Loading...
HomeMy WebLinkAboutCity Council Presentation 2019 Swimming Pool FinalRENOVATIONS Rexburg Rapids / Splash Park OVERVIEW Areas that need renovations at Rexburg Rapids/Splash Park 1.Splash Park Play Structure (sand, gel coat, and paint slides) 2.Rexburg Rapids Play Structure (sand, gel coat, and paint slides) 3.Rexburg Rapids Slide Tower (Stairs, Slides) SPLASH PARK PLAY STRUCTURE Hard Water & Discoloration SPLASH PARK – RED SLIDE Skate Board Marks Wear Marks from Usage SPLASH PARK - YELLOW SLIDE Untreated Spider Cracks Fiberglass cracks Usage Marks SPLASH PARK •Sand down inside and outside of the red and yellow slides •Gel coat the insides and speed area of the red and yellow slides. •Repaint whole play structure with slides. •- Total Cost: $23,750 •Would bid out this project to be SPLASH PARK FENCE IMPROVEMENTS •Fence off Splash Park Area with a 6 to 8’ fence with several access gates •To be designed if we decide to do •- Total Estimated Cost: $18,000 •Would plan on bidding out this project to be completed late August 2020. REXBURG RAPIDS PLAY STRUCTURE Discoloration Chemical Damage RED & GREEN SLIDE Spider Cracks Fading, Discoloration and wear. R E X B U R G R A P I D S P L A Y S T R U C T U R E - 2 0 2 0 B U D G E T • Sand down inside and outside of the red and green slides • Gel coat the insides of green and red slides • Repaint whole structure with slides. •- Total Cost: $25,500.00 •Would plan on bidding out this project to be completed late August 2020. PAINTING SLIDE TOWER / SLIDES •Paining of the Slides $22,400 •Gel Coat Inside of Slides $44,800 •Would plan on bidding out this project to be completed late August 2020. SLIDE TOWER RENOVATIONS •Structural Renovations- Cost and Options to be Determined- Current Estimate $100,410 •Would plan on bidding out this project to be completed late August 2021. CHP SYSTEM •Initial Cost $156,300 •Would need to bid out project •Payback Projection 8.7 Years with maintenance included •Maintenance Cost Estimates $89,800 •Projected Life 20 Years •Projected Savings $249,600 NECESSARY BUDGET ADJUSTMENTS FOR FY 2020 Splash Park •Fence Area $ 18,000 •Regelcoat and Paint Structure $ 23,800 •Total $ 41,800 •Would come from General Fund Contingency $133,800 •Would reduce contingency to $92,000 Rexburg Rapids •Regelcoat inside of Slides/Repaint outside of Slides $ 67,200 •Regelcoat/Repaint Kids Area Structure $ 25,500 •CHP System $156,300 •Total $249,000 •Projected Savings by End of FY 2020 for Rexburg Rapids Projects is $358,000 •Amount available for FY 2021 Projects would be estimated at approximately $80,000 plus the FY 2021 Transfer from the General Fund.