HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00247 - 144 E 1st N or 144 Charles Pl - SFRPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/24/2019 2:25 pm
Permit Details Permit Number: 14-00247
144 E 1st N or 144 Charles Place - SFR
144 E 1st N
Building - Single Family Residence
Permit Issued Date: 07/15/2014
Permit Inspection Statistics
21Total Inspections Completed:
19Total Inspections Passed:
Inspection Pass Rate: 90.48%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
07/16/2014PassTed DyeFooting Inspection
07/21/2014PassTed DyeFoundation Inspection
10/20/2014PassTed DyeResidential Framing/Structure Inspection
10/23/2014PassTed DyeResidential Insulation Inspection
11/03/2014PassTed DyeResidential Sheetrock/Drywall Inspection
06/09/2015PassTed DyeSidewalk Inspection
Main side walk (city side walk) is on 1st North.Inspector Comments:
06/09/2015FailTed DyeResidential Building Final
06/10/2015PassTed DyeResidential Building Final
Electrical Inspection Type
10/21/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
10/22/2014PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
11/03/2014PassBret StoddardResidential Electrical Service Inspection
04/10/2015PassBret StoddardResidential Electrical Service Inspection
06/09/2015FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
06/10/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Mechanical Inspection Type
10/08/2014PassDon AllenHVAC Rough-in
Rough in is good to coverInspector Comments:
06/09/2015PassDon AllenHVAC Final Inspection
GOOD FOR THE C/OInspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 14-00247
144 E 1st N or 144 Charles Place - SFR
144 E 1st N
Building - Single Family Residence
Permit Status of (Open) as of Report Date: 06/24/2019 2:25 pm
Permit
Inspection
Summary
Plumbing Inspection Type
08/08/2014PassDon AllenPlumbing Underground Inspection
All good to cover the ground workInspector Comments:
10/21/2014PassDon AllenPlumbing Rough-in
All good to cover the plumbing rough inInspector Comments:
01/30/2015PassDon AllenPlumbing Sewer
02/19/2015PassDon AllenPlumbing Water
will check final grade of meter at final of houseInspector Comments:
06/09/2015PassDon AllenPlumbing Final Inspection
Page 2 of 2