HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00300 - BYUI Hart Womens Locker Rm - RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/25/2019 10:46 am
Permit Details Permit Number: 14-00300
BYUI Hart Womens Locker Rm - Remodel
311 S 1st W
Commercial Remodel
Permit Issued Date: 08/07/2014
Permit Inspection Statistics
11Total Inspections Completed:
10Total Inspections Passed:
Inspection Pass Rate: 90.91%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
08/08/2014PassQuinton OwensCommercial Framing/Structure Inspection
08/18/2014PassQuinton OwensCommercial Framing/Structure Inspection
Light steel framed partitions braced to structure above in men's locker room
entrance and in women's accessible shower area.
Inspector Comments:
08/22/2014PassQuinton OwensCommercial Insulation Inspection
No thermal insulation, only sound insulation.Inspector Comments:
09/29/2014PassQuinton OwensCommercial Building Final
Electrical Inspection Type
08/19/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
08/20/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
09/05/2014FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
09/10/2014PassSAUREY AMANDACOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved per Jane Shaw.Inspector Comments:
Plumbing Inspection Type
08/12/2014PassDon AllenPlumbing Underground Inspection
All good to cover the underground.Inspector Comments:
08/21/2014PassDon AllenPlumbing Rough-in
All good to cover the plumbing rough inInspector Comments:
09/10/2014PassDon AllenPlumbing Final Inspection
All good for the c/oInspector Comments: