HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00362 - DL Evans Bank - Tenant FinishPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/11/2019 10:12 am
Permit Details Permit Number: 17-00362
DL Evans Bank - Tenant Finish
125 Valley River Dr
Commercial Tenant Finish
Permit Issued Date: 08/08/2017
Permit Inspection Statistics
18Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate: 83.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
08/22/2017FailTed DyeCommercial Framing/Structure Inspection
Ok to drywall front area when the electrical inspection has been completed.Inspector Comments:
08/28/2017PassTed DyeCommercial Framing/Structure Inspection
08/30/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
09/14/2017PassQuinton OwensSuspending Ceiling Inspection
Existing ceiling grid remained as was before remodel. New walls are built up to
ceiling.
Approved as a pre-existing condition.
Inspector Comments:
09/21/2017PassQuinton OwensCommercial Building Final
Electrical Inspection Type
08/18/2017PARTPASSBret StoddardCommercial Electrical Rough-in
08/24/2017PassBret StoddardCommercial Electrical Rough-in
09/14/2017PassBret StoddardCommercial Electrical Rough-in
09/21/2017PassBret StoddardCommerical Electrical Final Inspection
Fire Inspection Type
09/20/2017PassBret StoddardFire Alarm Final Inspection
10/04/2017PassDale PickeringFire Department Inspection
04/23/2018PassDavid DavisFire Sprinkler Final Inspection
Mechanical Inspection Type
09/15/2017PassDon AllenHVAC Rough-in
09/21/2017PassDon AllenHVAC Final Inspection
Page 1 of 2
(Continued)
Permit Details Permit Number: 17-00362
DL Evans Bank - Tenant Finish
125 Valley River Dr
Commercial Tenant Finish
Permit Status of (Open) as of Report Date: 06/11/2019 10:12 am
Permit
Inspection
Summary
Plumbing Inspection Type
08/16/2017PassDon AllenPlumbing Underground Inspection
GOOD TO COVER THE PLUMBING UNDERGROUNDInspector Comments:
08/24/2017PassDon AllenPlumbing Rough-in
09/21/2017FailDon AllenPlumbing Final Inspection
09/29/2017PassDon AllenPlumbing Final Inspection
Page 2 of 2