Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00377 - 270 Baldwin Drive - SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/27/2019 7:56 am Permit Details Permit Number: 14-00377 270 Baldwin Drive - SFR 270 Baldwin Drive Building - Single Family Residence Permit Issued Date: 09/15/2014 Permit Inspection Statistics 19Total Inspections Completed: 18Total Inspections Passed: Inspection Pass Rate: 94.74% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 09/23/2014PassTed DyeResidential Footing Inspection 09/24/2014PassTed DyeFoundation Inspection 10/17/2014PassTed DyeSheeting 10/27/2014PassTed DyeResidential Framing/Structure Inspection 10/31/2014PassTed DyeResidential Insulation Inspection 11/05/2014PassTed DyeResidential Sheetrock/Drywall Inspection 11/05/2014PassTed DyeSidewalk Inspection There's 6 " of crushed material as a base.Inspector Comments: 01/07/2015Fail Residential Building Final 01/12/2015PassQuinton OwensResidential Building Final Reinspected for egress ladder from unfinished basement.Inspector Comments: Electrical Inspection Type 10/06/2014PassBret StoddardResidential Electrical Service Inspection 10/27/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 12/19/2014PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 01/07/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Mechanical Inspection Type 10/24/2014PassDon AllenHVAC Rough-in All good to cover the mechanical rough in Gas presser held at 80 lb Inspector Comments: 01/07/2015PassDon AllenHVAC Final Inspection Good for the c/oInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 14-00377 270 Baldwin Drive - SFR 270 Baldwin Drive Building - Single Family Residence Permit Status of (Open) as of Report Date: 06/27/2019 7:56 am Permit Inspection Summary Plumbing Inspection Type 10/01/2014PassDon AllenPlumbing Underground Inspection All good to cover the undergroundInspector Comments: 10/02/2014PassDon AllenPlumbing Underground Inspection 10/22/2014PassDon AllenPlumbing Rough-in Good to cover the plumbing rough inInspector Comments: 01/05/2015PassDon AllenPlumbing Final Inspection Good for the c/oInspector Comments: Page 2 of 2