HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00467 - Edge Real Estate - AdditionPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 07/09/2019 12:11 pm
Permit Details Permit Number: 14-00467
Edge Real Estate - Addition
38 S 2nd E
Commercial Addition
Permit Issued Date: 12/10/2014
Permit Inspection Statistics
21Total Inspections Completed:
14Total Inspections Passed:
Inspection Pass Rate: 66.67%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
12/17/2014PassQuinton OwensCommercial Footing Inspection
12/18/2014PassTed DyeFoundation Inspection
02/03/2015PassTed DyeSheeting
Sheeting attached with staples with correct spacing.
Edge of braced wall panel has the double 2x material as spec.
Approved for cover.
Inspector Comments:
02/04/2015PassTed DyeCommercial Sheetrock/Drywall Inspection
02/12/2015FailTed DyeCommercial Framing/Structure Inspection
02/17/2015PassTed DyeCommercial Framing/Structure Inspection
02/19/2015PassQuinton OwensCommercial Insulation Inspection
Window U-factor = .31Inspector Comments:
04/10/2015FailQuinton OwensCommercial Building Final
04/16/2015N/AQuinton OwensSidewalk Inspection
N/A. Existing building already with sidewalk (except at driveway entrance - all
asphalt).
Inspector Comments:
4/15: Final reinspection done. Did not see address #'s on front of building (was
told temporary #'s installed) - will reinspect with parking lot. Bathrooms grab
bars are corrected.
Inspector Comments:
04/20/2015FailQuinton OwensCommercial Building Final
4/20: Parking lot paved & striped (see correction for ADA parking). Access from
parking to entrance has a ramp that requires handrails.
Inspector Comments:
04/24/2015PassQuinton OwensCommercial Building Final
After further review, handrails not required at ramp. Other items completed.Inspector Comments:
Electrical Inspection Type
12/10/2014PassBret StoddardCOM & MFR Electrical Service Inspection
02/17/2015PassBret StoddardCommercial Electrical Rough-in
04/10/2015FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
04/15/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Page 1 of 2
(Continued)
Permit Details Permit Number: 14-00467
Edge Real Estate - Addition
38 S 2nd E
Commercial Addition
Permit Status of (Open) as of Report Date: 07/09/2019 12:11 pm
Permit
Inspection
Summary
Mechanical Inspection Type
02/12/2015PassDon AllenHVAC Rough-in
hvac rough in looks goodInspector Comments:
04/10/2015PassDon AllenHVAC Final Inspection
Good for the c/oInspector Comments:
Plumbing Inspection Type
02/03/2015PassDon AllenPlumbing Rough-in
plumbing roughin is good to coverInspector Comments:
04/10/2015FailDon AllenPlumbing Final Inspection
The gpm on the water heater is to small for both sinks in the bathroom.Inspector Comments:
04/15/2015FailDon AllenPlumbing Final Inspection
need to have hot water fixed nthe bathroomsInspector Comments:
04/20/2015PassDon AllenPlumbing Final Inspection
All good for the c/oInspector Comments:
Page 2 of 2