HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00050 - Idaho Central Credit UnionPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 07/03/2019 9:57 am
Permit Details Permit Number: 14-00050
Idaho Central Credit Union
673 N 2nd E
Building - Commercial
Permit Issued Date: 04/03/2014
Permit Inspection Statistics
30Total Inspections Completed:
27Total Inspections Passed:
Inspection Pass Rate: 90.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
08/12/2014PassNatalie PowellPlanning and Zoning Final Inspection
08/19/2014FailJoel GrayPublic Works Final Inspection
1. Ring and cover for storm drain needs raised.
2. Water meter needs to be supported in a vertical position.
3. Has backflow device for sprinklers been tested.
Inspector Comments:
02/03/2015PassJoel GrayPublic Works Final Inspection
Prior items satisfactorily completed.Inspector Comments:
Building Inspection Type
04/14/2014FailTed DyeFooting Inspection
Rebar in F-1 footing is spread to far and not enough bar.
plans call for 8" centers each way on two levels.
Repair and call for reinspect.
Inspector Comments:
04/15/2014PassTed DyeFooting Inspection
corrections made to f-1 footing.Inspector Comments:
04/22/2014PassQuinton OwensFoundation Inspection
4/21: Inspected shortly after 12 pm. Much of the forms remain to be installed.
Rebar meets plan requirements EXCEPT on east side of building at jog in
foundation some horizontal rebar is missing. I will reinspect before pour.
Reinspected and approved early next morning. MTI special inspector on site.
Inspector Comments:
04/28/2014PassQuinton OwensFooting Inspection
Interior spot footings.Inspector Comments:
05/01/2014PassTed DyeFooting Inspection
05/05/2014PassTed DyeFooting Inspection
05/21/2014PassQuinton OwensFooting Inspection
piers at drive through columns for canopy and trash enclosure. Special inspector
on site for pour.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 14-00050
Idaho Central Credit Union
673 N 2nd E
Building - Commercial
Permit Status of (Open) as of Report Date: 07/03/2019 9:57 am
Permit
Inspection
Summary
05/23/2014FailQuinton OwensSheeting
Only a couple places need to be nailed on east side of building (see green paint)
and at parapet on south and west side of roof section with access opening. Some
anchors being fixed and will need studs put in and nailed to. Very nice job
keeping nails heads flush.
Inspector Comments:
06/10/2014PassQuinton OwensFraming/Structure Inspection
Includes but not limited to interior sheathing, steel stud framing, wood framing,
& hold downs plus some layout items.
Inspector Comments:
06/12/2014PassTed DyeInsulation Inspection
06/12/2014PassTed DyeInsulation Inspection
6" of friction fit with vapor barrier on outside walls. Inside walls had friction fit.Inspector Comments:
06/13/2014PassTed DyeSheetrock/Drywall Inspection
Drywall inspection on the back, north rooms only.Inspector Comments:
08/12/2014PassQuinton OwensCommercial Building Final
Building Final complete.Inspector Comments:
09/19/2014PassJoel GraySidewalk Inspection
Electrical Inspection Type
04/25/2014PassBret StoddardElectrical Underground Inspection
05/01/2014PassSAUREY AMANDAElectrical Underground Inspection
05/21/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
06/10/2014PassBret StoddardCommercial Electrical Rough-in
Partial approval for cover on interior walls, per Gabe Madrid.Inspector Comments:
07/03/2014PassBret StoddardCOM & MFR Electrical Service Inspection
08/07/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
08/14/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Fire Inspection Type
08/14/2014PassDale PickeringFire Department Final Inspection
Mechanical Inspection Type
07/28/2014PassDon AllenHVAC Final Inspection
All good for the c/oInspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 14-00050
Idaho Central Credit Union
673 N 2nd E
Building - Commercial
Permit Status of (Open) as of Report Date: 07/03/2019 9:57 am
Permit
Inspection
Summary
Plumbing Inspection Type
04/02/2014PassDon AllenPlumbing Sewer
all good to cover the sewer lineInspector Comments:
04/24/2014PassDon AllenPlumbing Underground Inspection
good to cover the ground workInspector Comments:
06/05/2014PassDon AllenPlumbing Rough-in
All good to cover the rough in on the plumbingInspector Comments:
08/07/2014PassDon AllenPlumbing Final Inspection
All good for the c/oInspector Comments:
Page 3 of 3