Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00300 - BYUI Hart Womens Locker Rm - RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/25/2019 10:46 am Permit Details Permit Number: 14-00300 BYUI Hart Womens Locker Rm - Remodel 311 S 1st W Commercial Remodel Permit Issued Date: 08/07/2014 Permit Inspection Statistics 11Total Inspections Completed: 10Total Inspections Passed: Inspection Pass Rate: 90.91% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 08/08/2014PassQuinton OwensCommercial Framing/Structure Inspection 08/18/2014PassQuinton OwensCommercial Framing/Structure Inspection Light steel framed partitions braced to structure above in men's locker room entrance and in women's accessible shower area. Inspector Comments: 08/22/2014PassQuinton OwensCommercial Insulation Inspection No thermal insulation, only sound insulation.Inspector Comments: 09/29/2014PassQuinton OwensCommercial Building Final Electrical Inspection Type 08/19/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 08/20/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/05/2014FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 09/10/2014PassSAUREY AMANDACOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved per Jane Shaw.Inspector Comments: Plumbing Inspection Type 08/12/2014PassDon AllenPlumbing Underground Inspection All good to cover the underground.Inspector Comments: 08/21/2014PassDon AllenPlumbing Rough-in All good to cover the plumbing rough inInspector Comments: 09/10/2014PassDon AllenPlumbing Final Inspection All good for the c/oInspector Comments: