Loading...
HomeMy WebLinkAboutPLAN P2 WASTE AND VENT - 19-00401 - Pizza Hut - Tenant RemodelEV A P O R A T O R EV A P O R A T O R 3 EX I S T I N G GR E A S E EX I S T I N G GR E A S E EX I S T I N G SA N I T A R Y EX I S T I N G SA N I T A R Y 3 3"GW 4"SW4"SW 3"GW 3"SW 3"GW 2"V 2"V 2"V2"V2"V 2"V 2"V 2"V 2" V 2" V 2" V 2" V 2" V FS 003 S1 004 6 FS 002 DW 001 7 WC2 001 WCO 003 FD 003 1 LV 001 S3 004 S3 004 S3 004 FD 003 1 FD 003 1 FD 003 1 FD 003 1 FD 003 1 S5 003 RTU 2 RTU 1 RTU 3 4 5 4 5 4 1"CD 1" C D 1"CD 1"CD 1"CD 8 8 8 9 9 9 9 WCO 003 WCO 003 WCO 003 WCO 003 4"VTR 2 9 3"GW EX I S T I N G G R E A S E EX I S T I N G SA N I T A R Y EX I S T I N G GR E A S E EX I S T I N G SA N I T A R Y 2"V 2"V 2"V 2"V 2"V 2"V 2"V 2"V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2"V 2"V 2"V 2"V 2"V 2"V FD 003 FD 003 FD 003 FD 003 FD 003 FD 003 FS 003 S1 004 FS 002 DW 001 S3 004 S3 004 S3 004 S5 003 WC2 001 LV 001 3"GW 3"SW 3"GW 3"GW 4"SW 4"SW 2" S W 4"SW 2"SW 3"SW 3"SW 2"SW 4"GW 4"GW 2"SW 3"GW 3"GW 4"VTR WCO 003 WCO 003 WCO 003 WCO 003 WCO 003 3"GW SHEET NUMBER RE V I S I O N S : DA T E : JO B N O : DR A W N : CH E C K E D : AC G # : 06 / 2 0 / 1 9 21 7 5 AA , K K , S O AR , C F 19 2 0 1 9 1 14 8 1 7 W e s t 9 5 t h S t r e e t L e n e x a , K a n s a s 6 6 2 1 5 P 9 1 3 3 2 2 5 1 5 0 F 9 1 3 3 2 2 5 1 5 5 ww w . A c e r t u s G r o u p . c o m FRANCHISEE 7300 W. 129TH STREET OVERLAND PARK, KANSAS 66213 PHONE: (913) 327-5555 FAX: (913) 327-5850 16 3 W M A I N S T . S U I T E T B D RE X B U R G , I D A H O PI Z Z A H U T # 2 1 7 5 08/16/19 CI T Y C O M M E N T S 8 / 1 6 / 1 9 P2 WA S T E A N D V E N T P L A N IMPORTANT NOTE: PLUMBING CONTRACTOR SHALL WRAP THE WALK-IN FREEZER DRAIN PIPING WITH HEAT TRACE TAPE, INSULATE WITH 3/4" ARMAFLEX INSULATION, AND PROVIDE PVC FIELD JACKET FOR ALL CONDENSATE PIPE IN THE FREEZER. 1.PLUMBING CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF THE SIZE & DEPTH OF THE EXISTING SANITARY WASTE PIPING. 2.REFER TO SHEET P1 - PLUMBING SCHEDULE FOR LINE SIZES NOT SHOWN ON PLAN. 3.ALL VENTS, VTRS, WCO'S, FCO'S, ETC. MAY NOT BE SHOWN ON PLAN. REFER TO PLUMBING RISER DIAGRAM FOR VERIFICATION. 4.INSTALL VTR AT LOCATIONS AS SHOWN ON PLUMBING PLAN AND PLUMBING RISER DIAGRAM. ALL OTHER VENTS GO TO VENT LINE AS SHOWN. 1 2 3 6 7 8 4 5 9 11/4" = 1'-0"WASTE AND VENT PLAN 2NTSKEYNOTES3NTSGENERAL NOTES PROVIDE WITH TRAP PRIMER AND CONNECT TO NEAREST CW PIPING. REFER TO DETAIL 3/P4 VENT UP THROUGH ROOF. SEE RISER FOR ALL VENT AND PIPE SIZING. PLUMBING VENTS TO BE LOCATED A MINIMUM OF 10' FROM FRESH AIR INTAKES. FIELD COORDINATE FINAL LOCATIONS. PROVIDE 1" COPPER CONDENSATE DRAIN LINE FROM THE EVAPORATOR COILS IN THE WALK-IN COOLER AND FREEZER. PROVIDE P-TRAPS ON CONDENSATE DRAIN LINE AT EVAPORATOR COILS. ROUTE TO FLOOR DRAIN AS SHOWN. CONDENSATE PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE IN WALK-IN COOLER AND FREEZER TO ALLOW FOR SHELVING INSTALLATION. 1-1/2" AIRGAP FOR INDIRECT WASTE REQUIRED. PROVIDE 1" PVC CONDENSATE LINE FOR HVAC UNITS. DRAIN INTO FLOOR DRAIN LOCATION AS SHOWN. PROVIDE AIR GAP PER CODE 1-1/2" MINIMUM REQUIRED. PROVIDE SCREWED CLEAN OUT TYPICAL AS SHOWN. ROUTE 2" WASTE LINE FROM 3-COMPARTMENT SINK TO FLOOR SINK WITH INDIRECT WASTE CONNECTION. PROVIDE AIR GAP PER CODE. 4" MINIMUM REQUIRED. ROUTE 2" WASTE LINE FROM DISHWASHER TO FLOOR SINK WITH INDIRECT WASTE CONNECTION. PROVIDE AIR GAP PER CODE. 4" MINIMUM REQUIRED. CONNECT NEW SANITARY WASTE PIPING TO EXISTING SANITARY WASTE LINE. VERIFY SIZE, DEPTH AND LOCATION. CONNECT NEW GREASE WASTE PIPING TO EXISTING GREASE WASTE LINE. VERIFY SIZE, DEPTH AND LOCATION. 4NTSWASTE AND VENT ISOMETRIC RISER 1 1 1