HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00026 - Windsor Manor Parking GaragePermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 07/02/2019 12:29 pm
Permit Details Permit Number: 14-00026
Windsor Manor Parking Garage
125 E 2nd S
Building - Commercial
Permit Issued Date: 01/13/2015
Permit Inspection Statistics
26Total Inspections Completed:
21Total Inspections Passed:
Inspection Pass Rate: 80.77%
Permit Inspection History *Refer to Individual Inspection Report for more Details
01/30/2015N/AQuinton OwensSuspending Ceiling Inspection
Building Inspection Type
03/24/2014PassTed DyeFoundation Inspection
spacing good
tied and sized rebar as per plan
cc3 rebar columns in place
Inspector Comments:
03/26/2014PassTed DyeFoundation Inspection
04/04/2014PassTed DyeFoundation Inspection
4-4-14 Inspected south foundation wall rebar on main level of parking garage
and cross over beam on west side
All looked good.
The special inspector was their at the same time and she agreed.
Inspector Comments:
04/07/2014PassTed DyeFooting Inspection
footings connecting crossover footings to north foundation wall footingsInspector Comments:
04/09/2014PassQuinton OwensFoundation Inspection
04/14/2014PassTed DyeFooting Inspection
Footing in north east corner for landing of stairsInspector Comments:
05/09/2014PassTed DyeFoundation Inspection
-Foundation inspection looks good.
-Rebar is the same as the drawing.
-Instructed to remove all sand and dirt from between forms before closing them
up.
Inspector Comments:
05/20/2014PassTed DyeFooting Inspection
floor of bottom level, that area on outside of columns on back half.Inspector Comments:
06/27/2014PassQuinton OwensFoundation Inspection
Parking pad on 2nd level.
Rebar in place and tied
Clean off deck of small garbage then ok to pour.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 14-00026
Windsor Manor Parking Garage
125 E 2nd S
Building - Commercial
Permit Status of (Open) as of Report Date: 07/02/2019 12:29 pm
Permit
Inspection
Summary
08/08/2014PassQuinton OwensFoundation Inspection
Second level foundation wall from parking entrance going around the east side
up to the Townhouses on the north side.
Inspector Comments:
08/15/2014PassQuinton OwensFoundation Inspection
10/09/2014PassTed DyeCommercial Footing Inspection
10/17/2014PassTed DyeFoundation Inspection
11/06/2014PassQuinton OwensFoundation Inspection
Request for upper driveway slab. Rebar was in place on Mon during site visit and
only needed to be supported up - approved.
Pressure test for heating lines to be done.
Inspector Comments:
11/07/2014PassQuinton OwensFoundation Inspection
Middle level parking entry rebar installed & supported off base. Upper barrier
walls
Inspector Comments:
12/18/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Elevator lobby on level 90 is actually part of building 2. No drywall in parking
structure other than west entry which is under building 1. These areas are
approved except that fire rating penetrations needs to be done.
Inspector Comments:
01/30/2015N/AQuinton OwensCommercial Framing/Structure Inspection
All concrete walls & Post-tensioned slab. Framing N/A.Inspector Comments:
01/30/2015N/AQuinton OwensCommercial Insulation Inspection
Not conditionedInspector Comments:
01/30/2015N/AQuinton OwensCommercial Sheetrock/Drywall Inspection
02/02/2015FailQuinton OwensCommercial Building Final
Railing required on both sides of exterior stairs at Northeast corner between
parking and building 2. Exit sign still missing near door in Southwest corner on
level 90, and on level 100 in Northeast corner. Fire rate sprinkler pipe penetration
on West wall next to overhead door.
Inspector Comments:
3/23 reinspection: Need verification of rated wall on back of townhomes on north
side of parking level 3.
Inspector Comments:
04/15/2015PassQuinton OwensCommercial Building Final
items completed for occupancy.Inspector Comments:
Electrical Inspection Type
01/15/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
Fire Inspection Type
12/24/2014PassDale PickeringFire Sprinkler Hydro
Page 2 of 3
(Continued)
Permit Details Permit Number: 14-00026
Windsor Manor Parking Garage
125 E 2nd S
Building - Commercial
Permit Status of (Open) as of Report Date: 07/02/2019 12:29 pm
Permit
Inspection
Summary
Plumbing Inspection Type
12/02/2014PassDon AllenPlumbing Underground Inspection
01/16/2015PassDon AllenPlumbing Rough-in
Page 3 of 3