Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00501 - 685 Tanglewood - New SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/11/2019 9:58 am Permit Details Permit Number: 17-00501 685 Tanglewood - SFR 685 Tanglewood Building - Single Family Residence Permit Issued Date: 08/31/2017 Permit Inspection Statistics 25Total Inspections Completed: 19Total Inspections Passed: Inspection Pass Rate: 76.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 09/20/2017PassLarry BeesleyResidential Footing Inspection All the re bar is good. Inspector Comments: 09/28/2017PassLarry BeesleyFoundation Inspection The forms and the re bar looks good and is ready to pour the concrete. Thanks 9-27-17 Inspector Comments: 01/30/2018FailLarry BeesleySheeting There was quite a few blocks at the end joints of the OSB that were missing and also the garage door openings need more nail on the header and trimmers. I went over the nailing patterns with the framers. Please call for a re inspection when corrections have been completed. Thanks Inspector Comments: 02/15/2018PassLarry BeesleySheeting All of the blocks have been installed and missed nails have been put in. THANKS.Inspector Comments: 03/12/2018FailLarry BeesleyResidential Framing/Structure Inspection The nuts on the anchor bolts need to be tightened down. The wall in the master bed room needs to be nailed down to the floor. Add blocks in the floor to carry the bearing of the girder supports to the foundation. Inspector Comments: 03/21/2018PassLarry BeesleyResidential Framing/Structure Inspection All of the corrections have been made and the Electrical, Mechanical and plumbing have passed. Thanks Inspector Comments: 03/27/2018PassLarry BeesleyResidential Insulation Inspection The up stair is good to cover. The holes in the bottom plate should be fire blocked with a orange Fire Blocking foam. The down stairs the holes in the top plate should be foamed the same as above.This is found in the IRC R302.11 #4 In the down stairs by the bathroom there are a few missing pieces of insulation for fire blocking. Just fix those thing s and go ahead and hang your sheet rock. I will stop by tomorrow or the next day and check. Thanks Inspector Comments: 03/27/2018PassLarry BeesleyRadon-Ground Inspection Don said he inspected the radon system in his plumbing rough in.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 17-00501 685 Tanglewood - SFR 685 Tanglewood Building - Single Family Residence Permit Status of (Open) as of Report Date: 06/11/2019 9:58 am Permit Inspection Summary 04/10/2018PassLarry BeesleyResidential Sheetrock/Drywall Inspection The cantilever in the garage needs sheet rock on the bottom of the overhang. The sheet rock and screws are all good. Go ahead with the taping. Thanks Inspector Comments: 07/12/2018PassLarry BeesleySidewalk Inspection The forms and the gravel are good, You are good to pour the concrete. ThanksInspector Comments: 07/20/2018FailLarry BeesleyResidential Building Final Ladders in window wells missing and tempered glass in the master bath.Inspector Comments: 07/24/2018PassLarry BeesleyResidential Building Final All of the corrections have been made and every thing looks good. All I need you to do is get the certificate of insulation put on the panel and let me know.You are good for your C.O. Thanks Inspector Comments: Electrical Inspection Type 03/12/2018PassBret StoddardResidential Electrical Service Inspection 03/14/2018PassBret StoddardResidential Electrical Rough-in 07/12/2018PassBret StoddardResidential Electrical Final Inspection Mechanical Inspection Type 03/12/2018FailDon AllenHVAC Rough-in 03/20/2018PassDon AllenHVAC Rough-in 07/20/2018PassDon AllenHVAC Final Inspection Good for C/OInspector Comments: Plumbing Inspection Type 10/11/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing undergroundInspector Comments: 10/24/2017PassDon AllenPlumbing Water 10/24/2017PassDon AllenPlumbing Sewer Good to cover the sewer lineInspector Comments: 03/12/2018FailDon AllenPlumbing Rough-in 03/21/2018PassDon AllenPlumbing Rough-in 07/20/2018FailDon AllenPlumbing Final Inspection 07/24/2018PassDon AllenPlumbing Final Inspection Page 2 of 2