Loading...
HomeMy WebLinkAboutTHERMAL ENVELOPE CALCS - 19-00154 - 1450 N 2nd E - Walmart - Grocery Pickup Addition(C) 2011 American Society of Heating, Refrigerating and Air -Conditioning Engineers, Inc. (www.ashrae.org). For personal use only. Additional reproduction, or transmission in either print or digital form is not permitted without ASHRAE's prior written permission. Energy Cost Budget (ECB) Compliance Report Project Name: Wal"Mart Supercenter Rexburg, ID - OGP Expansion Total (sfl Project Address: 1450 N. 2nd E., Rexburg, ID 83440 0.0%/0.00/0 Date: June 4, 2019 Designer of Record: Sean O. Eisler 0 Email: Sean.Eisler@hendersonengineers.com Telephone: (913) 742-5000 Contact Person (Modeler): Jarrod Easterwood - Henderson Engineers 0 Email: Jarrod.Easterwood @hendersonengineers.com Telephone: (913) 742-5000 City: Rexburg, ID Principal Heating Source: ❑✓ Fossil Fuel Electricity ❑Solar/Site Recovered ❑Other Weather Data: Hill Air Force Base Utah Space Summary Building use: Conditioned Area (sfl Unconditioned Total (sfl New Pick-up Area 1,400 sf 0.0%/0.00/0 1,400 sf Number of warnings 0 0 0 Number of errors 0 0 0 Number of defaults overridden 0 0 0 Total 1,400 sf 0 sf 1,400 sf Advisory Messages Compliance Result The design detailed in the above references plans complies with the mandatory requirements of the 2013 ASHRAE Standard and the Design Energy Cost does not exceed the Energy Cost Budget. Therefore this design DOES COMPLY with the 2013 ASHRAE ECB Compliance Methodology. Individual certifying authenticity of the data provided in this analysis: f -I-- Signature: ASHRAE Standard 90.1 - 2013 Title: Mechanical Designer Proposed Building Design Budget Building Difference Proposed - Budget Number of hours heating/cooling loads not met (system/plant) 0.0%/0.00/0 0.0%/0.00/0 0.0%/0.00/` Number of warnings 0 0 0 Number of errors 0 0 0 Number of defaults overridden 0 0 0 Compliance Result The design detailed in the above references plans complies with the mandatory requirements of the 2013 ASHRAE Standard and the Design Energy Cost does not exceed the Energy Cost Budget. Therefore this design DOES COMPLY with the 2013 ASHRAE ECB Compliance Methodology. Individual certifying authenticity of the data provided in this analysis: f -I-- Signature: ASHRAE Standard 90.1 - 2013 Title: Mechanical Designer 1878 Wal-Mart OGP Addition — Rexburci, ID Criteria Budget Design Proposed Design Codes (ASHRAE 90.1-2013 Rexburg, ID - 6B) Envelope CMU R-13.3 (U=.080) R-8.385 (U=.119) (CMU with Foamed -in Mass Walls place insulation and a 4" stud wall insulated Insulation to R-11.) Roof Insulation R-30 (U=.032) R-25 (U=0.04) Insulation entirely above deck Window U -Factor (Climate Zone 6) (U=.042) (U=1.09) Metal framing, fixed Window (Climate Zone 6) 0.4/0.46 SHGC =.52 SHGC/SC SC x.87 = SHGC; SC=.45 Perimeter (Climate Zone 6) (F=0.510) None — (F=0.73) Insulation Skylight Not required Per section 5.5.4.2.3 Same SHGC/SC Space is 1,400 sq. ft. Opaque Doors (Climate Zone 6) (U-0.5) R-4.31 (U=0.232) Lighting Lighting Power Storage: 0.66 W/sq. ft. Proposed Store: 536 W (0.383 W/sf) Density (W/sf) Per Table 9.5.1 Daylighting Daylighting Yes, Sales Floor Yes, Sales Floor Control Per Section 9.4.1.1, F Plug Loads Equipment Power same Same Density (W/sf) a y \5>a .2 7 § G E e E co E E 2 2 = 0 / � � � co I- CO / \ .o e) , m \ § 0o 0 0 c k \ § \CL co �.Q Gg§ (D CL o § � E k \ 0 IRlyo E \ £/ 0) § § § 2 < § � § 0 \ Wl m k § \ /\gN,E \ g E E > ° o = o f 2 % i u = e u = \ \ n q C'4 2 �® E G \ $ \ m [ \ / \ / ƒ -0 $ : c$ :3$ # _ % e § 0 ==$s) 2a o » _ E E E } E \ \ / U) Cl) / �{ �{ B 0 t t U_ :3 J EeL t&0E 8 \ \ \ E E E E m mLL 6 k CD � c, \ m \ / P,¥% 666 0 \ Wl m k § \ /\gN,E \ g E E > ° o = o f 2 % i u = e u = \ \ n q C'4 2 �® E G \ $ \ m [ \ / \ / ƒ -0 $ : c$ :3$ # _ % e § 0 ==$s) 2a o » _ E E E } E \ \ / U) Cl) / �{ �{ B 0 O� R�XBU�C U {� O �6 (" NED lie' Permit Details CITY OF REEXBURG America's Family Community Community Development Department 35 North 152 East Rexburg, ID 83440 Permit Technician (208) 372-2341 Inspection Hotline (208) 372-2344 1450 N 2nd E - Walmart - Grocery Pickup Addition 1450 N 2nd E Permit Review Status Current Building Review Status: REVISIONS Application Number: 19-00154 Commercial Addition Application Received Date: 04/04/2019 Application Approved Date: 04/05/2019 Application Approved Status: ACCEPTED Plan Reviews Still in Progress Status of Plan Reviews Completed Planning and Zoning Review - Site Plan Electrical Review COMPLETED 04/08/2019 Public Works Review - Site Plan Plumbing Review COMPLETED 04/16/2019 Fire Department Review - Site Plan Fire Sprinkler Review HVAC Review COMPLETED 04/16/2019 Fire Alarm Review Building Review REVISIONS 04/16/2019 Plan Review Details Building Review Status: REVISIONS Reviewed By: Quinton Owens quinton.owens@rexburg.org Review Date: 04/16/2019 *Please respond to 'REVISIONS" status items, with appropriate comment/documentation a.5 neededl DESCRIPTIONCOMMENTS Checked for linked cases Initial Walmart building permit 15-00015 YES ----- ------------------------------------------------------------------- ------ —----------------- —----------- ---- —---------------- ----- Building complies with IECC (IBC 1301) Submit thermal envelope information or energy compliance report to show compliance with energy codes. *Revisions Response : Special Inspection Contractor is identified (IBC Who will be performing the special inspections? 1704.2.1) "Revisions Response: REVISIONS REVISIONS Special Inspections are required as per IBC Remember to have all special inspection reports COMPLETED Chapter 17 submitted to the building inspector ector ------------------------------------------------ —------------- -- Approval ofplans does not constitute approval of variance from code Page 1 of 1 �1,XS USG O� &k I9 CITY o F Community Development Department Q REXBURG 35 North 1$1 East Rexburg, ID � :`7 Permit Technician (208) 372-2341 ' ,•' America's Family Community Inspection Hotline (208) 372-2344 Current Fire Sprinkler Review Status: APPROVED Permit Details Application Number: 19-00154 1450 N 2nd E - Walmart - Grocery Pickup Addition Commercial Addition 1450 N 2nd E Application Received Date: 04/04/2019 Application Approved Date: 04/05/2019 Application Approved Status: ACCEPTED Permit Review Status Plan Reviews Still in Progress Status of Plan Reviews Completed Public Works Review - Site Plan Electrical Review COMPLETED 04/08/2019 Fire Alarm Review Building Review Plumbing Review COMPLETED 04/16/2019 HVAC Review COMPLETED 04/16/2019 Building Review REVISIONS 04/16/2019 Planning and Zoning Review - Site Plan COMPLETED 04/22/2019 Fire Department Review - Site Plan COMPLETED 04/25/2019 Fire Sprinkler Review COMPLETED 04/25/2019 Plan Review Details Fire Sprinkler Review Status: APPROVED Review Date: 04/25/2019 Reviewed By: Dale Pickering dale.pickering@rexburg.org --- -- ---- —------------------ — ---- —------------- --------------------------------------------------------------------------- — -- Approval ofplans does not constitute approval of variance from code Page 1 of 1 CI'T'Y OF REXBUR America's Family Community Community Development Department 35 North 11t East Rexburg, ID 83440 Permit Technician (208) 372-2341 Inspection Hotline (208) 372-2344 Review Report Current Fire Department Review - Site Plan Status: APPROVED Permit Details Application Number: 19-00154 1450 N 2nd E - Walmart - Grocery Pickup Addition 1450 N 2nd E Permit Review Status Plan Reviews Still in Proqress Public Works Review - Site Plan Fire Sprinkler Review Fire Alarm Review Building Review Plan Review Details Fire Department Review - Site Plan Status: APPROVED Reviewed By: Dale Pickering dale.pickering@rexburg.org Commercial Addition Application Received Date: 04/04/2019 Application Approved Date: 04/05/2019 Application Approved Status: ACCEPTED Status of Plan Reviews Completed Electrical Review COMPLETED 04/08/2019 Plumbing Review COMPLETED 04/16/2019 HVAC Review COMPLETED 04/16/2019 Building Review REVISIONS 04/16/2019 Planning and Zoning Review - Site Plan COMPLETED 04/22/2019 Fire Department Review - Site Plan COMPLETED 04/25/2019 Review Date: 04/25/2019 *Please respond to 'REVISIONS" status items, with appropriate commenVdocumentation as needed., DESCRIPTION• Plans are approved for a footing/foundation YES ONLY permit? ------------------ -------- —------------------- -------------------------- ------------- ------ -------- Hydrant located within 150' from FDC ----------- -------------------------------------- — ---- ----- N/A ------------------ —--------------- No hydrants within 40' of building --------------------------------------- --------- ----- — — — --- — ---- — ..... COMPLETED ----------------- ------ —---....-------------------- 30' inside radius and 45' outside radius --------------------------- .......... .------------------------------ —--...---....-- ----- COMPLETED Building height >30' - fire lane to be 30' to 45' ------------- ---------- -------- ---- — -- - -- COMPLETED from building --- - -- ------ --------------- ------------------ ------------------------------------------------------- Minimum fire lane clearance 13'6" ------------------------------ ------ — ----------------------- ---- —-------- - — - -- COMPLETED ------------- Fire lanes exceeding 150' require a turn -around ------------ — ---------------------------------------------- ----- — — ------------------- __--------- ------- COMPLETED -------------- — ------------------ ----- — ------ ----- ---- -- -- — -- Approval of plans does not constitute approval of variance from code Page 1 of 1 C I TY OF REXBURG Americal Family Community Community Development Department 35 North 15t East Rexburg, ID 83440 Permit Technician (208) 372-2341 Inspection Hotline (208) 372-2344 Review Report Current Planning and Zoning Review - Site Plan Status: APPROVED Permit Details Application Number: 19-00154 1450 N 2nd E - Walmart - Grocery Pickup Addition 1450 N 2nd E Permit Review Status Plan Reviews Still in Progress Public Works Review - Site Plan Fire Department Review - Site Plan Fire Sprinkler Review Fire Alarm Review Building Review Plan Review Details Planning and Zoning Review - Site Plan Status: APPROVED Reviewed By: Val Christensen val.christensen@rexburg.org Commercial Addition Application Received Date: 04/04/2019 Application Approved Date: 04/05/2019 Application Approved Status: ACCEPTED Status of Plan Reviews Completed Electrical Review Plumbing Review HVAC Review Building Review Planning and Zoning Review - Site Plan COMPLETED 04/08/2019 COMPLETED 04/16/2019 COMPLETED 04/16/2019 REVISIONS 04/16/2019 COMPLETED 04/22/2019 Review Date: 04/22/2019 *Please respond to 'REVISIONS" status items, with appropriate commenvdocumentation as needed.) 'DESCRIPTION COMMENTSSTATUS Checked for linked cases -------------------------------------------------------------- — ----- — ---------------------- YES Dumpsters: 1 per 20 Units (non -dorm) or 1 per --------- ------- — -- — N/A 50 beds (Dorm)? ----------- ------------ — ------------ ------------------------ — —--------- -------- — - ------------------ ----- -- ---...... Easements ----- ------------ —------------------------------------ Defer to Public Works —----------------------- —---------------------- N/A Design standards Committee meeting held ........... ------------------ ---------- — ------ —---------- —---------- —-------- ---------------- ..---- - - N/A ----------- Check conditional use permit --------- — - —--------------------------------------------------------------------------------------------- ----- — ---------- ------- N/A Open/common spaces functional ----- ----- —------- —------------------------------ ------------ - - ------ -------- ------------ ------ -------- ... N/A ---- Fencing/screening (HVAC equipment, dumpsters, Defer to Public Works — .... - --- -- —Fencing/screening N/A parking, etc) ----- --- ------ ---------------- —---------- ------ - — -------------- — -------------------- --------- -... Trash dumpster shown and screened & for Defer to Public Works _ .... N/A right-hand truck ----------------------- — --------------------------------------------- — - —-------------------- ------ — ---- — Sidewalks along right of way access main streets ------------------------------------ --------- ------ ...------------------------- ------ — -- N/A Lighting Plan ------------------------------------------------------- ------ Defer to Public Works ---------------------------------------------------------------------------------- -----..---- — ----_ -------- N/A Flood plain check ------------- ------ --------------- — -- -- — — ---- -- ---------------------- N/A — ----- — - - - - ---- ----- -- Approval of plans does not constitute approval of variance from code Page 1 of 3 o�c,� �.�.xer�, r9 CITY OF r _0W_ �•t , s a e p yi' A mericaS Family CoYYJYT unio, Planning and Zoning Review - Site Plan (Continued) 1 ESCRIPTIO N COMMENTS Show existing and proposed easements ------- --------- ----------------------------- N/A - — ----------- ...-------- -------- --------- Legal desciption of proposed building site -- ------ ---------- — ------- N/A included ---------------------------------------------- -- —----------------------------------- — --------------------------- Parking space number ------------------- -------------------------------- —------- — ------------- N/A —-----...------ —­­ ------- --------- - Parking lot handicapped requirements --- --------------------------------------- -------- —-------- —-------- — ----... N/A ----------- - — - ------ ----------- -------- Unloading, loading area -- -------- - ---- — ---------------------- -- ------- - --- -- — -- .. --- COMPLETED — ------ --- ------- Parking spaces located in close proximity to -- ---- —-- — -------- -- - — -....- — COMPLETED buildings - — --------- —--------- — ------------- ------------- — --- --- — ----------- -------------------- — --- ---- — - - - - — - — Parking space sizes -------------- - — -------------- --------------- COMPLETED --------- — - ----------------------- Parking aisle widths ---------------------------- —-------------..------------------------------------ ----------- ..------- —-------- ---- ---- — -------- COMPLETED — Use is consistent with zoning designation -------------------------------------------------------------------------------- ----------- —------------------------------- ----- COMPLETED Compliance with comprehensive plan -------------------------------------------------- --------------------------- --------- - -------- COMPLETED ------------------------ Plans are to scale ------------------------------------------------------------------------ —------------ — ----- - --- -- — - ------- COMPLETED — North arrow & Streets labeled - --- --------- --- -- -- ---------- - ---- --- — -------------- —----------------- — ----- — COMPLETED -- - ----- — — -------- -- -- --- Building setbacks (front, side, back yards) ---------------------------------------- - ---- ------ - COMPLETED -------- ------------------------- Building height --------------------------------- - -------------------------------------- ---------- -- - -- - — ---- -- — — ----- — ..... COMPLETED ------------- Minimum distance between buildings ---------------------------------------------------- - —-------- — ..... — ------ ------- COMPLETED --------- ----------- ------ -- — ----------- Clear site triangle ------------ ---------- - —------------------------ ---- -- ----- ------- COMPLETED -------------- — ------ — ------------ Driveway,parking lot dimensions -------------------------------------------------- ---------------- — ------ — ---- -- ------ -----Driveway, COMPLETED ------------------- — ---------------------- Architectural design standards ----- -------------- — — -------------------------------- — ------------ —---------- — - ---- This provides additional architectural definition. COMPLETED ------------- Internal pedestrian walkways per zone --------------------------- ------------- --------- --------- ----------------------------------------- — - COMPLETED --------- ------------- — Snow storage --- --- ------- -- — ---------- ----------- .---------- ------------------ — -------------- ---- — ----- COMPLETED -------------------------------------------- Buffering/landscaping requirements — ------ — ---- — - — ----- ..... -- Replace all trees and bushes that are moved or COMPLETED ------- -------- -------------------- damaged. --------------- ------- ------ — --- -- - — -- Amount of Permeable vs. Non -Permeable Surface COMPLETED ----------—----------------------------- ----------- ----- — ----------- - — - — ----- — — ------------------- ------------ No ---------- No utility boxes in right of way? COMPLETED ------------------------------ ------ --------- --------------- --------------- — --------------- ------ -- -- - - - — — - - - ---- — - Approval of plans does not constitute approval of variance from code Page 2 of 3 U CITY OF REXBURG �America's Family Community Planning and Zoning Review - Site Plan (Continued) 1 N COMMENTS Bldg location, sq ft, dimensions, distance to COMPLETED property lines & between bldgs ------------------- ------ — ----- — ----- ------ — ----- ----- -- ------ - — ------ — -- Approval of plans does not constitute approval of variance from code Page 3 of 3