Loading...
HomeMy WebLinkAboutEMAIL - 17-00310 - 486 S 3rd W - The Roost - Bldg 3 - 12 Units IPM.Note Roost Bldg 3 not finaled Quinton Owens Roost Bldg 3 not finaled Quinton Owens EX /o=RexburgCityMail/ou=First Administrative Group/cn=Recipients/cn=quintono 'Jonathan McMullin' Roost Bldg 3 not finaled 00000002/o=RexburgCityMail/ou=First Administrative Group/cn=Recipients/cn=quintonoQuinton.Owens@rexburg.org 00000002/o=RexburgCityMail/ou=First Administrative Group/cn=Recipients/cn=quintonoQuinton.Owens@rexburg.org John, We had the attached letter mailed to the address in our system and it was returned. I attached the letter and the Final for Building and P&Z. Let me know if you have any questions. Quinton Owens, CFM Plans Examiner/Inspector City of Rexburg Phone: (208) 372-2173 Cell: (208) 716-1325 Quinton.Owens@rexburg.org 16.0 Quinton.Owens@rexburg.org 00000002/o=RexburgCityMail/ou=First Administrative Group/cn=Recipients/cn=quintono 'Jonathan McMullin' SMTP jsmconstruction.inc@gmail.com Jonathan McMullin jsmconstruction.inc@gmail.com image001.png .png image001.png image001.png image/png image001.png@01D517C9.D1A22EF0 Roost Building 3.pdf Quinton L. Owens Plans Examiner 35 N. 1st East, Rexburg, ID 83440 P. O. Box 280 Phone (208) 359.3020 ext. 2173 Fax (208) 359.3022 quinton.owens@rexburg.org www.rexburg.org March 4, 2019 John McMullin JSM Construction 334 Trejo St, Suite 16 Rexburg, ID 83440 Re: The Roost, Building 3 Mr. John McMullin: I am following up on the permit for the Roost, building 3. This permit has not been closed due to uncompleted inspections. A temporary occupancy was approved in January 2018, with some items to be completed for a final occupancy certificate. Planning & Zoning final was waiting for the site work to be completed in the spring but no re-inspection request was ever made and a follow up was missed by our department. The building final also had some corrections not yet inspected for approval. A copy of the Building and P&Z final inspections has been included with this letter. Call me as soon as the listed items are ready for inspection or if you have any questions. Sincerely, Quinton Owens, CFM Plans Examiner/Building Inspector .pdf ROOSTB~1.PDF Roost Building 3.pdf Roost3 Finals.pdf .pdf ROOST3~1.PDF Roost3 Finals.pdf