HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00325 - Mountain Lofts Welcome CenterPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 09/18/2019 4:39 pm
Permit Details Permit Number: 13-00325
538 S 2nd W - Mountain Lofts Welcome Center
538 S 2nd W
New Commercial Building
Permit Issued Date: 12/19/2013
Permit Issued Date: 12/19/2013
Permit Inspection Statistics
29Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 75.86%
Permit Inspection History *Refer to Individual Inspection Report for more Details
11/12/2013PassQuinton OwensFoundation Inspection
03/06/2014PassTed DyeInsulation Inspection
gaps around windows have been insulated.Inspector Comments:
05/30/2014PassNatalie PowellPlanning and Zoning Final Inspection
05/30/2014PassTed DyeSidewalk Inspection
Sidewalk at front of building is complete.
The side door has a required landing.
Inspector Comments:
06/30/2014PassJoel GrayPublic Works Final Inspection
Building Inspection Type
11/07/2013PassTed DyeFooting Inspection
11//7 footings NE CornerInspector Comments:
01/21/2014PassTed DyeSheeting
1/21/14 TD: exterior wall sheathing nail. - approved.Inspector Comments:
02/27/2014PassTed DyeFraming/Structure Inspection
framing looks good
trusses have proper lateral bracing
framing approved
Inspector Comments:
03/04/2014FailTed DyeInsulation Inspection
6" of fiberglass insulation
windows have a u-factor of .31
solar heat gain coeffcient is .33
visible transmittance is .62
around windows need insulated
w
Inspector Comments:
05/09/2014PassTed DyeBuilding Final
building passed off.
Parking and landscape inspections to be tied to buildings 1 and 2.
Inspector Comments:
05/30/2014PassTed DyeSidewalk Inspection
Page 1 of 3
(Continued)
Permit Details Permit Number: 13-00325
538 S 2nd W - Mountain Lofts Welcome Center
538 S 2nd W
New Commercial Building
Permit Status of (Open) as of Report Date: 09/18/2019 4:39 pm
Permit
Inspection
Summary
Electrical Inspection Type
03/07/2014PassBret StoddardCommercial Electrical Rough-in
04/29/2014PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power.Inspector Comments:
04/29/2014PassBret StoddardCOM & MFR Electrical Service Inspection
05/07/2014FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Receptacles not working in main room west wall, panel cover missing and no
schedule, lights in mail room not installed, no A/C units installed (40A OCPD),
lights and receptacles not installed for furnaces in attic space, call for a re-inspect
when ready.
Inspector Comments:
05/08/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. after installing breaker locks for water heaters(2),
no A/C units installed(40A OCPD).
Inspector Comments:
Fire Inspection Type
05/05/2014FailBret StoddardFire Alarm Final Inspection
05/07/2014FailBret StoddardFire Alarm Final Inspection
05/08/2014PassBret StoddardFire Alarm Final Inspection
06/03/2014PassDale PickeringFire Department Final Inspection
06/03/2014N/ADale PickeringFire Sprinkler Final Inspection
Mechanical Inspection Type
02/03/2014PassQuinton OwensHVAC Rough-in
Supply runs in attic require R-5 min (R4.2 + some attic insulation cover to add).
Rough in good. Condensate drains not done yet (Rechecked by Don and
approved)
Inspector Comments:
05/06/2014FailDon AllenHVAC Final Inspection
exhaust fan in bathroom was not working
need access on fire place
Inspector Comments:
05/29/2014PassDon AllenHVAC Final Inspection
All good for the c/oInspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 13-00325
538 S 2nd W - Mountain Lofts Welcome Center
538 S 2nd W
New Commercial Building
Permit Status of (Open) as of Report Date: 09/18/2019 4:39 pm
Permit
Inspection
Summary
Plumbing Inspection Type
02/20/2014PassDon AllenPlumbing Underground Inspection
All good to cover the under groundInspector Comments:
02/20/2014FailDon AllenPlumbing Rough-in
good to cover the rough inInspector Comments:
03/13/2014PassDon AllenPlumbing Water
all good on the meterInspector Comments:
05/08/2014PassDon AllenPlumbing Final Inspection
All good for c/oInspector Comments:
05/29/2014PassDon AllenPlumbing Rough-in
Page 3 of 3