HomeMy WebLinkAboutINSPECTION TICKETS - 18-00479 - 40 W 7th N - Basic American New Building AdditionMadison County Building Department 134 E Main Rexburg, Idaho 83440 INSPECTION TICKET Basic American Foods: 4/3/19 OFFICE COPY I, Ralph Robison met with Ted Dye (City of Rexburg Inspector). We went out to BAF and met with Site manager from Mass. from Dennis Group. We toured progress of job sight. Working on grading (on going) Electrical conduits backfilled Drain lines installed and back filled Poured most of the footings and foundation On the East side. They almost have the premiter Completed. Should have prep for 8" slabs this Coming week Setting up forms next to existing building Site prep for North side receiving area completed Ralph Robison Madison County Building Inspector Madison County Building Department 134 E Main Rexburg, Idaho 83440 INSPECTION TICKET Basic American Foods: 3/27/19 OFFICE COPY I, Ralph Robison met with Ted Dye (City of Rexburg Inspector). We went out to BAF and met with Travis Tripp from Dennis Group. We toured progress of job sight. Working on grading (on going) Electrical conduits backfilled 36 " deep slab poured Cure time was 28 days Plus so moving ahead with slab pour They had completed south side of slab Setting up forms next to existing building Doing grub work on North side (receiving area ,a c� �O Ralph Robison Madison County Building Inspector Madison County Building Department 134 E Main Rexburg, Idaho 83440 INSPECTION TICKET Basic American Foods: 3/19/19 OFFICE COPY I, Ralph Robison met with Ted Dye (City of Rexburg Inspector). We went out to BAF and met with Travis Tripp from Dennis Group. We toured progress of job sight. Working on grading (on going) Electrical conduits underground to be covered up 36 " deep slab 8" grid pattern double, top and bottom pattern Cure time was 28 days Plus so moving ahead with slab pour They were forming south side of slab. Ralph Robison Madison County Building Inspector