Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00049 - 450 S Physical Plant Way - BYUI Upper Field RestroomsPermit Inspection Summary Permit Status of (Open) as of Report Date: 05/31/2019 10:24 am Permit Details Permit Number: 16-00049 450 S Physical Plant Way - BYUI Upper Field Restrooms 450 S Physical Plant Way Building - Commercial Permit Issued Date: 05/16/2016 Permit Inspection Statistics 27Total Inspections Completed: 26Total Inspections Passed: Inspection Pass Rate: 96.30% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type Special inspector on site for pour (submit reports).Inspector Comments: 05/04/2016PassQuinton OwensCommercial Footing Inspection Ufer not identified in footing (will inspect with foundation).Inspector Comments: 05/05/2016PassQuinton OwensFoundation Inspection Copper ufer ground in bottom of east foundation wall.Inspector Comments: 05/20/2016PassTed DyeCommercial Footing Inspection 05/25/2016PassQuinton OwensFoundation Inspection Masonry wall reinforcement at 4'.Inspector Comments: 05/26/2016PassQuinton OwensFoundation Inspection Masonry wall reinforcement at 8'.Inspector Comments: 05/31/2016PassQuinton OwensFoundation Inspection Top of exterior masonry wall reinforcement. Special Inspector on site. 2nd required rebar in top added during inspection. Inspector Comments: 06/01/2016PassQuinton OwensFoundation Inspection Interior masonry wall reinforcement at 4'. Special Inspector is on site.Inspector Comments: 06/03/2016PassQuinton OwensFoundation Inspection Interior masonry wall reinforcement at 8'.Inspector Comments: Roof framing. Several nails for straps on roof missed blocking. Straps under deck on north end not completed. Inspector Comments: 6/28: Reinspected and approved.Inspector Comments: 06/28/2016PassQuinton OwensCommercial Framing/Structure Inspection Canopy Framing: add missing nails to hangers as indicated in just 3 locations.Inspector Comments: 06/28/2016PassQuinton OwensCommercial Insulation Inspection Interior foam board insulation.Inspector Comments: 06/30/2016PassQuinton OwensCommercial Framing/Structure Inspection Approved for drywall . Add missing insulation on west wall as indicated. Inspector Comments: 07/05/2016PassQuinton OwensCommercial Sheetrock/Drywall Inspection 07/27/2016PassQuinton OwensSidewalk Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 16-00049 450 S Physical Plant Way - BYUI Upper Field Restrooms 450 S Physical Plant Way Building - Commercial Permit Status of (Open) as of Report Date: 05/31/2019 10:24 am Permit Inspection Summary 07/28/2016PassQuinton OwensSlab Inspection Remaining sidewalkInspector Comments: 08/19/2016PassQuinton OwensCommercial Building Final Electrical Inspection Type 05/17/2016PassBret StoddardElectrical Underground Inspection 05/20/2016PassBret StoddardElectrical Underground Inspection 06/24/2016PassBret StoddardElectrical Rough-in COM-A,R,T 06/30/2016PassBret StoddardElectrical Rough-in COM-A,R,T 08/19/2016FailBret StoddardElectrical Final Inspection COM-A,R,T 08/26/2016PassBret StoddardElectrical Final Inspection COM-A,R,T Mechanical Inspection Type 06/30/2016PassDon AllenHVAC Rough-in Good to cover the mechanical rough inInspector Comments: 08/19/2016PassDon AllenHVAC Final Inspection Good for the c/oInspector Comments: Plumbing Inspection Type 05/18/2016PassDon AllenPlumbing Underground Inspection 06/30/2016PassDon AllenPlumbing Rough-in Good to cover the plumbing rough inInspector Comments: 08/19/2016PassDon AllenPlumbing Final Inspection Good for the c/oInspector Comments: Page 2 of 2