HomeMy WebLinkAboutPERMIT POLICIES ACKNOWLEDGEMENT - 19-00527 - 320 Barney Dairy Rd - Cell TowerInspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341 Revised 10/2016
Initials
Initials
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
Initials
Initials
Initials
Initials
PERMIT POLICIES ACKNOWLEDGMENT
The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you
understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to
proceeding with your project.
o APPROVAL OF CONSTRUCTION. Construction on any project can begin ONLY when you have received a Pink Building
Permit from the Building Department. Occupancy of any structure can begin ONLY when you have received an official
Certificate of Occupancy from the Building Department. These documents must be signed by the appropriate authorities
from the City of Rexburg. Any approvals can be verified by calling (208) 372-2167. Even if you hear from an inspector that
‘you’re good to go’, ultimately if you do not have a Building Permit or Certificate of Occupancy, the above policies will be
enforced.
o SCHEDULING INSPECTIONS. Scheduling inspections is the responsibility of the applicant and their contractor. Inspections
need to be called into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the
following business day. If an inspection is not done, the inspector may require any measures to be taken to allow him to
correctly perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been
put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in inspection.)
o STAIRWAYS REQUIRED. On jobsites for multi-level buildings the contractor must provide temporary stairs so that
workers and inspectors can safely access upper levels of the building. If these stairs are not provided, inspections may
not be completed. Extenuating circumstances will need to be approved by the Building Department.
o DIGITAL AS-BUILT PLANS. A Certificate of Occupancy will not be issued without digital copies of the As-Built Plans. It is
the Applicant’s responsibility to turn in digital copies of the As-Built Plans when the project is completed. No Certificate of
Occupancy will be issued without these plans, extenuating circumstances will need to be approved by the Building
Department.
o OCCUPYING A FINISHED BUILDING. No building may be occupied without receiving a signed Certificate of Occupancy. If a
building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the occupants may
be required to vacate.
o MAKING KNOWN POLICIES. It is your responsibility to inform anyone on your project of the above policies. All sub-
contractors will be held to this standard with no exceptions. The above policies will be enforced to all, regardless if this
information is passed on to them or not.