Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00362 - DL Evans Bank - Tenant FinishPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/11/2019 10:12 am Permit Details Permit Number: 17-00362 DL Evans Bank - Tenant Finish 125 Valley River Dr Commercial Tenant Finish Permit Issued Date: 08/08/2017 Permit Inspection Statistics 18Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 83.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 08/22/2017FailTed DyeCommercial Framing/Structure Inspection Ok to drywall front area when the electrical inspection has been completed.Inspector Comments: 08/28/2017PassTed DyeCommercial Framing/Structure Inspection 08/30/2017PassTed DyeCommercial Sheetrock/Drywall Inspection 09/14/2017PassQuinton OwensSuspending Ceiling Inspection Existing ceiling grid remained as was before remodel. New walls are built up to ceiling. Approved as a pre-existing condition. Inspector Comments: 09/21/2017PassQuinton OwensCommercial Building Final Electrical Inspection Type 08/18/2017PARTPASSBret StoddardCommercial Electrical Rough-in 08/24/2017PassBret StoddardCommercial Electrical Rough-in 09/14/2017PassBret StoddardCommercial Electrical Rough-in 09/21/2017PassBret StoddardCommerical Electrical Final Inspection Fire Inspection Type 09/20/2017PassBret StoddardFire Alarm Final Inspection 10/04/2017PassDale PickeringFire Department Inspection 04/23/2018PassDavid DavisFire Sprinkler Final Inspection Mechanical Inspection Type 09/15/2017PassDon AllenHVAC Rough-in 09/21/2017PassDon AllenHVAC Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 17-00362 DL Evans Bank - Tenant Finish 125 Valley River Dr Commercial Tenant Finish Permit Status of (Open) as of Report Date: 06/11/2019 10:12 am Permit Inspection Summary Plumbing Inspection Type 08/16/2017PassDon AllenPlumbing Underground Inspection GOOD TO COVER THE PLUMBING UNDERGROUNDInspector Comments: 08/24/2017PassDon AllenPlumbing Rough-in 09/21/2017FailDon AllenPlumbing Final Inspection 09/29/2017PassDon AllenPlumbing Final Inspection Page 2 of 2