HomeMy WebLinkAboutSIGN LOCATION PLAN - 18-00675 - 175 W 2nd S - Righteous SliceLEVEL 01 FF1-
BUILDING B
100' - 0"
LEVEL 02 -
BUILDING B
115' - 0"
LEVEL 03 -
BUILDING B
128' - 0"
LEVEL 04 -
BUILDING B
138' - 1 3/4"
T.O.W.- BUILDING B
147' - 2 1/8"
B.5B.1 B.19B.3 B.17B.2 B.4 B.6 B.8 B.10 B.14 B.16 B.18B.15B.13B.11B.9B.7 B.12
03.10
03.10
04.12
03.14 03.16 23.03
LEVEL 01 FF2-
BUILDING B
101' - 0"
LEVEL 01 FF3-
BUILDING B
101' - 10 3/4"
AL
I
G
N
S
U
P
P
O
R
T
S
W/
M
U
L
L
I
O
N
S
07.37
07.37
B-A202
A6
5% SLOPE IN
SIDEWALK
PLATFORM
110' - 8"
8'
-
0
"
15' - 0"
10
'
-
0
"
8'
-
0
"
2'
-
0
"
6'
-
6
"
8'
-
0
"
03.16
METERS METERSMETERS
03.16
07.37 07.4207.42
3 ' - 0 "
1' - 0"1' - 0"
07.39
DOWNSPOUT
DOWNSPOUT
LEVEL 01 FF1-
BUILDING B
100' - 0"
LEVEL 02 -
BUILDING B
115' - 0"
LEVEL 03 -
BUILDING B
128' - 0"
LEVEL 04 -
BUILDING B
138' - 1 3/4"
T.O.W.- BUILDING B
147' - 2 1/8"
T.O. PARAPET -
BUILDING A
154' - 9 1/8"
B.E B.F B.RB.MB.KB.DB.CB.A B.B B.JB.H B.L B.NB.G B.P
03.16
07.37
03.10
03.10
03.16
04.12
04.12
LEVEL 01 FF2-
BUILDING B
101' - 0"
LEVEL 01 FF3-
BUILDING B
101' - 10 3/4"
01.12
2'
-
0
"
3'
-
8
"
AL
I
G
N
S
U
P
P
O
R
T
S
W/
M
U
L
L
I
O
N
S
4'
-
5
"
PLATFORM
110' - 8"
03.1003.1003.1003.10 03.1003.10
07.3707.3707.3707.37
03.14
06.03
LEVEL 01 FF1-
BUILDING B
100' - 0"
LEVEL 02 -
BUILDING B
115' - 0"
LEVEL 03 -
BUILDING B
128' - 0"
LEVEL 04 -
BUILDING B
138' - 1 3/4"
T.O.W.- BUILDING B
147' - 2 1/8"
B.R B.K B.D B.C B.AB.BB.J B.HB.LB.N B.GB.P
PARKING GARAGE
N.I.C.
03.14
04.12
LEVEL 01 FF2-
BUILDING B
101' - 0"
LEVEL 01 FF3-
BUILDING B
101' - 10 3/4"
07.37
03.19
03.19
03.19
07.39
DOWNSPOUT INTO
GROUND. SEE PLUMBING.
D2
B-A321
method studioinc.
9 2 5 s o u t h w e s t t e m p l e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
p h o n e : (8 0 1) 5 3 2 - 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS
AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED
FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL
TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS
THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE
AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
d
c
b
a
E
d
c
b
a
1 2 3 4 5 6
1 2 3 4 5 6
1 - 13 - 2017
B-A203
EXTERIOR
ELEVATIONS
13.0670
NOVEMBER 28, 2017
226 South 1st West
Rexburg, ID 83440
HEMMING CEDARS -
BUILDING B - HOUSING
/ MIXED USE
CONFORMED SET #3 -
1/8" = 1'-0"A1 SOUTH ELEVATION - BUILDING B
1/8" = 1'-0"D4 WEST ELEVATION - BUILDING B
KEY NOTES
01.12 STEEL AWNINGS ABOVE RE:SECTIONS AND DETAILS
03.10 FIBER CEMENT PANEL: SMOOTH PANEL WITH ALUMINUM THIN SYSTEM - SEE
SPECIFICATIONS
03.14 BOARD AND BATTEN FIBER CEMENT BOARD - SEE SPECIFICATIONS
03.16 FIBER CEMENT PANEL: SMOOTH HORIZONTAL PANEL - SEE SPECIFICATIONS
03.19 EIFS REVEAL
04.12 THIN STONE VENEER - SEE SPECIFICATIONS
06.03 EXTERIOR V-GROOVE SIDING, TRUEXTERIOR SIDING & TRIM BY BORAL OR EQUAL
07.37 EXTERIOR INSULATION FINISH SYSTEM (WITH REVEALS) - COLOR 1
07.39 GUTTER SYSTEM W/ DOWN SPOUT
07.42 EXTERIOR INSULATION FINISH SYSTEM - COLOR 2
23.03 MECHANICAL LOUVER, SEE MECHANICAL DRAWINGS FOR LENGTH. AREA WITH NO
GRILL TO BE FINISHED WITH BREAK METAL AND PAINTED TO MATCH THE LOUVER
1/8" = 1'-0"D1 EAST ELEVATION - BUILDING B
EASTWEST
NORTH
KEY PLAN
6 ASI B05 3/17/17
7 ASI B07 - Bldg B
Update
6/14/17