Loading...
HomeMy WebLinkAboutCOMCHECK - 19-00401 - Pizza Hut - Tenant Remodel�( COMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Pizza Hut #2175 Project Type: Alteration Construction Site: Owner/Agent: 163 W Main St. Rexburg, ID Allowed Interior Lighting Power A Area Category 1 -Lobby (Common Space Types:Lobby - General) 2 -Kitchen Area (Common Space Types:Food Preparation) 3 -Restroom (Common Space Types:Restrooms) 4 -Storage (Common Space Types:Storage -50 - <=1000 sq.ft.) Proposed Interior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lobby ( Common Space TyLobby General Zan cq ftj LED 1: C: LED Downlight: Other: Track lighting 1: D,J: Track Lighting: Wattage based on 10 feet of track Kitchen Area ( Common Space Types�Food Preparation 945 sa•ft•) LED 2: A: 2x4 LED Troffer: Other: LED 3: A5: 2x2 LED Troffer: Other: Restroom ( Common Space Type&Restrooms 61 sq. t ) LED 4: A: 2x4 LED Troffer: Other: 3toraae ( Common Space Typ torage >-50 x1000 q ft 225 sq -ft.) LED 5: A: 2x4 LED Troffer: Other: Designer/Contractor: Brian Timmons, P.E. 14817 W. 95th Street Lenexa, KS 66215 B C D Floor Area Allowed Allowed Wafts (ft2) Wafts / ft2 (B X C) 240 0.90 216 945 1.21 1143 61 0.98 60 225 0.63 142 Total Allowed Watts = 1561 B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Waft. 1 13 12 156 0 0 300 300 1 15 45 675 1 1 44 44 1 1 45 45 1 5 45 225 Total Proposed Watts = 1444 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1,1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 1 of 14 Katherine Koby - Electrical Designer l`��i-K a_ k4 " 6/20/19 Name - Title Signature Date Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 2 of 14 �( COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Pizza Hut #2175 Location: Rexburg, Idaho Climate Zone: 6b Project Type: Alteration Construction Site: Owner/Agent: 163 W Main St. Rexburg, ID Mechanical Systems List Quantity System Type & Description Designer/Contractor: Brian Timmons, P.E. 14817 W. 95th Street Lenexa, KS 66215 RTU -1,2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h Proposed Efficiency = 80.50% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 61 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER Fan System: RTU -1,2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1950 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade RTU -3 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h Proposed Efficiency = 81.10% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 51 kBtu/h, Air -Cooled Condenser, Unknown Economizer Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER Fan System: RTU -3 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 1600 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade WHO03: Gas Storage Water Heater, Capacity: 60 gallons, Input Rating: 75 kBtu/h No minimum efficiency requirement applies Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Aaron Angel - Mechanical Designer 6/20/19 Name - Title Signature Date Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 3 of 14 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Reg.11) C103.2 i Plans, specifications, and/or ❑Complies [PR2]1 :calculations provide all information ❑Does Not ;with which compliance can be 'determined for the mechanical ❑Not Observable; systems and equipment and `❑Not Applicable ,document where exceptions to the :standard are claimed. Load calculations per acceptable :engineering standards and (handbooks. C103.2 ;Plans, specifications, and/or❑Complies [PR3]1 calculations provide all information ❑Does Not with which compliance can be ; determined for the service water :❑Not Observable heating systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Hot water j system sized per manufacturer's sizing guide. C103.2 :Plans, specifications, and/or ;❑Complies [PR4)1 :calculations provide all information :❑Does Not :with which compliance can be ;determined for the interior lighting '❑Not Observable and electrical systems and equipment ❑Not Applicable :and document where exceptions to ;the standard are claimed. Information provided should include interior ,lighting power calculations, wattage of; : bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID,cck Page 4 of 14 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Reo.ID C403.2.4. i Snow/ice melting system sensors for ❑Complies 5, ;future connection to controls. Freeze ;❑Does Not C403.2.4. :protection systems have automatic 6 ;controls installed. :❑Not Observable; [FO9]3 ;❑Not Applicable ; Additional Comments/Assumptions: 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 5 of 14 Section # Plumbing Rough -in Inspection Complies? Comments/Assumptions & Re .ID C404.5, Heated water supply piping conforms ;❑Complies C404.5.1, to pipe length and volume :❑Does Not C404.5.2 ; [PL6]3 requirements. Refer to section details. j :❑Not Observable; ❑Not Applicable C404.5, ;,Heated water supply piping conforms ❑Complies C404.5.1, .to pipe length and volume ;❑Does Not C404.5.2 ; [PL6]3 requirements. Refer to section details. a❑Not Observable ❑Not Applicable C404.5, :Heated water supply piping conforms❑Complies C404.5.1, :to pipe length and volume ❑Does Not C404.5.2 ; [PL6]3 requirements. Refer to section details. ; ,❑Not Observable'; '.❑Not Applicable ; C404.6.3 Pumps that circulate water between a❑Complies [PL7]3 heater and storage tank have controls :❑Does Not ;that limit operation from startup to ;[-]Not Observable', <= 5 minutes after end of heating cycle. ❑Not Applicable C404,6.3 Pumps that circulate water between a❑Complies [PL7]3 heater and storage tank have controls ;❑Does Not ;that limit operation from startup to ❑Not Observable; <= 5 minutes after end of heating icycle. ❑Not Applicable ; C404.6.3 Pumps that circulate water between a❑Complies [PL7]3 ; heater and storage tank have controls !❑Does Not ;that limit operation from startup to 3 ❑Not Observable ; ; <= 5 minutes after end of heating cycle. ;❑Not Applicable C404.7 Water distribution system that pumps ;❑Complies [PL8]3 :water from a heated -water supply =❑Does Not pipe back to the heated -water source :❑Not Observable through a cold -water supply pipe is a :demand ❑Not recirculation water system. Applicable Pumps within this system have j controls that start the pump upon ; receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. C404.7 Mater distribution system that pumps !❑Complies [PL8]3 :water from a heated -water supply ❑Does Not ; ;through pipe back to the heated -water source a cold -water supply pipe is a ❑Not Observable demand recirculation water system.❑Not Applicable ;Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water :entering the cold -water piping to 104°F. 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 6 of 14 Section # Plumbing Rough -in Inspection Complies? Comments/Assumptions & Re .ID C404.7 Water distribution system that pumps EComplies [PL8]3 !water from a heated -water supply ;❑Does Not pipe back to the heated -water source ;through a cold -water supply pipe is a []Not Observable: demand recirculation water system. :❑Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water ;entering the cold -water piping to ;104°F. Additional Comments/Assumptions: 1 JHigh Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 7 of 14 Section # Mechanical Rough -in Inspection Complies? Comments/Assumptions & Re .ID C402.2.6 ;Thermally ineffective panel surfaces of%❑Complies [ME41]3 sensible heating panels have ;❑Does Not ;insulation >= R-3.5. ❑Not Observable, }❑Not Applicable C403.2.13 : Unenclosed spaces that are heated ;❑Complies [ME71]2 ;use only radiant heat. �❑Does Not ❑Not Observable; j❑Not Applicable C403.2.3 HVAC equipment efficiency verified.❑Complies See the Mechanical Systems list for values. [ME55]2 ;❑Does Not ❑Not Observable j❑Not Applicable C403.2.4. Fault detection and diagnostics ;❑Complies 7 installed with air-cooled unitary DX ;❑Does Not [ME113]2 units having economizers. ❑Not Observable' ❑Not Applicable C403.2.6. 'Demand control ventilation provided 's❑Complies 1 `for spaces >500 ft2 and >25 :❑Does Not [ME5911 ;people/1000 ft2 occupant density and ;❑Not Observable: served by systems with air side economizer, auto modulating outside ;❑Not Applicable air damper control, or design airflow >3,000 cfm. C403.2.6. Enclosed parking garage ventilation❑Complies 2 has automatic contaminant detection ;❑Does Not [ME115]3 and capacity to stage or modulate ;fans to 50% or less of design capacity. ;❑Not Observable ❑Not Applicable C403.2.7 Exhaust air energy recovery on❑Complies [ME57]1 ;systems meeting Table C403.2.7(1) EDoes Not ;and C403.2.7(2). ;❑Not Observable ; ❑Not Applicable C403.2.8 ;,Kitchen exhaust systems comply with ;❑Complies [ME116]3 i replacement air and conditioned ;❑Does Not ; supply air limitations, and satisfy hood Observable rating requirements and maximum exhaust rate criteria. :❑Not ;❑Not Applicable C403.2.9 HVAC ducts and plenums insulated. ;❑Complies [ME60]2 ; Where ducts or plenums are installed ❑Does Not in or under a slab, verification may :❑Not Observable need to occur during Foundation i Inspection. ;❑Not Applicable C403.2.9 'Ducts and plenums sealed based on ;❑Complies [ME10]2 static pressure and location. ;❑Does Not ❑Not Observable ❑Not Applicable C403.2.9. i Ductwork operating >3 in. water ;❑Complies 1.3 column requires air leakage testing. ;❑Does Not [ME11]3 j❑Not Observable; ❑Not Applicable C403.2.9. ; Ductwork operating >3 in, water ;❑Complies 1.3 =column requires air leakage testing. :❑Does Not [ME11]3 ,❑Not Observable ; t❑Not Applicable 111 High Impact (Tier 1) 12 Medium Impact (Tier 2) 13 1 Low impact( 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 8 of 14 Section #Mechanical Rough -In Inspection & Re .ID Complies? Comments/Assumptions C403.3 'Air economizers provided where !❑Complies [ME62]1 required, meet the requirements for :❑Does Not design capacity, control signal, ;ventilation controls, high -limit shut-off„❑Not Observable; :integrated economizer control, and ;❑Not Applicable provide a means to relieve excess :outside air during operation. j C403.4.4. Multiple zone VAV systems with DDC ;❑Complies 6 ;of ;See the Mechanical Systems list for values. individual zone boxes have static ❑Does Not [ME110]3pressure setpoint reset controls. ,❑Not Observable; ❑Not Applicable C403.4.4. ; Multiple zone VAV systems with DDC ;❑Complies 6 .of individual zone boxes have static ,See the Mechanical Systems list for values. ❑Does Not [ME110]3 ;pressure setpoint reset controls. ❑Not Observable ❑Not Applicable C404.2.1 'Gas-fired water -heating equipment ;❑Complies [ME111]2 : installed in new buildings: where a ❑Does Not singular piece of water -heating equipment >= 1,000 kBtu/h serves :❑Not Observable :the entire building, thermal efficiency ;❑Not Applicable >= 90 Et. Where multiple pieces of water -heating equipment serve the :building with combined rating >_ 1,000 kBtu/h, the combined input - capacity -weighted -average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual i dwelling units and equipment <= 100 kBtu/h. C408.2.2. ;Air outlets andzone terminal devices ;❑Complies 1 ' have means for air balancing. EDoes Not ; [ME53]3 ;❑Not Observable ❑Not Applicable C403.5, !Refrigerated display cases, walk-in❑Complies C403.5.1, I coolers or walk-in freezers served by ❑Does Not C403.5.2 ;remote compressors and remote [ME123]3 ;condensers not located in a T❑Not Observable; condensing unit, have fan -powered ;❑Not Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor; systems that comply with C403.5.2.. Haaitionai comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID,cck Page 9 of 14 Section # Rough -in Electrical Inspection Complies? 7- Comments/Assumptions & Re .ID C405.2.1 :Lighting controls installed to uniformly❑Complies [EL15]1 :reduce the lighting load by at least :❑Does Not '50%. 3 ❑Not Observable: ❑Not Applicable C405.2.1 ;Occupancy sensors installed in ;❑Complies [EL18]1 :required spaces. j❑Does Not ' ❑Not Observable: j❑Not Applicable C405.2.1, ;Independent lighting controls installed ;❑Complies C405.2.2. per approved lighting plans and all ?❑Does Not 3 ;manual [EL23]2 ;visible controls readily accessible and; to occupants. ❑Not Observable; ❑Not Applicable C405.2.2. ;Automatic controls to shut off all ;❑Complies 1 ;building lighting installed in all ;❑Does Not [EL22]2 buildings. :[-]Not Observable ❑Not Applicable C405.2.3 ; Daylight zones provided with❑Complies [EL16]2 ;individual controls that control the ❑Does Not (lighting.❑Not lights independent of general area j Observable; ❑Not Applicable C405.2.3, Primary sidelighted areas are❑Complies C405.2.3. equipped with required lighting :❑Does Not a 11 C405.2.3. controls. ;❑Not Observable 2 ❑Not Applicable [EL20]1 j C405.2.3, :Enclosed spaces with daylight area ;[]Complies C405.2.3. C405.2.3. � under skylights and rooftop monitors !,❑Does Not 1, C405.2.3. ; are equipped with required lighting❑Not Observable controls. 311Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for ;❑Complies [EL4]1 :specific uses installed per approved ;❑Does Not lighting plans. i❑Not Observable: j❑Not Applicable C405.2.4 ;Additional interior lighting power ;❑Complies [EL8]1 ;allowed for special functions per the ';❑Does Not ;approved lighting plans and is Observable; ;automatically controlled and❑Not ❑Not separated from general lighting. Applicable j C405.3 Exit signs do not exceed 5 watts per❑Complies [EL6]1 face.❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 10 of 14 Section # Final Inspection Complies? Comments/Assumptions & Re .ID C303.3, I Furnished O&M instructions for ;❑Complies C408.2.5. :systems and equipment to the ;❑Does Not 2 ; [F]17]3 ; building owner or designated representative. ❑Not Observable ❑Not Applicable C303.3, :Furnished O&M manuals for HVAC I❑Complies C408.2.5. :systems within 90 days of system ❑Does Not 3;acceptance. [FI8]3 '❑Not Observable; s❑Not Applicable C403.2.2 ;HVAC systems and equipment ;❑Complies [F127]3 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable; ❑Not Applicable C403.2.4. ;Heating and cooling to each zone is i❑Complies 1 'controlled by a thermostat control. ;❑Does Not [F147]3 j Minimum one humidity control device per installed ❑Not Observable: humidification/dehumidification❑Not Applicable system. C403.2.4. Heating and cooling to each zone is❑Complies 1 ;controlled by a thermostat control. ❑Does Not (FI47]3 ; Minimum one humidity control device per installed ;❑Not Observable humidification/dehumidification ;❑Not Applicable j system. C403.2.4, ;Thermostatic controls have a 5 °F '❑Complies 1.2 ideadband. ;❑Does Not [F138]3 :[--]Not Observable: ❑Not Applicable C403.2.4. ;Temperature controls have setpoint❑Complies 1.3 :overlap restrictions. j❑Does Not [F120]3 ❑Not Observable: ❑Not Applicable C403.2.4. ; Each zone equipped with setback ;❑Complies 2 ;controls using automatic time clock or `❑Does Not [F139]3 :programmable control system. :❑Not Observable; ❑Not Applicable C403.2.4. ;Automatic Controls: Setback to 55°F­: ;❑Complies []Complies 2.1, (heat) and 85°F (cool); 7-day clock, 2- ❑Does Not C403.2.4. 2.2 I hour occupant override, 10-hour backup ❑Not Observable [F140]3 ;❑Not Applicable C403.2.4, ;Systems include optimum start ;❑Complies 2.3 controls. ;❑Does Not [FI41]3 ❑Not Observable: ❑Not Applicable , C403.2.4.:Systems include optimum start ;❑Complies 2.3 controls. ❑Does Not [FI4113 ❑Not Observable; ❑Not Applicable C404.3 ;Heat traps installed on supply and ;❑Complies [Fl11]3 :discharge piping of non-circulating ❑Does Not systems. ❑Not Observable; ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date: 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 11 of 14 Section # Final Inspection Complies? Comments/Assumptions & Re .113 C404A ;All piping insulated in accordance with ;❑Complies [F125]2 section details and Table C403.2.10.❑Does Not , ❑Not Observable; ❑Not Applicable C405.4.1 ;,Interior installed lamp and fixture ❑Complies See the Interior lighting fixture schedule for values. [F118]1 lighting power is consistent with what :❑Does Not is shown on the approved lighting ❑Not Observable ; plans, demonstrating proposed watts are less than or equal to allowed I ;❑Not Applicable j watts. C408.2.1 ; Commissioning plan developed by❑Complies [F128]1 ;registered design professional or❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ;❑Complies 1 ensure proper operation. :❑Does Not (F13111 ❑Not Observable; ❑Not Applicable C408.2.3. `: HVAC control systems have been UComplies 2 ;tested to ensure proper operation, :❑Does Not [FI10]1 calibration and adjustment of controls.'❑Not Observable' j❑Not Applicable C408,2.3. Economizers have been tested to ;❑Complies 3 ensure proper operation.❑Does Not (FI3211 I❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ;❑Complies [F129]1 completed and certified by registered ❑Does Not ;design professional or approved ;❑Not Observable: ; agency. ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings❑Complies 1 !,submitted within 90 days of system❑Does Not [F17]3 ;acceptance. ❑Not Observable: ❑Not Applicable C408.2.5. Furnished as -built drawings for ;❑Complies 1 electric power systems within 90 days !❑Does Not [FI16]3 ;of system acceptance. E❑Not Observable; ❑Not Applicable C408.2.5. ;An air and/or hydronic system :.❑Complies 3 balancing report is provided for HVAC ;❑Does Not [F14311 systems. ;❑Not Observable ❑Not Applicable C408.2.5. ; Final commissioning report due to `❑Complies 4 building owner within 90 days of ;❑Does Not [F130]1 :receipt of certificate of occupancy. ;❑Not Observable ; ❑Not Applicable C408.3 :,Lighting systems have been tested to ;❑Complies [F13311 !ensure proper calibration, adjustment, ❑Does Not programming, and operation. ;❑Not Observable ❑Not Applicable j Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 Medium Impact (Tier 2) 1 3 Low Impact (Tier 3) Project Title: Pizza Hut #2175 Report date; 06/20/19 Data filename: G:\Pizza Hut\1920191 Pizza Hut - Rexburg, ID #2175\Energy\Pizza Hut - Rexburg, ID.cck Page 12 of 14