Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00315 - Monkey Bars - New Commercial BuildingPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/25/2019 5:07 pm Permit Details Permit Number: 14-00315 366 Dividend Dr - Monkey Bars 366 Dividend Dr Building - Commercial Permit Issued Date: 12/22/2014 Permit Inspection Statistics 37Total Inspections Completed: 26Total Inspections Passed: Inspection Pass Rate: 70.27% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 09/15/2014PassQuinton OwensCommercial Footing Inspection Partial footing: East and North footings only. Rebar installed per plans. Remove dirt and gravel falling under forms - BOTTOM OF FOOTING MUST MEET THE REQUIRED WIDTH. Inspector Comments: 09/16/2014PassTed DyeFoundation Inspection Foundation walls; east wall 1-8 (all),all of North wall and just around the corner of the west wall, on the north end. Inspector Comments: 09/17/2014PassTed DyeCommercial Footing Inspection Footing inspection of the footings on the west side and the retaining wall footings are approved to be poured. Inspector Comments: 09/17/2014PassTed DyeFoundation Inspection Foundation inspection on the west side from the Northwest corner, south to the truck loading footings. Inspector Comments: 09/18/2014PassTed DyeFoundation Inspection 09/19/2014PassQuinton OwensFoundation Inspection Inspection of Piers just inside foundation wall.Inspector Comments: 12/22/2014FailQuinton OwensCommercial Framing/Structure Inspection Missing backing for grab bars in ADA bathroom. Both stairs do not comply with riser height (7" max) or tread depth (11" min - nose to nose). Handrails require extension at top and bottom which must return to a wall or post (be sure framing will accomodate such a handrail design). Anchor bolts required in all bearing wall. Floor truss bearing on single top plate (by steel columns North side) should be centered over stud (1" tolerance). Please submit floor truss manufacturer information for approved lateral bracing methods. Any special inspection done for slab pour or steel erection? No interior footing inspection scheduled with city & some steel connections covered with insulation. Inspector Comments: 01/14/2015FailQuinton OwensCommercial Framing/Structure Inspection Anchor bolts required on all interior bearing walls but were only found on dividing wall between offices and warehouse. Stairs not yet done. Floor trusses require bracing on bottom chords if no ceiling is installed on bottom chord. Floor trusses need verification from designer if lateral bracing is required or not at bearing points (asked Ryan with JRW for letter regarding lateral bracing). Reschedule when all is ready. Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 14-00315 366 Dividend Dr - Monkey Bars 366 Dividend Dr Building - Commercial Permit Status of (Open) as of Report Date: 06/25/2019 5:07 pm Permit Inspection Summary 01/16/2015FailQuinton OwensCommercial Building Final Warehouse side only approved. Must have all approvals to occupy any portion of building. Inspector Comments: 01/22/2015PassQuinton OwensCommercial Framing/Structure Inspection 01/22/2015FailQuinton OwensCommercial Sheetrock/Drywall Inspection Upper level drywall only approved for taping. Call for main level drywall inspection when ready. Inspector Comments: 02/03/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Main floor and stairs drywall inspection.Inspector Comments: 03/04/2015FailQuinton OwensCommercial Framing/Structure Inspection Acoustic ceiling has single room area over 1,000 sf which requires seismic bracing. Call if you have questions on placement requirements of bracing (716-1325). Inspector Comments: 04/09/2015FailQuinton OwensCommercial Building Final Nonabsorbant surface by toilets & mop sink (4' high on walls within 2 ft from sink or toilet.). Temporary Occupancy approved for moving in furnishings. Inspector Comments: 04/24/2015PassQuinton OwensCommercial Framing/Structure Inspection Tile ceiling re-inspect: Each portion has less than 1000 sf and is attached to 2 walls (they share expansion joint in middle). Appears to meet requirements. Inspector Comments: 05/28/2015FailQuinton OwensCommercial Building Final Re-inspection with all previous corrections not completed may result in additional inspection fees. Inspector Comments: 07/22/2015PassQuinton OwensCommercial Building Final Building items completed. Dale needs to complete the Fire Dept. inspection before issuing C.O. Inspector Comments: Electrical Inspection Type 12/05/2014PassBret StoddardCOM & MFR Electrical Service Inspection 12/31/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 03/11/2015FailBret StoddardCommercial Electrical Rough-in 03/30/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Page 2 of 3 (Continued) Permit Details Permit Number: 14-00315 366 Dividend Dr - Monkey Bars 366 Dividend Dr Building - Commercial Permit Status of (Open) as of Report Date: 06/25/2019 5:07 pm Permit Inspection Summary Fire Inspection Type 10/29/2014PassDale PickeringFire Sprinkler Rough-in Thrust block - PassInspector Comments: 01/13/2015PassDale PickeringFire Sprinkler Rough-in Rough-in inspection was for the 1st floor of the business area only. the 2nd floor and warehouse area are still in need of inspections. DP Inspector Comments: 01/16/2015FailDale PickeringFire Sprinkler Final Inspection 02/17/2015PassDale PickeringFire Underground Inspection 03/23/2015FailBret StoddardFire Alarm Final Inspection 03/24/2015PassBret StoddardFire Alarm Final Inspection 04/14/2015PassDale PickeringFire Sprinkler Hydro 08/12/2015PassDale PickeringFire Department Final Inspection Mechanical Inspection Type 12/22/2014PassDon AllenHVAC Rough-in mechanical looks good all good to coverInspector Comments: 01/16/2015PassDon AllenHVAC Final Inspection 03/11/2015FailDon AllenHVAC Final Inspection Exhaust fans in the bathroom on the main floor are not wired in.Inspector Comments: Plumbing Inspection Type 10/08/2014PassDon AllenPlumbing Underground Inspection All good to cover the undergroundInspector Comments: 10/08/2014PassDon AllenPlumbing Sewer Good to cover the sewerInspector Comments: 12/05/2014PassDon AllenWater Meter Inspection water meter looks good will check final for the meter on thr final of the building.Inspector Comments: 12/22/2014PassDon AllenPlumbing Rough-in Good to cover the plumbing rough inInspector Comments: 04/03/2015PassDon AllenPlumbing Final Inspection All good for the c/oInspector Comments: Page 3 of 3