x 9'-11" MUD ROOM 7'-7" x 9'-11" WINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULE ID A B C D E F G H I J K L TYPE TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD QTY 3 2 2 2 1 2 1 1 4 8 2 1 HEIGHT 8' 8'-8" 6'-8" 8'-8" 8'-8" 6'-8" 8'-8" 7'-8" 8'-8" 6'-8" 4'-8" 8'-8" SIZE W 2' 2' 3' 3' 4' 4' 4' 4' 4' 5' 5' 10' HT 2' 6' 4' 7' 2' 2' 4' 4' 7' 4' 4' 7' NOTES DOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULE ID 1 2 3 4 5 6 7 8 9 10 11 QTY 1 1 1 1 2 15 2 4 1 1 1 LOCATION Interior Interior Interior Exterior Exterior Interior Interior Interior Exterior Exterior Exterior FIRE RATING YES DOOR W 1'-6" 2'-4" 2'-6" 3' 3' 3' 5' 6' 6' 9' 18' HT 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 7'-8" 9' 9' NOTES SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O. IDIDIDID SW1 LOCATIONLOCATIONLOCATIONLOCATION EXTERIOR STUDSSTUDSSTUDSSTUDS 2X6 O.C.O.C.O.C.O.C. 16" SHEATINGSHEATINGSHEATINGSHEATING 7/16" OSB FASTENINGFASTENINGFASTENINGFASTENING 8d NAILS EDGESEDGESEDGESEDGES 4" O.C. FIELDFIELDFIELDFIELD 8" O.C. NOTESNOTESNOTESNOTES COLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULE IDIDIDID C1 C2 C3 C4 C5 C6 C7 C8 C9 MATERIALMATERIALMATERIALMATERIAL D.F. #1 D.F. #1 GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD SIZESIZESIZESIZE 8" 8X8 MIN. 2X4 2X4 2X4 2X6 2X6 2X6 2X6 PLYPLYPLYPLY 1 1 3 3 5 2 2 3 4 POST BASEPOST BASEPOST BASEPOST BASE ABU ABU - ABU - - ABU - - POST CAPPOST CAPPOST CAPPOST CAP - - - - - - - - - NOTENOTENOTENOTE HEADERSHEADERSHEADERSHEADERS IDIDIDID H1 H2 H3 H4 H5 PLYPLYPLYPLY 2 2 2 1 1 SIZESIZESIZESIZE 2X10 SPF 1-3/4 x 9-1/2 MICROLAM 1-3/4 x 11-7/8 MICROLAM (5-1/8"X13-1/2") 24F-V4 GLB (5-1/8"X15") 24F-V4 GLB NOTENOTENOTENOTE 1 MAIN LEVEL WALL FRAMINGMAIN LEVEL WALL FRAMINGMAIN LEVEL WALL FRAMINGMAIN LEVEL WALL FRAMING SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" GENERAL FRAMING NOTE:GENERAL FRAMING NOTE:GENERAL FRAMING NOTE:GENERAL FRAMING NOTE: 1. EXTERIOR WALL FRAMING SHALL BE CONVENTIONAL 2x6 FRAMING @ 16" O.C. U.N.O. 2. IF LUMBER GRADING IS NOT SPECIFIED, ASSUME SPF#2 OR BETTER. 3. SEE SHEAR OR BRACE WALL PANEL SCHEDULE FOR WALL SHEATHING AND FASTENING. 4. ENSURE THAT WALLS TALLER THAN 10' HAVE BLOCKING @ PANEL EDGES AND FIRE BLOCKING. 5. ENSURE THAT INTERIOR BEARING WALLS ARE SUPPORTED IN FLOOR BY BLOCKING OR DOUBLE JOISTS. 6. ENSURE THAT COLUMNS INDICATED ON MAIN OR UPPER FLOORS ARE DIRECTLY SUPPORT BY BEAMS OR COLUMNS IN LOWER FLOORS OR SOLID BLOCKING. PROVIDE POSITIVE CONNECTI ONS BETWEEN UPPER AND LOWER. 7. INSTALL ALL HANGERS, HOLD DOWNS, TIES, AND ANCHORS & CAPS AS SPECIFIED IN MANUFACTURER DOCUMENTATION. 8. ENSURE THAT WINDOWS & DOORS ARE FLASHED AND SEALED OVER AN APPROVED WALL/ROOFING MEMBRANE TO ENSURE MOISTURE PROTECTION 9. INSTALL SIDING PER MANUFACTURER REQ., INCLUDING RAIN SCREEN OR OTHER. 10. ALL STAIRS SHALL BE CONVENTIONAL IN CONSTRUCTION WITH A MAX RISE OF 7 3/4" AND A MINIMUM RUN OF 10". 11. PROVIDE GUARD RAILS @ 36" FROM NOSING, AND HANDRAILS AT THE SAME. 12. ENSURE TIMBER CONNECTIONS ARE ADEQUATELY SUPPORT AND BRACED WHERE THEY CONNECT TO THE LIGHT FRAME STRUCTURE. DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E WA L L F R A M I N G SH E E T T I T L E : S-102 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 8'15'8'-101/2"9'-11/2"15'-6" 7'-6"7'-6"4'4'5'-9"27'-9" 17 ' - 7 " 19 ' - 5 " J J J JF F J H 6 8 6 6 66 6 8 8 6 1 8 7 7 2 A- 3 0 1 1 A-301 1 A-301 56'-6" 2' 37 ' 39 ' 56'-6" 15'8'33'-6" 2' 37 ' 39 ' 14'-81/2"13'1'-1"5'-5"13'8'-41/2" 13 ' - 7 " 1' 5' - 5 " 2' - 6 " 13 ' - 7 " 12'-21/2"2'-6"7'-41/2"2'-6" 8' - 4 " 5' - 3 " 12 ' - 4 " 14'-8"16'-4" 22 ' - 6 " 13 ' - 7 " 6' - 1 1/ 2 " 2' - 6 " 11 ' - 1 " 8'2'-6" 4'-21/2" 8'-4"4'-8"6'-6"8'-4" 2' - 6 " 2'-21/2" 8'-31/2"4'-21/2" SW 1 SW 1 SW 1 SW 1 SW1SW1SW1SW1 SW 1 SW 1 SW 1 SW 1 SW1SW1SW1SW1 SW1SW1SW1SW1 SW1SW1SW1SW1 BALOON FRAME WALLS BALOON FRAME WALLS BALOON FRAME WALLS H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 H1H1H1H1 FLOOR BEAM TO EXTEND UP INTO BOTTOM OF THIS WALL. OPEN TO BELOW BATH BATH STORAGE BEDROOM #2 14'-7" x 12'-4" BEDROOM #3 14'-7" x 13'-6" BEDROOM #4 12'-7" x 13'-6" FAMILY ROOM 30'-7" x 22'-2" BEDROOM #5 12'-7" x 13'-6" WINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULEWINDOW SCHEDULE ID A B C D E F G H I J K L TYPE TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD QTY 3 2 2 2 1 2 1 1 4 8 2 1 HEIGHT 8' 8'-8" 6'-8" 8'-8" 8'-8" 6'-8" 8'-8" 7'-8" 8'-8" 6'-8" 4'-8" 8'-8" SIZE W 2' 2' 3' 3' 4' 4' 4' 4' 4' 5' 5' 10' HT 2' 6' 4' 7' 2' 2' 4' 4' 7' 4' 4' 7' NOTES DOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULEDOOR SCHEDULE ID 1 2 3 4 5 6 7 8 9 10 11 QTY 1 1 1 1 2 15 2 4 1 1 1 LOCATION Interior Interior Interior Exterior Exterior Interior Interior Interior Exterior Exterior Exterior FIRE RATING YES DOOR W 1'-6" 2'-4" 2'-6" 3' 3' 3' 5' 6' 6' 9' 18' HT 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 7'-8" 9' 9' NOTES SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O.SHEAR WALL SCHEDULE: ALL EXTERIOR WALLS SW1 U.N.O. IDIDIDID SW1 LOCATIONLOCATIONLOCATIONLOCATION EXTERIOR STUDSSTUDSSTUDSSTUDS 2X6 O.C.O.C.O.C.O.C. 16" SHEATINGSHEATINGSHEATINGSHEATING 7/16" OSB FASTENINGFASTENINGFASTENINGFASTENING 8d NAILS EDGESEDGESEDGESEDGES 4" O.C. FIELDFIELDFIELDFIELD 8" O.C. NOTESNOTESNOTESNOTES COLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULE IDIDIDID C1 C2 C3 C4 C5 C6 C7 C8 C9 MATERIALMATERIALMATERIALMATERIAL D.F. #1 D.F. #1 GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD SIZESIZESIZESIZE 8" 8X8 MIN. 2X4 2X4 2X4 2X6 2X6 2X6 2X6 PLYPLYPLYPLY 1 1 3 3 5 2 2 3 4 POST BASEPOST BASEPOST BASEPOST BASE ABU ABU - ABU - - ABU - - POST CAPPOST CAPPOST CAPPOST CAP - - - - - - - - - NOTENOTENOTENOTE HEADERSHEADERSHEADERSHEADERS IDIDIDID H1 H2 H3 H4 H5 PLYPLYPLYPLY 2 2 2 1 1 SIZESIZESIZESIZE 2X10 SPF 1-3/4 x 9-1/2 MICROLAM 1-3/4 x 11-7/8 MICROLAM (5-1/8"X13-1/2") 24F-V4 GLB (5-1/8"X15") 24F-V4 GLB NOTENOTENOTENOTE FOUNDATION WALL FLOOR FRAMING PONY WALL WALL SHEETING (SEE BWP SCHEDULE FOR SIZE & FASTENING) PORTAL HEADER (SEE HEADER SCHEDULE FOR SIZE & TYPE) FASTEN SHEATHING TO HEADER W/ 8D COMMON OR GAL. BOX NAILS IN 3" GRID PATTERN HOLD DOWNS (SEE FDN. PLAN) HOLD DOWNS (SEE FDN. PLAN) HEADER TO JACK-STUD STRAP PER TABLE R602.10.6.4 ON BOTH SIDES OF OPENING OPPOSITE SIDE OF SHEATHING 1 SECOND LEVEL WALL FRAMINGSECOND LEVEL WALL FRAMINGSECOND LEVEL WALL FRAMINGSECOND LEVEL WALL FRAMING SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 7 PORTAL WALL FRAMEPORTAL WALL FRAMEPORTAL WALL FRAMEPORTAL WALL FRAME NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE GENERAL FRAMING NOTE:GENERAL FRAMING NOTE:GENERAL FRAMING NOTE:GENERAL FRAMING NOTE: 1. EXTERIOR WALL FRAMING SHALL BE CONVENTIONAL 2x6 FRAMING @ 16" O.C. U.N.O. 2. IF LUMBER GRADING IS NOT SPECIFIED, ASSUME SPF#2 OR BETTER. 3. SEE SHEAR OR BRACE WALL PANEL SCHEDULE FOR WALL SHEATHING AND FASTENING. 4. ENSURE THAT WALLS TALLER THAN 10' HAVE BLOCKING @ PANEL EDGES AND FIRE BLOCKING. 5. ENSURE THAT INTERIOR BEARING WALLS ARE SUPPORTED IN FLOOR BY BLOCKING OR DOUBLE JOISTS. 6. ENSURE THAT COLUMNS INDICATED ON MAIN OR UPPER FLOORS ARE DIRECTLY SUPPORT BY BEAMS OR COLUMNS IN LOWER FLOORS OR SOLID BLOCKING. PROVIDE POSITIVE CONNECTIONS BETWEEN UPPER AND LOWER. 7. INSTALL ALL HANGERS, HOLD DOWNS, TIES, AND ANCHORS & CAPS AS SPECIFIED IN MANUFACTURER DOCUMENTATION. 8. ENSURE THAT WINDOWS & DOORS ARE FLASHED AND SEALED OVER AN APPROVED WALL/ROOFING MEMBRANE TO ENSURE MOISTURE PROTECTION 9. INSTALL SIDING PER MANUFACTURER REQ., INCLUDING RAIN SCREEN OR OTHER. 10. ALL STAIRS SHALL BE CONVENTIONAL IN CONSTRUCTION WITH A MAX RISE OF 7 3/4" AND A MINIMUM RUN OF 10". 11. PROVIDE GUARD RAILS @ 36" FROM NOSING, AND HANDRAILS AT THE SAME. 12. ENSURE TIMBER CONNECTIONS ARE ADEQUATELY SUPPORT AND BRACED WHERE THEY CONNECT TO THE LIGHT FRAME STRUCTURE. DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E WA L L F R A M I N G SH E E T T I T L E : S-103 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O TOILET DRAIN TOILET DRAIN SHOWER DRAIN TUB DRAIN C4C4C4C4C1C1C1C1C1C1C1C1 FJ3FJ3FJ3FJ3 C7C7C7C7 C7C7C7C7 FLOOR JOISTS PER SCHEDULE, OVER PRESSURE TREATED SI LL PLATE. 3/4" T&G OSB w/ GLUE AND 10d RING SHANK NAILS 3/12 SPACING (TYP) 8" CONCRETE PORCH CAP. #4 BARS @12" O.C. BOTH WAYS NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER: LAYOUT CONFLICT WITH PLUMBING, DESIGN TO ACCOMMODATE TOILETS AS INDICATED ON PLANS 2 A- 3 0 1 2 A- 3 0 1 1 A-301 1 A-301 FLOOR BEAMSFLOOR BEAMSFLOOR BEAMSFLOOR BEAMS IDIDIDID FB1 FB2 FB3 FB4 TYPETYPETYPETYPE 1-3/4" X 11-7/8" 1.9E MICROLAM (2) 1-3/4" X 11-7/8" 1.9E MICROLAM (5-1/8"X10-1/2") 24F-V4 GLB (5-1/8"X25-1/2") 24F-V4 GLB HANGERHANGERHANGERHANGER MIU 1.56/11 IUS3.56/11.88 NA NA NOTENOTENOTENOTE HANGER @ BEAMS HANGER @ BEAMS FLOOR JOISTSFLOOR JOISTSFLOOR JOISTSFLOOR JOISTS IDIDIDID FJ3 TYPETYPETYPETYPE 11-7/8" TJI 210 @ 16" O.C. HANGERHANGERHANGERHANGER NA NOTENOTENOTENOTE COLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULE IDIDIDID C1 C2 C3 C4 C5 C6 C7 C8 C9 MATERIALMATERIALMATERIALMATERIAL D.F. #1 D.F. #1 GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD SIZESIZESIZESIZE 8" 8X8 MIN. 2X4 2X4 2X4 2X6 2X6 2X6 2X6 PLYPLYPLYPLY 1 1 3 3 5 2 2 3 4 POST BASEPOST BASEPOST BASEPOST BASE ABU ABU - ABU - - ABU - - POST CAPPOST CAPPOST CAPPOST CAP - - - - - - - - - NOTENOTENOTENOTE 1111 2222 3333 2222 KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - FLOOR JOISTS PER MANUFACTURER (TYP) 2 - ACCESS TO BE LOCATED IN FLOOR FRAMING OR FND WALL. ACCESS LOCATION T.B.D. PER OWNER BUILDER. 3 - IF ACCESS IS BELOW GRADE AN AREA WAY OF NO LESS THAN 16"X24" SHALL BE PROVIDED AND IS TO BE BELOW THE THRESHOLD OF THE ACCESS OPENING 3 FIRST FLOOR FRAMINGFIRST FLOOR FRAMINGFIRST FLOOR FRAMINGFIRST FLOOR FRAMING SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 5 CRAWL SPACE ACCESSCRAWL SPACE ACCESSCRAWL SPACE ACCESSCRAWL SPACE ACCESS NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E FL O O R F R A M I N G SH E E T T I T L E : S-201 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 2 A- 3 0 1 1 A-301 1 A-301 TOILET DRAIN TUB DRAIN TOILET DRAIN TUB DRAIN FB3FB3FB3FB3 FB4FB4FB4FB4 THIS BEAM TO BE FLUSH WITH BOTTOM OF FLOOR & EXTENDING UP INTO WALL. NOTCH COLUMN TO RECEIVE BEAM & FASTEN WITH (2) 5/8" LAG BOTLTS (TYP) FB 2 FB 2 FB 2 FB 2 FB 2 FB 2 FB 2 FB 2 FJ3FJ3FJ3FJ3 HEADER BELOW. SEE SCHEDULE. C3C3C3C3 C1C1C1C1C1C1C1C1 C6C6C6C6 C6C6C6C6 C8C8C8C8 C9C9C9C9 C5C5C5C5 FB 1 FB 1 FB 1 FB 1 FB1FB1FB1FB1 BLOCK OUT FOR STAIRS OPEN TO BELOW FLOOR JOISTS PER SCHEDULE. 3/4" T&G OSB w/ GLUE AND 10d RING SHANK NAILS 3/12 SPACING (TYP) NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER:NOTE TO FLOOR JOIST MANUFACTURER: LAYOUT CONFLICT WITH PLUMBING, DESIGN TO ACCOMMODATE TOILETS AS INDICATED ON PLANS FLOOR BEAMSFLOOR BEAMSFLOOR BEAMSFLOOR BEAMS IDIDIDID FB1 FB2 FB3 FB4 TYPETYPETYPETYPE 1-3/4" X 11-7/8" 1.9E MICROLAM (2) 1-3/4" X 11-7/8" 1.9E MICROLAM (5-1/8"X10-1/2") 24F-V4 GLB (5-1/8"X25-1/2") 24F-V4 GLB HANGERHANGERHANGERHANGER MIU 1.56/11 IUS3.56/11.88 NA NA NOTENOTENOTENOTE HANGER @ BEAMS HANGER @ BEAMS FLOOR JOISTSFLOOR JOISTSFLOOR JOISTSFLOOR JOISTS IDIDIDID FJ3 TYPETYPETYPETYPE 11-7/8" TJI 210 @ 16" O.C. HANGERHANGERHANGERHANGER NA NOTENOTENOTENOTE COLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULECOLUMN SCHEDULE IDIDIDID C1 C2 C3 C4 C5 C6 C7 C8 C9 MATERIALMATERIALMATERIALMATERIAL D.F. #1 D.F. #1 GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD GANG STUD SIZESIZESIZESIZE 8" 8X8 MIN. 2X4 2X4 2X4 2X6 2X6 2X6 2X6 PLYPLYPLYPLY 1 1 3 3 5 2 2 3 4 POST BASEPOST BASEPOST BASEPOST BASE ABU ABU - ABU - - ABU - - POST CAPPOST CAPPOST CAPPOST CAP - - - - - - - - - NOTENOTENOTENOTE 1 SECOND FLOOR FRAMINGSECOND FLOOR FRAMINGSECOND FLOOR FRAMINGSECOND FLOOR FRAMING SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E FL O O R F R A M I N G SH E E T T I T L E : S-202 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch 9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch 9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch 9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch 9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch9/12 Pitch 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 6 /1 2 P i t c h 3 /1 2 P i t c h 3 /1 2 P i t c h 3 /1 2 P i t c h 3 /1 2 P i t c h 4/12 Pitch4/12 Pitch4/12 Pitch4/12 Pitch 4 /1 2 P i t c h 4 /1 2 P i t c h 4 /1 2 P i t c h 4 /1 2 P i t c h 2 A- 3 0 1 2 A- 3 0 1 1 A-301 1 A-301 RB 2 RB 2 RB 2 RB 2 RB 2 RB 2 RB 2 RB 2 NOTCH COLUMN TO RECEIVE BEAM & FASTEN WITH (2) 5/8" LAG BOTLTS (TYP) RB 1 RB 1 RB 1 RB 1 RB1RB1RB1RB1 NOTCH COLUMN TO RECEIVE BEAM & FASTEN WITH (2) 5/8" LAG BOTLTS (TYP) ROOF OVERBUILD ROOF OVERBUILD ROOF BEAMSROOF BEAMSROOF BEAMSROOF BEAMS IDIDIDID RB1 RB2 BEAM SIZEBEAM SIZEBEAM SIZEBEAM SIZE (2) 2X8 SPF#1 (5-1/8"X10-1/2") 24F-V4 GLB BEAM PLYBEAM PLYBEAM PLYBEAM PLY 1 1 BEAM HANGERBEAM HANGERBEAM HANGERBEAM HANGER NA NA NOTENOTENOTENOTE 1 2 6 3 4 5 7 KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - OSB SHEETING 2 - MONO TRUSS WITH CLEAT POCKET 3 - 2X6 CLEAT, LEDGERLOK @ 8" O.C. 4 - 2X8 BLOCKING 5 - 2X BLOCKING 6 - 2X6 WALL WITH OSB WALL SHEETING 7 - BEAM PER ROOF FRAMING PLAN 1 ROOF LAYOUTROOF LAYOUTROOF LAYOUTROOF LAYOUT SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" 3 TRUSS-TO-WALL DETAILTRUSS-TO-WALL DETAILTRUSS-TO-WALL DETAILTRUSS-TO-WALL DETAIL NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE ROOF FRAMING NOTE:ROOF FRAMING NOTE:ROOF FRAMING NOTE:ROOF FRAMING NOTE: 1. MANUFACTURED TRUSSES DESIGN PER MANUFACTURER. 2. SIMPSON H1 TIES @ EA. TRUSS. 3. PROVIDE GANG STUDS UNDER ALL GIRDER TRUSSES PLY TO MATCH PLY OF GIRDER TRUSS. 4. PROVIDE ATTIC VENTILATION @ 1:150 OR LOCAL CODE. 5. 5/8 OSB DECKING 16 GAGE STAPLES 4/12 SPACING. 6. ICE /WATER BARRIER @ ALL EDGES, EVES, GABLES, RIDGES & VALLEYS TO 24" OF INTERIOR DIMENSION. 7. #15 ROOFING FELT MINIMUM. 8. DRIP EDGE & SHINGLES/METAL PER OWNER/BUILDER. 9. FASCIA/SOFFIT TO MATCH SIDING . DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E RO O F F R A M I N G SH E E T T I T L E : S-301 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O Be l o w F r o s t 6" M i n 1 5 4 3 2 7 6 8 KEYNOTESKEYNOTESKEYNOTESKEYNOTES 1 - FOOTING, SEE PLAN AND SCHEDULE FOR SIZE AND REINF. 2 - CONCRETE WALL 3 - CONCRETE SLAB 4 - CONT. SILL PLATE AND ANCHOR BOLTS 5 - WALL STUDS 6 - WALL SHEATHING 7 - REQ'D PANEL EDGE NAILING 8 - J-BOLTS SIZE/TYPE PER PLAN 6 6 6 6 1 48 1 7 2 13 3 4 5 3 1 32 4 5 EXTERIOR SHEATHING AT CORNER INTERIOR SHEATHING AT CORNER INTERIOR SHEATHING AT WALL INTERSECTION KEYNOTESKEYNOTESKEYNOTESKEYNOTES 1 - EDGE NAILING PER SHEAR WALL SCHEDULE. 2 - WALL SHEATHING AS OCCURS. 3 - LOCATION OF STRAP AT END OF SHEAR WALL, SEE PLAN FOR TYPE OF STRAP. 4 - FULL HEIGHT WOOD STUD TYP. 5 - 16d FACE NAIL AT 16" O.C. 6 - DISTANCE FROM CORNERS TO CENTER OF STRAP EQUALS WIDTH OF WALL (MAX.) 7 - 16d FACE NAIL AT 6" O.C. 1 2 3 4 5 6 7 8 KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - ROOF FINISH PER OWNER/BUILDER. OVER MIN #15 ROOFING FELT. 2 - OSB SHEETING 3 - MIN 2' ICE & WATER SHIELD 4 - DRIP LEDGE 5 - SUB FACIA 6 - SOFFIT 7 - WALL FINISH PER OWNER/BUILDER 8 - OSB WALL SHEETING 1111 2222 3333 4444 55556666 7777 88889999 10101010 11111111 12121212 CEILING OF NEXT LEVEL KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - 6'8" HEAD CLEARANCE ENTIRETY OF STAIRS 2 - HANDRAIL 36" FROM STAIR NOISING 3 - 7-3/4" MAX RISE 4 - 10" MIN RUN 5 - 2X CLEAT. PRESSURE TREATED IF FLOOR IS CONCRETE 6 - DRY WALL 7 - LVL STRINGER 8 - SIMPSON SLOPABLE HANGER 9- FLOOR FRAMING 10 - RIM BOARD 11 - LVL DROPPED TO MATCH STRINGERS 12 - FILLER BLOCK 1111 2222 3333 2222 KEYNOTES:KEYNOTES:KEYNOTES:KEYNOTES: 1 - FLOOR JOISTS PER MANUFACTURER (TYP) 2 - ACCESS TO BE LOCATED IN FLOOR FRAMING OR FND WALL. ACCESS LOCATION T.B.D. PER OWNER BUILDER. 3 - IF ACCESS IS BELOW GRADE AN AREA WAY OF NO LESS THAN 16"X24" SHALL BE PROVIDED AND IS TO BE BELOW THE THRESHOLD OF THE ACCESS OPENING 7 8 4 6 531212 4 91110 8 6 OPTION 1 OPTION 2 KEYNOTESKEYNOTESKEYNOTESKEYNOTES 1 - (4) 16d NAILS INTO EACH ROOF FRAMING MEMBER 2 - 2x8 (MIN) CONT BEARING PLATE. 3 - TOE NAIL OVER-BUILD FRAMING TO BEARING PLATE W/ (3) 16d NAILS MIN. 4 - ROOF SHEATHING 5 - 2x OVERBUILD FRAMING 6 - TOP CHORD OF TRUSS OR ROOF FRAMING MEMBER 7 - 2x STUD PONY WALL AS OCCURS ON PLAN (WALL SHALL BE CENTERED BETWEEN MAX SPAN), ALIGN OVER TRUSS PANEL POINT. 8 - ROOF SHEATHING (SHEATH LOWER ROOF PRIOR TO CONSTRUCTION OF OVER-BUILD). 9 - PREFABRICATED OVERBUILD ROOF TRUSSES @ 24" O.C. 10 - (3) 16d NAILS INTO EACH ROOF FRAMING MEMBER. 11 - 2x6 (MIN) CONT BEARING PLATE. 12 - EDGE NAILING 8d NAILS AT 4" O.C. 8 732" TYP. WITH SOLID BLOCKING 10 3 9 12 3 4 6 5 3 TYP. DOOR OPENING TYP. WINDOW OPENING B B A SECTION A SECTION B KEYNOTESKEYNOTESKEYNOTESKEYNOTES 1 - HEADER BEARING TRIMMERS OR HEADERS 2 - FULL HEIGHT STUD FLOOR TO FLOOR 3 - A.P.A. RATED WALL SHEATHING 4 - REQ'D PANEL EDGE NAILING 5 - COIL STRAP 6 - 2x FLAT BLOCKING 7 - HEADER AT DOOR OR WINDOW, TYP. 8 - CEILING OR FLOOR LINE 9 - FLOOR LINE 10 - SIMPSON CS16 COILED STRAP CUT TO FIT EACH OPENING TOP AND BOTTOM (TOP ONLY AT DOORS) FILL EVERY OTHER NAIL HOLE WITH 8d COMMON NAILS FOUNDATION WALL FLOOR FRAMING PONY WALL WALL SHEETING (SEE BWP SCHEDULE FOR SIZE & FASTENING) PORTAL HEADER (SEE HEADER SCHEDULE FOR SIZE & TYPE) FASTEN SHEATHING TO HEADER W/ 8D COMMON OR GAL. BOX NAILS IN 3" GRID PATTERN HOLD DOWNS (SEE FDN. PLAN) HOLD DOWNS (SEE FDN. PLAN) HEADER TO JACK-STUD STRAP PER TABLE R602.10.6.4 ON BOTH SIDES OF OPENING OPPOSITE SIDE OF SHEATHING 3 STUD WALL TO CONCRETE WALL CONNECTIONSTUD WALL TO CONCRETE WALL CONNECTIONSTUD WALL TO CONCRETE WALL CONNECTIONSTUD WALL TO CONCRETE WALL CONNECTION NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 2 TYPICAL SHEAR SHEATHING @ WALL INTERSECTIONTYPICAL SHEAR SHEATHING @ WALL INTERSECTIONTYPICAL SHEAR SHEATHING @ WALL INTERSECTIONTYPICAL SHEAR SHEATHING @ WALL INTERSECTION NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 4 ROOF EAVEROOF EAVEROOF EAVEROOF EAVE NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 5 TYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMINGTYPICAL RESIDENTIAL STAIR FRAMING NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 6 CRAWL SPACE ACCESSCRAWL SPACE ACCESSCRAWL SPACE ACCESSCRAWL SPACE ACCESS NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 7 ROOF OVERBUILDROOF OVERBUILDROOF OVERBUILDROOF OVERBUILD NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 1 LATERAL TIES @ OPENINGSLATERAL TIES @ OPENINGSLATERAL TIES @ OPENINGSLATERAL TIES @ OPENINGS NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE 8 PORTAL WALL FRAMEPORTAL WALL FRAMEPORTAL WALL FRAMEPORTAL WALL FRAME NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE GENERAL DETAILS:GENERAL DETAILS:GENERAL DETAILS:GENERAL DETAILS: THESE DETAILS ARE PROVIDED FOR THE BUILDERS CONVENIENCE, AND ARE NOT NECESSARILY APPLICABLE IN ALL BUILDINGS. IT IS THE RESPONSIBILITY OF THE BUILDER/CONTRACTOR TO CONTACT THE ENGINEER OR DESIGNER FOR CLARIFICATION OR ADDITIONAL DETAILS IF NECESSARY. DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E DE T A I L S SH E E T T I T L E : R-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O DW F F DRW DESK KING HI D D E N PA N T R Y D O O R U P 1 MAIN FLOOR MEPMAIN FLOOR MEPMAIN FLOOR MEPMAIN FLOOR MEP SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" MEP DRAWING NOTE: 1. These drawings are provided for the Mechanical, Electrical, and Plumbing contractors to make notations and changes according to the direction of the homeowner and general contractor. 2. It is the responsibility of the individual contractors to ensure that all trade-specific design is done according to the latest code standards and the homeowners preference 3. The trade contractors shall present all material and fixture selections for homeowner approval prior to purchase and installation 4. If the installation of any pipes, ductwork, wires or other material require modification of the specified structure, the general contractor shall contact the structural engineer or designer to verify that such modification will not negatively effect the strength of the effected structural element DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E ME P M A R K U P P L A N SH E E T T I T L E : E-101 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O FULL FULL FULL FULL LINEN LINEN FOOSBALL TABLE 5'X10' FLOOR SPACE LINEN D O W N 1 SECOND FLOOR MEPSECOND FLOOR MEPSECOND FLOOR MEPSECOND FLOOR MEP SCALE: SCALE: SCALE: SCALE: 1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0" MEP DRAWING NOTE: 1. These drawings are provided for the Mechanical, Electrical, and Plumbing contractors to make notations and changes according to the direction of the homeowner and general contractor. 2. It is the responsibility of the individual contractors to ensure that all trade-specific design is done according to the latest code standards and the homeowners preference 3. The trade contractors shall present all material and fixture selections for homeowner approval prior to purchase and installation 4. If the installation of any pipes, ductwork, wires or other material require modification of the specified structure, the general contractor shall contact the structural engineer or designer to verify that such modification will not negatively effect the strength of the effected structural element DR A W N B Y : CH K ' D B Y : B. M . Y . W. B . S . PL O T D A T E : 9/ 1 2 / 2 0 1 9 EN G I N E E R : R A Y M C D O U G A L , P E DE S C R I P T I O N RE V I S I O N D A T E ME P M A R K U P P L A N SH E E T T I T L E : E-102 PLN# 19-03-005 10 6 6 N o r t h Y e l l o w s t o n e H w y Re x b u r g , I D 8 3 4 4 0 ww w . s o u t h f o r k e n g i n e e r i n g . c o m 20 8 - 8 5 2 - 6 2 3 6 So u t h F o r k D e s i g n G r o u p , L L C Co p y r i g h t 2 0 1 6 | S o u t h f o r k E n g i n e e r i n g | A l l R i g h t s R e s e r v e d . DA N N Y & A N G E L A R I C K S 37 3 1 C E D A R C O V E RE X B U R G , I D A H O