Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Issued Date: 07/28/2016
Permit Inspection Statistics
269Total Inspections Completed:
111Total Inspections Passed:
Inspection Pass Rate: 41.26%
Permit Inspection History *Refer to Individual Inspection Report for more Details
01/05/2018PARTPASSQuinton OwensPlanning and Zoning Final Inspection
* Parking for Building A requires partial occupancy of parking garage as per
conditional separation from contractor areas and building B construction.
* Landscaping and other exterior requirements for P&Z will be inspected when
entire project (all buildings) is ready for full occupancy. Approved for C.O. on
building A.
Inspector Comments:
04/04/2019PassQuinton OwensPlanning and Zoning Final Inspection
Building Inspection Type
06/01/2016PassQuinton OwensCommercial Footing Inspection
Footings from grid line G.21 on north to east side grid lineInspector Comments:
06/07/2016PassQuinton OwensFoundation Inspection
Waiting on arrival of 1" rod for TD5 on courtyard side foundation wall to be
installed.
Inspector Comments:
06/13/2016PassQuinton OwensCommercial Footing Inspection
06/17/2016PassQuinton OwensCommercial Footing Inspection
Elevator slab. Add keyway for waterstop called for in detail.Inspector Comments:
06/22/2016PassQuinton OwensFoundation Inspection
CONDITIONAL APPROVAL. No water stop in keyway upon inspection. Informed
contractor, and later poured without re-inspection. Concrete reinforcement
approved as per plans.
Inspector Comments:
Interior footings on west section from south end up to about grid A.J:
Stopped by over an hour early while doing another inspection on site and was
told the rebar will be tied up and ready between 11:30 - 12:00 (instead of 11:00
as scheduled). Arrived no later than a few minutes after 12 (same time as
concrete). Cross bars added where found missing in 2 F3C footings.
Inspector Comments:
07/06/2016PassQuinton OwensCommercial Footing Inspection
** Verify with engineer the F4C footing missing from schedule. **Inspector Comments:
Northeast interior footings from about grid A.J to A.25. Fix clearances as
identified on site to subcontractor.
Inspector Comments:
07/11/2016PassQuinton OwensCommercial Footing Inspection
Note: Foundation insulation missing on west foundation at grid A.W.Inspector Comments:
Page 1 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
08/17/2016PassQuinton OwensCommercial Footing Inspection
South exterior footing from SE corner A.42 to A.1 (west footing on grid A.1 not
being poured at this time).
Inspector Comments:
08/19/2016PassQuinton OwensCommercial Footing Inspection
Southwest Elevator footing only.Inspector Comments:
08/22/2016PassQuinton OwensFoundation Inspection
South foundation wall of south wing and SW elevator foundation wall.Inspector Comments:
08/25/2016FailQuinton OwensCommercial Footing Inspection
09/16/2016PassQuinton OwensCommercial Footing Inspection
9/15/16: Inspection for exterior footing on north side of south wing and footing
extension to parking garage footing by southwest elevator.
Inspector Comments:
09/21/2016PassQuinton OwensFoundation Inspection
PARTIAL FOUNDATION:
Added foundation by elevator on grid AU (doweled into garage foundation).
Remaining wall south of elevator on grid P1.
Foundation on North side of south wing.
Inspector Comments:
09/21/2016PassQuinton OwensCommercial Footing Inspection
PARTIAL FOOTING:
Two interior spot footings by grid PW at P20 & P24
Inspector Comments:
10/05/2016FailQuinton OwensCommercial Footing Inspection
Interior footings on south wing (F6A footings poured previously):
Special Inspector not on site for concrete testing. Do not cover concrete that has
not been tested until shown to meet design strength. Special Inspections
required as per ACI 318.
Inspector Comments:
10/19/2016FailQuinton OwensCommercial Framing/Structure Inspection
Inspection for hold downs on east wing (all 5 levels):
found some blocking missing at floor ceiling assemblies. (single 2x's where 2 are
needed or floor joist only without added blocks).
Inspector Comments:
10/28/2016PassQuinton OwensSheeting
Roof sheeting on East wing (from stairs to south end). Add nailing to 2 locations
identified with contractor before covering.
Inspector Comments:
11/10/2016PassQuinton OwensSheeting
One joint missing several nails on one sheet - south exterior wall on top floor.
Approved to wrap exterior (re-inspection can be done with later inspection)
Inspector Comments:
North half of building a roof sheeting.Inspector Comments:
12/02/2016PassTed DyeSheeting
Also looked at earth bound system to be covered by sheeting.Inspector Comments:
Page 2 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
12/12/2016PassTed DyeSheeting
Sheeting on north wing (north and south walls)passed nailing inspection.
Ok to cover.
Inspector Comments:
12/12/2016PassTed DyeCommercial Insulation Inspection
12/15/2016PARTPASSQuinton OwensCommercial Insulation Inspection
East wing, 3rd & 4th level in floor joists above rated ceiling: Penetrations above
corridor wall are fire blocked. Approved for cover in dry locations most units are
still dripping through floor). Any damaged insulation needs to be replaced.
Inspector Comments:
1st & 2nd Level ceiling insulation above drop ceiling areas:
Fire blocking penetrations has not been done above corridor walls. Main corridor
ceilings approved to hang. Finish insulating full height of floor cavity on east side
of south end entry.
Inspector Comments:
12/27/2016PARTPASSQuinton OwensCommercial Insulation Inspection
Do not hang ceilings in units so fire blocking may be inspected.Inspector Comments:
12/29/2016FailQuinton OwensCommercial Framing/Structure Inspection
Levels 1 & 2: Previous items not done (penetrations above corridor wall in floor
cavity need to be fire blocked - fire rating not required here).
Inspected shear panels behind tubs in east wing on levels 1,2, & 3 - approved.
Also discussed 2 hour rating on sides of pop-outs: these have bearing elements
which need 2 hour rated protection for structural rather than for fire separation
(found some blocking missed in floor cavity at these bearing points).
Inspector Comments:
01/03/2017PARTPASSQuinton OwensCommercial Insulation Inspection
PARTIAL PASS: Insulation above dropped ceiling areas on east wing, 2nd floor
ONLY.
Fire blocking done at penetrations above corridor partition walls (except above
door to mechanical closet for SE apartment)
Inspector Comments:
PARTIAL APPROVAL: Inspect blocking missed at exterior bearing point in floor on
sides of pop-outs.
Inspector Comments:
01/03/2017FailQuinton OwensCommercial Framing/Structure Inspection
(NOT a full framing inspection - ONLY dropped ceiling areas have been inspected
for floor framing and insulation).
Inspector Comments:
Second floor fire blocking in floor above corridor walls in east wing. Unfinished
penetrations sealed during inspection except above mechanical closet for SE unit.
Insulation installed in floor above dropped ceiling areas.
Inspector Comments:
01/06/2017PassQuinton OwensCommercial Framing/Structure Inspection
4th floor framing. Some top plate penetrations are not fire caulked in each unit.
Some units need ceiling drywall backing along unit separation wall.
Inspector Comments:
First floor fire blocking in floor above corridor walls in east wing. One penetration
not sealed above unit on west side of corridor (correction was planned to be
done right away and permission given to submit picture). Insulation installed in
floor above dropped ceiling areas.
Inspector Comments:
Page 3 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Second floor re-inspect fire blocking in floor above corridor wall at mechanical
room for SE unit.
Inspector Comments:
01/09/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Request made to inspect top/bottom plate plumbing penetrations. These will be
inspected with ALL penetrations as one inspection.
Inspector Comments:
01/17/2017PassTed DyeCommercial Insulation Inspection
01/17/2017FailTed DyeCommercial Framing/Structure Inspection
01/20/2017PassTed DyeCommercial Insulation Inspection
01/27/2017PassTed DyeCommercial Insulation Inspection
01/27/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
02/02/2017FailQuinton OwensCommercial Framing/Structure Inspection
Re-inspection of 3rd floor, east wing units- Finish drywall for fire rating above
dropped ceilings in indicated bathrooms. Fire stopping and blocking completed.
Inspector Comments:
Top floor north wing framing:
Be sure ceiling drywall has backing at edges along party walls. Finish fire blocking
above corridor walls. Hangers missing on ends of ceiling joists north elevator.
Inspector Comments:
02/03/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Re-inspection of 3rd floor, east wing. - Approved for cover.Inspector Comments:
02/03/2017PARTPASSQuinton OwensCommercial Insulation Inspection
WARNING: For further approvals, cut insulation to fit. Over compressed insulation
results in reduced R-value and will fail inspections.
Inspector Comments:
02/03/2017PARTPASSQuinton OwensResidential Sheetrock/Drywall Inspection
4th Level, east wing in units onlyInspector Comments:
Ok to insulate ceiling in dropped areas in apartments and corridor on levels 3 & 4
of north wing.
Inspector Comments:
DO NOT COVER UNLESS ALL NEEDED INSPECTIONS ARE APPROVEDInspector Comments:
02/06/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Tie down system in exterior side extensions at pop outs on south wing approved
to cover (sheeting). Call for sheeting inspection on south wing when ready.
Inspector Comments:
2nd floor, East wing only. Corrections made and re-inspected in afternoon.Inspector Comments:
02/09/2017PARTPASSQuinton OwensCommercial Insulation Inspection
One correction required before covering is change out non-rated dryer vent
recess in manger's unit (corridor wall shall be rated on both sides). It may be
inspected with drywall since it will remain visible.
Inspector Comments:
Inspection on 3rd floor east wing. Approved for tape & texture.Inspector Comments:
02/09/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Inspection of 2nd floor east wing fire rating above dropped ceilings,Inspector Comments:
Page 4 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
02/15/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
East wing, 2nd floor approved for taping (excluding south end of corridor - not
approved for cover yet). A few locations missing screws were marked and may
be re-inspected with next inspection.
Inspector Comments:
02/15/2017FailQuinton OwensCommercial Framing/Structure Inspection
East wing, first level framing. Some anchor bolts are not properly installed, Fire
caulking/blocking not yet completed. Fire rate penetrations in stud between
non-rated laundry section of wall and rated section containing 4" PVC pipes.
Inspector Comments:
02/15/2017PARTPASSQuinton OwensSheeting
Roof sheeting on south wing approved for cover. A few locations found on wall to
be nailed (marked on stud in green paint) although wall sheeting is not
completed yet.
Inspector Comments:
Roof sheathing and exterior wall sheathing on south wing.Inspector Comments:
Roof sheathing approved for cover.Inspector Comments:
02/16/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Wall sheathing has nailing needed in various locations (marked inside on stud
with green paint)
Inspector Comments:
02/21/2017PassTed DyeCommercial Framing/Structure Inspection
2nd Floor, North wing corredor, fire blocking has been done
5th floor units 507, 508, 509 and 510 have had the framing inspection of those
area's to have prerock. All those area's 'looked good.
Inspector Comments:
02/21/2017PassTed DyeCommercial Insulation Inspection
Re-inspect sheathing on south wing exterior walls. (2 locations on 5th level not
nailed yet). Plan to nail while installing building wrap and re-inspect with framing.
Inspector Comments:
02/22/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Framing inspection on 2nd floor of north wing above dropped ceiling areas.
Approved for insulation.
Inspector Comments:
North wing, Floors 2 & 3 floor cavities over dropped ceiling areas only in
apartments and corridor.
Inspector Comments:
02/27/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Excludes west of kitchen in northeast unit where it is not sufficiently dried in
(west side of building is not completed).
Inspector Comments:
02/28/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
East wing, first floor units and corridor (excluding north and south end common
areas).
Inspector Comments:
North wing, 4th floor apartments and corridor areas above dropped ceilings only.Inspector Comments:
02/28/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Excludes west of kitchen in northeast unit where it is not sufficiently dried in
(west side of building is not completed).
Inspector Comments:
Page 5 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
03/02/2017PARTPASSQuinton OwensCommercial Insulation Inspection
East wing, 5th floor insulation above dropped ceiling areas is approved for cover
(in units and corridor).
Inspector Comments:
03/08/2017PARTPASSQuinton OwensCommercial Insulation Inspection
East wing 5th level attic foam insulation above dropped ceiling areas in
apartments and corridor. (excludes south end common area - not ready).
Inspector Comments:
03/10/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
1st floor north wing framing above dropped ceiling area in apartments and
corridor. Approved for insulation.
Inspector Comments:
03/14/2017PARTPASSQuinton OwensCommercial Insulation Inspection
North wing, 1st level insulation in floor above dropped ceiling areas (units &
corridor).
Inspector Comments:
Pre-rock areas in East wing apartments on 5th floor not approved as noted
below:
Inspector Comments:
Corridor wall in concealed cavity by tubs has no drywall. (be sure joints &
perimeter gaps are sealed)
Inspector Comments:
Southeast corner unit has roof drain pipe penetration without fire collar (rest of
roof drain in unit to north needs fire rated cover as discussed with Nate
Richards).
Inspector Comments:
03/16/2017FailQuinton OwensCommercial Sheetrock/Drywall Inspection
Exterior bearing walls are 2 hour rated (5th floor south exterior wall of east
apartment is bearing). Partial bearing in bedroom and south wall of bathroom
including behind tub).
Inspector Comments:
East wing, 5th floor insulation:
South unit on west side is missing corridor sound insulation on south wall (no
access from corridor side due to sheathing)
Inspector Comments:
03/16/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Insulation in other apartments and corridor is approved for cover.Inspector Comments:
03/17/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Insulation added as needed in south wall of Unit 509Inspector Comments:
East wing, 5th floor, units 507, 509, & 510 only.Inspector Comments:
Required 2nd layer of drywall added behind tub on south wall of 410 from
exterior side. Approved for insulation and cover.
Inspector Comments:
03/21/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Was insulation correctly installed in South exterior bathroom wall of 410? (same
wall on lower floors are interior walls)
Inspector Comments:
Page 6 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
INSPECTION FOR:
South wall of mechanical rooms in NE common area on 2,3,& 4th floors and party
walls on 1st floor and 5th floor (5th floor party walls are not ready to be
insulated).
Inspector Comments:
03/21/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Be sure rough-in's to be inspected are approved before insulating. Framing
approved on south wall of mechanical rooms.
Inspector Comments:
Party/Shear walls only in south wing.Inspector Comments:
03/23/2017FailQuinton OwensCommercial Framing/Structure Inspection
Also found R-11 in exterior wall at tub location in southeast corner of courtyard
(4th & 5th floor covered). Make correction and leave uncovered until insulation
inspection is approved.
Inspector Comments:
03/28/2017PARTPASSQuinton OwensCommercial Insulation Inspection
South wing: Insulation inside party shear walls prior to interior sheeting.Inspector Comments:
03/28/2017PARTPASSQuinton OwensSheeting
Shear walls behind tubs inspected and approved for cover.Inspector Comments:
03/29/2017PassTed DyeCommercial Insulation Inspection
03/30/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
South wing roof framing inspection only prior to foam application to attic exterior.Inspector Comments:
03/31/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
East wing, 5th floor corridor from stairs to south corridor intersection. Missed
screws at 3 studs just south of entrance to #509.
Inspector Comments:
04/06/2017PassQuinton OwensCommercial Insulation Inspection
04/06/2017FailQuinton OwensCommercial Framing/Structure Inspection
South wing, 3rd level floor/ceiling framing inspection above dropped ceiling
areas.
Inspector Comments:
04/06/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
South wing, 2nd level floor framing above dropped ceiling areas only (apartments
and main corridor). Approved to insulate in this area only.
Inspector Comments:
Storage closets at west end of corridor are approved for insulating walls & ceiling.
Inspector Comments:
04/07/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Rooms on north side of corridor at east end has not had framing inspection
(should not be insulated).
Inspector Comments:
Page 7 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
04/10/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Partial inspection of south wing, 4th level, insulation above dropped ceilings prior
to hanging rated ceiling. All units are not ready for insulation. Will be
re-inspected tomorrow morning.
Inspector Comments:
04/11/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Inspection of south wing, 4th level (corridor & apartments), insulation above
dropped ceilings prior to hanging rated ceiling. Exterior portions of floor assembly
have been corrected for thermal insulation values.
Inspector Comments:
04/13/2017PARTPASSQuinton OwensCommercial Insulation Inspection
South wing, 2nd level insulation in floor above dropped ceiling areas (includes
apartments and corridor except above ramp and closets off hallway).
Inspector Comments:
04/14/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
South wing utility/storage closets off corridor at west end on levels 2, 3, & 4 are
approved for insulation.
Inspector Comments:
04/19/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Rooms #111, 112, 113 and 116 Approved
Also the closets off of the corridor on the west side of the south wing have also
been approved.
Inspector Comments:
04/24/2017PARTPASSTed DyeCommercial Insulation Inspection
04/24/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Framing inspections of north tower units 404, 405 and 406.Inspector Comments:
05/02/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Inspected units 412, 413, 414, 415 and 416.
OK to insulate
Inspector Comments:
05/03/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
05/04/2017PassTed DyeCommercial Framing/Structure Inspection
Units inspected and passed are; 316, 315, 313, 311, and 312.
Crush blocks were installed between beam and trimmers on 3rd and 4th floors of
south wing.
Inspector Comments:
05/04/2017PassTed DyeCommercial Insulation Inspection
Insulation inspected and passed in units; 411, 412, 413, 414, 415, And 416.
The storage area's in corridor Across from above units are OK to drywall.
Inspector Comments:
05/08/2017FailQuinton OwensCommercial Insulation Inspection
3rd level of south wing only.Inspector Comments:
05/09/2017PARTPASSTed DyeCommercial Insulation Inspection
05/11/2017PassTed DyeCommercial Framing/Structure Inspection
Units 205 and 305Inspector Comments:
Page 8 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
05/16/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
* First level NE Lobby & office area (floor/ceiling inspection only)
* Approved to insulate ceiling above Lobby & Office area.
Inspector Comments:
05/25/2017PassTed DyeCommercial Framing/Structure Inspection
South tower, level 2, all units.Inspector Comments:
05/26/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
South wing, 3rd level: Apartments only approved for taping except east end unit
on north side of corridor (not ready).
Inspector Comments:
South wing, 5th floor apartments onlyInspector Comments:
Northeast corner (east end) of lobby sprayed with fireguard approved to insulate.
Use mineral wool insulation due to difficulty of applying fireguard and possibly
not getting 100% coverage.
Inspector Comments:
06/01/2017FailQuinton OwensCommercial Insulation Inspection
Drywall inspection of south wing, 3rd floor unit on east end: unit not completely
ready. Do not tape until inspected.
Inspector Comments:
06/01/2017PARTPASSTed DyeCommercial Footing Inspection
Footing Just north of court yard. Continuation of north tower.Inspector Comments:
06/02/2017PassTed DyeCommercial Insulation Inspection
Insulation reinspection of those areas in attic, on the outside vertical truss
members that missed being insulated the first time.
Inspector Comments:
06/05/2017PassTed DyeCommercial Insulation Inspection
South tower second level (2).Inspector Comments:
06/07/2017PassTed DyeFoundation Inspection
North tower, West foundation inspection to complete.Inspector Comments:
06/09/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
06/14/2017FailTed DyeCommercial Framing/Structure Inspection
Building A, North Tower,N.E. Commons Framing inspection.Inspector Comments:
06/14/2017FailTed DyeCommercial Insulation Inspection
Units 205 and 305 in North Tower.Inspector Comments:
06/14/2017PassTed DyeCommercial Footing Inspection
Building A, North tower west end.
3 spot footing inspected. Passed.
Inspector Comments:
Page 9 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
06/22/2017PARTPASSTed DyeCommercial Insulation Inspection
Locations of inspections; --2nd and 3rd floor, N.East lobby areas, ceiling only. OK.
--Unit 205, walls, ceiling, fire caulk recheck and window foam;ceilings good, fire
caulk good, insulation around windows need to be sealed better and walls have
one corner in living room on Left side that needs insulation behind blocks and
sheetrock needed in separation wall on corridor separation wall.
--Unit 305, walls, ceiling, fire caulk recheck and window foam; walls, left corner in
livin room on south wall needs insulation behind blocking, ceilings good, fire caulk
good, window foam around windows needs to be sealed better and sheetrock
needed in concealed area on corridor separation wall
Inspector Comments:
06/23/2017PassTed DyeCommercial Framing/Structure Inspection
4th floor N.East commons area framing.Inspector Comments:
06/26/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
Units inspected for screw patterns are; 511, 513, 514, 515 and 516Inspector Comments:
06/27/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
INSPECTED 4 AND 5TH LEVEL COMMONS AND MECH. ROOM ON THE NORTH
TOWER EAST SIDE.
Inspector Comments:
06/30/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Re-inspect South wing 5th floor corridor corrections (fill in 2 small stud cavities on
wall to west of entry to garage)
insulated wall between corridor wall and concealed space of south wing east unit
on north of corridor
5th floor common area approved for foam insulation at roof deck.
Inspector Comments:
07/05/2017FailTed DyeCommercial Framing/Structure Inspection
Inspected both stair wells.Inspector Comments:
07/05/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
07/06/2017PassTed DyeCommercial Footing Inspection
07/06/2017N/AQuinton OwensCommercial Framing/Structure Inspection
Consultation review of framing above suspended ceiling grid:
* Submit assembly information for fire rating verification.
* Exterior walls require 2 hour rating all the way to top of wall.
* Interior walls require fire blocking between wall & ceiling concealed space.
Inspector Comments:
07/19/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Inspected north tower, 1st floor, N.East corner, office area.Inspector Comments:
07/25/2017PassTed DyeCommercial Insulation Inspection
Inspected the Media room and the S. East and the N. East stairwells.
All approved for cover.
Inspector Comments:
Page 10 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
07/26/2017PARTPASSTed DyeCommercial Insulation Inspection
Inspected 1st floor lobby walls and ceiling.
Also the 4th and 5th floor commoms area(N. East corner) ceilings.
Inspector Comments:
07/28/2017FailTed DyeCommercial Insulation Inspection
07/28/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Drywall inspection was of the 2nd and 3rd floor halls, on the south tower and the
Hair salon (room 230) and the storage room (room 228).
Inspector Comments:
08/01/2017PassTed DyeCommercial Framing/Structure Inspection
Fire caulking on ceiling of study area on the S.East corners.
High density rockwool was used to cover holes created by the mainpower supply
lines.
Inspector Comments:
08/03/2017PassTed DyeCommercial Framing/Structure Inspection
08/04/2017PARTPASSTed DyeCommercial Insulation Inspection
08/07/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
08/07/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
08/08/2017PARTPASSTed DyeCommercial Insulation Inspection
08/10/2017PassTed DyeCommercial Insulation Inspection
08/18/2017PassTed DyeCommercial Insulation Inspection
08/22/2017FailTed DyeCommercial Framing/Structure Inspection
Inspected units on all floor in the north tower,those framed with 1st phase west
of commons and offices.
Fire caulking needed to be finished in back bath room,next to panels, some
plumbing water and drain lines.
Complete and call for a reinspection before insulation.
Inspector Comments:
08/25/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection
* 205 & 305: rated separation in concealed space by tub is not completed. Leave
open for re-inspection.
* Pre-rock areas in 506 is not ready for inspection.
* Partial approval to insulate (from Kitchen/Living room and east bedroom &
bathroom) in 104,204,304,404, & 504
* Approved to insulate in 105 & 505
* (405 & 406 Done & painted)
Inspector Comments:
Page 11 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
08/25/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Insulation is approved for cover as follows:
* Approved to hang drywall including dropped ceilings in 205 & 305 (west of
living room might not have sufficient protection from rain leaking above) -
EXCEPT rated separation in concealed space by tub is not completed. Leave open
for re-inspection.
* Approved to hang drywall and pre-rock areas in 506 (Pre-rock to be inspected)
-Leave concealed space by tub open for inspection of rated separation.
* Partial approval to pre-rock above drop ceilings (from Kitchen/Living room and
east bedroom & bathroom) in 104,204,304,404, & 504
* Approved to pre-rock above drop ceilings in 105 & 505 (Pre-rock to be
inspected)
* (405 & 406 Done & painted)
Inspector Comments:
08/28/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
Area's inspected:
Unit 205
2nd level commons
3rd level, unit 305
Data room
Bathroom off of commons.
4th level; Commons area
Data room
Bathroom.
Stair well levels 1,2,3 and 4.
All those mentioned in this inspection report PASSED
Inspector Comments:
08/29/2017PARTPASSTed DyeSheeting
Partial Sheeting inspection of second section of building on the north tower.
Wall referances are; Wall on Grid A.12 between grid lines A.E and A.D levels
1-3
Wall on Grid line A.D between A.3 and A.12. Levels 1-3
Inspector Comments:
08/30/2017PassTed DyeCommercial Insulation Inspection
Elevator roomInspector Comments:
08/31/2017FailTed DyeCommercial Framing/Structure Inspection
09/01/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
Areas and units inspected;
Unit 506 OK
1st floor commons area
1st floor Storage room west of the south garage entrance(South tower)
1st floor The Janitors room next to the storage room(south tower)
1st floor South East entrance area(South tower)
1st floor South tower corridor.
5th floor Commons area in N.E. corner of building
5th floor data and the room above the mechanical room on 4th floor.
Inspector Comments:
Page 12 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
09/11/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Inspected area; N.West Stair well/ 1st floor Snow melt room and Main electrical
room.
OK to tape.
Inspector Comments:
09/11/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Concealed earth bound rod inspections only.
Other items that failed are from a previous inspection and will be inspected at a
later date.
Inspector Comments:
09/11/2017PARTPASSTed DyeCommercial Insulation Inspection
09/11/2017PARTPASSTed DyeSheeting
Sheeting inspection of South wall in court yard stories 1-5, West end stories 1-4
and North side stories 1-3.
Inspector Comments:
09/12/2017FailTed DyeCommercial Framing/Structure Inspection
Earth hold down inspections only.Inspector Comments:
09/12/2017PARTPASSTed DyeCommercial Insulation Inspection
09/12/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Drywall inspection for unit 105Inspector Comments:
09/14/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
09/14/2017PARTPASSTed DyeSheeting
-Inspected levels 3 and 4 and 5 of the west side of the north tower.
-Inspected levels 3, 4 and 5 of the nortside of the North tower
-Inspected Roof sheeting on the North tower, remainder of sheeting.
Inspector Comments:
09/25/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Partial inspection. listed items onlyInspector Comments:
09/26/2017FailQuinton OwensCommercial Insulation Inspection
Corridor ceilings in remaining section of north wing on levels 1 to 4:
* Not completed on ceiling by entry to parking garage or in closet areas off
hallway.
* missing piece halfway down corridor on fourth level.
Inspector Comments:
09/29/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Insulation on corridor ceiling in remainder of north wing. Levels 1 to 4.
Corrections needed in closets at west end - floor cavities need full insulation at
exterior wall.
Inspector Comments:
10/03/2017PARTPASSQuinton OwensCommercial Insulation Inspection
* Corrections by entries to parking garage. Remainder of north wing corridor
ceiling insulation on levels 1 - 4 approved for cover.
* EXCEPT in closets - Floor cavities at exterior wall require full height insulation.
Inspector Comments:
Page 13 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
10/03/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Corridor ceilings on levels 1 - 4 approved for taping EXCEPT in closets on 3rd
floor where insulation was covered without approval (missing proper insulation at
exterior wall).
Inspector Comments:
10/06/2017PARTPASSQuinton OwensCommercial Insulation Inspection
Inspection of sprayed foam insulation in attic on remainder of north wing.Inspector Comments:
10/13/2017PARTPASSTed DyeCommercial Insulation Inspection
10/19/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Unit 403; Fire caulk earth bound rod in S.East corner of west bedroom.
Fire caulk 2 holes in the same bedroom on exterior wall.
Unit 402; Fire caulk 3 holes above the laundry.
4th floor storage; Fire caulk 2 holes on separation wall.
Unit 503 and 502 OK.
Unit 504 Fire caulk electrical holes in East bedroom on north wall of the closet.
Fire caulk electrical hole on the right side as you enter the unit, in the top
plate.
Inspector Comments:
10/20/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
Unit 403; Fire caulk earth bound rod in S.East corner of west bedroom.
COMPLETED
Fire caulk 2 holes in the same bedroom on exterior wall.COMPLETED
Unit 402; Fire caulk 3 holes above the laundry. COMPLETED
4th floor storage; Fire caulk 2 holes on separation wall. COMPLETED
Inspector Comments:
10/20/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
North and East corridors
Inspection of drop ceiling penetrations.
All penetrations have been sealed.
Inspector Comments:
10/24/2017PARTPASSTed DyeCommercial Framing/Structure Inspection
10/24/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
10/24/2017PassTed DyeCommercial Insulation Inspection
10/26/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
East and South Corridors, Levels 1, 2, 3, 4 and 5 have all the fire caulking
above the droped ceiling and they are approved for cover.
Inspector Comments:
10/27/2017PassTed DyeCommercial Framing/Structure Inspection
Inspected fire caulking and framing on 1st floor(101-103) and 2nd floor
(201-203).
All 5 floors have framing completed.
Inspector Comments:
Page 14 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
10/31/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
403 and 503 need concealed chase seperation wall and ceiling drywalled and
taped.
504 and 505 OK to tape and texture
Inspector Comments:
10/31/2017PARTPASSTed DyeCommercial Insulation Inspection
11/01/2017PassTed DyeCommercial Framing/Structure Inspection
Fire caulk inspection of main electrical line(to panels) penetration through
exterior wall plates.
Inspector Comments:
11/01/2017FailTed DyeCommercial Insulation Inspection
11/02/2017FailTed DyeCommercial Sheetrock/Drywall Inspection
11/06/2017FailTed DyeCommercial Sheetrock/Drywall Inspection
11/06/2017PARTPASSTed DyeCommercial Insulation Inspection
11/06/2017PassTed DyeSheeting
Shear wall inspection of units 302, 202 and 102. All Passed.Inspector Comments:
11/13/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Lower ceilings(furdowns)that passed are: 501, 502, 503, 504, 505, 401, 402, 403
and 404.
In unit 203 the pre-rock above the vanity needs to be fire taped where the
plumbers cut the ceiling open to find a leak.
Inspector Comments:
11/14/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Unit 303; Box in drain line fire tape and then fire caulk around pipe exiting the
box. Remember the annulat space around the pipe.
Also fire tape all boxes made.
The Vent suppling heat for the storage room will need to have the fire
dampner and back draft as discussed between alan and the hvac company.
302 Fire tape the corner in the east bathroom on the east seperation wall in the
upper corner.
301; OK
201; OK
202; OK
203; Fire tape pre-rock ceiling in the vanity/laundry room where the plumbers
cut out to find leaky pipe.
Fire dampner in the same location as in unit 303.
204; Box in around 4" line, fire tape and then apply a fire collar where the pipe
exits the box.
Inspector Comments:
11/20/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
11/20/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
102, 104 and 105 are approved to hang drywall. All fire taping and fire caulking
have been completed.
Inspector Comments:
Page 15 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
11/28/2017FailTed DyeCommercial Framing/Structure Inspection
11/28/2017PassTed DyeCommercial Sheetrock/Drywall Inspection
North West stair tower drywall inspectionInspector Comments:
12/01/2017FailTed DyeCommercial Framing/Structure Inspection
12/01/2017PassTed DyeCommercial Insulation Inspection
Insulation inspection of exercise room.Inspector Comments:
12/04/2017PassTed DyeCommercial Framing/Structure Inspection
12/04/2017PassTed DyeCommercial Insulation Inspection
Drywall in fitness center only.Inspector Comments:
12/14/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Find studs above old door openings for needed screws (north side of interior
middle wall)
Inspector Comments:
Page 16 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
12/18/2017FailTed DyeCommercial Building Final
Unit 516 Weather stripping needed in attic access.
Fire caulk supply under vanity in east bedrooms bathroom.
Mechanical room was locked so could not inspect.
S-533 Tape joint on ceiling where sheetrock was cut.
S-532 OK
J-531 Patch and tape holes in wall and ceiling.
S-530 Uncover sprinkler head
Garage entrance: Sprinkler through prerock needs annular space in drywall then
fire caulk.
Unit 513: weather stripping needed in attic access.
Unit 511: Weather stripping needed in attic access.
Mechanical room OK
Electrical closet: fire caulk around electrical conduits.
Unit 512: East bedrooms bathroom needs to have the gaps around the sprinkler
pipe fixed.
Weather stripping needed in attic access.
Mechanical closet closed. could not inspect.
Unit 514: The smoke detector is missing in the east bedroom.
Weather stripping is missing in the attic access.
Unit 416: Smoke detector in west bedroom is not communicating with other.
Weather stripping is missing in the attic access.
Mechanical closet was locked so coulk not inspect.
Unit 415: The weather stipping is missing in the attic access.
Mechanical closet was locked so I could not inspect.
Unit 413: The weather stripping is missing in the attic access.
Mechanical closet was locked so I coulk not inspect.
Unit 412: Outlet missing above the vanity.
In the east bathroom there is a space in the drywall around the sprinkler
head.
Weather stripping missing in the attic access.
Open electrical box in the west bedroom.
Mechanical closet; a larger annular space is needed around the right
furnuss vent pipe then fire caulk.
Garage Entrance: Fire tape the top inside corner above doors on prerock.
S-430: OK
Data room: Fire caulk around data cables coming through the drwall.
S-433: OK.
Inspector Comments:
Page 17 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
12/19/2017FailTed DyeCommercial Building Final
Unit 410 Under repair from water damage.
410 Mechanical room: Water line and condensation lines through the ceiling need
to be fire caulked.
Unit 408 The supply for the toilet in the north and south bathroom wall needs
fire caulked.
Mechanical room: locked. could not inspect.
Unit 407 The south double vanity supplies need fire caulked.
The smoke detector in the middle bedroom is not communication with
the others.
The smoke detectors in the north bedroom and the one in the corridor
outside of the bedroom are not working.
407 Mechanical room: Fire caulk is needed around the condensation lines.
407 Mechanical room: locked could not inspect.
Unit 409: The North bathroom toilet supply needs fore caulked.
409 Mechanical room Locked. could not inspect.
Inspector Comments:
Page 18 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
3rd FLOOR.
Unit 317 OK
317 Mechanical: Sheetrock around the sprinkler head has to ig of a hole
Unit 317 OK
317 Mechanical room: Fire caulk between furnace white vent pipes.
Unit 313: C.O./Smoke detector is missing in main living area.
There is a hole around the sprinkler head in east bedroom.
313 Mechanical room: Provide the proper annular space around the furnace vent
pipes and then fire caulk.
- In the hall there is a outlet that is next to the 313 mechanical room on the right
side that has a hole in the drywall.
Unit 311 OK
311 Mechanical room: A annular space is needed around the furnace vent pipes
and the drain line at the ceiling level and then fire caulked.
ELECTRICAL PANEL CLOSET: The drywall needs to be fire taped.
BENCH ALCOVE: Has an electrical box.
Unit 312: OK
312 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
Unit 314: East middle and west bedrooms smoke detectors are not
communicating.
314 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
S-330 OK
S-331: Tape patch on ceiling.
S-332 OK
S-332 OK
S-333 OK
Unit 310: OK
310 Mechanical room: OK
Unit 307: OK
307 Mechanical room: Gas pipe,furnace vent pipe and drain lines are in meed of
fire caulk where missed.
Unit 309: Handicap (Bedroom) ? on counter height and is the Cabinet easily
converable.
309 Mechanical room: OK
2nd Floor.
Unit 216: OK
216 Mechanical room: Locked so could not inspect.
Unit 215: Smoke gasket missing on main door.
215 Mechanical room:Fire caulk between furnace vent pipes.
Unit 213: OK
213 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
Unit 211: Smoke detector in the west bedroom and outside the bedroom have no
Inspector Comments:
Page 19 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
power.
211 Mechanical room: Fire caulk around the white furnace vent pipe.
--The room in the south corridor at the east end on the north side is locked.
Could not inspect.
Kitchen room has open electrical boxes.
The counter top and the plumbing has not been completed.
Unit 212 ?
212 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
Unit 214: OK
214 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
DATA room: Fire caulk hole where data lines pass through the drywall.
12/21/2017FailTed DyeCommercial Building Final
S-233 OK
Study Room in South east corner of building: OK
Unit 210: OK
210 Mechanical room: Locked. could not inspect.
Unit 208: Locked
208 Mechanical: Locked
Unit 207 Open electrical box in the mirror above the double vanity.
207 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
Unit 209 Handicap unit. convertible cabinets?
209 Mechanical room: Create an annular space around the furnace vent pipes
and then fire caulk.
Inspector Comments:
Page 20 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
12/21/2017FailTed DyeCommercial Building Final
Cedars
Unit 116 Approved
116 Mechanical room: Provide the required annular space around all penetrations
through the ceiling or front wall and then fire caulk.BLUE WATER LINE******
Unit 115 Approved
115 Mechanical room: Mechanical room: Provide the required annular space
around all penetrations through the ceiling or front wall and then fire caulk.
Unit 113 The light switch cover is missing in the west bathroom.
The smoke detector in the west bedroom is not communicating with others.
113 Mechanical room: Mechanical room: Provide the required annular space
around all penetrations through the ceiling or front wall and then fire caulk**
BLUE WATER LINE
Unit 111 The supply for the toilet in the east bathroom has a hole passed the
escutcheon.
111 Mechanical room: Mechanical room: Provide the required annular space
around all penetrations through the ceiling or front wall and then fire caulk.
ELECTRICAL CLOSET: Fire caulk around electrical conduits.
VESTIBULE: Finish hanging, taping and texturing.
Unit 112 The supply for the toilet has a hole pasted the escutcheon.
112 Mechanical room. Mechanical room: Provide the required annular space
around all penetrations through the ceiling or front wall and then fire
caulk.**FIRE CAULK AROUND 4 PIPES
Unit 114: Approved
114 Mechanical room: Mechanical room: Provide the required annular space
around all penetrations through the ceiling or front wall and then fire
caulk(including the condensation chase). 2 PIPE NEED FIRE CAULKED
There is a drip in the blue water line.
S-130: Approved
J-131: Light missing.APPROVED
Fire caulk around the drain line that penetrates the separation walls. Create and
annular space around the pipe.STILL TO BE DONE
ELECTRICAL PANEL ROOM: Fire caulk around the conduits.APPROVED
BOILER ROOM: Fire caulk all penetrations.FIRE COLLAR
***Make all corrections then call for a re-inspection.
Inspector Comments:
Page 21 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Unit 516; Approved
516 Mechanical room; Approved
S 533 tape on ceiling sprinkler head
S532 Approved
J531Tape holes in wall and ceiling
S530 Approved
Unit 515; Approved
515 Mechanical room; Create annular space around furnace vent pipes then fire
caulk.
Unit 513;Approved.
513 Mechanical room; Approved
Unit 511; Approved
Mechanical room; Approved
Electrical Closet; Fire caulk around conduits.
Unit 512 East bedrooms bathroom tape hole around fire sprinkler head.
512 Mechanical room; Back furnace vent pipe needs to have a annular space cut
in and then fire caulked.
Unit 514; Approved
514 Mechanical room;Create a annular space around the white furnace vent
pipes and then fire caulk.
Unit 508; Fire caulk supplies behind toilets in both bathrooms on each end.
Fire caulk under vanities on separation walls.
508 Mechanical room; create annular space around furnace vent pipes and then
fire caulk.
The fire alarm in the north bedroom is not communicating with others.
Unit 507; Fire caulk supplies behind toilets in separation walls.
Fire caulk supplies under vanities on the separation walls.
507 Mechanical room.Create annular space around furnace vent pipes and the
fire caulk.
Unit 509; In the west bathroom the supply Needs to have an annular space
around it and then fire caulk.
509 Mechanical room; Create an annular space around the furnace vent pipes
and then fire caulk.
Unit 510; Cover plate is missing on the clean out behind the double vanity
drawers.
Fire caulk around drain lines under left side double sink vanity
510 Mechanical; Mechanical room; Create an annular space around the furnace
vent pipes and then fire caulk.
Inspector Comments:
Page 22 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
12/27/2017FailTed DyeCommercial Building Final
Unit 316; Approved
316 Mechanical; Sheetrock around the sprinkler has a big hole that needs to be
patched.
Unit 315 Approved
315 Mechanical room; Fire caulk between furnace vent pipes.
Unit 313; Approved.
313 Mechanical room; Approved.
Unit 311 Approved
311 Mechanical room; Approved
Electrical closet; drywall needs to be fire taped.
Fire caulk around conduits.
Unit 312; Approved
312 Mechanical room;Mechanical room; Create an annular space around the
furnace vent pipes and then fire caulk.
Unit 314; East, middle and west bedroom smoke detectors are not
communicating with others.
314 Mechanical room; Mechanical room; Create an annular space around the
furnace vent pipes and then fire caulk
S-330; Approved
J-331; drywall patch needs to be taped.
S-332; Approved
S-333 Approved
Unit 310 Approved
310 Mechanical room; Approved
Unit 307 Approved
307 Mechanical room; Approved
Unit 309; Approved
309 Mechanical room; Approved
Unit 308; The middle hall and the south smoke detectors are not communicating
with each other.
Inspector Comments:
North wing final inspection on 12-29-17
3 storage closets on west end of corridor APPROVED
Unit 403; East bathoom has hole behind toilet
Unit 405; Smoke/C.O. detector needed ouside of west bedrooms.
405 Mechanical Room; APPROVED.
Unit 406 Smoke/C.O. detector needed ouside of bedrooms.
Outlet missing above double vanity.
406 Mechanical room; APPROVED
Unit 404; Smoke/C.O. detector needed ouside of bedrooms.
404 Mechanical room; APPROVED
Unit 402; Smoke/C.O. detector needed ouside of bedrooms.
Hole along tub in east bathroom.
402 Mechanical room; APPROVED
Unit 401 Smoke/C.O. detector needed ouside of bedrooms.
401 Mechanical rooms APPROVED
Inspector Comments:
Page 23 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
3RD FLOOR
West Storage room; APPROVED
Electrical room; APPROVED
Storage room; APPROVED
Unit 303 Smoke/C.O. detector needed ouside of bedrooms.
303 Mechanical room; APPROVED
Unit 305; Smoke/C.O. detector needed ouside of bedrooms.
305 Mecanical room; APPROVED
Unit 304; Smoke/C.O. detector needed ouside of bedrooms.
304 Mechanical room; APPROVED
Unit 302; Smoke/C.O. detector needed ouside of bedrooms.
302 Mechanical room; APPROVED
Unit 301; Smoke/C.O. detector needed ouside of bedrooms.
301 Mechanical room; APPROVED
Unit 302; Smoke/C.O. detector needed ouside of bedrooms.
302 Mechanical room; APPROVED
Inspector Comments:
2nd FLOOR
Lobby Mecanical room; Box in 4" line.
Fire tape corner above door.
Unit 204; Smoke/C.O. detector needed ouside of bedrooms.
Sprinkler heads in west bedroom need uncovered and escuchins.
204 Mechaical room; APPROVED
Unit 202; Smoke/C.O. detector needed ouside of bedrooms.
202 Mecanical room; APPROVED
Unit 201; Smoke/C.O. detector needed ouside of bedrooms.
201 Mechanical room; APPROVED
3 STORAGE on west end; APPROVED
Unit 202; Smoke/C.O. detector needed ouside of bedrooms.
202 Mechancial room; APPROVED
Unit 201; Smoke/C.O. detector needed ouside of bedrooms.
201 Mechanical room; APPROVED
3 STORAGE closets on west end; APPROVED
Unit 203; Smoke/C.O. detector needed ouside of bedrooms.
203 Mechanical room; Fire tape around sprinkler head
Unit 205; Smoke/C.O. detector needed ouside of bedrooms.
205 Mechanical room; APPROVED
Inspector Comments:
12/29/2017FailTed DyeCommercial Building Final
NORTH TOWER HALLS
1-5 corridors approved for cover.
Inspector Comments:
Page 24 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Southeast corner 1st floor entrance lobby. Approved
Unit 110; Smoke/C.O. detector needed in double sink area outside of bedrooms.
110 Mechanical room; Fire caulk around blue waterline.
Unit 108; Smoke/C.O. detector needed in double sink area outside of bedrooms.
108 Mechanical room; ??
Media entertainment room; OK
Unit 109; Patch holes in ceilings.
109 Mechanical room. Fire caulk water lines.
Fire caulk space to space penetraions.
Office mechanical room; Additional fire caulk is needed around electrical flex
Inspector Comments:
Unit 516; Smoke/C.O. detector needed in double sink area outside of bedrooms.
515Mechanical closet; Approved
S-533; fire caulk joints and around sprinkler head.
S-532 Approved
J-531; Approved
S-530; Approved
Garage entrance; Approved
Unit 515; Smoke/C.O. detector needed in double sink area outside of bedrooms.
515 Mechanical closet;Create annular space around furnace vent pipes then fire
caulk.
Unit 513; Smoke/C.O. detector needed in double sink area outside of bedrooms.
513 Mechanical room; Approved
Unit 511; Smoke/C.O. detector needed in double sink area outside of bedrooms.
511 Mechanical room; Approved
Unit 512; tape hole around sprinkler head.
512 Mechanical room;Back furnace vent pipe needs an annular space and the fire
caulked.
Unit 514; Smoke/C.O. detector needed in double sink area outside of bedrooms.
514 Mechanical room;Create and annullar space around white furnace pipes, then
fire caulk
Unit 508; fire caulk supplies behind toilets
Fire caulk supplies under vanitys on separation walls in both bathrooms.
Smoke/C.O. detector needed in double sink area outside of bedrooms.
508 Mechanical room; Approved
Unit 507; Fire caulk supplies behind toilets and under vanity's on separation walls
in the north bathrooms.
Smoke/C.O. detector needed in double sink area outside of bedrooms.
507 Mechanical room; Fire caulk around white pipe in the back left corner.
Unit 509; Smoke/C.O. detector needed in double sink area outside of bedrooms.
509 Mechanical room; Approved
Unit 510; Fire caulk around drain line under left sid double sink vanity.
Smoke/C.O. detector needed in double sink area outside of bedrooms.
510 Mechanical room; Provide a annular space around furnace vent pipes then
fire caulk.
Inspector Comments:
Page 25 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
01/02/2018FailTed DyeCommercial Building Final
4TH FLOOR
UNIT 416; Smoke detector in west bedroom is not communicating with others
Smoke/C.O. detector needed in double sink area outside of bedrooms.
416 Mechanical room;Locked
UNIT 415; Smoke/C.O. detector needed in double sink area outside of bedrooms.
415 Mechanical room; locked
UNIT 413; Smoke/C.O. detector needed in double sink area outside of
bedrooms.
413 Mechanical room; Fire caulk gas line.
UNIT 411; Smoke/C.O. detector needed in double sink area outside of
bedrooms.
411 Mechanical room; locked
CLOSET IN SOUTH WING NORTH EAST CORNER:Fire caulk fire alarm wire.
BENCH ALCOVE;The drywall on the ceiling needs to be patched.
UNIT 412; WATER DAMAGE. Will inspect when damage has been repaired.
412 Mechanical room; The fire tape is coming off of the right side wall.
UNIT 414; Cut a annular space around the drain line under the east vanity.double
sink area, then fire caulk.
Smoke/C.O. detector needed in double sink area outside of bedrooms.
414 Mechanical room; cut a larger annular space around the right furnace pipe
then fire caulk.
Garage enterance; Approved
S-430; Approved
DATA ROOM;Approved
S-433 Approved
Inspector Comments:
Page 26 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
01/05/2018PARTPASSTed DyeCommercial Building Final
Page 27 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Those Units and there Mechanical rooms that passed inspections are as follows:
1st floor
Units 101-115
1st floor commons and offices
Mail room
Fitness room
Storage closets
Electrical closet
Halls
Boiler room (Ice melt.
2nd Floor
-Units 201-215
Commons area
Salon
Data Room
Mechanical room(Water heaters for 1st and 2nd floors).
Study room
Bathroom
Storage rooms
Mechanical room 223-A
3nd Floor
Units 301-315
Practice rooms
Game room
Mechanical room 323-A
4th Floor
Units 401-415*
Electrical room
Commons area
Mechanical room 423-A
Bathroom
Outdoor Living
5th Floor
Units 501-515
Restroom
Storage rooms
Patio
Commons Study room.
Stairs:
N.West Stairwell......A Placard is needed in each level on each floor.
Inspector Comments:
Page 28 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
The placard will need all the information found
in the ICC, Section 1022.9
*****THIS APPLIES TO ALL STAIRWELLS.*****
East Stairwell
S. West Stairwell
11/27/2018FailQuinton OwensCommercial Building Final
All Exit Stair Enclosures.
* Fire rate penetrations through rated walls. (Interior walls and exterior bearing
walls)
* Per IBC, in addition to the stair identification sign, a floor level sign shall be
adjacent to the door (raised characters and braille). The commentary says such
signs are in a consistent location to be useful. A117.1 says they are to be
"alongside" the door. Nothing I found restricts using the stair identification sign
for the floor level sign also. All location and height requirements must be met.
The baseline of braille and raised characters shall be between 48" and 60" above
floor. To be alongside door I will accept signs within 12" from door jamb. (2012
IBC sect. 1022.9 & A117.1 sect. 703)
Inspector Comments:
All Exit Stair Enclosures.
* Fire rate penetrations through rated walls. (Interior walls and exterior bearing
walls)
* A floor level sign shall be "alongside" the door going into corridor. I met with
the sign installer and we observed only the first level sign in east stair. With the
locating method described to me we agreed the location of that sign would work.
Other sign locations were to be verified before re-inspection, but ALL others were
found to be just beyond reach using the same method during inspection, and
should be re-located closer to door.
* Sign on level 2 for south stair is missing.
Inspector Comments:
04/03/2019PARTPASSQuinton OwensCommercial Building Final
Exterior door of North Exit Stairs does not shut properly and door on 2nd level to
south stair has trouble closing completely. Building maintenance should ensure
fire doors continue to shut properly.
Inspector Comments:
05/13/2019PassQuinton OwensCommercial Building Final
05/22/2019PassJoel GraySidewalk Inspection
1. Some prior placed sidewalk has been damaged and needs replaced in spring.Inspector Comments:
Page 29 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Electrical Inspection Type
09/22/2016PassBret StoddardElectrical Underground Inspection
10/03/2016PassBret StoddardElectrical Underground Inspection
10/26/2016PassBret StoddardElectrical Underground Inspection
12/21/2016PARTPASSBret StoddardResidential Electrical Rough-in
12/28/2016PARTPASSBret StoddardCommercial Electrical Rough-in
01/04/2017PARTPASSBret StoddardCommercial Electrical Rough-in
01/17/2017PassBret StoddardResidential Electrical Rough-in
01/26/2017PassBret StoddardCommercial Electrical Rough-in
01/27/2017PassBret StoddardCommercial Electrical Rough-in
02/01/2017PassBret StoddardResidential Electrical Rough-in
02/08/2017PassBret StoddardCommercial Electrical Rough-in
02/15/2017PassBret StoddardResidential Electrical Rough-in
02/17/2017PARTPASSBret StoddardCommercial Electrical Rough-in
02/22/2017PassBret StoddardCOM & MFR Electrical Service Inspection
03/16/2017PARTPASSBret StoddardCommercial Electrical Rough-in
03/29/2017PARTPASSBret StoddardResidential Electrical Rough-in
04/04/2017PARTPASSBret StoddardResidential Electrical Rough-in
05/10/2017PARTPASSBret StoddardResidential Electrical Rough-in
05/24/2017PARTPASSBret StoddardResidential Electrical Rough-in
05/26/2017PARTPASSBret StoddardResidential Electrical Rough-in
08/03/2017PassBret StoddardCommercial Electrical Rough-in
08/09/2017PARTPASSBret StoddardCommercial Electrical Rough-in
08/11/2017PARTPASSBret StoddardCommercial Electrical Rough-in
09/29/2017PARTPASSBret StoddardResidential Electrical Rough-in
10/09/2017PARTPASSBret StoddardCommercial Electrical Rough-in
10/23/2017PARTPASSBret StoddardCommercial Electrical Rough-in
10/26/2017FailBret StoddardCOM & MFR Electrical Service Inspection
10/27/2017PassBret StoddardElectrical Underground Inspection
11/03/2017PARTPASSBret StoddardCommercial Electrical Rough-in
Page 30 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
11/13/2017PARTPASSBret StoddardCommercial Electrical Rough-in
11/14/2017PARTPASSBret StoddardCommercial Electrical Rough-in
11/22/2017PassBret StoddardCOM & MFR Electrical Service Inspection
11/22/2017PARTPASSBret StoddardCommercial Electrical Rough-in
12/13/2017PARTPASSBret StoddardResidential Electrical Final Inspection
12/14/2017PARTPASSBret StoddardCommerical Electrical Final Inspection
12/15/2017PARTPASSBret StoddardCommerical Electrical Final Inspection
12/18/2017PARTPASSBret StoddardCommerical Electrical Final Inspection
12/19/2017PARTPASSBret StoddardResidential Electrical Final Inspection
12/27/2017FailBret StoddardResidential Electrical Final Inspection
01/05/2018PARTPASSBret StoddardResidential Electrical Final Inspection
01/16/2018PassBret StoddardElectrical Underground Inspection
02/05/2018PassBret StoddardResidential Electrical Final Inspection
07/23/2018PARTPASSBret StoddardCommercial Electrical Rough-in
Fire Inspection Type
01/04/2017PassDale PickeringFire Sprinkler Rough-in
03/22/2017PassDale PickeringFire Sprinkler Rough-in
Inspection completed by David Davis 3/22/17. Phase 2 and Phase 3 Approved for
cover.
Inspector Comments:
04/06/2017PassDale PickeringFire Sprinkler Rough-in
09/13/2017PassDale PickeringFire Sprinkler Rough-in
10/04/2017PassDale PickeringFire Sprinkler Rough-in
12/12/2017PassDale PickeringFire Sprinkler Rough-in
12/20/2017PassDale PickeringFire Sprinkler Final Inspection
01/05/2018PassBret StoddardFire Alarm Final Inspection
Page 31 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Mechanical Inspection Type
11/07/2016PassDon AllenHVAC Rough-in
01/17/2017PassDon AllenHVAC Rough-in
good to cover the mechanical above the sheetrock on building a section 2Inspector Comments:
01/24/2017PassDon AllenHVAC Rough-in
01/31/2017PassDon AllenHVAC Rough-in
02/08/2017FailDon AllenHVAC Rough-in
The heating for the hair salon needs it own heat. Can not be supplied by the apt.
next just north of it.
Inspector Comments:
02/21/2017PassDon AllenHVAC Rough-in
03/16/2017PassDon AllenHVAC Rough-in
04/13/2017PassDon AllenHVAC Rough-in
05/05/2017PassDon AllenHVAC Rough-in
05/25/2017PassDon AllenHVAC Rough-in
09/12/2017PassDon AllenHVAC Rough-in
Pass.
- Shane Hill
Inspector Comments:
09/19/2017PassDon AllenHVAC Rough-in
10/27/2017PassDon AllenHVAC Rough-in
Good to cover the infloor heat on the south side parking rampInspector Comments:
11/09/2017PassDon AllenHVAC Rough-in
11/16/2017PassDon AllenHVAC Rough-in
12/27/2017PassDon AllenHVAC Final Inspection
01/04/2018PassDon AllenHVAC Final Inspection
Page 32 of 33
(Continued)
Permit Details Permit Number: 16-00289
155 W 2nd S - Hemming Cedars II - Bldg A - 75 Units - Dormitory Housing
155 W 2nd S
New Multi-Family Residential/Dormitory
Permit Status of (Open) as of Report Date: 05/23/2019 1:51 pm
Permit
Inspection
Summary
Plumbing Inspection Type
09/19/2016PassDon AllenPlumbing Underground Inspection
Good to cover the main sewer lineInspector Comments:
01/10/2017PassDon AllenPlumbing Rough-in
02/08/2017PassDon AllenPlumbing Rough-in
Good to cover the plumbing on the 2 floor of building A section 1Inspector Comments:
03/22/2017PassDon AllenPlumbing Rough-in
04/27/2017PassDon AllenPlumbing Water
Good to cover the water lines on the 4 floor in section 3Inspector Comments:
06/22/2017PassDon AllenPlumbing Underground Inspection
Good to cover the main line.Inspector Comments:
08/09/2017PassDon AllenPlumbing Water
Good to cover the water rough in on the 1st floor south side of buildingInspector Comments:
10/26/2017PassDon AllenPlumbing Rough-in
Gas line in section 3 held at 60 lbInspector Comments:
11/08/2017PassDon AllenPlumbing Water
Good to cover the water lines in ther apt that are marked on the doorInspector Comments:
11/22/2017PassDon AllenPlumbing Rough-in
Good to cover the plumbing in the fitness room on the 1st floorInspector Comments:
12/14/2017FailDon AllenPlumbing Final Inspection
12/21/2017PassDon AllenPlumbing Final Inspection
01/04/2018PARTPASSDon AllenPlumbing Final Inspection
Approved for a temp. C/O. will need to see the sink in the bathroom located in
the gym after its installed.
Inspector Comments:
01/05/2018PassDon AllenPlumbing Final Inspection
Public Works
01/03/2018PARTPASSJoel GrayPublic Works Preliminary Final Inspection
1. Sidewalk in SE corner by ground sleeve needs replaced.
2. Fill open 5x5 squares in sidewalk to prevent hazard.
3. Dumpster enclosure completed.
4. Will be looked at in spring: water valves raised, courtyard and other manholes.
Inspector Comments:
Page 33 of 33