HomeMy WebLinkAboutCOMCHECK - 19-00401 - Pizza Hut - Tenant Remodel�( COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: Pizza Hut #2175
Project Type: Alteration
Construction Site: Owner/Agent:
163 W Main St.
Rexburg, ID
Allowed Interior Lighting Power
A
Area Category
1 -Lobby (Common Space Types:Lobby - General)
2 -Kitchen Area (Common Space Types:Food Preparation)
3 -Restroom (Common Space Types:Restrooms)
4 -Storage (Common Space Types:Storage -50 - <=1000 sq.ft.)
Proposed Interior Lighting Power
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
Lobby ( Common Space TyLobby General Zan cq ftj
LED 1: C: LED Downlight: Other:
Track lighting 1: D,J: Track Lighting: Wattage based on 10 feet of track
Kitchen Area ( Common Space Types�Food Preparation 945 sa•ft•)
LED 2: A: 2x4 LED Troffer: Other:
LED 3: A5: 2x2 LED Troffer: Other:
Restroom ( Common Space Type&Restrooms 61 sq. t )
LED 4: A: 2x4 LED Troffer: Other:
3toraae ( Common Space Typ torage >-50 x1000 q ft 225 sq -ft.)
LED 5: A: 2x4 LED Troffer: Other:
Designer/Contractor:
Brian Timmons, P.E.
14817 W. 95th Street
Lenexa, KS 66215
B
C
D
Floor Area
Allowed
Allowed Wafts
(ft2)
Wafts / ft2
(B X C)
240
0.90
216
945
1.21
1143
61
0.98
60
225
0.63
142
Total Allowed Watts =
1561
B C D E
Lamps/ # of Fixture (C X D)
Fixture Fixtures Waft.
1 13
12
156
0 0
300
300
1 15
45
675
1 1
44
44
1 1
45
45
1 5 45 225
Total Proposed Watts = 1444
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1,1.0 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 1 of 14
Katherine Koby - Electrical Designer l`��i-K a_ k4 " 6/20/19
Name - Title Signature Date
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 2 of 14
�( COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Information
Energy Code:
2015 IECC
Project Title:
Pizza Hut #2175
Location:
Rexburg, Idaho
Climate Zone:
6b
Project Type:
Alteration
Construction Site: Owner/Agent:
163 W Main St.
Rexburg, ID
Mechanical Systems List
Quantity System Type & Description
Designer/Contractor:
Brian Timmons, P.E.
14817 W. 95th Street
Lenexa, KS 66215
RTU -1,2 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h
Proposed Efficiency = 80.50% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 61 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER
Fan System: RTU -1,2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1950 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade
RTU -3 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h
Proposed Efficiency = 81.10% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 51 kBtu/h, Air -Cooled Condenser, Unknown Economizer
Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER
Fan System: RTU -3 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 1600 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade
WHO03:
Gas Storage Water Heater, Capacity: 60 gallons, Input Rating: 75 kBtu/h
No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Aaron Angel - Mechanical Designer 6/20/19
Name - Title Signature Date
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 3 of 14
COMcheck Software Version 4.1.1.0
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Reg.11)
C103.2
i Plans, specifications, and/or
❑Complies
[PR2]1
:calculations provide all information
❑Does Not
;with which compliance can be
'determined for the mechanical
❑Not Observable;
systems and equipment and
`❑Not Applicable
,document where exceptions to the
:standard are claimed. Load
calculations per acceptable
:engineering standards and
(handbooks.
C103.2
;Plans, specifications, and/or❑Complies
[PR3]1
calculations provide all information
❑Does Not
with which compliance can be
; determined for the service water
:❑Not Observable
heating systems and equipment and
❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
j system sized per manufacturer's
sizing guide.
C103.2
:Plans, specifications, and/or ;❑Complies
[PR4)1
:calculations provide all information :❑Does
Not
:with which compliance can be
;determined for the interior lighting '❑Not
Observable
and electrical systems and equipment
❑Not Applicable
:and document where exceptions to
;the standard are claimed. Information
provided should include interior
,lighting power calculations, wattage of;
:
bulbs and ballasts, transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID,cck Page 4 of 14
Section
# Footing / Foundation Inspection Complies? Comments/Assumptions
& Reo.ID
C403.2.4. i Snow/ice melting system sensors for ❑Complies
5, ;future connection to controls. Freeze ;❑Does Not
C403.2.4. :protection systems have automatic
6 ;controls installed. :❑Not Observable;
[FO9]3 ;❑Not Applicable ;
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 5 of 14
Section
#
Plumbing Rough -in Inspection
Complies?
Comments/Assumptions
& Re .ID
C404.5,
Heated water supply piping conforms ;❑Complies
C404.5.1,
to pipe length and volume :❑Does Not
C404.5.2 ;
[PL6]3
requirements. Refer to section details. j
:❑Not Observable;
❑Not Applicable
C404.5, ;,Heated
water supply piping conforms ❑Complies
C404.5.1, .to
pipe length and volume ;❑Does Not
C404.5.2 ;
[PL6]3
requirements. Refer to section details.
a❑Not Observable
❑Not Applicable
C404.5, :Heated
water supply piping conforms❑Complies
C404.5.1, :to
pipe length and volume ❑Does Not
C404.5.2 ;
[PL6]3
requirements. Refer to section details. ;
,❑Not Observable';
'.❑Not Applicable ;
C404.6.3
Pumps that circulate water between a❑Complies
[PL7]3
heater and storage tank have controls :❑Does Not
;that
limit operation from startup to ;[-]Not Observable',
<= 5 minutes after end of heating
cycle. ❑Not Applicable
C404,6.3
Pumps that circulate water between a❑Complies
[PL7]3
heater and storage tank have controls ;❑Does Not
;that
limit operation from startup to ❑Not Observable;
<= 5 minutes after end of heating
icycle. ❑Not Applicable ;
C404.6.3
Pumps that circulate water between a❑Complies
[PL7]3 ;
heater and storage tank have controls !❑Does Not
;that
limit operation from startup to 3
❑Not Observable ;
;
<= 5 minutes after end of heating
cycle. ;❑Not Applicable
C404.7
Water distribution system that pumps ;❑Complies
[PL8]3 :water
from a heated -water supply =❑Does Not
pipe back to the heated -water source :❑Not Observable
through a cold -water supply pipe is a
:demand
❑Not
recirculation water system. Applicable
Pumps within this system have j
controls that start the pump upon ;
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
C404.7
Mater distribution system that pumps !❑Complies
[PL8]3 :water
from a heated -water supply ❑Does Not
;
;through
pipe back to the heated -water source
a cold -water supply pipe is a ❑Not Observable
demand recirculation water system.❑Not Applicable
;Pumps
within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering
the cold -water piping to
104°F.
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 6 of 14
Section
# Plumbing Rough -in Inspection Complies? Comments/Assumptions
& Re .ID
C404.7 Water distribution system that pumps EComplies
[PL8]3 !water from a heated -water supply ;❑Does Not
pipe back to the heated -water source
;through a cold -water supply pipe is a []Not Observable:
demand recirculation water system. :❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
;entering the cold -water piping to
;104°F.
Additional Comments/Assumptions:
1 JHigh Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 7 of 14
Section
#
Mechanical Rough -in Inspection
Complies?
Comments/Assumptions
& Re .ID
C402.2.6
;Thermally ineffective panel surfaces of%❑Complies
[ME41]3
sensible heating panels have
;❑Does Not
;insulation >= R-3.5.
❑Not Observable,
}❑Not Applicable
C403.2.13
: Unenclosed spaces that are heated
;❑Complies
[ME71]2
;use only radiant heat.
�❑Does Not
❑Not Observable;
j❑Not Applicable
C403.2.3
HVAC equipment efficiency verified.❑Complies
See the Mechanical Systems list for values.
[ME55]2
;❑Does Not
❑Not Observable
j❑Not Applicable
C403.2.4.
Fault detection and diagnostics
;❑Complies
7
installed with air-cooled unitary DX
;❑Does Not
[ME113]2
units having economizers.
❑Not Observable'
❑Not Applicable
C403.2.6.
'Demand control ventilation provided
's❑Complies
1
`for spaces >500 ft2 and >25
:❑Does Not
[ME5911
;people/1000 ft2 occupant density and
;❑Not Observable:
served by systems with air side
economizer, auto modulating outside
;❑Not Applicable
air damper control, or design airflow
>3,000 cfm.
C403.2.6.
Enclosed parking garage ventilation❑Complies
2
has automatic contaminant detection
;❑Does Not
[ME115]3
and capacity to stage or modulate
;fans to 50% or less of design capacity.
;❑Not Observable
❑Not Applicable
C403.2.7
Exhaust air energy recovery on❑Complies
[ME57]1
;systems meeting Table C403.2.7(1)
EDoes Not
;and C403.2.7(2).
;❑Not Observable ;
❑Not Applicable
C403.2.8
;,Kitchen exhaust systems comply with
;❑Complies
[ME116]3
i replacement air and conditioned
;❑Does Not
; supply air limitations, and satisfy hood
Observable
rating requirements and maximum
exhaust rate criteria.
:❑Not
;❑Not Applicable
C403.2.9
HVAC ducts and plenums insulated.
;❑Complies
[ME60]2
; Where ducts or plenums are installed
❑Does Not
in or under a slab, verification may
:❑Not Observable
need to occur during Foundation
i Inspection.
;❑Not Applicable
C403.2.9
'Ducts and plenums sealed based on
;❑Complies
[ME10]2
static pressure and location.
;❑Does Not
❑Not Observable
❑Not Applicable
C403.2.9.
i Ductwork operating >3 in. water
;❑Complies
1.3
column requires air leakage testing.
;❑Does Not
[ME11]3
j❑Not Observable;
❑Not Applicable
C403.2.9.
; Ductwork operating >3 in, water
;❑Complies
1.3
=column requires air leakage testing.
:❑Does Not
[ME11]3
,❑Not Observable ;
t❑Not Applicable
111 High Impact (Tier 1) 12 Medium Impact (Tier 2) 13 1 Low impact( 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 8 of 14
Section
#Mechanical Rough -In Inspection
& Re .ID
Complies?
Comments/Assumptions
C403.3 'Air economizers provided where !❑Complies
[ME62]1 required, meet the requirements for
:❑Does Not
design capacity, control signal,
;ventilation controls, high -limit shut-off„❑Not
Observable;
:integrated economizer control, and ;❑Not
Applicable
provide a means to relieve excess
:outside air during operation.
j
C403.4.4. Multiple zone VAV systems with DDC ;❑Complies
6 ;of
;See the Mechanical Systems list for values.
individual zone boxes have static
❑Does Not
[ME110]3pressure setpoint reset controls.
,❑Not
Observable;
❑Not Applicable
C403.4.4. ; Multiple zone VAV systems with DDC ;❑Complies
6 .of individual zone boxes have static
,See the Mechanical Systems list for values.
❑Does Not
[ME110]3 ;pressure setpoint reset controls.
❑Not Observable
❑Not Applicable
C404.2.1 'Gas-fired water -heating equipment ;❑Complies
[ME111]2 : installed in new buildings: where a ❑Does Not
singular piece of water -heating
equipment >= 1,000 kBtu/h serves :❑Not Observable
:the entire building, thermal efficiency ;❑Not Applicable
>= 90 Et. Where multiple pieces of
water -heating equipment serve the
:building with combined rating >_
1,000 kBtu/h, the combined input -
capacity -weighted -average thermal
efficiency >= 90 Et. Exclude input
rating of equipment in individual
i dwelling units and equipment <= 100
kBtu/h.
C408.2.2. ;Air outlets andzone terminal devices ;❑Complies
1 ' have means for air balancing. EDoes Not ;
[ME53]3
;❑Not Observable
❑Not Applicable
C403.5, !Refrigerated display cases, walk-in❑Complies
C403.5.1, I coolers or walk-in freezers served by ❑Does Not
C403.5.2 ;remote compressors and remote
[ME123]3 ;condensers not located in a T❑Not Observable;
condensing unit, have fan -powered ;❑Not Applicable
condensers that comply with Sections
C403.5.1 and refrigeration compressor;
systems that comply with C403.5.2..
Haaitionai comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID,cck Page 9 of 14
Section
#
Rough -in Electrical Inspection
Complies?
7-
Comments/Assumptions
& Re .ID
C405.2.1
:Lighting controls installed to uniformly❑Complies
[EL15]1
:reduce the lighting load by at least
:❑Does Not
'50%.
3
❑Not Observable:
❑Not Applicable
C405.2.1 ;Occupancy
sensors installed in ;❑Complies
[EL18]1
:required spaces. j❑Does
Not '
❑Not Observable:
j❑Not
Applicable
C405.2.1, ;Independent
lighting controls installed ;❑Complies
C405.2.2.
per approved lighting plans and all ?❑Does
Not
3 ;manual
[EL23]2 ;visible
controls readily accessible and;
to occupants.
❑Not Observable;
❑Not Applicable
C405.2.2. ;Automatic
controls to shut off all ;❑Complies
1 ;building
lighting installed in all ;❑Does
Not
[EL22]2
buildings.
:[-]Not
Observable
❑Not Applicable
C405.2.3 ;
Daylight zones provided with❑Complies
[EL16]2 ;individual
controls that control the
❑Does Not
(lighting.❑Not
lights independent of general area j
Observable;
❑Not Applicable
C405.2.3,
Primary sidelighted areas are❑Complies
C405.2.3.
equipped with required lighting :❑Does
Not a
11
C405.2.3.
controls.
;❑Not
Observable
2
❑Not Applicable
[EL20]1 j
C405.2.3, :Enclosed
spaces with daylight area ;[]Complies
C405.2.3.
C405.2.3. �
under skylights and rooftop monitors !,❑Does Not
1,
C405.2.3. ;
are equipped with required lighting❑Not Observable
controls.
311Not
Applicable
[EL21]1
C405.2.4
Separate lighting control devices for ;❑Complies
[EL4]1 :specific
uses installed per approved ;❑Does Not
lighting
plans.
i❑Not Observable:
j❑Not Applicable
C405.2.4 ;Additional interior lighting power ;❑Complies
[EL8]1 ;allowed for special functions per the ';❑Does Not
;approved lighting plans and is
Observable;
;automatically controlled and❑Not
❑Not
separated from general lighting. Applicable j
C405.3 Exit signs do not exceed 5 watts per❑Complies
[EL6]1 face.❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 10 of 14
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Re .ID
C303.3,
I Furnished O&M instructions for
;❑Complies
C408.2.5.
:systems and equipment to the
;❑Does Not
2 ;
[F]17]3 ;
building owner or designated
representative.
❑Not Observable
❑Not Applicable
C303.3, :Furnished
O&M manuals for HVAC
I❑Complies
C408.2.5. :systems
within 90 days of system
❑Does Not
3;acceptance.
[FI8]3
'❑Not Observable;
s❑Not Applicable
C403.2.2 ;HVAC
systems and equipment
;❑Complies
[F127]3
capacity does not exceed calculated
❑Does Not
loads.
❑Not Observable;
❑Not Applicable
C403.2.4. ;Heating
and cooling to each zone is
i❑Complies
1 'controlled
by a thermostat control.
;❑Does Not
[F147]3 j
Minimum one humidity control device
per installed
❑Not Observable:
humidification/dehumidification❑Not
Applicable
system.
C403.2.4.
Heating and cooling to each zone is❑Complies
1 ;controlled
by a thermostat control.
❑Does Not
(FI47]3 ;
Minimum one humidity control device
per installed
;❑Not Observable
humidification/dehumidification
;❑Not Applicable
j
system.
C403.2.4, ;Thermostatic
controls have a 5 °F '❑Complies
1.2 ideadband.
;❑Does
Not
[F138]3
:[--]Not
Observable:
❑Not Applicable
C403.2.4. ;Temperature
controls have setpoint❑Complies
1.3 :overlap
restrictions. j❑Does
Not
[F120]3
❑Not Observable:
❑Not Applicable
C403.2.4. ;
Each zone equipped with setback ;❑Complies
2 ;controls
using automatic time clock or `❑Does
Not
[F139]3 :programmable
control system.
:❑Not
Observable;
❑Not Applicable
C403.2.4. ;Automatic
Controls: Setback to 55°F:
;❑Complies
[]Complies
2.1,
(heat) and 85°F (cool); 7-day clock, 2-
❑Does Not
C403.2.4.
2.2 I
hour occupant override, 10-hour
backup
❑Not Observable
[F140]3
;❑Not
Applicable
C403.2.4, ;Systems
include optimum start ;❑Complies
2.3
controls. ;❑Does
Not
[FI41]3
❑Not Observable:
❑Not Applicable ,
C403.2.4.:Systems
include optimum start ;❑Complies
2.3
controls.
❑Does Not
[FI4113
❑Not Observable;
❑Not Applicable
C404.3 ;Heat
traps installed on supply and ;❑Complies
[Fl11]3 :discharge
piping of non-circulating
❑Does Not
systems.
❑Not Observable;
❑Not Applicable
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date: 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 11 of 14
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Re .113
C404A
;All piping insulated in accordance with ;❑Complies
[F125]2
section details and Table C403.2.10.❑Does
Not
,
❑Not Observable;
❑Not Applicable
C405.4.1
;,Interior installed lamp and fixture
❑Complies See the Interior lighting fixture schedule for values.
[F118]1
lighting power is consistent with what
:❑Does Not
is shown on the approved lighting
❑Not Observable
; plans, demonstrating proposed watts
are less than or equal to allowed
I
;❑Not Applicable
j watts.
C408.2.1
; Commissioning plan developed by❑Complies
[F128]1
;registered design professional or❑Does
Not
approved agency.
❑Not Observable
❑Not Applicable
C408.2.3.
HVAC equipment has been tested to
;❑Complies
1
ensure proper operation.
:❑Does Not
(F13111
❑Not Observable;
❑Not Applicable
C408.2.3.
`: HVAC control systems have been
UComplies
2
;tested to ensure proper operation,
:❑Does Not
[FI10]1
calibration and adjustment of controls.'❑Not
Observable'
j❑Not Applicable
C408,2.3.
Economizers have been tested to
;❑Complies
3
ensure proper operation.❑Does
Not
(FI3211
I❑Not Observable
❑Not Applicable
C408.2.4
Preliminary commissioning report
;❑Complies
[F129]1
completed and certified by registered
❑Does Not
;design professional or approved
;❑Not Observable:
; agency.
❑Not Applicable
C408.2.5.
Furnished HVAC as -built drawings❑Complies
1
!,submitted within 90 days of system❑Does
Not
[F17]3
;acceptance.
❑Not Observable:
❑Not Applicable
C408.2.5.
Furnished as -built drawings for
;❑Complies
1
electric power systems within 90 days
!❑Does Not
[FI16]3
;of system acceptance.
E❑Not Observable;
❑Not Applicable
C408.2.5.
;An air and/or hydronic system
:.❑Complies
3
balancing report is provided for HVAC
;❑Does Not
[F14311
systems.
;❑Not Observable
❑Not Applicable
C408.2.5.
; Final commissioning report due to
`❑Complies
4
building owner within 90 days of
;❑Does Not
[F130]1
:receipt of certificate of occupancy.
;❑Not Observable ;
❑Not Applicable
C408.3
:,Lighting systems have been tested to
;❑Complies
[F13311
!ensure proper calibration, adjustment,
❑Does Not
programming, and operation.
;❑Not Observable
❑Not Applicable j
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 Medium Impact (Tier 2) 1 3 Low Impact (Tier 3)
Project Title: Pizza Hut #2175 Report date; 06/20/19
Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 12 of 14