Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00126 - 148 Harvard Ave - SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 07/01/2019 10:19 am Permit Details Permit Number: 14-00126 148 Harvard Ave - SFR 148 Harvard Ave Building - Single Family Residence Permit Issued Date: 04/18/2014 Permit Inspection Statistics 25Total Inspections Completed: 19Total Inspections Passed: Inspection Pass Rate: 76.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 04/18/2014PassTed DyeFooting Inspection 04/18/2014PassTed DyeFooting Inspection 04/21/2014PassTed DyeFoundation Inspection 06/19/2014FailTed DyeSheeting Some sheeting missed being nailed to the studs. The Studs are marked with green and black paint. We can inspect the corrections at the time of the framing inspection or call for a reinspect. Inspector Comments: 06/27/2014FailTed DyeFraming/Structure Inspection Put truss tie downs on back porch trusses. top of stairs going to bonus is not finished Can check these items at insulation inspection Inspector Comments: 07/01/2014FailQuinton OwensFraming/Structure Inspection Top winder treads incorrect - narrowest end of treads must be 6" min. Add studs for drywall backing at top of stairs. More support needed for ceiling drywall at basement drops (drywall span limited to 2 ft). Lateral bracing missing above bearing wall. Anchor bolts needed in bearing wall. Ceiling in basement apt not rated at exhaust fan penetrations, and will need to be rated in concealed space above fireplace. Inspector Comments: 07/01/2014FailQuinton OwensInsulation Inspection Windows not installed. Did not seal door bell wire penetration at top plate in hall.Inspector Comments: 07/09/2014PassTed DyeSheetrock/Drywall Inspection 09/18/2014PassTed DyeResidential Building Final Approved for finalInspector Comments: 10/27/2014PassTed DyeSheeting 10/29/2014PassTed DyeCommercial Insulation Inspection 10/29/2014PassQuinton OwensResidential Framing/Structure Inspection 10/29/2014PassTed DyeSidewalk Inspection 10/29/2014PassTed DyeCommercial Building Final Page 1 of 2 (Continued) Permit Details Permit Number: 14-00126 148 Harvard Ave - SFR 148 Harvard Ave Building - Single Family Residence Permit Status of (Open) as of Report Date: 07/01/2019 10:19 am Permit Inspection Summary Electrical Inspection Type 06/30/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 07/07/2014PassBret StoddardResidential Electrical Service Inspection 09/12/2014PassSAUREY AMANDASFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection GFCI Cover in mech room Faceplates in master bathroom (installed backsplash) Main panel cover installed Contractor on site made corrections. Inspected and approved per Jane Allred. Inspector Comments: Mechanical Inspection Type 06/27/2014PassDon AllenHVAC Rough-in All good to coverInspector Comments: 09/12/2014PassDon AllenHVAC Final Inspection hvac looks good all good for the c/oInspector Comments: Plumbing Inspection Type 04/30/2014FailDon AllenPlumbing Underground Inspection need to install the tracer lineInspector Comments: 06/30/2014PassDon AllenPlumbing Underground Inspection Good to cover the under groundInspector Comments: 06/30/2014PassDon AllenPlumbing Rough-in All good to cover the rough inInspector Comments: 08/20/2014PassDon AllenPlumbing Sewer 09/12/2014FailDon AllenPlumbing Final Inspection 10/29/2014PassDon AllenPlumbing Final Inspection Page 2 of 2