Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00517 - Papa John's Tenant ImprovementPermit Inspection Summary Permit Status of (Open) as of Report Date: 07/05/2019 9:17 am Permit Details Permit Number: 14-00517 Papa John's Tenant Improvement 76 S 2nd W Commercial Tenant Finish Permit Issued Date: 12/15/2014 Permit Inspection Statistics 15Total Inspections Completed: 14Total Inspections Passed: Inspection Pass Rate: 93.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 12/11/2014PassQuinton OwensCommercial Building Final 12/12/2014PassQuinton OwensCommercial Framing/Structure Inspection Framing inspection done as part of Northpoint Building C permit (13-00493). Penetrations added between floors and into shaft for this permit have been inspected and approved. Inspector Comments: 12/18/2014PassQuinton OwensCommercial Insulation Inspection Insulation completed as part of Northpoint Building C (13-00493).Inspector Comments: 10/20/2015N/AQuinton OwensCommercial Sheetrock/Drywall Inspection Inspected as part of Northpoint C building permit.Inspector Comments: Electrical Inspection Type 11/12/2014PassBret StoddardCommercial Electrical Rough-in 12/12/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Fire Inspection Type 12/15/2014PassBret StoddardFire Alarm Final Inspection 10/15/2015PassDale PickeringFire Sprinkler Rough-in 10/21/2015PassDale PickeringFire Sprinkler Final Inspection 10/21/2015PassDale PickeringFire Department Final Inspection Mechanical Inspection Type 12/18/2014PassDon AllenHVAC Rough-in Good to cover the mechanical rough inInspector Comments: 10/20/2015PassDon AllenHVAC Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 14-00517 Papa John's Tenant Improvement 76 S 2nd W Commercial Tenant Finish Permit Status of (Open) as of Report Date: 07/05/2019 9:17 am Permit Inspection Summary Plumbing Inspection Type 12/15/2014PassDon AllenPlumbing Final Inspection need to fix floor drains in the kitchenInspector Comments: 12/18/2014PassDon AllenPlumbing Rough-in good to cover the plumbing rough inInspector Comments: 01/06/2015PassDon AllenPlumbing Final Inspection Good for the c/oInspector Comments: Page 2 of 2