HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00501 - 685 Tanglewood - New SFRPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/11/2019 9:58 am
Permit Details Permit Number: 17-00501
685 Tanglewood - SFR
685 Tanglewood
Building - Single Family Residence
Permit Issued Date: 08/31/2017
Permit Inspection Statistics
25Total Inspections Completed:
19Total Inspections Passed:
Inspection Pass Rate: 76.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
09/20/2017PassLarry BeesleyResidential Footing Inspection
All the re bar is good.
Inspector Comments:
09/28/2017PassLarry BeesleyFoundation Inspection
The forms and the re bar looks good and is ready to pour the concrete. Thanks
9-27-17
Inspector Comments:
01/30/2018FailLarry BeesleySheeting
There was quite a few blocks at the end joints of the OSB that were missing and
also the garage door openings need more nail on the header and trimmers. I
went over the nailing patterns with the framers. Please call for a re inspection
when corrections have been completed. Thanks
Inspector Comments:
02/15/2018PassLarry BeesleySheeting
All of the blocks have been installed and missed nails have been put in. THANKS.Inspector Comments:
03/12/2018FailLarry BeesleyResidential Framing/Structure Inspection
The nuts on the anchor bolts need to be tightened down. The wall in the master
bed room needs to be nailed down to the floor. Add blocks in the floor to carry
the bearing of the girder supports to the foundation.
Inspector Comments:
03/21/2018PassLarry BeesleyResidential Framing/Structure Inspection
All of the corrections have been made and the Electrical, Mechanical and
plumbing have passed. Thanks
Inspector Comments:
03/27/2018PassLarry BeesleyResidential Insulation Inspection
The up stair is good to cover. The holes in the bottom plate should be fire
blocked with a orange Fire Blocking foam. The down stairs the holes in the top
plate should be foamed the same as above.This is found in the IRC R302.11 #4
In the down stairs by the bathroom there are a few missing pieces of insulation
for fire blocking. Just fix those thing s and go ahead and hang your sheet rock. I
will stop by tomorrow or the next day and check. Thanks
Inspector Comments:
03/27/2018PassLarry BeesleyRadon-Ground Inspection
Don said he inspected the radon system in his plumbing rough in.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 17-00501
685 Tanglewood - SFR
685 Tanglewood
Building - Single Family Residence
Permit Status of (Open) as of Report Date: 06/11/2019 9:58 am
Permit
Inspection
Summary
04/10/2018PassLarry BeesleyResidential Sheetrock/Drywall Inspection
The cantilever in the garage needs sheet rock on the bottom of the overhang.
The sheet rock and screws are all good. Go ahead with the taping. Thanks
Inspector Comments:
07/12/2018PassLarry BeesleySidewalk Inspection
The forms and the gravel are good, You are good to pour the concrete. ThanksInspector Comments:
07/20/2018FailLarry BeesleyResidential Building Final
Ladders in window wells missing and tempered glass in the master bath.Inspector Comments:
07/24/2018PassLarry BeesleyResidential Building Final
All of the corrections have been made and every thing looks good. All I need you
to do is get the certificate of insulation put on the panel and let me know.You are
good for your C.O. Thanks
Inspector Comments:
Electrical Inspection Type
03/12/2018PassBret StoddardResidential Electrical Service Inspection
03/14/2018PassBret StoddardResidential Electrical Rough-in
07/12/2018PassBret StoddardResidential Electrical Final Inspection
Mechanical Inspection Type
03/12/2018FailDon AllenHVAC Rough-in
03/20/2018PassDon AllenHVAC Rough-in
07/20/2018PassDon AllenHVAC Final Inspection
Good for C/OInspector Comments:
Plumbing Inspection Type
10/11/2017PassDon AllenPlumbing Underground Inspection
Good to cover the plumbing undergroundInspector Comments:
10/24/2017PassDon AllenPlumbing Water
10/24/2017PassDon AllenPlumbing Sewer
Good to cover the sewer lineInspector Comments:
03/12/2018FailDon AllenPlumbing Rough-in
03/21/2018PassDon AllenPlumbing Rough-in
07/20/2018FailDon AllenPlumbing Final Inspection
07/24/2018PassDon AllenPlumbing Final Inspection