Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00170 - 295 Jefferson Dr - SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/27/2019 9:53 am Permit Details Permit Number: 14-00170 295 Jefferson Dr - SFR 295 Jefferson Dr Building - Single Family Residence Permit Issued Date: 05/13/2014 Permit Inspection Statistics 23Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 73.91% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 05/15/2014PassTed DyeFooting Inspection 2 -1/2" rebar suspended of the ground. good base setbacks right Inspector Comments: 05/15/2014PassTed DyeFoundation Inspection 2 bars in to 12" overlaps good bars away from sides of forms Inspector Comments: 07/11/2014FailTed DyeFraming/Structure Inspection -Stairs are not to code. winder stairs can not jog in 6" and then start the 6" as stated in the code. the 6" must start at the inside wall and then go in 12" and at that point their has to be a measurement of 10" from the front of one tread to the back of that same tread. -Anchor bolts needed 6" from the ends of walls at all corners and from edges of doors. The walls near the front entry have no anchor bolts in them at all. Check all exterior walls. -Interior bearing wall also need anchor bolts. -Tempered glass needed in window at the bottom of the stairs Inspector Comments: 07/14/2014FailTed DyeFraming/Structure Inspection Repair of stairs is not completedInspector Comments: 07/15/2014PassTed DyeFraming/Structure Inspection 07/15/2014PassTed DyeInsulation Inspection 09/03/2014PassTed DyeSidewalk Inspection Sidewalk base has 6" of compacted granular fill.Inspector Comments: 11/14/2014FailTed DyeResidential Building Final 11/14/2014PassTed DyeResidential Sheetrock/Drywall Inspection drywall inspected at an earler date but missed being enteredInspector Comments: 11/14/2014PassTed DyeResidential Building Final Page 1 of 2 (Continued) Permit Details Permit Number: 14-00170 295 Jefferson Dr - SFR 295 Jefferson Dr Building - Single Family Residence Permit Status of (Open) as of Report Date: 06/27/2019 9:53 am Permit Inspection Summary Electrical Inspection Type 05/28/2014PassBret StoddardResidential Electrical Service Inspection 07/14/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 10/03/2014FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 10/06/2014PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection All deficiencies corrected from prior inspection. No A/C unit installed (50A OCPD).Inspector Comments: Mechanical Inspection Type 07/14/2014FailDon AllenHVAC Rough-in The gas manifold needs to be brought out of the wall.The 1st port is in side the wall and will be covered when sheet rocked. Inspector Comments: 07/17/2014PassDon AllenHVAC Rough-in hvac all good to coverInspector Comments: 11/14/2014PassDon AllenHVAC Final Inspection hvac all good for the c/oInspector Comments: Plumbing Inspection Type 06/02/2014PassDon AllenPlumbing Underground Inspection 09/22/2014FailDon AllenWater Meter Inspection Need to install braceing for the meterInspector Comments: 10/05/2014PassDon AllenPlumbing Rough-in 10/29/2014PassDon AllenWater Meter Inspection Water meter looks goodInspector Comments: need to fix the hose bib on the back of the houseInspector Comments: 11/14/2014PassDon AllenPlumbing Final Inspection Good for the c/oInspector Comments: 11/14/2014PassDon AllenPlumbing Final Inspection OK to issue C.OInspector Comments: Page 2 of 2