Loading...
HomeMy WebLinkAboutSIGN LOCATION PLAN - 18-00675 - 175 W 2nd S - Righteous SliceLEVEL 01 FF1- BUILDING B 100' - 0" LEVEL 02 - BUILDING B 115' - 0" LEVEL 03 - BUILDING B 128' - 0" LEVEL 04 - BUILDING B 138' - 1 3/4" T.O.W.- BUILDING B 147' - 2 1/8" B.5B.1 B.19B.3 B.17B.2 B.4 B.6 B.8 B.10 B.14 B.16 B.18B.15B.13B.11B.9B.7 B.12 03.10 03.10 04.12 03.14 03.16 23.03 LEVEL 01 FF2- BUILDING B 101' - 0" LEVEL 01 FF3- BUILDING B 101' - 10 3/4" AL I G N S U P P O R T S W/ M U L L I O N S 07.37 07.37 B-A202 A6 5% SLOPE IN SIDEWALK PLATFORM 110' - 8" 8' - 0 " 15' - 0" 10 ' - 0 " 8' - 0 " 2' - 0 " 6' - 6 " 8' - 0 " 03.16 METERS METERSMETERS 03.16 07.37 07.4207.42 3 ' - 0 " 1' - 0"1' - 0" 07.39 DOWNSPOUT DOWNSPOUT LEVEL 01 FF1- BUILDING B 100' - 0" LEVEL 02 - BUILDING B 115' - 0" LEVEL 03 - BUILDING B 128' - 0" LEVEL 04 - BUILDING B 138' - 1 3/4" T.O.W.- BUILDING B 147' - 2 1/8" T.O. PARAPET - BUILDING A 154' - 9 1/8" B.E B.F B.RB.MB.KB.DB.CB.A B.B B.JB.H B.L B.NB.G B.P 03.16 07.37 03.10 03.10 03.16 04.12 04.12 LEVEL 01 FF2- BUILDING B 101' - 0" LEVEL 01 FF3- BUILDING B 101' - 10 3/4" 01.12 2' - 0 " 3' - 8 " AL I G N S U P P O R T S W/ M U L L I O N S 4' - 5 " PLATFORM 110' - 8" 03.1003.1003.1003.10 03.1003.10 07.3707.3707.3707.37 03.14 06.03 LEVEL 01 FF1- BUILDING B 100' - 0" LEVEL 02 - BUILDING B 115' - 0" LEVEL 03 - BUILDING B 128' - 0" LEVEL 04 - BUILDING B 138' - 1 3/4" T.O.W.- BUILDING B 147' - 2 1/8" B.R B.K B.D B.C B.AB.BB.J B.HB.LB.N B.GB.P PARKING GARAGE N.I.C. 03.14 04.12 LEVEL 01 FF2- BUILDING B 101' - 0" LEVEL 01 FF3- BUILDING B 101' - 10 3/4" 07.37 03.19 03.19 03.19 07.39 DOWNSPOUT INTO GROUND. SEE PLUMBING. D2 B-A321 method studioinc. 9 2 5 s o u t h w e s t t e m p l e s a l t l a k e c i t y , u t a h 8 4 1 0 1 p h o n e : (8 0 1) 5 3 2 - 4 4 2 2 sheet: title: revisions : p r o j e c t # : d a t e : UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC. project: E d c b a E d c b a 1 2 3 4 5 6 1 2 3 4 5 6 1 - 13 - 2017 B-A203 EXTERIOR ELEVATIONS 13.0670 NOVEMBER 28, 2017 226 South 1st West Rexburg, ID 83440 HEMMING CEDARS - BUILDING B - HOUSING / MIXED USE CONFORMED SET #3 - 1/8" = 1'-0"A1 SOUTH ELEVATION - BUILDING B 1/8" = 1'-0"D4 WEST ELEVATION - BUILDING B KEY NOTES 01.12 STEEL AWNINGS ABOVE RE:SECTIONS AND DETAILS 03.10 FIBER CEMENT PANEL: SMOOTH PANEL WITH ALUMINUM THIN SYSTEM - SEE SPECIFICATIONS 03.14 BOARD AND BATTEN FIBER CEMENT BOARD - SEE SPECIFICATIONS 03.16 FIBER CEMENT PANEL: SMOOTH HORIZONTAL PANEL - SEE SPECIFICATIONS 03.19 EIFS REVEAL 04.12 THIN STONE VENEER - SEE SPECIFICATIONS 06.03 EXTERIOR V-GROOVE SIDING, TRUEXTERIOR SIDING & TRIM BY BORAL OR EQUAL 07.37 EXTERIOR INSULATION FINISH SYSTEM (WITH REVEALS) - COLOR 1 07.39 GUTTER SYSTEM W/ DOWN SPOUT 07.42 EXTERIOR INSULATION FINISH SYSTEM - COLOR 2 23.03 MECHANICAL LOUVER, SEE MECHANICAL DRAWINGS FOR LENGTH. AREA WITH NO GRILL TO BE FINISHED WITH BREAK METAL AND PAINTED TO MATCH THE LOUVER 1/8" = 1'-0"D1 EAST ELEVATION - BUILDING B EASTWEST NORTH KEY PLAN 6 ASI B05 3/17/17 7 ASI B07 - Bldg B Update 6/14/17