HomeMy WebLinkAboutTHERMAL ENVELOPE CALCS - 19-00154 - 1450 N 2nd E - Walmart - Grocery Pickup Addition(C) 2011 American Society of Heating, Refrigerating and Air -Conditioning Engineers, Inc. (www.ashrae.org).
For personal use only. Additional reproduction, or transmission in either print or
digital form is not permitted without ASHRAE's prior written permission.
Energy Cost Budget (ECB) Compliance Report
Project Name:
Wal"Mart Supercenter Rexburg, ID
- OGP Expansion
Total
(sfl
Project Address:
1450 N. 2nd E., Rexburg, ID 83440
0.0%/0.00/0
Date: June 4, 2019
Designer of Record:
Sean O. Eisler
0
Email: Sean.Eisler@hendersonengineers.com
Telephone: (913) 742-5000
Contact Person
(Modeler):
Jarrod Easterwood - Henderson
Engineers
0
Email: Jarrod.Easterwood
@hendersonengineers.com
Telephone: (913) 742-5000
City:
Rexburg, ID
Principal Heating Source:
❑✓ Fossil Fuel Electricity
❑Solar/Site Recovered ❑Other
Weather Data: Hill Air Force Base Utah
Space Summary
Building use:
Conditioned Area
(sfl
Unconditioned
Total
(sfl
New Pick-up Area
1,400 sf
0.0%/0.00/0
1,400 sf
Number of warnings
0
0
0
Number of errors
0
0
0
Number of defaults overridden
0
0
0
Total
1,400 sf
0 sf
1,400 sf
Advisory Messages
Compliance Result
The design detailed in the above references plans complies with the mandatory requirements of the 2013 ASHRAE Standard and the Design Energy Cost does not exceed
the Energy Cost Budget. Therefore this design DOES COMPLY with the 2013 ASHRAE ECB Compliance Methodology.
Individual certifying authenticity of the data provided in this analysis: f -I--
Signature:
ASHRAE Standard 90.1 - 2013
Title: Mechanical Designer
Proposed Building Design
Budget Building
Difference Proposed -
Budget
Number of hours heating/cooling loads not met (system/plant)
0.0%/0.00/0
0.0%/0.00/0
0.0%/0.00/`
Number of warnings
0
0
0
Number of errors
0
0
0
Number of defaults overridden
0
0
0
Compliance Result
The design detailed in the above references plans complies with the mandatory requirements of the 2013 ASHRAE Standard and the Design Energy Cost does not exceed
the Energy Cost Budget. Therefore this design DOES COMPLY with the 2013 ASHRAE ECB Compliance Methodology.
Individual certifying authenticity of the data provided in this analysis: f -I--
Signature:
ASHRAE Standard 90.1 - 2013
Title: Mechanical Designer
1878 Wal-Mart OGP Addition — Rexburci, ID
Criteria
Budget Design
Proposed Design
Codes (ASHRAE 90.1-2013
Rexburg, ID - 6B)
Envelope
CMU
R-13.3 (U=.080)
R-8.385 (U=.119) (CMU with Foamed -in
Mass Walls
place insulation and a 4" stud wall insulated
Insulation
to R-11.)
Roof Insulation
R-30 (U=.032)
R-25 (U=0.04)
Insulation entirely
above deck
Window U -Factor
(Climate Zone 6) (U=.042)
(U=1.09)
Metal framing,
fixed
Window
(Climate Zone 6) 0.4/0.46
SHGC =.52
SHGC/SC
SC x.87 = SHGC; SC=.45
Perimeter
(Climate Zone 6) (F=0.510)
None — (F=0.73)
Insulation
Skylight
Not required Per section 5.5.4.2.3
Same
SHGC/SC
Space is 1,400 sq. ft.
Opaque Doors
(Climate Zone 6) (U-0.5)
R-4.31 (U=0.232)
Lighting
Lighting Power
Storage: 0.66 W/sq. ft.
Proposed Store: 536 W (0.383 W/sf)
Density (W/sf)
Per Table 9.5.1
Daylighting
Daylighting
Yes, Sales Floor
Yes, Sales Floor
Control
Per Section 9.4.1.1, F
Plug Loads
Equipment Power
same
Same
Density (W/sf)
a y
\5>a
.2 7 § G E
e E
co E E
2 2 = 0 /
�
�
�
co
I-
CO
/ \
.o
e)
, m
\ §
0o
0
0
c k
\ §
\CL
co
�.Q
Gg§
(D CL
o § �
E k \ 0
IRlyo
E
\
£/
0)
§
§
§
2
<
§ �
§
0
\
Wl
m k § \
/\gN,E
\ g E E > °
o = o f 2 %
i u = e u =
\ \ n q C'4
2
�® E
G \ $
\ m [ \ / \
/
ƒ -0 $
: c$ :3$ # _ % e § 0
==$s) 2a
o » _
E E E } E \ \
/ U) Cl) /
�{
�{
B
0
t t
U_ :3
J
EeL
t&0E
8 \ \ \ E
E E
E m mLL 6
k
CD
�
c, \ m \ /
P,¥%
666
0
\
Wl
m k § \
/\gN,E
\ g E E > °
o = o f 2 %
i u = e u =
\ \ n q C'4
2
�® E
G \ $
\ m [ \ / \
/
ƒ -0 $
: c$ :3$ # _ % e § 0
==$s) 2a
o » _
E E E } E \ \
/ U) Cl) /
�{
�{
B
0
O� R�XBU�C
U {� O
�6
(" NED lie'
Permit Details
CITY OF
REEXBURG
America's Family Community
Community Development Department
35 North 152 East
Rexburg, ID 83440
Permit Technician (208) 372-2341
Inspection Hotline (208) 372-2344
1450 N 2nd E - Walmart - Grocery Pickup Addition
1450 N 2nd E
Permit Review Status
Current Building Review Status: REVISIONS
Application Number: 19-00154
Commercial Addition
Application Received Date: 04/04/2019
Application Approved Date: 04/05/2019
Application Approved Status: ACCEPTED
Plan Reviews Still in Progress
Status of Plan Reviews Completed
Planning and Zoning Review - Site Plan
Electrical Review
COMPLETED
04/08/2019
Public Works Review - Site Plan
Plumbing Review
COMPLETED
04/16/2019
Fire Department Review - Site Plan
Fire Sprinkler Review
HVAC Review
COMPLETED
04/16/2019
Fire Alarm Review
Building Review
REVISIONS
04/16/2019
Plan Review Details
Building Review Status: REVISIONS
Reviewed By: Quinton Owens
quinton.owens@rexburg.org
Review Date: 04/16/2019
*Please respond to 'REVISIONS" status items, with appropriate comment/documentation a.5 neededl
DESCRIPTIONCOMMENTS
Checked for linked cases Initial Walmart building permit 15-00015 YES
----- ------------------------------------------------------------------- ------ —----------------- —----------- ---- —---------------- -----
Building complies with IECC (IBC 1301)
Submit thermal envelope information or energy
compliance report to show compliance with
energy codes.
*Revisions Response :
Special Inspection Contractor is identified (IBC Who will be performing the special inspections?
1704.2.1)
"Revisions Response:
REVISIONS
REVISIONS
Special Inspections are required as per IBC Remember to have all special inspection reports COMPLETED
Chapter 17 submitted to the building inspector
ector
------------------------------------------------ —------------- --
Approval ofplans does not constitute approval of variance from code
Page 1 of 1
�1,XS USG
O�
&k I9 CITY o F
Community Development Department
Q REXBURG
35 North 1$1 East
Rexburg, ID �
:`7
Permit Technician (208) 372-2341
'
,•' America's Family Community
Inspection Hotline (208) 372-2344
Current Fire Sprinkler Review Status: APPROVED
Permit Details
Application Number: 19-00154
1450 N 2nd E - Walmart - Grocery Pickup Addition
Commercial Addition
1450 N 2nd E
Application Received Date: 04/04/2019
Application Approved Date: 04/05/2019
Application Approved Status: ACCEPTED
Permit Review Status
Plan Reviews Still in Progress
Status of Plan Reviews Completed
Public Works Review - Site Plan
Electrical Review COMPLETED 04/08/2019
Fire Alarm Review
Building Review
Plumbing Review COMPLETED 04/16/2019
HVAC Review COMPLETED 04/16/2019
Building Review REVISIONS 04/16/2019
Planning and Zoning Review - Site Plan COMPLETED 04/22/2019
Fire Department Review - Site Plan COMPLETED 04/25/2019
Fire Sprinkler Review COMPLETED 04/25/2019
Plan Review Details
Fire Sprinkler Review Status: APPROVED
Review Date: 04/25/2019
Reviewed By: Dale Pickering
dale.pickering@rexburg.org
--- -- ---- —------------------ — ---- —-------------
--------------------------------------------------------------------------- — --
Approval ofplans does not constitute approval of variance from code
Page 1 of 1
CI'T'Y OF
REXBUR
America's Family Community
Community Development Department
35 North 11t East
Rexburg, ID 83440
Permit Technician (208) 372-2341
Inspection Hotline (208) 372-2344
Review
Report
Current Fire Department Review - Site Plan Status: APPROVED
Permit Details Application Number: 19-00154
1450 N 2nd E - Walmart - Grocery Pickup Addition
1450 N 2nd E
Permit Review Status
Plan Reviews Still in Proqress
Public Works Review - Site Plan
Fire Sprinkler Review
Fire Alarm Review
Building Review
Plan Review Details
Fire Department Review - Site Plan Status: APPROVED
Reviewed By: Dale Pickering
dale.pickering@rexburg.org
Commercial Addition
Application Received Date: 04/04/2019
Application Approved Date: 04/05/2019
Application Approved Status: ACCEPTED
Status of Plan Reviews Completed
Electrical Review
COMPLETED
04/08/2019
Plumbing Review
COMPLETED
04/16/2019
HVAC Review
COMPLETED
04/16/2019
Building Review
REVISIONS
04/16/2019
Planning and Zoning Review - Site Plan
COMPLETED
04/22/2019
Fire Department Review - Site Plan
COMPLETED
04/25/2019
Review Date: 04/25/2019
*Please respond to 'REVISIONS" status items, with appropriate commenVdocumentation as needed.,
DESCRIPTION•
Plans are approved for a footing/foundation
YES
ONLY permit?
------------------ -------- —-------------------
-------------------------- ------------- ------ --------
Hydrant located within 150' from FDC
----------- --------------------------------------
— ---- -----
N/A
------------------ —---------------
No hydrants within 40' of building
--------------------------------------- ---------
----- — — — --- — ---- — .....
COMPLETED
----------------- ------ —---....--------------------
30' inside radius and 45' outside radius
--------------------------- .......... .------------------------------
—--...---....-- -----
COMPLETED
Building height >30' - fire lane to be 30' to 45'
------------- ---------- -------- ---- — -- - --
COMPLETED
from building
--- - -- ------ --------------- ------------------
-------------------------------------------------------
Minimum fire lane clearance 13'6"
------------------------------ ------ — -----------------------
---- —-------- - — - --
COMPLETED
-------------
Fire lanes exceeding 150' require a turn -around
------------ — ----------------------------------------------
----- — — ------------------- __--------- -------
COMPLETED
-------------- — ------------------ ----- — ------ ----- ---- -- -- — --
Approval of plans does not constitute approval of variance from code
Page 1 of 1
C I TY OF
REXBURG
Americal Family Community
Community Development Department
35 North 15t East
Rexburg, ID 83440
Permit Technician (208) 372-2341
Inspection Hotline (208) 372-2344
Review
Report
Current Planning and Zoning Review - Site Plan Status: APPROVED
Permit Details Application Number: 19-00154
1450 N 2nd E - Walmart - Grocery Pickup Addition
1450 N 2nd E
Permit Review Status
Plan Reviews Still in Progress
Public Works Review - Site Plan
Fire Department Review - Site Plan
Fire Sprinkler Review
Fire Alarm Review
Building Review
Plan Review Details
Planning and Zoning Review - Site Plan Status: APPROVED
Reviewed By: Val Christensen
val.christensen@rexburg.org
Commercial Addition
Application Received Date: 04/04/2019
Application Approved Date: 04/05/2019
Application Approved Status: ACCEPTED
Status of Plan Reviews Completed
Electrical Review
Plumbing Review
HVAC Review
Building Review
Planning and Zoning Review - Site Plan
COMPLETED
04/08/2019
COMPLETED
04/16/2019
COMPLETED
04/16/2019
REVISIONS
04/16/2019
COMPLETED
04/22/2019
Review Date: 04/22/2019
*Please respond to 'REVISIONS" status items, with appropriate commenvdocumentation as needed.)
'DESCRIPTION
COMMENTSSTATUS
Checked for linked cases
--------------------------------------------------------------
— ----- — ----------------------
YES
Dumpsters: 1 per 20 Units (non -dorm) or 1 per
--------- ------- — -- —
N/A
50 beds (Dorm)?
----------- ------------ — ------------ ------------------------
— —--------- -------- — -
------------------ ----- -- ---......
Easements
----- ------------ —------------------------------------
Defer to Public Works
—----------------------- —----------------------
N/A
Design standards Committee meeting held
........... ------------------ ----------
— ------ —---------- —---------- —--------
---------------- ..---- - -
N/A
-----------
Check conditional use permit
--------- — - —---------------------------------------------------------------------------------------------
----- — ---------- -------
N/A
Open/common spaces functional
----- ----- —------- —------------------------------ ------------
- - ------ -------- ------------
------ -------- ...
N/A
----
Fencing/screening (HVAC equipment, dumpsters,
Defer to Public Works
— .... - --- --
—Fencing/screening
N/A
parking, etc)
----- --- ------ ---------------- —---------- ------
- — -------------- — --------------------
--------- -...
Trash dumpster shown and screened & for
Defer to Public Works
_ ....
N/A
right-hand truck
----------------------- — ---------------------------------------------
— - —--------------------
------ — ---- —
Sidewalks along right of way access main streets
------------------------------------ ---------
------ ...-------------------------
------ — --
N/A
Lighting Plan
-------------------------------------------------------
------
Defer to Public Works
----------------------------------------------------------------------------------
-----..---- — ----_ --------
N/A
Flood plain check
------------- ------ --------------- —
-- -- — — ---- -- ----------------------
N/A
— ----- — - - - - ---- ----- --
Approval of plans does not constitute approval of variance from code
Page 1 of 3
o�c,� �.�.xer�,
r9 CITY OF
r
_0W_
�•t , s a e p yi' A mericaS Family CoYYJYT unio,
Planning and Zoning Review - Site Plan (Continued)
1 ESCRIPTIO N
COMMENTS
Show existing and proposed easements
------- --------- -----------------------------
N/A
- — ----------- ...-------- -------- ---------
Legal desciption of proposed building site
-- ------ ---------- — -------
N/A
included
---------------------------------------------- --
—----------------------------------- — ---------------------------
Parking space number
------------------- --------------------------------
—------- — -------------
N/A
—-----...------ — ------- --------- -
Parking lot handicapped requirements
--- ---------------------------------------
-------- —-------- —-------- — ----...
N/A
----------- - — - ------ ----------- --------
Unloading, loading area
-- -------- - ---- — ---------------------- --
------- - --- -- — -- .. ---
COMPLETED
— ------ --- -------
Parking spaces located in close proximity to
-- ---- —-- — -------- -- - — -....- —
COMPLETED
buildings
- — --------- —--------- — ------------- -------------
— --- --- — ----------- -------------------- — --- ---- — - - - - — - —
Parking space sizes
-------------- - — -------------- ---------------
COMPLETED
--------- — - -----------------------
Parking aisle widths
---------------------------- —-------------..------------------------------------
----------- ..------- —-------- ---- ---- — --------
COMPLETED
—
Use is consistent with zoning designation
--------------------------------------------------------------------------------
----------- —------------------------------- -----
COMPLETED
Compliance with comprehensive plan
--------------------------------------------------
--------------------------- --------- - --------
COMPLETED
------------------------
Plans are to scale
------------------------------------------------------------------------
—------------ — ----- - --- -- — - -------
COMPLETED
—
North arrow & Streets labeled
- --- --------- --- -- -- ----------
- ---- --- — -------------- —----------------- — ----- —
COMPLETED
-- - ----- — — -------- -- -- ---
Building setbacks (front, side, back yards)
----------------------------------------
- ---- ------ -
COMPLETED
-------- -------------------------
Building height
--------------------------------- - --------------------------------------
---------- -- - -- - — ---- -- — — ----- — .....
COMPLETED
-------------
Minimum distance between buildings
----------------------------------------------------
- —-------- — ..... — ------ -------
COMPLETED
--------- ----------- ------ -- — -----------
Clear site triangle
------------ ---------- - —------------------------
---- -- ----- -------
COMPLETED
-------------- — ------ — ------------
Driveway,parking lot dimensions
--------------------------------------------------
---------------- — ------ — ---- -- ------
-----Driveway,
COMPLETED
------------------- — ----------------------
Architectural design standards
----- -------------- — — --------------------------------
— ------------ —---------- — - ----
This provides additional architectural definition. COMPLETED
-------------
Internal pedestrian walkways per zone
--------------------------- ------------- ---------
--------- ----------------------------------------- — -
COMPLETED
--------- ------------- —
Snow storage
--- --- ------- -- — ---------- ----------- .----------
------------------ — -------------- ---- — -----
COMPLETED
--------------------------------------------
Buffering/landscaping requirements
— ------ — ---- — - — ----- ..... --
Replace all trees and bushes that are moved or COMPLETED
------- -------- --------------------
damaged.
--------------- ------- ------ — --- -- - — --
Amount of Permeable vs. Non -Permeable Surface
COMPLETED
----------—----------------------------- ----------- ----- — ----------- - — - — ----- — — ------------------- ------------
No
---------- No utility boxes in right of way? COMPLETED
------------------------------ ------ --------- --------------- --------------- — --------------- ------ -- -- - - - — — - - - ---- — -
Approval of plans does not constitute approval of variance from code
Page 2 of 3
U
CITY OF
REXBURG
�America's Family Community Planning and Zoning Review - Site Plan (Continued)
1 N COMMENTS
Bldg location, sq ft, dimensions, distance to COMPLETED
property lines & between bldgs
------------------- ------ — ----- — ----- ------ — ----- ----- -- ------ - — ------ — --
Approval of plans does not constitute approval of variance from code
Page 3 of 3