Loading...
HomeMy WebLinkAboutSPECIAL INSPECTIONS - 17-00801 - 2300 University Blvd - Madison High School - AdditionProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: CMPS Sidewalk Replacement 18001B BYU-Idaho DePatco 4/18/19 Clear 10:00 AM 52 12:00 PM I arrived on site and began my observations of the concrete on the South end of the Clark building around the steam vault. I observed that the contractor had doweled into the existing concrete and vault lid. I observed the contractor place the concrete. The contractor was notified of the test results and my observations prior to leaving. Digitally signed by Jacob Christensen Date: 2019.04.21 14:51:53 -06'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 4379 psi Madison High School Addition Madison School District 170 HS 18005B 4214 20 yds MSAC534, MP322, Super Plasticizer J. Christensen 04/12/2019 7:15:00 AM 7 2.1 79 27 8 NA 49A 49E 49C 49B 49D 4 4 4 4 4 04/19/19 05/10/19 05/10/19 05/10/19 38,625 55,215 54,598 55,324 63,5003,072 4,392 4,343 4,401 Digitally signed by Jacob Christensen Date: 2019.05.10 10:14:20 -06'00' 12.57 Walters Ready Mix Slab on grade - Gym Floor - NW Corner 7 28 28 28 H 12.57 12.57 12.57 1 of 3 J. Christensen Apr 13, 2019 10:00:00 AM Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 4255 psi Madison High School Addition Madison School District 170 HS 18005B 4218 60 yds MSAC534, MP322, Super Plasticizer J. Christensen 04/12/2019 8:10:00 AM 7.5 2.4 71 31 8 NA 50A 50E 50C 50B 50D 4 4 4 4 4 04/19/19 05/10/19 05/10/19 05/10/19 40,513 53,600 52,376 54,471 33,5003,222 4,264 4,166 4,333 Digitally signed by Jacob Christensen Date: 2019.05.10 10:12:27 -06'00' 12.57 Walters Ready Mix Slab on grade - Gym Floor - SW Corner 7 28 28 28 H 12.57 12.57 12.57 2 of 3 J. Christensen Apr 13, 2019 10:00:00 AM 4 6 1 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 4389 Madison High School Addition Madison School District 170 HS 18005B 4232 110 yds MSAC534, MP322, Super Plasticizer J. Christensen 04/12/2019 9:30:00 AM 6.75 1.8 69 31 8 NA 51A 51E 51C 51B 51D 4 4 4 4 4 04/19/19 05/10/19 05/10/19 05/10/19 44,126 52,614 56,525 56,357 23,5003,510 4,185 4,496 4,483 Digitally signed by Jacob Christensen Date: 2019.05.10 10:09:06 -06'00' 12.57 Walters Ready Mix Slab on grade - Gym Floor - Center 7 28 28 28 H 12.57 12.57 12.57 3 of 3 J. Christensen Apr 13, 2019 10:00:00 AM 2 6 3 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition Madison School District 170 HS 18005B 4335 80 yds MSAC534, MP322 J. Christensen 04/17/2019 9:00:00 AM 8 1.3 73 37 8 NA 59A 59E 59C 59B 59D 4 4 4 4 4 04/24/19 05/15/19 05/15/19 05/15/19 44,507 6 3,5003,54012.57 Walters Ready Mix Slab on Grade - East gym slab 7 28 28 28 H 1 of 1 J. Christensen Apr 18, 2019 8:00:00 AM Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 4,681 psi Madison High School Addition Madison School District 170 HS 18005B 4335 80 yds MSAC534, MP322 J. Christensen 04/17/2019 9:00:00 AM 8 1.3 73 37 8 NA 59A 59E 59C 59B 59D 4 4 4 4 4 04/24/19 05/15/19 05/15/19 05/15/19 44,507 57,365 59,032 60,140 63,5003,540 4,563 4,696 4,784 Digitally signed by Jacob P Christensen Date: 2019.05.17 12:29:08 -06'00' 12.57 Walters Ready Mix Slab on Grade - East gym slab 7 28 28 28 H 12.57 12.57 12.57 1 of 1 J. Christensen Apr 18, 2019 8:00:00 AM 6 6 6 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition Madison School District 170HS 18005B 04815 18.5 MP322, MAAE90 J. Denton 05/01/2019 8:00:00 AM 7.75 2.5 68 34 79A 79E 79C 79B 79D 4 05/08/19 05/29/19 05/29/19 05/29/19 43,930 2 3,5003,49412.57 Walters Ready Mix Slab on Deck - East Side of Gym 7 28 28 28 H Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition Madison School District 400 18005B 05156 9.50 out of 19 MP322, MAAE90 TBC 05/13/2019 9:14:00 AM 5.25 5 61.1 57.9 87A 87E 87C 87B 87D 4 05/20/19 06/10/19 06/10/19 06/10/19 07/08/19 54,295 6 4,5004,31912.57 Walters North side walk in front of doors 7 28 28 28 H 1 of 1 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Addition 18005B Madison School District Thompson Excavation 5/9/2019 TBC 2:00 PM 4:00 PM 10483 2426 609 BSTop of 3/4" Base 2.7 132 97% Classroom Addition North sidewalk Top of 3/4" Base 3/4 Base 97% 132 3.1 127.8 131.5 100% 132 3.8 131.4 136 3/4 Base Top of 3/4" Base Classroom Addition North sidewalk 98% 132 2.7 129 132.1 3/4 Base Top of 3/4" Base Classroom Addition North sidewalk 101% 132 3 133.3 139.9 3/4 Base Top of 3/4" Base Classroom Addition North sidewalk Digitally signed by Jacob Christensen Date: 2019.05.10 13:56:01 -06'00' BS BS BS BS 1 127.9 131.1Classroom Addition North sidewalk 3/4 Base 5 2 3 4 Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District Headwaters 4/26/2019 windy and clear 3 PM 45 5 PM I arrived on site to test for moisture levels in the cinder block walls of the east gymnasium addition. I took several tests approximately 10 feet apart along each wall. For the West Wall the tests were done about 20 feet apart. All numbers are in terms of percent moisture within the building material. North Wall- (east drain)25.8, 11.8, 11.1, 14.3, 12.7, 10.6, 14.4. East Wall- 15.4, 17, 19.1, 17.5, 16.4. South Wall- 13.8, (east drain)17.1, 15.5, 14.1, 12.4, (west drain)25.8, 13.7. West Wall- (spaced about 20 feet apart) 12.4, 13.5, 15.8 Digitally signed by Jacob Christensen Date: 2019.04.30 14:09:19 -06'00' 8129697 ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District IEI 4/29/19 clear 8:00 AM 34 10:00 AM I arrived on site and began my observations of the 2nd floor steel decking on the East side of the gymnasium. I observed that the steel decking was secured to the angle iron and beams below using puddle welds and Hilti pins. I observed that the seams were crimped at 12" on center in general conformance with the project documents. Digitally signed by Jacob Christensen Date: 2019.04.30 13:57:26 -06'00' 8129697 ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District Edelmeyer Concrete 5/1/19 Windy 7:30 AM 30 10:30 AM I arrived on site and began my observation of the concrete reinforcement for the interior slab on grade at the second level on the east side of the gymnasium as well as two slabs on the southeast side and northeast side on the first level. The reinforcement was tied and placed in general conformance with project documents. I observed that the contractors had properly placed rebar chairs to lift the reinforcement. I then observed the placement of the concrete. I notified the contractor of my observations and test results prior to leaving. Digitally signed by Jacob Christensen Date: 2019.05.06 09:08:28 -06'00' 8129697 ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District Headwaters 5/3/2019 clear 9:00 AM 45 11:00 AM I arrived on site and began my observation and testing for moisture in the CMU walls of the east gymnasium addition. (Numbers are in percent moisture) North wall East Drain: 4 ft above finish grade15.8 Either side of the drain 4 ft above finish grade 12.6 and 12.1. At South wall East Drain: -4 ft above finish grade: 13.4 -8 ft above finish grade: 14.6 -12 ft above finish grade: 18.9 -18 ft above finish grade: 12.2 -24 ft above finish grade: 12.1 At South wall West Drain -4 ft above finish grade: 12.1 -8 ft above finish grade: 11.9 -12 ft above finish grade: 14.0 -18 ft above finish grade: 11.4 -24 ft above finish grade: 13.1 Digitally signed by Jacob Christensen Date: 2019.05.06 09:12:41 -06'00' - ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District IEI 5/9/19 Clear 1:00 PM 58 3:00 PM I arrived on site and began my observations of the last section of the roof decking on the East side of the gymnasium addition. I observed that the contractor had used Hilti pins to secure the deck to the joists and ledger. I observed that in a couple of the corners the contractor was unable to get the Hilti pin gun into position and so the contractor used 3/4" puddle welds. I also observed that the contractor used the versalock crimper for the seams at +/- 12" on center. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob Christensen Date: 2019.05.13 12:16:11 -06'00' 8129697 ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Addition 18005B Madison School District Headwaters 5-13-19 Sunny 8:00 AM 60 10:30 AM ● I arrived on site and began my observations, I observed the placement of the concrete along the north side if the building side walk and curbing, I observed the air as a 5 the slump as a 5.25 and the concrete temperature as 61.1. I informed the contractor of my observations. Digitally signed by Jacob Christensen Date: 2019.05.13 11:59:39 -06'00' 8129697 curbing along road west side of building side walk pad out side of north door west curbing along building Page 2 of 2 Description: Description: Description: Description: Additional Comments: In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test #Test Location: Lift:Material Type: Wet: MA: % of MA: Test # Test # Test # Test # Test # Test # Test Location: Lift:Material Type: % of MA:MA: Wet: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Reviewed By: Remarks: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Test # Test # Test # Test # Test # Test # Test # % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Page of Madison High School Event Stadium 18005C Madison School District Depatco May 1, 2019 L. Hammar 11:00 AM 7:00 PM 3491 734 2834 13th st. Type II 141.6 151.9 93% 13th st. Type II 93%151.9 141.7 93%151.9 140.8 Type II 13th st. 92%151.9 140 Type II 13th st. 92%151.9 140.2 Type II 13th st. 93%151.9 140.6 Type II 13th st. 93%151.9 141.1 Type II 13th st. Digitally signed by Jacob Christensen Date: 2019.05.06 09:15:54 -06'00' 93%151.9 140.9 Type II 13th st. 97%151.9 147 Type II 13th st. 95%151.9 144.6 Type II 13th st. 97%151.9 147.2 Type II 13th st. 95%151.9 145 Type II 13th st. 94%151.9 143.1 Type II 13th st. 93%151.9 141.9 Type II 13th st. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 11 In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test #Test Location: Lift:Material Type: Wet: MA: % of MA: Test # Test # Test # Test # Test # Test # Test Location: Lift:Material Type: % of MA:MA: Wet: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Reviewed By: Remarks: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Test # Test # Test # Test # Test # Test # Test # % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Page of MHS Stadium 18005C Madison School District DePatco 5/10/2019 J. Denton 10:00 AM 5:30 PM 3491 726 2866 North side of track Na 2 140.6 151.9 93% North east side of track Na 2 94%151.9 142.1 96%151.9 145.4 2Na North east side of track 97%151.9 147.5 2Na East side of track 94%151.9 143.5 2Na Sout east side of track 94%151.9 142.2 2Na South east side of track 96%151.9 146.2 2Na South side of track Digitally signed by Jacob P Christensen Date: 2019.05.17 12:32:27 -06'00' 94%151.9 142.4 2Na South west side of track 91%151.9 138.9 2Na South west side of track 94%151.9 142.8 2Na West side of track 92%151.9 140.3 2Na North west side of track 92%151.9 140.2 2Na North west side of track 1 2 3 4 5 6 7 8 9 10 11 12 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 5,683 psi Madison High School Event Stadium Madison School District 500F 18005C 4013 10 yds MP322, MAAE90 J. Christensen 04/03/2019 12:45:00 PM 0.75 5.5 56 48 4 57 45A 45E 45C 45B 45D 4 4 4 4 4 04/10/19 05/01/19 05/01/19 05/01/19 54,704 67,456 71,741 75,107 14,5004,351 5,366 5,707 5,975 Digitally signed by Jacob Christensen Date: 2019.05.06 09:01:29 -06'00' 12.57 Walters Ready Mix 13th West, East Curb 7 28 28 28 H 12.57 12.57 12.57 1 if 1 J. Christensen Apr 4, 2019 8:00:00 AM 2 1 1 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 7,375 psi Madison High School Event Stadium Madison School District 500F 18005C 4350 9 yds MP322, MAAE90 J. Christensen 04/17/2019 12:20:00 PM 0.75 5.8 61 46 4 57 60A 60E 60C 60B 60D 4 4 4 4 4 04/24/19 05/15/19 05/15/19 05/15/19 64,658 92,555 93,135 92,420 14,5005,143 7,363 7,409 7,352 Digitally signed by Jacob P Christensen Date: 2019.05.17 12:35:55 -06'00' 12.57 Walters Ready Mix Curb and Gutter 13th West - South Half 7 28 28 28 H 12.57 12.57 12.57 1 of 1 J. Christensen Apr 18, 2019 9:00:00 AM 2 6 2 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 5145 psi Madison High School Event Stadium Madison School District 500F 18005C 4509 10.75 yds MP322, MAAE90 J. Christensen 04/22/2019 12:15:00 PM 5 5.5 62 54 69A 69E 69C 69B 69D 4 4 4 4 04/29/19 05/20/19 05/20/19 05/20/19 44,969 63,875 64,225 65,930 34,5003,577 5,081 5,109 5,245 Digitally signed by Jacob Christensen Date: 2019.05.20 09:17:45 -06'00' 12.57 Walters Ready Mix Track - slab on grade, West bleachers 7 28 28 28 H 12.57 12.57 12.57 1 of 1 J. Christensen Apr 23, 2019 3:00 PM 6 6 4 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium Madison School District 292 18005C 05288 10 of 90 Super plastisizer TBC 05/16/2019 6:30:00 AM 8.25 2.5 67.6 63 90A 90E 90C 90B 90D 05/23/19 06/13/19 06/13/19 06/13/19 48,275 1 4,5003,84012.57 Walters Inside stadium second level decking under the bleachers south end. 7 28 28 28 H 1 of 2 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium Madison School District 292 18005C 05297 10 of 90 Super plastisizer TBC 05/16/2019 6:33:00 AM 9 2.25 64.4 65.4 89A 89E 89C 89B 89D 05/23/19 06/13/19 06/13/19 06/13/19 43,540 4,5003,463 0 0 0 12.57 Walters Under stadium the bleachers second level north end 7 28 28 28 H 12.57 12.57 12.57 2 fo 2 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Stadium 18005C Madison School District Edstrom Construction Apr 11, 2019 J. Christensen 2:00 PM 4:00 PM 3491 10Subbase 4.6 139.8 102% 13th West South End Subbase Pit Run 98% 139.8 4.7 137.7 144.1 101% 139.8 5.5 140.5 148.2 Pit Run Subbase West Fire Access 99% 139.8 5.1 138.7 145.7 Pit Run Subbase West Fire Access Digitally signed by Jacob Christensen Date: 2019.04.21 15:36:51 -06'00' 10 10 10 1 142.7 149.313th West South End Pit Run 2 3 4 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Event Stadium 18005C Madison School District Apr 16, 2019 J. Christensen 8:30 AM 3491 745 2852 BSBottom of curb 4.9 135.8 96% Curb line - North Fire lane North side Bottom of curb 3/4" Base 95% 135.8 6.6 128.5 137 96% 135.8 5.8 130.3 137.8 3/4" Base Bottom of curb Curb line - North Fire lane North side 97% 135.8 5.8 131.5 139.2 3/4" Base Bottom of curb Curb line - North Fire lane South side 99% 135.8 6.6 134.1 143 3/4" Base Bottom of curb Curb line - South Fire lane North side 98% 135.8 6.4 133.6 142.1 3/4" Base Bottom of curb Curb line - South Fire lane North side 100% 135.8 7.2 135.4 145.2 3/4" Base Bottom of curb Curb line - South Fire lane South side Digitally signed by Jacob Christensen Date: 2019.04.21 15:41:31 -06'00' BS BS BS BS BS BS 1 130.5 136.9Curb line - North Fire lane North side 3/4" Base 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 100% 135.8 4.4 135.4 141.4 3/4" Base Bottom of curb Curb line - South Fire lane South side 135.8 97% 4.1 131.7 137.1 3/4" Base Bottom of curb Curb Line - 13th West - East side 135.8 96% 5.6 130.5 137.8 3/4" Base Bottom of curb Curb Line - 13th West - East side 135.8 95% 3.8 129.1 134 3/4" Base Bottom of curb Curb Line - 13th West - West side BS BS BS BS 8 11 9 10 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Stadium 18005C Madison School District Edstrom's Construction Apr 30, 2019 L. Hammar 3:00 PM 5:00 PM 3491 733 2855 BSTop of base 7.1 130.5 96% Football Field- East Half Top of base Turf Base 91% 130.5 5.4 119 125.5 89% 130.5 3 116.5 120.1 Turf Base Top of base Football Field- East Half 91% 130.5 6.5 118.2 125.9 Turf Base Top of base Football Field- East Half 88% 130.5 2.4 114.3 117.1 Turf Base Top of base Football Field- East Half Digitally signed by Jacob Christensen Date: 2019.05.06 09:21:02 -06'00' BS BS BS BS 1 125 134.3Football Field- East Half Turf Base 5 2 3 4 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Stadium 18005C Madison School District Edstrom's Construction Apr 30, 2019 L. Hammar 3:00 PM 5:30 PM 3491 733 2855 BSTop of 3/4 4 136 98% 13th St. Top of 3/4 3/4 96% 135.8 3.4 130.6 135 95% 135.8 4.1 129.2 134.4 3/4 Top of 3/4 13th St. 96% 135.8 3.9 129.8 134.9 3/4 Top of 3/4 13th St. 100% 135.8 4.9 135.5 142.1 3/4 Top of 3/4 13th St. 96% 135.8 5 129.7 136.2 Top of 3/4 13th St. 96% 135.8 3.3 130 134.3 3/4 Top of 3/4 13th St. Digitally signed by Jacob Christensen Date: 2019.05.01 09:54:26 -06'00' BS BS BS BS BS BS 1 133 138.513th St. 3/4 5 6 7 2 3 4 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Stadium 18005C Madison School District Edstrom's Construction Apr 30, 2019 L. Hammar 3:00 PM 5:30 PM 3491 733 2855 BSTop of 3/4 3.3 136 97% 13th St. Top of 3/4 3/4 97% 135.8 2.8 131.6 135.3 97% 135.8 3 131.8 135.7 3/4 Top of 3/4 13th St. Digitally signed by Jacob Christensen Date: 2019.05.01 09:58:48 -06'00' BS BS 8 132 135.913th St. 3/4 9 10 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number Madison High School Event Stadium 18005C Madison School District Headwaters Construction Ma5/10/2019 J. Denton 8:00 AM 10:00 AM 3491 726 2866 BSTop of base 3.4 135.8 97% North side of track Top of base Three quarter 95% 135.8 3.2 128.4 132.5 100% 135.8 5.7 135.5 143.3 Three quarter Top of base North west side of track 100% 135.8 3.8 135.9 141.1 Three quarter Top of base North west side of track 95% 135.8 4.2 128.9 134.3 Three quarter Top of base West side of track 96% 135.8 4.6 129.8 135.7 Three quarter Top of base South west side of track 101% 135.8 4.2 136.9 142.7 Three quarter Top of base South west side of track Digitally signed by Jacob Christensen Date: 2019.05.13 08:40:26 -06'00' BS BS BS BS BS BS 1 131.4 135.9Northeast side of track Three quarter 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 97% 135.8 3.4 132.4 137 Three quarter Top of base South side of track 135.8 100% 3.8 135.4 140.6 Three quarter Top of base South east side of track 135.8 98% 3.9 133.5 138.7 Three quarter Top of base South east sideof track 135.8 98% 2.9 133.5 137.4 Three quarter Top of base East side of track 135.8 98% 5.4 133.3 140.5 Three quarter Top of base North east side of track BS BS BS BS BS 8 11 12 Turf Base On Site Stock Pile ASTM D698 C SIZE PASSING Low High 3"100% 2"100% 1"100% 3/4"100% 1/2"73% 3/8"61% No. 4 39% No. 8 30% No. 16 27% No. 30 26% No. 50 22% No. 100 5% No. 200 0.5% 130.5 6.3% Reviewed By: Jacob Christensen CEO Project #: Lab #: Test Method Siev Anlysis Sample Received: Report Date Maximum Density Optimum Moisture ASTM D2216 Moisture Content As Received 2.4% ASTM C136 Corrected Density & Moisture Content ASTM D4718 SPECIFICATION Madison High School Event Stadium Madison School District Material Description: Sample Location: April 23, 2019 April 23, 2019 18005C 76 Client: Project Name: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0.0010.010.1110100 80 90 100 110 120 130 140 150 160 0%5%10%15%20% . Percent Moisture Gs=2.65 Gs=2.75 Gs=2.85 Dr y D e n s i t y ( p c f ) Pe r c e n t P a s s i n g Sieve Size (mm) 338 Oaktrail Drive • Rexburg, ID 83440 • 208.970.6237 Permeable Aggregate On site stock pile SIZE PASSING SPECIFICATION Low High 3"100% 2"100% 1"100% 3/4"100% 1/2"80% 3/8"68% No. 4 44% No. 8 34% No. 16 31% No. 30 30% No. 50 25% No. 100 5% No. 200 0.6% Reviewed By: Jacob Christensen CEO Moisture Content As Received Sample Received: Report Date Material Description: Sample Location: Client: Project Name: Project #: 2.9% April 23, 2019 April 26, 2019 Lab #: Madison School District MHS Stadium 18005C 76 ASTM D2216 Sieve Analysis ASTM C136 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0.0010.010.1110100 Pe r c e n t P a s s i n g Sieve Size (mm) 338 Oaktrail Drive • Rexburg, ID 83440 • 208.970.6237 Permeable Aggregate On site stock pile SIZE PASSING SPECIFICATION Low High 3"100% 2"100% 1"100% 3/4"100% 1/2"74% 3/8"61% No. 4 40% No. 8 30% No. 16 27% No. 30 26% No. 50 22% No. 100 5% No. 200 0.5% Reviewed By: Jacob Christensen CEO 2.6% April 23, 2019 April 26, 2019 Lab #: Madison School District MHS Stadium 18005C 77 ASTM D2216 Sieve Analysis ASTM C136 Moisture Content As Received Sample Received: Report Date Material Description: Sample Location: Client: Project Name: Project #: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0.0010.010.1110100 Pe r c e n t P a s s i n g Sieve Size (mm) 338 Oaktrail Drive • Rexburg, ID 83440 • 208.970.6237 Permeable Aggregate On site stock pile SIZE PASSING SPECIFICATION Low High 3"100% 2"100% 1"100% 3/4"100% 1/2"75% 3/8"62% No. 4 41% No. 8 32% No. 16 29% No. 30 28% No. 50 24% No. 100 5% No. 200 0.5% Reviewed By: Jacob Christensen CEO 2.2% April 23, 2019 April 26, 2019 Lab #: Madison School District MHS Stadium 18005C 75 ASTM D2216 Sieve Analysis ASTM C136 Moisture Content As Received Sample Received: Report Date Material Description: Sample Location: Client: Project Name: Project #: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0.0010.010.1110100 Pe r c e n t P a s s i n g Sieve Size (mm) 338 Oaktrail Drive • Rexburg, ID 83440 • 208.970.6237 Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 4/22/19 Clear 2:00 PM 55 4:00 PM I arrived on site and began my observations of the masonry walls in the interior of the Southern Building. I observed the reinforcement at the 8' level that it was in general conformance with project documents. I observed the contractor pump the grout into place and manually consolidate it. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob Christensen Date: 2019.04.30 16:06:20 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Stadium 18005C Madison School District Daniels Masonry 4/24/2019 Cloudy, Windy 9:00 AM 57 11:00 AM I arrived on site and began my observation of the steel reinforcement of the masonry wall at the 12' level along grid lines E:6-10. The steel placement was in general conformance with the project documents. I then observed the contractors pour the grout and manually consolidate it. I then let the contractors know what I observed before leaving the site Digitally signed by Jacob Christensen Date: 2019.04.30 16:34:49 -06'00' 8129697 ● Steel placement in the masonry Page 2 of 2 Description: Description: Description: Description: Additional Comments: Contractor manually consolidating the grout Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 4/29/2019 clear 2:30 PM 50 4:30 PM I arrived on site and started my observation and inspection of the Masonry Reinforcement and Grout placement Between Grid Lines E- F, and 5-11. The reinforcement was in general conformance with project documents. I observed the contractor consolidate the grout for the duration of the pour. Digitally signed by Jacob Christensen Date: 2019.04.30 16:37:36 -06'00' 8129697 view of horizontal reinforcement and mesh. view of horizontal, vertical reinforcement present for the duration of the pour. Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 4/30/19 Cloudy 2:30 PM 30 4:30 PM ● ● I arrived on site and began my observation of the steel rebar placement. The steel was placed within conformance to the plans. I then observed the grout being poured into the masonry and I observed the contractors consolidating the grout manually. I then informed the contractors of my observations. Digitally signed by Jacob Christensen Date: 2019.05.01 10:01:07 -06'00' 81296978 Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Edstrom Construction 4/30/19 Clear 8:00 AM 45 12:00 PM I arrived onsite and began my observations of the roof deck for the stadium on the SW corner. I observed that the contractor had secured the decking in general conformance with the project documents and had to weld the seems together in stead of crimping because there was not enough room due to the beam above. I notified the contractor of my observations prior to leaving. While on site, I walked the football field with Don Thorp, Headwaters. He showed me an area of concern on the center East side of the field where the turf base material was saturated and pumping. The contractor excavated down to the subgrade to try and identify if the problem was below the fabric. A sample of the saturated material was taken for a sieve analysis. results will be reported to the contractor as soon as they are available. I also observed a large area in the center of the field that was yielding and pumping. I notified the contractor of this and outlined the area in question with spray paint. Digitally signed by Jacob Christensen Date: 2019.04.30 15:45:48 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 5/1/19 Partly Cloudy 1:30 PM 47 3:30 PM ● ● I arrived on site and began my observation of the steel reinforcement for the masonry wall along grid lines 11-5:E at the 20' elevation. I observed that the steel ties and reinforcements were in general conformance with the project drawings. Then I began my observation of the grout placement. I observed the contractors manually consolidating the grout. I then informed the contractor what I observed before leaving the site. Digitally signed by Jacob Christensen Date: 2019.05.06 09:26:40 -06'00' 8129697 Steel reinforcement placment Steel reinforcement placement Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 5/2/19 Partly Cloudy 11:30 AM 50 1:30 PM I arrived on site and began my observation of the steel reinforcements at 5-11:E at the 24' elevation. The steel reinforcements were placed within general conformance of the project's plans. I then observed the contractors pour grout and consolidated manually. I then informed the contractor of my observations before leaving the site. Digitally signed by Jacob Christensen Date: 2019.05.06 09:29:31 -06'00' 8129697 Steel reinforcement placement Steel Reinforcement placement Contractors manually consolidating the grout. Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 5/3/19 Clear 10:00 AM 45 12:00 PM I arrived on site and began my observation of the masonry reinforcement and grout placement along grid lines 5-11:E at 28' elevation. I observed the contractor consolidating the grout manually. I observed it was done in general conformance to project documents. I notified contractor of my observations. Digitally signed by Jacob Christensen Date: 2019.05.06 09:33:31 -06'00' 8129697 Horizontal reinforcement Horizontal reinforcement vertical reinforcement Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District Daniels Masonry 5/8/19 Clear 11:00 AM 41 1:00 PM I arrived on site and began my observations of the interior masonry wall in the South building at the 12' elevation. I observed that the reinforcement was placed in general conformance with the project documents. I observed the contractor pump the grout into place and consolidate it manually. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob Christensen Date: 2019.05.13 08:36:19 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Madison High School Event Stadium 18005C Madison School District JM Construction/ Headwaters 5/16/2019 Overcast 5:30 AM 64 9:30 AM ● ● I arrived on site and began my observations. I observed the testing and placement of the concrete and the slump for the two tests at 8.25 in and 9 in respectively, the air for the two tests were 2.5 and 2.25. The concrete temperature was 67.6 and 64.4 degrees Fahrenheit. I observed the placement of the concrete under the bleachers on the second level. I also observed that the concrete reinforcement appear to be placed according to specification. I informed the contractor of my observations as I left the site. Digitally signed by Jacob Christensen Date: 2019.05.17 09:16:25 -06'00' 8129697 placed concrete view of concrete placement method conreate reinforcment Page 2 of 2 Description: Description: Description: Description: Additional Comments: