HomeMy WebLinkAboutINSPECTION TICKET QUINTON - 19-00364 - East Idaho Credit Union - New BuildingInspection
Ticket
Building Review on 07/15/2019:
Permit Number: 19-00364Permit Details
Building - Commercial
Permit Issued Date:
Permit Issued Date: Final Inspections Required
Fire Sprinkler Final Inspection HVAC Final Inspection
Plumbing Final Inspection Fire Department Final Inspection
Public Works Final Inspection Fire Alarm Final Inspection
Planning and Zoning Final Inspection Commercial Electrical Final Inspection
Commercial Building Final
310 N 2nd E
East Idaho Credit Union - New Building
Inspection Details
quinton.owens@rexburg.org
Inspected By: Quinton Owens
Building Review on 07/15/2019:
D ESCRIPTIO N CO M M EN TS STATUS
Service Facilities comply with IBC 1109.12 Please identify accessible service counter space
per IBC 1109.12.3 & A117.1 sect. 904.3
REVISIONS
Ventilation is provided as per IBC Section 1203 Crawl space ventilation? See also notes on
crawl spaces in flood hazard area.
REVISIONS
Building shows compliance with prescriptive
requirements or as shown on a submitted
energy report.
Submitted COMcheck has lighting certificate but
it does not have thermal energy report.
Foundation insulation at interior slab on grade?
REVISIONS
Building or Structures located in Flood Area have
Flood Certificate per 1612.5
Flood vents are required if crawl space floor is
less than 1 foot above base flood elevation, and
the crawlspace floor cannot be more than 2 feet
below lowest adjacent grade (see FEMA TB-11).
Unit heater shown in crawl space shall also be
properly protected from flood hazard.
* Note: Building is in flood zone and will require
an elevation certificate. Plans show finished
floor elevation at 4870.7 ft.
REVISIONS
Special Inspection Contractor is identified (IBC
1704.2.1)
Who is the special inspection contractor?REVISIONS
Wood Framing has been designed by a licensed
Engineer and meets the requirements of IBC
Chapter 23 or meets the requirements for
Conventional Light-Frame Construction as per
IBC Section 2308
N/A
Concealed spaces are fireblocked/draftstopped
per Section 718
Fireblocking per IBC 718 will be approved based
on inspection.
APPROVED
Special Inspections are required as per IBC
Chapter 17
With the previous building removed, structural
fill for new building shall also have compaction
tests done.
APPROVED
Inspection
Ticket
Planning and Zoning Review - Site Plan on 07/15/2019:
Permit Number: 19-00364Permit Details
Building - Commercial
Permit Issued Date:
Permit Issued Date: Final Inspections Required
Fire Sprinkler Final Inspection HVAC Final Inspection
Plumbing Final Inspection Fire Department Final Inspection
Public Works Final Inspection Fire Alarm Final Inspection
Planning and Zoning Final Inspection Commercial Electrical Final Inspection
Commercial Building Final
310 N 2nd E
East Idaho Credit Union - New Building
Inspection Details
quinton.owens@rexburg.org
Inspected By: Quinton Owens
Planning and Zoning Review - Site Plan on 07/15/2019:
D ESCRIPTIO N CO M M EN TS STATUS
Show existing and proposed easements Dumpster is located under the overhead power
lines. What does the power company require for
clearance? Joel with Public Works says it cannot
go under the power lines under any
circumstance.
REVISIONS
Do parking stalls meet code requirements?
(Sizes & number of stalls/doors or beds?
Parking stalls are to be 20 feet in length. Up to
25% may be as little as 16 ft for compact cars
and marked as such. Parking lengths may be 19
ft ONLY where parked vehicles overhang a 6 ft
wide sidewalk or overhang landscaping within
the same property.
REVISIONS
Do sidewalks meet requirements by zone?Sidewalks along perpendicular parking shall be
either 6 ft wide minimum or parking shall be
provided with wheel stops along 5 ft sidewalks
to prevent vehicle overhang. Which option will
be applied? The plan shows 5 ft walkway with
no wheel stops.
REVISIONS
Are utilities fenced or screened from view?Gates on dumpster enclosure shall be able to
open 180 degrees to allow truck to pick up from
the side (see detail C1/A106)
REVISIONS
Are the landscaping requirements met? (# of
trees, caliper of trees, etc.)
Are green space percentage requirements met?
Landscaping plan needed to show required
trees and shrubs to screen parking lot to street.
(Rexburg Development Code 7.00.080.b)
REVISIONS
Building shall meet design standards required
either by the zone designation or supplemental
regulations in chapter 4.
Submit landscaping plan for further review of
features applicable to the city's development
code section 7.00.040.b
REVISIONS
Is the land in a floodplain? Is it designated on
the plat?
(If in floodplain, floodplain certificate needed.)
Building is in flood zone and will require an
elevation certificate. Plans show finished floor
elevation at 4870.7 ft (more than the required
freeboard)
APPROVED
Page 1 of 2
(Continued)
Permit Number: 19-00364
D ESCRIPTIO N CO MMEN TS STATUS
Page 2 of 2